Search results for: aid projects and South-South cooperation
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2822

Search results for: aid projects and South-South cooperation

2342 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle

Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter

Abstract:

The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.

Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework

Procedia PDF Downloads 79
2341 Promoters' Perspectives on the Impact of Development Projects: Do They Suffer from Any Forms of Social Injustice?

Authors: Ola Hosny

Abstract:

This paper illustrates promoters’ role in any development project and factors affecting their performance. The paper starts by giving an overview of the Egyptian context and the born of non-formal education. This is then followed by answers to the following questions; who are promoters, why build promoters’ skills, do promoters suffer from any forms of social injustice, what is meant by leadership’s skills, why build promoters’ leadership skills in specific, and finally what is the desired final destination. Given the fact that promoters are the actual implementers on ground of any project, this paper pinpoints the extent to which promoters' capacities should be developed to institutionalize projects' values into the community, transfer knowledge, and be able to act as pillars of change to sustain the maximum achievements from any intervention, illustrating the role of education for sustainable development. The paper wraps-up by a conclusion that reflects the main findings.

Keywords: social justice, women's empowerment, gender equity, young rural women, promoters

Procedia PDF Downloads 336
2340 Environmental Impact Assessments in Peru: Tools for Violence

Authors: Nadia Degregori

Abstract:

This paper focuses on Peru’s Environmental Impact Assessment’s communication and participation mechanisms, whose rationale is to prevent conflictive situations by –supposedly- providing high-quality information about mining projects and their impacts to affected stakeholders. It is argued that, in fact, these mechanisms enhance citizens’ feelings of fear and/or mistrust towards mining projects and the companies behind them because their design follows a top-down perspective that limits “participation” to a passive reception of information, and which does not address power unbalances between communities and companies or government. As well, the paper contends that this way of managing the social aspects of Environmental Impact Assessments in Peru leads stakeholders who possess less power (typically communities) to incline towards maintaining the status quo and avoiding negotiations with either the central government or mining companies as a defence mechanism for avoiding a bad negotiation.

Keywords: community relations, environmental impact assessments, governance and participation, mining, Peru

Procedia PDF Downloads 407
2339 Study of the Suitability for the Use of Gravel in the Regions around Araz River in Karabakh as a Concrete Aggregate

Authors: S. B. Shahmarova, F. N. Iskandarli, J. T. Zeynalov, F. N. Mammadov, M. M. Mirzayev, F. Y. Bayramov

Abstract:

The physical, mechanical, and chemical properties of aggregates play an important role in the production of ready-mixed concrete. Furthermore, the alkali-silicate reaction of aggregates is one of the essential factors in construction projects for the durability and longer service life of buildings and construction structures to be built. It is necessary to use the aggregates from the liberated regions of Karabakh and East Zangazur in the preparation of concretes to be produced for reconstruction and renovation projects in those regions. In this regard, the study of the physical and mechanical properties of aggregates in the regions around the Araz River (Fuzuli, Jabrayil, and Zangilan) became a significant issue. So, gravel samples were taken from seven different sources located in the regions around Araz River, where the quarries are planned to be built. The chemical oxide composition of the samples was determined, water absorption and specific gravity tests, chloride, alkali-silicate reaction tests, aggregate crushing strength test, Los Angeles, and frost resistance (into the solution of MgSO₄ and Na₂SO₄) tests were performed, and the results were evaluated in accordance with the relevant standards. As a result, it was determined that the aggregates in the regions around the Araz River (Fuzuli, Jabrayil, and Zangilan) conform to the relative standards and can be used effectively in the production of various concretes to be used for the projects in Karabakh.

Keywords: aggregates of the regions around Araz River (Fuzuli, Jabrayil, and Zangilan), physical and mechanical properties, alkali-silicate reaction, Karabakh, Azerbaijan

Procedia PDF Downloads 73
2338 Key External Causes of Poor Performance of Engineering and Technical Departments within Governmental Construction Projects in Saudi Arabia

Authors: Alaa A. Al-Harthi, Abdulrahman S. Bageis, Bingunath Ingirige

Abstract:

