6754 Project Time and Quality Management during Construction
Authors: Nahed Al-Hajeri
Abstract:
Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time
Procedia PDF Downloads 2426753 Identifying Barriers of Implementing Building Information Modelling in Construction
Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh
Abstract:
BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.Keywords: building information modelling, construction, design and construction, designers
Procedia PDF Downloads 1846752 Computational Material Modeling for Mechanical Properties Prediction of Nanoscale Carbon Based Cementitious Materials
Authors: Maryam Kiani, Abdul Basit Kiani
Abstract:
At larger scales, the performance of cementitious materials is impacted by processes occurring at the nanometer scale. These materials boast intricate hierarchical structures with random features that span from the nanometer to millimeter scale. It is fascinating to observe how the nanoscale processes influence the overall behavior and characteristics of these materials. By delving into and manipulating these processes, scientists and engineers can unlock the potential to create more durable and sustainable infrastructure and construction materials. It's like unraveling a hidden tapestry of secrets that hold the key to building stronger and more resilient structures. The present work employs simulations as the computational modeling methodology to predict mechanical properties for carbon/silica based cementitious materials at the molecular/nano scale level. Studies focused on understanding the effect of higher mechanical properties of cementitious materials with carbon silica nanoparticles via Material Studio materials modeling.Keywords: nanomaterials, SiO₂, carbon black, mechanical properties
Procedia PDF Downloads 1406751 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques
Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah
Abstract:
Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.Keywords: BIM, construction projects, cost estimation, NRM, ontology
Procedia PDF Downloads 5516750 The Effect of Climate on Noble Houses of Siraf in the Early Islamic Centuries (Case Study: House N)
Authors: Mohadese Sukhtesaraii, Mohammad Esmail Esmaili Jelodar, Kosar Sookhtesaraii
Abstract:
Throughout history, humans have always wanted to have a shelter to live in, and this need and desire became the beginning of building and architecture. It was necessary to build a shelter and a building, dealing with the surrounding nature. The design and construction of architectural spaces are always influenced by nature, climate, and geographical location, and It is believed clearly see this influence even in the use of materials used in the construction of architectural buildings. The historical port of Siraf is located on the northern coast of the Persian Gulf in Bushehr province and 38 km from Kangan port. Geographically and climatically, Siraf is considered one of the hot and humid areas. The Zagros mountains, which continue from the Iranian plateau to the sea, end at Bandar Siraf; As a result, it creates a strip one kilometer wide by the sea. The location of Siraf in the restrictive conditions of the mountains and the sea has made it impossible to expand the city. The main goal of the current research is to investigate the climate of Siraf and the influence of the region's climate on the architecture and design of residential buildings in Siraf, known as noble houses, in the early Islamic centuries. In this research, it is looking for an answer to the question of how the climatic and geographical conditions have affected the architecture of Siraf buildings. The theoretical framework of this research can be expressed based on the influence of climate on the historical architecture of Bandar Seraf and the spatial analysis of archeology. Also, the research method will be analytical-descriptive and using field and library studies. The authors of the article believe that the architectural spaces of the early Islamic centuries of Siraf city were affected by the climate and geographical location, and the architects started building buildings by considering factors such as the sun's radiation, wind direction, and the position of the mountains and the sea. To use the regional and environmental potential for buildings.Keywords: hose N, noble hose, islamic era, siraf, climate
Procedia PDF Downloads 876749 Environmental and Socioeconomic Determinants of Climate Change Resilience in Rural Nigeria: Empirical Evidence towards Resilience Building
Authors: Ignatius Madu
Abstract:
The study aims at assessing the environmental and socioeconomic determinants of climate change resilience in rural Nigeria. This is necessary because researches and development efforts on building climate change resilience of rural areas in developing countries are usually made without the knowledge of the impacts of the inherent rural characteristics that determine resilient capacities of the households. This has, in many cases, led to costly mistakes, delayed responses, inaccurate outcomes, and other difficulties. Consequently, this assessment becomes crucial not only to policymakers and people living in risk-prone environments in rural areas but also to fill the research gap. To achieve the aim, secondary data were obtained from the Annual Abstract of Statistics 2017, LSMS-Integrated Surveys on Agriculture and General Household Survey Panel 2015/2016, and National Agriculture Sample Survey (NASS), 2010/2011.Resilience was calculated by weighting and adding the adaptive, absorptive and anticipatory measures of households variables aggregated at state levels and then regressed against rural environmental and socioeconomic characteristics influencing it. From the regression, the coefficients of the variables were used to compute the impacts of the variables using the Stochastic Regression of Impacts on Population, Affluence and Technology (STIRPAT) Model. The results showed that the northern States are generally low in resilient indices and are impacted less by the development indicators. The major determining factors are percentage of non-poor, environmental protection, road transport development, landholding, agricultural input, population density, dependency ratio (inverse), household asserts, education and maternal care. The paper concludes that any effort to a successful resilient building in rural areas of the country should first address these key factors that enhance rural development and wellbeing since it is better to take action before shocks take place.Keywords: climate change resilience; spatial impacts; STIRPAT model; Nigeria
Procedia PDF Downloads 1506748 Lack of BIM Training: Investigating Practical Solutions for the State of Kuwait
Authors: Noor M. Abdulfattah, Ahmed M. Khalafallah, Nabil A. Kartam
Abstract:
Despite the evident benefits of building information modeling (BIM) to the construction industry, it faces significant implementation challenges in the State of Kuwait. This study investigates the awareness of construction stakeholders of BIM implementation challenges, and identifies various solutions to overcome these challenges. Specifically, the main objectives of this study are to: (1) characterize the barriers that deter utilization of BIM, (2) examine the awareness of engineers, architects, and construction stakeholders of these barriers, and (3) identify practical solutions to facilitate BIM utilization. A questionnaire survey was designed to collect data on the aforementioned objectives from local companies and senior BIM experts. It was found that engineers are highly aware of BIM implementation barriers. In addition, it was concluded from the questionnaire that the biggest barrier is the lack of BIM training. Based on expert feedback, the study concluded with a number of recommendations on how to overcome the barriers of BIM utilization. This should prove useful to the construction industry stakeholders and can lead to significant changes to design and construction practices.Keywords: building information modeling (BIM), construction, information technology, challenges
Procedia PDF Downloads 2616747 Recycling Strategies of Construction Waste in Egypt
Authors: Hanan Anwar
Abstract:
All systems recycle. The construction industry has not only become a major consumer of natural materials along with a source of pollution. Environmental integrated production, reusing and recycling is of great importance in Egypt nowadays. Governments should ensure that the technical, environmental and economic feasibility of alternative systems is considered and is taken into account before construction starts. Hereby this paper focuses on the recycle of building materials as a way for environment protection and sustainable development. Environmental management integrates the requirements of sustainable development. There are many methods used to reduce waste and increase profits through salvage, reuse, and the recycling of construction waste. Sustainable development as a tool to continual improvement cycle processes innovations to save money.Keywords: environment, management, reuse, recycling, sustainable development
Procedia PDF Downloads 3146746 An Introduction to Critical Chain Project Management Methodology
Authors: Ranjini Ramanath, Nanjunda P. Swamy
Abstract:
Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.Keywords: critical chain project management methodology, critical chain, project management, construction management
Procedia PDF Downloads 4236745 The Impact of Artificial Intelligence on Construction Projects
Authors: Muller Salah Zaky Toudry
Abstract:
The complexity arises in defining the development great due to its notion, based on inherent market situations and their requirements, the diverse stakeholders itself and their desired output. An quantitative survey based totally approach was adopted in this optimistic examine. A questionnaire-primarily based survey was performed for the assessment of production fine belief and expectations within the context of excellent development technique. The survey feedback of experts of the leading creation corporations/companies of Pakistan production industry have been analyzed. The monetary ability, organizational shape, and production revel in of the construction companies shaped basis for their selection. The great belief become located to be venture-scope-orientated and taken into consideration as an extra cost for a production assignment. Any excellent improvement technique changed into expected to maximize the profit for the employer, via enhancing the productiveness in a creation project. The look at is beneficial for the construction specialists to evaluate the prevailing creation great perception and the expectations from implementation of any pleasant improvement approach in production projects.Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception client loyalty, NPS, pre-construction, schedule reduction
