Search results for: GPRA Redevelopment projects
1726 Clients’ Priorities in Delivery of Green Projects: South African Perspective
Authors: C. Mothobiso, D. Root
Abstract:
Purpose: This study attempts to identify the clients’ main priorities when delivering green projects. The aim is to compare if the clients have the same interest that are similar in delivery of convectional buildings as compared to green buildings. The main purpose is to find why other clients are investing in green buildings while others are reluctant and adopting green building at a slow pace. Design/methodology/approach: A sample of construction professional accredited by the Green Building Council of South Africa (GBCSA) was sent a questionnaire to participate in the research. Since GBSCSA accredited professionals have knowledge and experience about the green buildings, they are chosen as the sample. The research is qualitative because it evaluates the perceptions and knowledge around the subject matter. Research limitations: The research focuses only on the South African construction clients. Findings: Findings reveal that private clients invest more on green buildings as compared to government and parastatal entities. Private clients prioritise on maximising returns on investments and they mainly invest on buildings that save energies and have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building project as compared to government and Parastatals clients. Shortage of expertise and managerial skill leads to low adaptation of green buildings in the government and parastatal projects. Other factors, which seem to disintegrate the adoption of green buildings, are the readiness of supply chain within the industry and inappropriate procurements strategies adopted by clients. The evaluation of the clients’ priorities will enable the design team to come up with innovative ways to approach the design process so that clients’ priorities and needs are identified and met. Practical implications: The findings are indicating that clients’ needs and priorities have a huge impact on the delivery of the project in terms of time, quality and cost of the project.Keywords: construction clients, design team, green construction and project deliver
Procedia PDF Downloads 2701725 The Effects of Training Load on Some Selected Fitness Variables in the Case of U-17 Female Volleyball Project Players, Central Ethiopia
Authors: Behailu Shigute Habtemariam
Abstract:
The aim of the study was to examine the effects of training load on some selected fitness performance variables of volleyball players in the case of U-17 female volleyball project players in the central Ethiopia region. Methods: In this study, quasi-experimental design was used. For the purpose of this study, twenty-three volleyball players were used as a subject from the two projects. The data collected through fitness performance assessment were analyzed and interpreted into a meaningful idea using manually as well as with computer in order to compare physical fitness variables and changes observed among participants. Those are taking part in the effects of training load on some selected physical fitness variables. The collected data were analyzed by means of the Statistical Package for Social Science version (SPSS V 20). The independent t-test was used to show the mean differences between the groups, and the paired T-test was used to compare the mean differences of the pre and post-training within each group. The level of significance will be set at Alfa 0.05. Results: The results are displayed using tables and figures. A significant difference was found in the mean differences of pre-test values (19.7 cm) and post-test values (37.5 cm) of the Durame city project on the flexibility test (MD =17.8 cm, P = 0.00). On the other hand, there was a significant difference in the mean difference of pre-test values of (18 cm) and post-test values (26.3 cm) of the Hosana city project on the flexibility test ( MD = 8.3 cm, P = 0.00). Conclusion: According to the results of the present studies, there were significant improvements from pre to post-test at Durame City and Hosana City projects on agility, flexibility, power, and speed fitness tests. On the other hand, a significant difference was not found before beginning the exercise between the two projects; however, a significant difference was found after 12 weeks of training.Keywords: overload, performance, training, volleyball
Procedia PDF Downloads 971724 Construction of a Supply Chain Model Using the PREVA Method: The Case of Innovative Sargasso Recovery Projects in Ther Lesser Antilles
Authors: Maurice Bilioniere, Katie Lanneau
Abstract:
Suddenly appeared in 2011, invasions of sargasso seaweeds Fluitans and Natans are a climatic hazard which causes many problems in the Caribbean. Faced with the growth and frequency of the phenomenon of massive sargasso stranding on their coasts, the French West Indies are moving towards the path of industrial recovery. In this context of innovative projects, we will analyze the necessary requirements for the management and performance of the supply chain, taking into account the observed volatility of the sargasso input. Our prospective approach will consist in studying the theoretical framework of modeling a hybrid supply chain by coupling the discreet event simulation (DES) with a valuation of the process costs according to the "activity-based costing" method (ABC). The PREVA approach (PRocess EVAluation) chosen for our modeling has the advantage of evaluating the financial flows of the logistic process using an analytical model chained with an action model for the evaluation or optimization of physical flows.Keywords: sargasso, PREVA modeling, supply chain, ABC method, discreet event simulation (DES)