Poor levels of performance and low productivity were highlighted by many previous studies as a major cause of failure in the Saudi construction industry. This paper provides recommendations to address key external indicators that led to poor levels of performance and low productivity in Engineering and Technical Departments (ETDs) within the Saudi governmental agencies. The ETDs are client’s representative on behalf of the Saudi Ministries. This paper represents a part of an investigation which contained external and internal challenges that led to occurrence of the research problem. The paper is focusing on the external challenges which contain 14 indicators. These 14 external indicators had been examined carefully through comprehensive review of the literature then have been tested through quantitative and qualitative methods. 400 questionnaires were distributed to dozens of different bodies. The actual response rate was 47% completed responses. Four semi-structured interviews were conducted with senior practitioners from the Public Construction Sector. The finding showed that the 14 external indicators directly and/or indirectly influence the Public Construction Sector. It was noticed significantly that these indicators have prevented the ETDs from performing properly. It was also found that the 14 external indicators were constant with all kinds of Government Construction Projects in the Saudi context. Addressing the 14 external indicators requires to be planned over the long run which is responsible by relevant Saudi governmental authorities under the umbrella of the Saudi Council of Ministers. The study recommends that Project Management Office (PMO) should be considered in order to improve the performance of the ETDs.

Keywords: construction projects' performance, low engineering productivity, public construction sector

Procedia PDF Downloads 573
2337 Political Economy in Climate Change Adaptation Efforts: Exploring Enclosure, Exclusion, Encroachment, and Entrenchment from the Case of Bangladesh

Authors: Shafiqul Islam, Cordia Chu

Abstract:

Bangladesh contributes little to global climate change, yet it is one of the countries most vulnerable to climate change. Based on semi-structured in-depth interviews and literature review, focusing public spending distribution process, this paper demonstrates how the processes of political economy- enclosure, exclusion, encroachment, and entrenchment hinder the Climate Change Adaptation (CCA) efforts of Bangladesh Climate Change Trust Fund (BCCTF). Enclosure refers to when CCA projects allocated to less vulnerable areas or expand the roles of influencing actors into the public sphere. Exclusion refers to when CCA projects limit affected people's access to resources or marginalize particular stakeholders in decision-making activities. Encroachment refers to when allocation of CCA projects and selection of location and issues degrade the environmental affect or contribute to other forms of disaster risk. Entrenchment refers to when CCA projects aggravate the disempowerment of common people worsen the concentrations of wealth and income inequality within a community. In the case of Bangladesh, climate change policies implemented under the country’s National Adaptation Program of Action (NAPA) and Bangladesh Climate Change Strategic Action Plan (BCCSAP) have somehow enabled influential-elites to mobilize and distribute resources through bureaucracies. Exclusionary forms of fund distribution of CCA exist at both the national and local scales. CCA related allocations have encroached through the low land areas development project without consulting local needs. Most severely, CCA related unequal allocations have entrenched social class trapping the backward communities vulnerable to climate related disasters. Planners and practitioners of BCCTF need to take necessary steps to eliminate the potential risks from the processes of enclosure, exclusion, encroachment, and entrenchment happens in project fund allocations.

Keywords: Bangladesh, climate change adaptation, political economy, public fund distribution

Procedia PDF Downloads 117
2336 Investigating Causes of Pavement Deterioration in Khartoum State, Sudan

Authors: Magdi Mohamed Eltayeb Zumrawi

Abstract:

It is quite essential to investigate the causes of pavement deterioration in order to select the proper maintenance technique. The objective of this study was to identify factors cause deterioration of recently constructed roads in Khartoum state. A comprehensive literature concerning the factors of road deterioration, common road defects and their causes were reviewed. Three major road projects with different deterioration reasons were selected for this study. The investigation involved field survey and laboratory testing on those projects to examine the existing pavement conditions. The results revealed that the roads investigated experienced severe failures in the forms of cracks, potholes and rutting in the wheel path. The causes of those failures were found mainly linked to poor drainage, traffic overloading, expansive subgrade soils and the use of low quality materials in construction. Based on the results, recommendations were provided to help highway engineers in selecting the most effective repair techniques for specific kinds of distresses.