Procedia PDF Downloads 146744 Legacy of Smart Cities on Urban Future: Discussing the Future of Smart City by Sharing Its Experiences
Authors: Arsalan Makinian
Abstract:
Our future cities will constantly evolve the necessary technologies for tomorrow’s needs. Technologies which enable a better kind of prosperity and security. This paper reports on the precedent of a smart city from its beginning to prevalence among urbanism academic literature and reports of tech companies. The article aims to direct urban foresight studies and to build a pathway for the future of smart city concept by gathering theoretical and empirical experiences related to smart cities with both top-down and bottom-up approaches. It hopes to deliver results of different studies, pilot projects, and development strategies of some of the smart cities in order to allow a shareable knowledge to take shape and develop in terms of qualitative aspects of a smart city. Now the definition of the smart city goes beyond removing physical boundaries, changing the concept of mobility and providing electronic service for citizens, it now constitutes fields such as energy efficiency, economic competitiveness, protecting the environment and finally, it takes advantage of technology and data science to improve the quality of life. In the smart city, the role of citizens is considered as both final purpose and contributor. Emerging issues which are almost implications of advanced technologies -as the most important trends of the future- and their reflection on the society need to be foresighted. Educating and fostering knowledge of smartness is one of the targets of the smart city concept. In this regard, some of these smart cites have established research and development units to share their projects and smart city initiatives. Due to this fact, gaining experience and sharing the results of this subject is necessary for technology management and moving toward a smart urban future.Keywords: age of urban tech, bottom-up approach, role of citizens, smart city
Procedia PDF Downloads 1386743 Numerical Modelling of Dust Propagation in the Atmosphere of Tbilisi City in Case of Western Background Light Air
Authors: N. Gigauri, V. Kukhalashvili, A. Surmava, L. Intskirveli, L. Gverdtsiteli
Abstract:
Tbilisi, a large city of the South Caucasus, is a junction point connecting Asia and Europe, Russia and republics of the Asia Minor. Over the last years, its atmosphere has been experienced an increasing anthropogenic load. Numerical modeling method is used for study of Tbilisi atmospheric air pollution. By means of 3D non-linear non-steady numerical model a peculiarity of city atmosphere pollution is investigated during background western light air. Dust concentration spatial and time changes are determined. There are identified the zones of high, average and less pollution, dust accumulation areas, transfer directions etc. By numerical modeling, there is shown that the process of air pollution by the dust proceeds in four stages, and they depend on the intensity of motor traffic, the micro-relief of the city, and the location of city mains. In the interval of time 06:00-09:00 the intensive growth, 09:00-15:00 a constancy or weak decrease, 18:00-21:00 an increase, and from 21:00 to 06:00 a reduction of the dust concentrations take place. The highly polluted areas are located in the vicinity of the city center and at some peripherical territories of the city, where the maximum dust concentration at 9PM is equal to 2 maximum allowable concentrations. The similar investigations conducted in case of various meteorological situations will enable us to compile the map of background urban pollution and to elaborate practical measures for ambient air protection.Keywords: air pollution, dust, numerical modeling, urban
Procedia PDF Downloads 1856742 Linearization and Process Standardization of Construction Design Engineering Workflows
Authors: T. R. Sreeram, S. Natarajan, C. Jena
Abstract:
Civil engineering construction is a network of tasks involving varying degree of complexity and streamlining, and standardization is the only way to establish a systemic approach to design. While there are off the shelf tools such as AutoCAD that play a role in the realization of design, the repeatable process in which these tools are deployed often is ignored. The present paper addresses this challenge through a sustainable design process and effective standardizations at all stages in the design workflow. The same is demonstrated through a case study in the context of construction, and further improvement points are highlighted.Keywords: syste, lean, value stream, process improvement
Procedia PDF Downloads 1236741 Deep Injection Wells for Flood Prevention and Groundwater Management
Authors: Mohammad R. Jafari, Francois G. Bernardeau
Abstract:
With its arid climate, Qatar experiences low annual rainfall, intense storms, and high evaporation rates. However, the fast-paced rate of infrastructure development in the capital city of Doha has led to recurring instances of surface water flooding as well as rising groundwater levels. Public Work Authority (PWA/ASHGHAL) has implemented an approach to collect and discharge the flood water into a) positive gravity systems; b) Emergency Flooding Area (EFA) – Evaporation, Infiltration or Storage off-site using tankers; and c) Discharge to deep injection wells. As part of the flood prevention scheme, 21 deep injection wells have been constructed to discharge the collected surface and groundwater table in Doha city. These injection wells function as an alternative in localities that do not possess either positive gravity systems or downstream networks that can accommodate additional loads. These injection wells are 400-m deep and are constructed in a complex karstic subsurface condition with large cavities. The injection well system will discharge collected groundwater and storm surface runoff into the permeable Umm Er Radhuma Formation, which is an aquifer present throughout the Persian Gulf Region. The Umm Er Radhuma formation contains saline water that is not being used for water supply. The injection zone is separated by an impervious gypsum formation which acts as a barrier between upper and lower aquifer. State of the art drilling, grouting, and geophysical techniques have been implemented in construction of the wells to assure that the shallow aquifer would not be contaminated and impacted by injected water. Injection and pumping tests were performed to evaluate injection well functionality (injectability). The results of these tests indicated that majority of the wells can accept injection rate of 200 to 300 m3 /h (56 to 83 l/s) under gravity with average value of 250 m3 /h (70 l/s) compared to design value of 50 l/s. This paper presents design and construction process and issues associated with these injection wells, performing injection/pumping tests to determine capacity and effectiveness of the injection wells, the detailed design of collection system and conveying system into the injection wells, and the operation and maintenance process. This system is completed now and is under operation, and therefore, construction of injection wells is an effective option for flood control.Keywords: deep injection well, flood prevention scheme, geophysical tests, pumping and injection tests, wellhead assembly
Procedia PDF Downloads 1196740 The Porsche Pavilion in Wolfsburg, Germany
Authors: H. Pasternak, T. Krausche
Abstract:
The Porsche Pavilion is an innovative stainless steel construction using the principle, often used in ship and car design, as an advantage for building a light but stiff structure. The Pavilion is a one of a kind and outstanding construction that you can find. It fits right in the existing parts of the Autostadt within the lagoon landscape and was built in only eight months. With its curving lines and exiting bends the structure is an extraordinary work which was designed by Henn architects, Munich. The monocoque has a good balance between material and support structure. The stiffness is achieved by the upper and lower side sheathing plates and the intermediate formers. Also the roof shell has no joints and a smooth surface. The assembling of the structure requires a large time and effort cost due to many welds which are necessary to connect all section to one large shell.Keywords: construction welding, exhibition building, light steel construction, monocoque
Procedia PDF Downloads 5236739 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling
Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao
Abstract:
In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis
Procedia PDF Downloads 1466738 Shopping Centers in the Context of a Growing and Changing City: The Case of Konya Kent Plaza
Authors: H. Derya Arslan
Abstract:
Shopping centers have become an important part of urban life. The numbers of shopping centers have rapidly increased for ten years, in Turkey. Malls that have been built with increasing speed in the last two decades meet most social and cultural needs of people. In this study, architectural characteristics of a recent mall built in the city of Konya in Turkey have been discussed. The assessment of the mall in question has been made in the context of a growing and changing city. The study opened up new horizons and discussion areas to entrepreneurs who make significant investments in shopping centers, architects who design shopping centers as efficient commercial and social environments, and social scientists that investigate the effects of increase in these closed urban spaces on urban life.Keywords: shopping center, architecture, city, social
Procedia PDF Downloads 3366737 An Exploration of Architecture Design Methods in Urban Fringe Belt Based on Typo-Morphological Research- A Case of Expansion Project of the Second Middle School in Xuancheng, China
Authors: Dong Yinan, Zhou Zijie
Abstract:
Urban fringe belt is an important part of urban morphology research. Different from the relatively fixed central district of city, the position of fringe belt is changing. In the process of urban expansion, the original fringe belt is likely to be merged by the new-built city, even become new city public center. During the change, we are facing the dialectic between restoring the organicity of old urban form and creating new urban image. There are lots of relevant research in urban scale, but when we focus on building scale, rare design method can be proposed, thus some new individual building cannot match the overall urban planning intent. The expansion project of the second middle school in Xuancheng is facing this situation. The existing campus is located in the south fringe belt of Xuancheng, Anhui province, China, adjacent to farmland and ponds. While based on the Xucheng urban planning, the farmland and ponds will be transformed into a big lake, around which new public center will be built; the expansion of the school becomes an important part of the boundary of the new public center. Therefore, the expansion project faces challenges from both urban and building scale. In urban scale, we analyze and summarize the fringe belt characters through the reading of existing and future urban organism, in order to determine the form of the expansion project. Meanwhile, in building scale, we study on different types of school buildings and select appropriate type which can satisfy to both urban form and school function. This research attempts to investigate design methods based on an under construction project in Xuancheng, a historic city in southeast China. It also aims to bridge the gap from urban design to individual building design through the typo-morphological research.Keywords: design methods, urban fringe belt, typo-morphological research, middle school