Procedia PDF Downloads 1761723 Project Management and International Development: Competencies for International Assignment
Authors: M. P. Leroux, C. Coulombe
Abstract:
Projects are popular vehicles through which international aid is delivered in developing countries. To achieve their objectives, many northern organizations develop projects with local partner organizations in the developing countries through technical assistance projects. International aid and international development projects precisely have long been criticized for poor results although billions are spent every year. Little empirical research in the field of project management has the focus on knowledge transfer in international development context. This paper focuses particularly on personal dimensions of international assignees participating in project within local team members in the host country. We propose to explore the possible links with a human resource management perspective in order to shed light on the less research problematic of knowledge transfer in development cooperation projects. The process leading to capacity building being far complex, involving multiple dimensions and far from being linear, we propose here to assess if traditional research on expatriate in multinational corporations pertain to the field of project management in developing countries. The following question is addressed: in the context of international development project cooperation, what personal determinants should the selection process focus when looking to fill a technical assistance position in a developing country? To answer that question, we first reviewed the literature on expatriate in the context of inter organizational knowledge transfer. Second, we proposed a theoretical framework combining perspectives of development studies and management to explore if parallels can be draw between traditional international assignment and technical assistance project assignment in developing countries. We conducted an exploratory study using case studies from technical assistance initiatives led in Haiti, a country in Central America. Data were collected from multiple sources following qualitative study research methods. Direct observations in the field were allowed by local leaders of six organization; individual interviews with present and past international assignees, individual interview with local team members, and focus groups were organized in order to triangulate information collected. Contrary from empirical research on knowledge transfer in multinational corporations, results tend to show that technical expertise rank well behind many others characteristics. Results tend to show the importance of soft skills, as a prerequisite to succeed in projects where local team have to collaborate. More importantly, international assignees who were talking knowledge sharing instead of knowledge transfer seemed to feel more satisfied at the end of their mandate than the others. Reciprocally, local team members who perceived to have participated in a project with an expat looking to share instead of aiming to transfer knowledge seemed to describe the results of project in more positive terms than the others. Results obtained from this exploratory study open the way for a promising research agenda in the field of project management. It emphasises the urgent need to achieve a better understanding on the complex set of soft skills project managers or project chiefs would benefit to develop, in particular, the ability to absorb knowledge and the willingness to share one’s knowledge.Keywords: international assignee, international project cooperation, knowledge transfer, soft skills
Procedia PDF Downloads 1421722 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site
Authors: Fatmah Almathkour
Abstract:
Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.Keywords: construction supply chain, inventory control supply chain, transshipment
Procedia PDF Downloads 1221721 Evaluation of Academic Research Projects Using the AHP and TOPSIS Methods
Authors: Murat Arıbaş, Uğur Özcan
Abstract:
Due to the increasing number of universities and academics, the fund of the universities for research activities and grants/supports given by government institutions have increased number and quality of academic research projects. Although every academic research project has a specific purpose and importance, limited resources (money, time, manpower etc.) require choosing the best ones from all (Amiri, 2010). It is a pretty hard process to compare and determine which project is better such that the projects serve different purposes. In addition, the evaluation process has become complicated since there are more than one evaluator and multiple criteria for the evaluation (Dodangeh, Mojahed and Yusuff, 2009). Mehrez and Sinuany-Stern (1983) determined project selection problem as a Multi Criteria Decision Making (MCDM) problem. If a decision problem involves multiple criteria and objectives, it is called as a Multi Attribute Decision Making problem (Ömürbek & Kınay, 2013). There are many MCDM methods in the literature for the solution of such problems. These methods are AHP (Analytic Hierarchy Process), ANP (Analytic Network Process), TOPSIS (Technique for Order Preference by Similarity to Ideal Solution), PROMETHEE (Preference Ranking Organization Method for Enrichment Evaluation), UTADIS (Utilities Additives Discriminantes), ELECTRE (Elimination et Choix Traduisant la Realite), MAUT (Multiattribute Utility Theory), GRA (Grey Relational Analysis) etc. Teach method has