Keywords: pavement, deterioration, causes, failures

Procedia PDF Downloads 329
2335 Case Study Approach Using Scenario Analysis to Analyze Unabsorbed Head Office Overheads

Authors: K. C. Iyer, T. Gupta, Y. M. Bindal

Abstract:

Head office overhead (HOOH) is an indirect cost and is recovered through individual project billings by the contractor. Delay in a project impacts the absorption of HOOH cost allocated to that particular project and thus diminishes the expected profit of the contractor. This unabsorbed HOOH cost is later claimed by contractors as damages. The subjective nature of the available formulae to compute unabsorbed HOOH is the difficulty that contractors and owners face and thus dispute it. The paper attempts to bring together the rationale of various HOOH formulae by gathering contractor’s HOOH cost data on all of its project, using case study approach and comparing variations in values of HOOH using scenario analysis. The case study approach uses project data collected from four construction projects of a contractor in India to calculate unabsorbed HOOH costs from various available formulae. Scenario analysis provides further variations in HOOH values after considering two independent situations mainly scope changes and new projects during the delay period. Interestingly, one of the findings in this study reveals that, in spite of HOOH getting absorbed by additional works available during the period of delay, a few formulae depict an increase in the value of unabsorbed HOOH, neglecting any absorption by the increase in scope. This indicates that these formulae are inappropriate for use in case of a change to the scope of work. Results of this study can help both parties in deciding on an appropriate formula more objectively, considering the events on a project causing the delay and contractor's position in respect of obtaining new projects.

Keywords: absorbed and unabsorbed overheads, head office overheads, scenario analysis, scope variation

Procedia PDF Downloads 147
2334 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 312
2333 A Systematic Snapshot of Software Outsourcing Challenges

Authors: Issam Jebreen, Eman Al-Qbelat

Abstract:

Outsourcing software development projects can be challenging, and there are several common challenges that organizations face. A study was conducted with a sample of 46 papers on outsourcing challenges, and the results show that there are several common challenges faced by organizations when outsourcing software development projects. Poor outsourcing relationship was identified as the most significant challenge, with 35% of the papers referencing it. Lack of quality was the second most significant challenge, with 33% of the papers referencing it. Language and cultural differences were the third most significant challenge, with 24% of the papers referencing it. Non-competitive price was another challenge faced by organizations, with 21% of the papers referencing it. Poor coordination and communication were also identified as a challenge, with 21% of the papers referencing it. Opportunistic behavior, lack of contract negotiation, inadequate user involvement, and constraints due to time zone were also challenges faced by organizations. Other challenges faced by organizations included poor project management, lack of technical capabilities, vendor employee high turnover, poor requirement specification, IPR issues, poor management of budget, schedule, and delay, geopolitical and country instability, the difference in development methodologies, failure to manage end-user expectations, and poor monitoring and control. In conclusion, outsourcing software development projects can be challenging, but organizations can mitigate these challenges by selecting the right outsourcing partner, having a well-defined contract and clear communication, having a clear understanding of the requirements, and implementing effective project management practices.

Keywords: software outsourcing, vendor, outsourcing challenges, quality model, continent, country, global outsourcing, IT workforce outsourcing.

Procedia PDF Downloads 68
2332 Proposing an Improved Managerial-Based Business Process Framework

Authors: Alireza Nikravanshallmani, Jamshid Dehmeshki, Mojtaba Ahmadi

Abstract:

Modeling of business processes, based on BPMN (Business Process Modeling Notation), helps analysts and managers to understand business processes, and, identify their shortages. These models provide a context to make rational decision of organizing business processes activities in an understandable manner. The purpose of this paper is to provide a framework for better understanding of business processes and their problems by reducing the cognitive load of displayed information for their audience at different managerial levels while keeping the essential information which are needed by them. For this reason, we integrate business process diagrams across the different managerial levels to develop a framework to improve the performance of business process management (BPM) projects. The proposed framework is entitled ‘Business process improvement framework based on managerial levels (BPIML)’. This framework, determine a certain type of business process diagrams (BPD) based on BPMN with respect to the objectives and tasks of the various managerial levels of organizations and their roles in BPM projects. This framework will make us able to provide the necessary support for making decisions about business processes. The framework is evaluated with a case study in a real business process improvement project, to demonstrate its superiority over the conventional method. A questionnaire consisted of 10 questions using Likert scale was designed and given to the participants (managers of Bank Refah Kargaran three managerial levels). By examining the results of the questionnaire, it can be said that the proposed framework provide support for correct and timely decisions by increasing the clarity and transparency of the business processes which led to success in BPM projects.