Procedia PDF Downloads 5066736 Reaching New Levels: Using Systems Thinking to Analyse a Major Incident Investigation
Authors: Matthew J. I. Woolley, Gemma J. M. Read, Paul M. Salmon, Natassia Goode
Abstract:
The significance of high consequence, workplace failures within construction continues to resonate with a combined average of 12 fatal incidents occurring daily throughout Australia, the United Kingdom, and the United States. Within the Australian construction domain, more than 35 serious, compensable injury incidents are reported daily. These alarming figures, in conjunction with the continued occurrence of fatal and serious, occupational injury incidents globally suggest existing approaches to incident analysis may not be achieving required injury prevention outcomes. One reason may be that, incident analysis methods used in construction have not kept pace with advances in the field of safety science and are not uncovering the full range system-wide contributory factors that are required to achieve optimal levels of construction safety performance. Another reason underpinning this global issue may also be the absence of information surrounding the construction operating and project delivery system. For example, it is not clear who shares the responsibility for construction safety in different contexts. To respond to this issue, to the author’s best knowledge, a first of its kind, control structure model of the construction industry is presented and then used to analyse a fatal construction incident. The model was developed by applying and extending the Systems Theoretic and Incident Model and Process method to hierarchically represent the actors, constraints, feedback mechanisms, and relationships that are involved in managing construction safety performance. The Causal Analysis based on Systems Theory (CAST) method was then used to identify the control and feedback failures involved in the fatal incident. The conclusions from the Coronial investigation into the event are compared with the findings stemming from the CAST analysis. The CAST analysis highlighted additional issues across the construction system that were not identified in the coroner’s recommendations, suggested there is a potential benefit in applying a systems theory approach to incident analysis in construction. The findings demonstrate the utility applying systems theory-based methods to the analysis of construction incidents. Specifically, this study shows the utility of the construction control structure and the potential benefits for project leaders, construction entities, regulators, and construction clients in controlling construction performance.Keywords: construction project management, construction performance, incident analysis, systems thinking
Procedia PDF Downloads 1286735 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects
Authors: Abdullah Almusharraf, Andrew Whyte
Abstract:
The sub-task pattern in terms of the deviations and defects should be identified and understand in order to improve the quality practices in construction projects. Therefore, the sub-task susceptibility to exposure to deviations and defects have been evaluated and classified via six classifications that have proposed in this study. 34 case studies on specific sub-task (from compression member in construction concrete structure) have been collected from seven construction projects in order to examined study’s classifications. The study revealed that the sub-task has high sensitive to deviation where (91%) of the cases recorded as deviations, however, only (19%) of cases recorded as defects. Another findings were that the actual work during the execution process has high source of deviation for this sub-task (74%) while only (26%) of the deviation source was due to both design documentations with the actual work. These findings significantly imply that it could be used the study’s classifications to determine the pattern of each sub-task and develop the proactive actions to overcome issues of the sub-task deviations and defects.Keywords: sub-tasks, deviations, defects, quality, construction projects
Procedia PDF Downloads 4446734 Adaptive Assemblies: A Scalable Solution for Atlanta's Affordable Housing Crisis
Authors: Claudia Aguilar, Amen Farooq
Abstract:
Among other cities in the United States, the city of Atlanta is experiencing levels of growth that surpass anything we have witnessed in the last century. With the surge of population influx, the available housing is practically bursting at the seams. Supply is low, and demand is high. In effect, the average one-bedroom apartment runs for 1,800 dollars per month. The city is desperately seeking new opportunities to provide affordable housing at an expeditious rate. This has been made evident by the recent updates to the city’s zoning. With the recent influx in the housing market, young professionals, in particular millennials, are desperately looking for alternatives to stay within the city. To remedy Atlanta’s affordable housing crisis, the city of Atlanta is planning to introduce 40 thousand of new affordable housing units by 2026. To achieve the urgent need for more affordable housing, the architectural response needs to adapt to overcome this goal. A method that has proven successful in modern housing is to practice modular means of development. A method that has been constrained to the dimensions of the max load for an eighteen-wheeler. This approach has diluted the architect’s ability to produce site-specific, informed design and rather contributes to the “cookie cutter” stigma that the method has been labeled with. This thesis explores the design methodology for modular housing by revisiting its constructability and adaptability. This research focuses on a modular housing type that could break away from the constraints of transport and deliver adaptive reconfigurable assemblies. The adaptive assemblies represent an integrated design strategy for assembling the future of affordable dwelling units. The goal is to take advantage of a component-based system and explore a scalable solution to modular housing. This proposal aims specifically to design a kit of parts that are made to be easily transported and assembled but also gives the ability to customize the use of components to benefit all unique conditions. The benefits of this concept could include decreased construction time, cost, on-site labor, and disruption while providing quality housing with affordable and flexible options.Keywords: adaptive assemblies, modular architecture, adaptability, constructibility, kit of parts
Procedia PDF Downloads 856733 Synthesising Smart City and Smart Port Concepts: A Conceptualization for Small and Medium-Sized Port City Ecosystems
Authors: Christopher Meyer, Laima Gerlitz
Abstract:
European Ports are about to take an important step towards their future economic development. Existing legislatives such as the European Green Deal are changing the perspective on ports as individual logistic institutions and demand a more holistic view on ports in their characteristic as ecosystem involving several different actors in an interdisciplinary and multilevel approach. A special role is taken by small and medium-sized ports facing the same political restriction and future goals - such as reducing environmental impacts with 2030 and 2050 as targets - while suffering from low financing capacity, outdated infrastructure, low innovation measures and missing political support. In contrast, they are playing a key role in regional economic development and cross-border logistics as well as facilitator for the regional hinterland. Also, in comparison to their big counterparts, small and medium-sized ports are often located within or close to city areas. This does not only bear more challenges especially when it comes to the environmental performance, but can also carry out growth potentials by putting the city as a key actor into the port ecosystem. For city development, the Smart City concept is one of the key strategies currently applied mostly on demonstration level in selected cities. Hence, the basic idea behind is par to the Smart Port concept. Thus, this paper is analysing potential synergetic effects resulting from the application of Smart City and Smart Port concepts for small and medium-sized ports' ecosystems closely located to cities with focus on innovation application, greening measurements and economic performances as well as strategic positioning of the ports in Smart City initiatives.Keywords: port-city ecosystems, regional development, sustainability transition, innovation policy
Procedia PDF Downloads 786732 Analysis of Landscape Pattern Evolution in Banan District, Chongqing, Based on GIS and FRAGSTATS
Authors: Wenyang Wan
Abstract:
The study of urban land use and landscape pattern is the current hotspot in the fields of planning and design, ecology, etc., which is of great significance for the construction of the overall humanistic ecosystem of the city and optimization of the urban spatial structure. Banan District, as the main part of the eastern eco-city planning of Chongqing Municipality, is a new high ground for highlighting the ecological characteristics of Chongqing, realizing effective transformation of ecological value, and promoting the integrated development of urban and rural areas. The analytical methods of land use transfer matrix (GIS) and landscape pattern index (Fragstats) were used to study the characteristics and laws of the evolution of land use landscape pattern in Banan District from 2000 to 2020, which provide some reference value for Banan District to alleviate the ecological contradiction of landscape. The results of the study show that: ① Banan District is rich in land use types, of which the area of cultivated land will still account for 57.15% of the total area of the landscape until 2020, accounting for an absolute advantage in the land use structure of Banan District; ② From 2000 to 2020, land use conversion in Banan District is characterized as: Cropland > woodland > grassland > shrubland > built-up land > water bodies > wetlands, with cropland converted to built-up