some advantages compared with others (Ömürbek, Blacksmith & Akalın, 2013). Hence, to decide which MCDM method will be used for solution of the problem, factors like the nature of the problem, types of choices, measurement scales, type of uncertainty, dependency among the attributes, expectations of decision maker, and quantity and quality of the data should be considered (Tavana & Hatami-Marbini, 2011). By this study, it is aimed to develop a systematic decision process for the grant support applications that are expected to be evaluated according to their scientific adequacy by multiple evaluators under certain criteria. In this context, project evaluation process applied by The Scientific and Technological Research Council of Turkey (TÜBİTAK) the leading institutions in our country, was investigated. Firstly in the study, criteria that will be used on the project evaluation were decided. The main criteria were selected among TÜBİTAK evaluation criteria. These criteria were originality of project, methodology, project management/team and research opportunities and extensive impact of project. Moreover, for each main criteria, 2-4 sub criteria were defined, hence it was decided to evaluate projects over 13 sub-criterion in total. Due to superiority of determination criteria weights AHP method and provided opportunity ranking great number of alternatives TOPSIS method, they are used together. AHP method, developed by Saaty (1977), is based on selection by pairwise comparisons. Because of its simple structure and being easy to understand, AHP is the very popular method in the literature for determining criteria weights in MCDM problems. Besides, the TOPSIS method developed by Hwang and Yoon (1981) as a MCDM technique is an alternative to ELECTRE method and it is used in many areas. In the method, distance from each decision point to ideal and to negative ideal solution point was calculated by using Euclidian Distance Approach. In the study, main criteria and sub-criteria were compared on their own merits by using questionnaires that were developed based on an importance scale by four relative groups of people (i.e. TUBITAK specialists, TUBITAK managers, academics and individuals from business world ) After these pairwise comparisons, weight of the each main criteria and sub-criteria were calculated by using AHP method. Then these calculated criteria’ weights used as an input in TOPSİS method, a sample consisting 200 projects were ranked on their own merits. This new system supported to opportunity to get views of the people that take part of project process including preparation, evaluation and implementation on the evaluation of academic research projects. Moreover, instead of using four main criteria in equal weight to evaluate projects, by using weighted 13 sub-criteria and decision point’s distance from the ideal solution, systematic decision making process was developed. By this evaluation process, new approach was created to determine importance of academic research projects.Keywords: Academic projects, Ahp method, Research projects evaluation, Topsis method.
Procedia PDF Downloads 5901720 Critical Path Segments Method for Scheduling Technique
Authors: Sherif M. Hafez, Remon F. Aziz, May S. A. Elalim
Abstract:
Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times which lead to greater efficiency in planning and control of projects. CPM was useful for scheduling construction projects, but researchers had highlighted a number of serious drawbacks that limit its use as a decision support tool and lacks the ability to clearly record and represent detailed information. This paper discusses the drawbacks of CPM as a scheduling technique and presents a modified critical path method (CPM) model which is called critical path segments (CPS). The CPS scheduling mechanism addresses the problems of CPM in three ways: decomposing the activity duration of separated but connected time segments; all relationships among activities are converted into finish–to–start relationship; and analysis and calculations are made with forward path. Sample cases are included to illustrate the shortages in CPM, CPS full analysis and calculations are explained in details, and how schedules can be handled better with the CPS technique.Keywords: construction management, scheduling, critical path method, critical path segments, forward pass, float, project control
Procedia PDF Downloads 3531719 Public-Private Partnership Projects in Canada: A Case Study Approach
Authors: Samuel Carpintero
Abstract:
Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.Keywords: PPP, concession, infrastructure, construction
Procedia PDF Downloads 3001718 Human Centred Design Approach for Public Transportation
Authors: Jo Kuys, Kirsten Day
Abstract:
Improving urban transportation systems requires an emphasis on users’ end-to-end journey experience, from the moment the user steps out of their home to when they arrive at their destination. In considering such end-to-end experiences, human centred design (HCD) must be integrated from the very beginning to generate viable outcomes for the public. An HCD approach will encourage innovative outcomes while acknowledging all factors that need to be understood along the journey. We provide evidence to show that when designing for public transportation, it is not just about the physical manifestation of a particular outcome; moreover, it’s about the context and human behaviours that need to be considered throughout the design process. Humans and their behavioural factors are vitally important to successful implementation of sustainable public transport systems. Through an in-depth literature review of HCD approaches for urban transportation systems, we provide a base to exploit the benefits and highlight the importance of including HCD in public transportation projects for greater patronage, resulting in more sustainable cities. An HCD approach is critical to all public transportation projects to understand different levels of transportation design, from the setting of transport policy to implementation to infrastructure, vehicle, and interface design.Keywords: human centred design, public transportation, urban planning, user experience