Keywords: business process management (BPM), business process modeling, business process reengineering (BPR), business process optimizing, BPMN

Procedia PDF Downloads 431
2331 Managing a Cross-Disciplinary Research Project in a University: The Case of LEARNIT

Authors: Yulia Stukalina

Abstract:

This paper explores the main issues related to implementing a cross-disciplinary research project (LEARNIT) based on collaboration between universities from three European countries. The paper discusses the importance of using the holistic approach to managing scientific projects with due account for the complicated nature of the educational environment of a modern university. To illustrate this approach, the author describes some actions to be taken for supporting different focus areas of LEARNIT project, in the process using integrated tangible, non-tangible, and semi-tangible resources of the partner university. The methodology of the paper is based on the academic literature and research papers analysis within management discipline. The analysis reported in the paper is also based on the author’s professional experience in the area of managing international research projects in a university.

Keywords: LEARNIT, focus area, project management, resources

Procedia PDF Downloads 251
2330 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 133
2329 Mobile Learning in Teacher Education: A Review in Context of Developing Countries

Authors: Mehwish Raza

Abstract:

Mobile learning (m-learning) offers unique affordances to learners, setting them free of limitations posed by time and geographic space; thus becoming an affordable device for convenient distant learning. There is a plethora of research available on mobile learning projects planned, implemented and evaluated across disciplines in the context of developed countries, however, the potential of m-learning at different educational levels remain unexplored with little evidence of research carried out in developing countries. Despite the favorable technical infrastructure offered by cellular networks and boom in mobile subscriptions in the developing world, there is limited focus on utilizing m-learning for education and development purposes. The objective of this review is to unify findings from m-learning projects that have been implemented in developing countries such as Pakistan, Bangladesh, Philippines, India, and Tanzania for teachers’ in-service training. The purpose is to draw upon key characteristics of mobile learning that would be useful for future researchers to inform conceptualizations of mobile learning for developing countries.

Keywords: design model, developing countries, key characteristics, mobile learning

Procedia PDF Downloads 422
2328 Performing the Landscape: Temporary and Performative Practices in Landscape Production

Authors: Miguel Costa

Abstract:

Despite the "time" element being an intrinsic characteristic of the work with the landscape, its execution and completion are also often dependent on external factors, i.e., the slow bureaucratic procedures required for the implementation of a project. In the urban areas of the city, these conditions are even more present — some landscape projects are articulated with the architectural/urban design, transporting itself long, expensive and inflexible processes related with the constant transformations of contemporary urban culture, where the needs and expectations could change before the project is finished. However, despite the renewed interest and growing concern for issues related to the landscapes (particularly since the European Landscape Convention, its scope and fields of action, extended to all the landscapes and not just the selected ones), still lacks the need for a greater inclusion of citizens in its protection and construction processes as well as a greater transparency and clarity of the consequences and results of their active participation. This article aims to reflect on the production processes of urban landscapes, on its completion runtime and its relationship with the citizens by introducing temporary projects as a fieldwork methodology, as well as using the contribution of different professional practices and knowledge for its monitoring, execution, and implementation. These strategies address a more interdisciplinary, transdisciplinary and performative approach, not only from the ephemeral experience of objects and actions but also from the processes and the dynamic events that are organized from these objects and actions over the landscape. The goal is to discuss the results of these approaches on its different dimensions: critical dimension; experimental and strategic dimension; pedagogical dimension; political dimension; cultural.

Keywords: landscape fieldwork, interdisciplinarity, public inclusion, public participation, temporary projects, transdisciplinarity

Procedia PDF Downloads 305
2327 Prevention of Green Gentrification: The Case of the Sustainable Urban Policy in Paris

Authors: Elise Machline

Abstract:

In the late 1980’s, sustainable urban development emerged in Europe. Sustainable neighborhoods are one attempt to implement sustainable urban energy planning in the city. So, for twenty years, projects of sustainable neighborhoods (or ‘eco-neighborhoods’) have emerged in Europe. Debates about sustainability no longer restrict it to environmental concerns (to limit greenhouse gas emissions), but rather extend to the economic and social dimensions. A growing number of empirical studies demonstrate that sustainable urbanism yield rental/sale premia, as well as higher occupancy rates and thus higher asset values. For example, European eco neighborhood projects usually focus on the middle to upper classes, given the costs involved in renting or buying the dwellings built in such projects. As a result sustainable residential buildings are not affordable and their construction tends to have a gentrifying effect. An increasing number of countries are institutionalizing green strategies for affordable housing. In France, the sustainable neighborhoods ‘ecoquartier’ must meet environmental performance criteria, have a potential for economic development and, provide social and functional diversity. The issue of social diversity trough the provision of affordable housing has emerged as a dimension of public housing policies. Thus, the ecoquartier residential buildings must be both energy efficient and affordable. Through the Parisian example our study considers how the concept of social diversity and other elements of sustainability are illustrated in the ecoquartiers and whether the authorities have been able to avoid gentrification when implementing a sustainable urban policy.