land being the largest; ③ From 2000 to 2020, the landscape elements of Banan District were distributed in a balanced way, and the landscape types were rich and diversified, but due to the influence of human interference, it also presented the characteristics that the shape of the landscape elements tended to be irregular, and the dominant patches were distributed in a scattered manner, and the patches had poor connectivity. It is recommended that in future regional ecological construction, the layout should be rationally optimized, the relationship between landscape components should be coordinated, and the connectivity between landscape patches should be strengthened, and the degree of landscape fragmentation should be reduced.Keywords: land use transfer, landscape pattern evolution, GIS and FRAGSTATS, Banan District
Procedia PDF Downloads 806731 The Utilization of Recycled Construction and Demolition Waste Aggregate in Asphaltic Concrete
Authors: Inas Kamel, Noor Z. Habib
Abstract:
Utilizing construction and demolition wastes in hotmix asphalt (HMA) pavement construction can reduce the adverse environmental effect of its inadequate disposal and reduce the pressure of extracting and processing mineral aggregates (MA). This study aims to examine the viability of replacing MA by recycled construction and demolition waste aggregates (RCDWA) in the wearing course of asphaltic concrete (AC) pavements without compromising its loadbearing capacity. The Marshall Method was used to evaluate the performance of AC wearing course specimens by replacing MA by 10%, 20% and 30% RCDWA. Grade 60/70 bitumen was used in the range 3.0-5.5%, with 05% increments, to generate the optimum bitumen content (OBC). From the volumetric analysis and test property curves, the mixture containing 20% RCDWA was chosen as the preferred mix at 5.1% OBC. It possessed a 10% increase in Marshall Stability compared to the reference specimen, containing 100% MA, and a 6% increase in Marshall flow.Keywords: aggregate, asphaltic concrete, Marshall method, optimum bitumen content, recycled construction and demolition waste
Procedia PDF Downloads 1566730 Analyzing the Economic Impact and Stakeholder Perception of Destination Promotion: A Case Study of the First City on the Mississippi as 'True North'
Authors: Kelly La Venture
Abstract:
Destination promotion has become increasingly important to economic development in the United States. Key stakeholders of the First City on the Mississippi recognizes the importance of the visitor economy and decided to invest in destination promotion of the city as ‘True North’. The purpose of the study was to analyze the economic impact and stakeholder perceptions of destination promotion of the First City on the Mississippi as ‘True North’ using the case study method. Using a semi-structured guide consisting of 8 questions and additional probing questions, investigators engaged in 30-90 minute interviews with 20 key stakeholders. Data captured was then subjected to thematic analysis and interpretation. Through a review of literature and interview analysis, data indicate(1) there is increasing value in the visitor economy of the First City on the Mississippi,(2) the visitor economy warrants investments in destination promotion,(3) economic development can be more effective through coordination of destination promotion of as ‘True North’ and,(4) destination promotion fuels development across the entire economic spectrum. As a result, the First City on the Mississippi should prioritize marketing efforts of as ‘True North’ and coordinate these efforts with economic development initiatives. The destination promotion of the First City on the Mississippi as ‘True North’ may raise the communities profile and open doors to increased tourism, business relocation, business expansion, and entrepreneurs ready to start up a new organization.Keywords: case study method, destination promotion, economic development, leisure and business travel
Procedia PDF Downloads 2956729 Integrating Sustainable Construction Principles into Curriculum Design for Built Environment Professional Programs in Nigeria
Authors: M. Yakubu, M. B. Isah, S. Bako
Abstract:
This paper presents the findings of a research which sought to investigate the readiness to integrate sustainable construction principles into curriculum design for built environment professional programs in the Nigerian Universities. Developing the knowledge and understanding that construction professionals acquire of sustainable construction practice leads to considerable improvement in the environmental performance of the construction sector. Integrating sustainable environmental issues within the built environment education curricula provide the basis of this research. An integration of sustainable development principles into the universities built environment professional programmes are carried out with a view of finding solutions to the key issues identified. The perspectives of academia have been assessed and findings tested for validity through the analysis of primary quantitative data that has been collected. The secondary data generated has shown that there are significant differences in the approach to curriculum design within the built environment professional programmes, and this reveals that there is no ‘best practice’ that is clearly identifiable. Sequel to the above, this research reveals that engaging all stakeholders would be a useful component of built environment curriculum development, and that the curriculum be negotiated with interested parties. These parties have been identified as academia, government, construction industry and built environment professionals.Keywords: built environment, curriculum development, sustainable construction, sustainable development