Procedia PDF Downloads 1871717 Entrants’ Knowledge of the Host Country’s Institutional Environments: A Critical Success Factor of International Projects in Emerging Least Developed Countries
Authors: Rameshwar Dahal, S. Ping Ho
Abstract:
Although the demand for infrastructure development forms a promising market opportunity for international firms, the dominance of informal institutions over formal ones, investors are facing extraordinary institutional challenges when investing in emerging Least Developed Countries (LDCs). We believe that, in emerging LDCs, the project performance heavily depends on how well the entrants respond to the challenges exerted by the host institutional environments. Which primarily depends on how much they learn about the host institution and what strategy they apply in response. In Nepal, almost all international or global infrastructure projects are financed by international financers, so the procurement process of the infrastructure projects financed by foreign agencies is guided by the policies and regulations of the financer. Because of limited resources and the financers’ demand, contractors and consults are procured internationally. Moreover, the resources, including but not limited to construction material, manpower, and equipment, also need to be imported. Therefore, the involvement of international companies as an entrant in global infrastructure projects of LDCs is obvious. In a global project (GP), participants from different geographical and institutional environments hold different beliefs and have disparate interests. Therefore, the entrants face the challenges exerted by the host institutional environments. The entrants must either adapt to the institutions prevailing in the environment or resist the institutional pressures. It is hypothesized that, in emerging LDCs, the project performance heavily depends on how much the entrants learn about the host institutional knowledge and how well they respond to the institutional environments. While it is impossible to generalize the phenomenon and contextual conditions because of their vast diversity, this study has answered why and how participants’ level of institutional knowledge impacts the project's implementation performance. To draw that conclusion, firstly, we explored two typical GPs from Nepal. For this study, the data were collected by conducting interviews and examining the secondary data, such as the project reports published by the financers, project data provided by interviewees, and news reports. In an event analysis, firstly, we identify the sources, causes, or nature of the institutional challenges; secondly, we analyze the entrant’s responses to the exerted challenges and evaluate the impacts of the responses on the overall project performance. In this study, at first, the events occurred during the project implementation process have a causal link with the local institutions that demand the entrants’ response are extracted. Secondly, each event is scrutinized as the critical success factor of the case project. Finally, it is crucially examined whether and what institutional knowledge in these events played a critical role in project success or failure. The results also provide insights into the crucial institutional knowledge in LDCs and the subsequent strategy implications for undertaking projects in LDCs.Keywords: emerging countries, LDC, project management, project performance, institutional knowledge, institutional theory
Procedia PDF Downloads 631716 Sino-Russian Cooperation in the Arctic (Based on the Materials of the Russian Press)
Authors: Cui Long (Allen)
Abstract:
The role of the Arctic in world politics and international relations has increased significantly over the past decades. With its large natural resources, the Arctic region has important geopolitical, strategic, and economic significance. All this determines the interest in it not only of the Arctic states but also of states located far from the Arctic. One of these states is the People's Republic of China. Relations between China and Russia in recent decades have been built on the basis of strategic partnership. Joint projects in the Arctic have become the most important priority area of this partnership. These are projects in the transport and energy fields. A large number of works by Russian scientists are devoted to the Sino-Russian Arctic cooperation. Most authors consider cooperation as a guarantee of stability for China and Russia in a globalized world. However, there are authors who believe that there are separate contradictions in the relations between the Arctic and non-Arctic countries. In their opinion, China sometimes acts as a competitor, and its activities become expansionist. In general, according to the Russian authors, Sino-Russian cooperation is mutually beneficial and is under development. China and Russia have a long way to go in the issue of sustainable development of the Arctic.Keywords: People’s Republic of China, Russian Federation, Arctic, historiography
Procedia PDF Downloads 671715 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects
Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco
Abstract:
Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.Keywords: project management, project management maturity, maturity models, project success
Procedia PDF Downloads 1631714 Identifying the Challenges of Subcontractors Management in Building Area Projects and Providing Solutions (Supply Chain Management Approach)
Authors: Hamideh Sadat Zekri, Seyed Mojtaba Hosseinalipour, Mohammadreza Hafezi
Abstract:
Nowadays, an organization cannot usually overcome all tasks singly due to the increasing complexity and vast expanse of projects, increment in uncertainty of activities, fast advances in technology, advent and influence of various factors in decision-making and implication of projects, and competitive atmosphere of different affairs. Thus, firms proceed to outsource the tasks to subcontractors. Nevertheless, large Iranian contracting companies suffer from extra consumed costs and time owing to conflicts between the activities of suppliers and subcontractors. The paucity of coordination in planning and execution, scarcity of coordination among suppliers, subcontractors, and the main contractor during the implementation of construction activities and also the lack of proper management of the aforesaid situation result in the growth of contradictions, number of claims, and legal issues in a project and consequently impose enormous expenses on those companies. Regarding the prosperity of supply chain management in other industries, its importance is increasingly getting appreciated in the field of construction. The ultimate aim of supply chain management is an effective delivery of the best value for customers, which is achievable by encouraging the members to interact and collaborate. In the present research, there was an effort to obtain a set of relevant challenges in the managing of subcontractors by identifying the main contractors and subcontractors and their role in the execution of projects and the supply chain management in the construction industry. Then, some of those challenges were selected in accordance with the views of industry professionals and academic experts. In the next step, a questionnaire was prepared and completed based on the analytic hierarchy process (AHP) and the challenges were prioritized. When it comes to subcontractors, the findings of the research demonstrate that difficulties in timely payments, alterations in approved drawings and the lack of rectification of job after completion by the subcontractor, paucity of a predetermined and legal process for qualifications of subcontractors, neglecting the supply chain processes in material procurement from producers, and delays in delivery of works by a subcontractor are the most significant problems. Finally, some solutions for encountering, eradicating, or reducing of mentioned problems are presented in accordance with previous studies and a survey from specialists.Keywords: main contractors, subcontractors, supply chain management, construction supply chain, analytic hierarchy process, solution
Procedia PDF Downloads 631713 The Impact of Political Events on National Archaeological Heritage and Tourism Industry: Study Case of Egypt after January 25th, 2011
Authors: Sabry A. El Azazy
Abstract:
Tourism plays an essential role in supporting the National Economy. Egypt was ranked as one of the most attractive touristic destinations worldwide. Tourism as a service sector affects political events and unstable conditions. Within the revolution of January 25th, 2011, tourism became below standards, and the archeological heritage sites were subject to threat. Because of the political tension and social instability, Egypt's tourism sector has drastically dropped. Currently, Egypt is working on overcoming the crisis caused by political unrest. However, it is expected to take a long time to get back to where it was, especially in terms of regaining the confidence of travelers in the country's ability to guarantee and maintain security and stability. Recently, many great projects have been done, such as; New Administrative Cairo Capital, New Suez Canal logistic project, New City of Al Alamin, New Grand Egyptian Museum, as well as other great projects that reflect positively on the tourism industry and archaeological heritage development in Egypt.Keywords: archaeology, archaeological heritage, attractions, national economy, political events, touristic destinations, tourism industry
Procedia PDF Downloads 1631712 Travel Behaviour and Perceptions in Trips with a Ferry Connection
Authors: Trude Tørset, María Díez Gutiérrez
Abstract:
The west coast of Norway features numerous islands and fjords. Ferry services connect the roads when these features make the construction challenging. Currently, scientific effort is designated to assess potential ferry replacement projects along the European road E-39. The inconvenience of ferry dependency is imprecisely represented in the transport models, thus transport analyses of ferry replacement projects appear as guesstimates rather than reliable input to decision-making processes of such costly projects. Trips including ferry connections imply more inconvenient elements than just travel time and cost. The goal of this paper is to understand and explain the extra inconveniences associated to the dependency of the ferry. The first scientific approach is to identify the characteristics of the ferry travelers and their trips’ features, as well as whether the ferry represents an obstacle for some specific trip types. In doing so, a survey was conducted in 2011 in eight E-39 ferries and in 2013 in 18 ferries connecting different road categories. More than 