Keywords: sustainable neighborhoods, social diversity, social housing policies, green buildings

Procedia PDF Downloads 333
2326 Community’s Role in Slum Development: A Case Study of the Kabul Old City

Authors: Habibi Said Mustafa, Hiroko Ono

Abstract:

Kabul, the capital of Afghanistan, has witnessed a major population growth in the last decades which caused a significant increase in the number of informal settlements. The residents are suffering from many problems such as poor infrastructure, shortage of public facilities, depriving of the sense of ownership and facing much environmental degradation. Even though majority of the residents are living in such condition, the government response has been quite weak. The government’s main planning strategy has been upgrading in the form of provision of facilities and improving elements of physical infrastructure, unfortunately most of the projects which had not community’s support, faced with lots of challenges such as people’s resistance or even in some cases the project rather than solving the problem, compounded them to a worse condition. A major reason as to why many projects have not been effective in achieving certain objectives in the past is the results of local people were not being involved. Community participation plays an important role in slum development projects. The development of an integrated urban development concept these days without the mobilization of participants and community seems difficult and impossible. Therefore this paper looks into factors and methods which can help in creating a participatory approach for developing the slums in Kabul city. Furthermore, it describes the result of a questionnaire which was conducted on a part of the Kabul Old City due to hear resident’s problem related to the slum upgrading and collect their opinions on this regard. The research also points out some factors which can severely hamper the successful implementation of a slum upgrading project if not adequately addressed.

Keywords: Community empowerment, Informal settlements, Job opportunities, People participation

Procedia PDF Downloads 150
2325 Meiji Centennial as a Media Event: Ideas for Upcoming Turkish Republic Centennial

Authors: Hasan Topacoglu

Abstract:

The Meiji Restoration was a chain of events that restored Japan in 1868 and considered as the beginning of Japanese Modernization by many scholars. In 1968, to honor its modern incarnation, Japan celebrated Meiji Centennial as one of the biggest Media Events in the country after the World War II. It was celebrated all around the country throughout the year following with a central event in Tokyo. Meanwhile, Japanese scholars started an opposition movement and claimed that Government was using this event to raise nationalism, pointing at Government’s statement on the meaning of Meiji. Most of the scholars, unfortunately, were hooked into the ideological problem of the Government’s way of planning and evaluated it as a failure. However, scholars missed out an important point that apart from the central event in Tokyo, each city planned its own event and celebrated it on a different date, also with a different theme. For example, Kyoto showed a regional characteristic and focused on Kyoto’s own culture, tradition etc., and highlighted a further past than 100 years. This was mainly because some areas/cities had a different ‘memory’ for Meiji Restoration than Tokyo which was reflected through the way they celebrated Meiji Centennial. On the other hand, 2023 will be the year of Turkish Republic Centennial. A year which will be marked by national and maybe even international events. Although an official committee has not been announced yet, The 2023 Vision, a list of goals has been released by the Government to coincide with the centenary of the Republic of Turkey in 2023 and there are some ongoing projects that are planned to be completed by then. By looking at the content of these projects, it is possible to say that Government is aiming to focus on Modernization through the Centennial. However, some of the projects are already showing some interesting characteristics such as the Istanbul New Airport whose design is inspired by Selimiye Mosque’s Islamic-Ottoman figure. It is true that Turkey and Japan have different historical backgrounds and the timeline of the Meiji Restoration and Foundation of Turkish Republic are different. Therefore, a particular comparison between these two events is not justified. However, they may have more in common than we are up to think because, each country marked the start of a new nation conceived on modern principles. For that reason, it is important to understand the similarities or differences between Meiji Centennial and Turkish Republic Centennial as a media event. This study introduces Meiji Centennial as a media event and analyses opposition movement along with the meaning of Meiji Centennial. Additionally, it explains regional characteristic differences and gives Kyoto as an example. Moreover, it introduces some of the ongoing Centennial projects in Turkey and analyses the meaning of the Turkish Republic Centennial through these projects. Without comparing Japan and Turkey, it explains the case of Japan but the discussion centers on deepening our understanding of Centennial as a Media Event and remarks some important aspects for Turkey’s upcoming Centennial events.