Procedia PDF Downloads 4206728 The Successful in Construction Project via Effectiveness of Project Team
Authors: Zarabizan Zakaria, Hayati Zainal
Abstract:
The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.Keywords: project team, leadership, construction project, project successful
Procedia PDF Downloads 1766727 Economic Growth and Total Factor Productivity by the Use of Rail Way Transport in the City of Medellín - Colombia in the Period 2012-2016
Authors: Mauricio Molina
Abstract:
The present research project aims to determine whether it is possible to have a statement, allowing you to have an economic model to establish clearly if the population that uses the rail system underground in the city of Medellin with an increase in productivity total factor. The present project aims to concentrate on the surroundings to the system underground for a period of 60 months in the city of Medellin. According to the review bibliographic is can establish that in it most of them cases, the cities that have with systems of transport rail are more productive. And should to its time present is an analysis that may lead to determine if effectively the use of the transport railway improves the productivity of a city and its inhabitants.Keywords: economic growth, mobility urban, total factor productivity, rail transport
Procedia PDF Downloads 2876726 Development of Work Breakdown Structure for EVMS in South Korea
Authors: Dong-Ho Kim, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun
Abstract:
In the construction site, the cost and schedules are the most important management elements. Despite efforts to integrated management the cost and schedule, WBS classification is struggling to differ from each other. The cost and schedule can be integrated and can be managed due to the characteristic of the detail system in the case of Korea around the axis of pressure and official fixture system. In this research, the Work Breakdown Structure (WBS) integrating the cost and schedules around in government office construction, WBS which can be used in common was presented in order to analyze the detail system of the public institution construction and improve. As to this method, the efficient administration of not only the link application of the cost and schedule but also construction project is expected.Keywords: WBS, EVMS, integrated cost and schedule, Korea case
Procedia PDF Downloads 3846725 Research and Design of Functional Mixed Community: A Model Based on the Construction of New Districts in China
Authors: Wu Chao
Abstract:
The urban design of the new district in China is different from other existing cities at the city planning level, including Beijing, Shanghai, Guangzhou, etc. And the urban problems of these super-cities are same as many big cities around the world. The goal of the new district construction plan is to enable people to live comfortably, to improve the well-being of residents, and to create a way of life different from that of other urban communities. To avoid the emergence of the super community, the idea of "decentralization" is taken as the overall planning idea, and the function and form of each community are set up with a homogeneous allocation of resources so that the community can grow naturally. Similar to the growth of vines in nature, each community groups are independent and connected through roads, with clear community boundaries that limit their unlimited expansion. With a community contained 20,000 people as a case, the community is a mixture for living, production, office, entertainment, and other functions. Based on the development of the Internet, to create more space for public use, and can use data to allocate resources in real time. And this kind of shared space is the main part of the activity space in the community. At the same time, the transformation of spatial function can be determined by the usage feedback of all kinds of existing space, and the use of space can be changed by the changing data. Take the residential unit as the basic building function mass, take the lower three to four floors of the building as the main flexible space for use, distribute functions such as entertainment, service, office, etc. For the upper living space, set up a small amount of indoor and outdoor activity space, also used as shared space. The transformable space of the bottom layer is evenly distributed, combined with the walking space connected the community, the service and entertainment network can be formed in the whole community, and can be used in most of the community space. With the basic residential unit as the replicable module, the design of the other residential units runs through the idea of decentralization and the concept of the vine community, and the various units are reasonably combined. At the same time, a small number of office buildings are added to meet the special office needs. The new functional mixed community can change many problems of the present city in the future construction, at the same time, it can keep its vitality through the adjustment function of the Internet.Keywords: decentralization, mixed functional community, shared space, spatial usage data
Procedia PDF Downloads 123