Keywords: media events, Meiji centennial, the 2023 vision, Turkish republic centennial

Procedia PDF Downloads 314
2324 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 146
2323 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 258
2322 A Literature Review on the Barriers in Incorporating Universal Design in Public Transportation Projects: Southeast Asian Countries

Authors: Oscar Conrad Pili De Jesus

Abstract:

In consonance with the UN Convention on Rights for People with Disabilities, countries are mandated to provide a barrier-free environment through adherence to universal design and full participation of persons with disabilities (PWDs) in planning and implementation, but there is little action in incorporating universal design in the public environment. Travelling freely and independently is paramount to the needs of the PWDs to participate in daily activities ahead of them, and it contributes to the advancement of their inclusion in society, in which universal design is a catalyst to provide seamless access and mobility. This study aims to determine the barriers to incorporating the concept of universal design in transportation projects in Southeast Asian countries. Based on a literature review and using the accessible journey chain as a framework, barriers are identified and categorized in the components of public transport within the context of utilization of the transport mode, the built environment within the transport infrastructure, and the first and last miles of travel. Some findings in the study which constitute solutions to creating a barrier-free environment were identified as information to guide the future research agenda in efficiently incorporating universal design in transportation projects in Southeast Asian countries. The study reflected that the focus of most literature is on the built environment, noting that there is a need for future studies to investigate universal design in the context of the public transport component in the active journey chain.

Keywords: public transportation, barriers, universal design, persons with disabilities, accessible journey chain

Procedia PDF Downloads 112
2321 Assessment of Environmental Risk Factors of Railway Using Integrated ANP-DEMATEL Approach in Fuzzy Conditions

Authors: Mehrdad Abkenari, Mehmet Kunt, Mahdi Nourollahi

Abstract:

Evaluating the environmental risk factors is a combination of analysis of transportation effects. Various definitions for risk can be found in different scientific sources. Each definition depends on a specific and particular perspective or dimension. The effects of potential risks present along the new proposed routes and existing infrastructures of large transportation projects like railways should be studied under comprehensive engineering frameworks. Despite various definitions provided for ‘risk’, all include a uniform concept. Two obvious aspects, loss and unreliability, have always been pointed in all definitions of this term. But, selection as the third aspect is usually implied and means how one notices it. Currently, conducting engineering studies on the environmental effects of railway projects have become obligatory according to the Environmental Assessment Act in developing countries. Considering the longitudinal nature of these projects and probable passage of railways through various ecosystems, scientific research on the environmental risk of these projects have become of great interest. Although many areas of expertise such as road construction in developing countries have not seriously committed to these studies yet, attention to these subjects in establishment or implementation of different systems have become an inseparable part of this wave of research. The present study used environmental risks identified and existing in previous studies and stations to use in next step. The second step proposes a new hybrid approach of analytical network process (ANP) and DEMATEL in fuzzy conditions for assessment of determined risks. Since evaluation of identified risks was not an easy touch, mesh structure was an appropriate approach for analyzing complex systems which were accordingly employed for problem description and modeling. Researchers faced the shortage of real space data and also due to the ambiguity of experts’ opinions and judgments, they were declared in language variables instead of numerical ones. Since fuzzy logic is appropriate for ambiguity and uncertainty, formulation of experts’ opinions in the form of fuzzy numbers seemed an appropriate approach. Fuzzy DEMATEL method was used to extract the relations between major and minor risk factors. Considering the internal relations of risk major factors and its sub-factors in the analysis of fuzzy network, the weight of risk’s main factors and sub-factors were determined. In general, findings of the present study, in which effective railway environmental risk indicators were theoretically identified and rated through the first usage of combined model of DEMATEL and fuzzy network analysis, indicate that environmental risks can be evaluated more accurately and also employed in railway projects.

Keywords: DEMATEL, ANP, fuzzy, risk

Procedia PDF Downloads 392
2320 Critical Appraisal, Smart City Initiative: China vs. India

Authors: Suneet Jagdev, Siddharth Singhal, Dhrubajyoti Bordoloi, Peesari Vamshidhar Reddy

Abstract:

There is no universally accepted definition of what constitutes a Smart City. It means different things to different people. The definition varies from place to place depending on the level of development and the willingness of people to change and reform. It tries to improve the quality of resource management and service provisions for the people living in the cities. Smart city is an urban development vision to integrate multiple information and communication technology (ICT) solutions in a secure fashion to manage the assets of a city. But most of these projects are misinterpreted as being technology projects only. Due to urbanization, a lot of informal as well government funded settlements have come up during the last few decades, thus increasing the consumption of the limited resources available. The people of each city have their own definition of Smart City. In the imagination of any city dweller in India is the picture of a Smart City which contains a wish list of infrastructure and services that describe his or her level of aspiration. The research involved a comparative study of the Smart City models in India and in China. Behavioral changes experienced by the people living in the pilot/first ever smart cities have been identified and compared. This paper discussed what is the target of the quality of life for the people in India and in China and how well could that be realized with the facilities being included in these Smart City projects. Logical and comparative analyses of important data have been done, collected from government sources, government papers and research papers by various experts on the topic. Existing cities with historically grown infrastructure and administration systems will require a more moderate step-by-step approach to modernization. The models were compared using many different motivators and the data is collected from past journals, interacting with the people involved, videos and past submissions. In conclusion, we have identified how these projects could be combined with the ongoing small scale initiatives by the local people/ small group of individuals and what might be the outcome if these existing practices were implemented on a bigger scale.

Keywords: behavior change, mission monitoring, pilot smart cities, social capital

Procedia PDF Downloads 267
2319 Social Awareness and Praxical Knowledge

Authors: F. Saptouw, L. Reddy

Abstract:

Tertiary institutions are often faced with a challenge when incorporating social awareness into course content. The information campaigns in the media often alienate the viewers and the knowledge is not readily assimilated into the students’ consciousness. This paper will present a discussion of the results of collaborative teaching projects run by the Michaelis School of fine art and the HIV/AIDS, Inclusivity and Change Unit (HAICU) at the University of Cape Town. In these projects the artistic process is employed to generate ‘praxical knowledge’ in the student body about socially relevant issues like HIV-AIDS, Gender-Based Violence (GBV) and sexual identity, specifically LGBTQI. The combination of lectures, group discussions and the creative process has been a very successful way to disseminate information amongst the student population. Evidence of the project’s success will be provided by referencing interviews, focus groups as well as surveys done with the participants. This paper will conclude by arguing for the positive role of practice-led research in developing a socially conscious public.

Keywords: art, education, HIV-AIDS, practice-led research

Procedia PDF Downloads 298
2318 Human Capital Mobility of a Skilled Workforce: A Need for a Future of Europe

Authors: Tiron-Tudor Adriana, Farcas Teodora Viorica, Ciolomic Ioana Andreea

Abstract:

The issue of human capital mobility inside Europe is still an open one. Even though there were created some tools in order to better move from one country to another to work and study the number of the people doing this is very low because of various factors presented in this paper. The "rethinking educational" agenda of the European Commission has open the floor for new projects which can create steps towards a European language for skills and competences, qualifications. One of these projects is the Partnership for Exchange of experience in Student on-the-job Training. As part of this project, we are interested to see the situation of the human capital inside EU and the elements that were created until now to support this mobility. Also, the main objective of the project is to make a comparison between the four countries involved in PEST project (Romania, Hungary, Finland, and Estonia), at the education and internship level. The results are helpful for the follow of the project, for identifying where changes can be done and need to be done.

Keywords: ECVET, human capital mobility, partnership exchange, students on the job mobility, vocational education and training

Procedia PDF Downloads 399
2317 The End Is Just the Beginning: The Importance of Project Post-Implementation Reviews

Authors: Catalin-Teodor Dogaru, Ana-Maria Dogaru

Abstract:

Success means different things to different people. For us, project managers, it becomes even harder to find a definition. Many factors have to be included in the evaluation. Moreover, literature is not very helpful, lacking consensus and neutrality. Post-implementation reviews (PIR) can be an efficient tool in evaluating how things worked on a certain project. Despite the visible progress, PIR is not a very detailed subject yet and there is not a common understanding in this matter. This may be the reason that some organizations include it in the projects’ lifecycle and some do not. Through this paper, we point out the reasons why all project managers should pay proper attention to this important step and to the elements, which can be assessed, beside the already famous triple constraints: cost, budget, and time. It is essential to take notice that PIR is not a checklist. It brings the edge in eliminating subjectivity and judging projects based on actual proof. Based on our experience, our success indicator model, presented in this paper, contributes to the success of the project! In the same time, it increases trust among customers who will perceive success more objectively.

Keywords: project, post implementation, review, success, indicators

Procedia PDF Downloads 351
2316 Navigating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Derrick Mirindi, Frederic Mirindi, Oluwakemi Oshineye

Abstract:

The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 45
2315 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 124
2314 Economic Integration in Eurasia: Modeling of the Current and Future Architecture

Authors: M. G. Shilina

Abstract:

The prospects for political and economic development of the Eurasian space are currently discussed at both governmental and expert levels. New concepts actively proposed by the Eurasian governments require the analysis and search for effective implementation options. In the paper, an attempt to identify effective solutions to the problems surrounding the current economic integration of the Eurasian states is given on the basis of an interdisciplinary, comprehensive, structured analysis. The phenomenon is considered through the prism of the international law, world economy and politics, combined with the study of existing intergovernmental practice. The modeling method was taken as the basis for the research and is supplemented by legal and empirical methods. The detailed multi-level model of practical construction the 'Great Eurasia' (the GE) concept is proposed, the option for building a phased interaction in Eurasia is given through the prism of construction by the Eurasian Economic Union (the EAEU) as the main tool. The Shanghai Cooperation Organization (the SCO) is seen as the most promising element of the model. The SCO is capable of streamlining the formation of the GE and determine the transformation of Eurasia into a common economic space. Effective development of the economic integration between Eurasian states on the framework of the SCO is optimal. The SCO+ could be used as a platform for integration-integration processes formation. The creation of stable financial ties could become the basis for the possible formation of an expanded transregional integration platform. The paper concludes that the implementation of the proposed model could entail a gradual economic rapprochement of Eurasia and beyond.

Keywords: economic integration, The Eurasian Economic Union, The European Union, The Shanghai Cooperation Organization, the silk road economic belt

Procedia PDF Downloads 106
2313 Exercise and Social Activities for Elderly with an Impairment Who Are Living Alone in the Community: Effects and Influencing Factors of a Dutch Program

Authors: Renate Verkaik, Mieke Rijken, Hennie Boeije

Abstract:

Elderly who are living alone and who are having one or more impairments are vulnerable for a loss of wellbeing and institutionalization. Physical exercise and social activities together with peers have the potential to make them more resilient. The Dutch program ‘More Resilience, Longer at Home’ initiated by FNO funded 126 local projects to stimulate vulnerable older citizens to participate in exercise and social activities, and as such to improve wellbeing and independent living. The program evaluation addressed the following questions: (1) what are the effects of the program on older (65+) participants exercise behavior, social activities and what is the relationship with wellbeing?, (2) which factors contribute to successful implementation of the projects and their outcomes? A mixed method approach was used. Effects on participants were assessed with a short survey, containing questions on exercise, social engagement, daily functioning, loneliness and life satisfaction. Results of the participants were compared with those of a reference group from the Dutch national population. Perceived influencing factors were investigated with a questionnaire for project leaders. This questionnaire was based on site visits and interviews with project leaders, volunteers and participating elderly. Preliminary results show that social engagement of the participating elderly rises significantly (p ≤ .05) as do their exercise levels and daily functioning. They experience less social loneliness, but not less emotional loneliness. Additionally, there is a positive association between daily functioning and life satisfaction and between exercise and life satisfaction. Perceived influencing factors that contribute to successful implementation of the projects can be categorized in 4 types: (1) characteristics of the activities; (2) profiles of the involved staff (professionals and volunteers), (3) characteristics of the organization, (4) the social political environment. Conclusions are that local projects have been successful in stimulating older citizens to participate in exercise and social activities. Multiple factors need to be addressed to ensure sustainability and scaling-up of the good practices.

Keywords: elderly living alone in the community, exercise and social activities, resilience, quality of life

Procedia PDF Downloads 112