20,000 passengers answered with their trip and socioeconomic characteristics. The travel patterns in the different ferry connections were compared. The analysis showed that the trip features differed based on the location of the ferry connections, yet independently of the road category. Additionally, the patterns were compared to the national travel survey to detect differences in the travel patterns due to the use of the ferry connections. The results showed that the share of commuting trips within the same travel time was lower if the ferry was part of the trip. The second scientific approach is to know how the different travelers perceive potential benefits for a ferry replacement project. In the 2011 survey, some of the questions were about the relevance of nine different benefits this project might bring. Travelers identified the better access to public services and job market as the most valuable benefits, followed by the reduced planning of the trip. In 2016, a follow-up survey in some of the ferry connections was carried out in order to investigate variations in travelers’ perceptions. The growing interest in ferry replacement projects might make travelers more aware of the potential benefits these would bring to their daily lives. This paper describes the travel behaviour of travelers using a ferry connection as part of their trips, as well as the potential inconveniences associated to these trips. The findings might provide valuable input to further development of transport models, concept evaluations and cost benefit analysis methods.Keywords: ferry connections, ferry trip, inconvenience costs, travel behaviour
Procedia PDF Downloads 2271711 Promises versus Realities: A Critical Assessment of the Integrated Design Process
Authors: Firdous Nizar, Carmela Cucuzzella
Abstract:
This paper explores how the integrated design process (IDP) was adopted for an architectural project. The IDP is a relatively new approach to collaborative design in architectural design projects in Canada. It has gained much traction recently as the closest possible approach to the successful management of low energy building projects and has been advocated as a productive method for multi-disciplinary collaboration within complex projects. This study is based on the premise that there are explicit and implicit dimensions of power within the integrated design process (IDP) in the green building industry that may or may not lead to irreconcilable differences in a process that demands consensus. To gain insight on the potential gap between the theoretical promises and practical realities of the IDP, a review of existing IDP literature is compared with a case study analysis of a competition-based architectural project in Canada, a first to incorporate the IDP in its overall design format. This paper aims to address the undertheorized power relations of the IDP in a real project. It presents a critical assessment through the lens of the combined theories of deliberative democracy by Jürgen Habermas, with that of agonistic pluralism by political theorist Chantal Mouffe. These two theories are intended to more appropriately embrace the conflictual situations in collaborative environments, and shed light on the relationships of power, between engineers, city officials, architects, and designers in this conventional consensus-based model. In addition, propositions for a shift in approach that embraces conflictual differences among its participants are put forth based on concepts of critical spatial practice by Markus Meissen. As IDP is a relatively new design process, it requires much deliberation on its structure from the theoretical framework built in this paper in order to unlock its true potential.Keywords: agonistic pluralism, critical spatial practice, deliberative democracy, integrated design process
Procedia PDF Downloads 1731710 Foreseen the Future: Human Factors Integration in European Horizon Projects
Authors: José Manuel Palma, Paula Pereira, Margarida Tomás
Abstract:
Foreseen the future: Human factors integration in European Horizon Projects The development of new technology as artificial intelligence, smart sensing, robotics, cobotics or intelligent machinery must integrate human factors to address the need to optimize systems and processes, thereby contributing to the creation of a safe and accident-free work environment. Human Factors Integration (HFI) consistently pose a challenge for organizations when applied to daily operations. AGILEHAND and FORTIS projects are grounded in the development of cutting-edge technology - industry 4.0 and 5.0. AGILEHAND aims to create advanced technologies for autonomously sort, handle, and package soft and deformable products, whereas FORTIS focuses on developing a comprehensive Human-Robot Interaction (HRI) solution. Both projects employ different approaches to explore HFI. AGILEHAND is mainly empirical, involving a comparison between the current and future work conditions reality, coupled with an understanding of best practices and the enhancement of safety aspects, primarily through management. FORTIS applies HFI throughout the project, developing a human-centric approach that includes understanding human behavior, perceiving activities, and facilitating contextual human-robot information exchange. it intervention is holistic, merging technology with the physical and social contexts, based on a total safety culture model. In AGILEHAND we will identify safety emergent risks, challenges, their causes and how to overcome them by resorting to interviews, questionnaires, literature review and case studies. Findings and results will be presented in “Strategies for Workers’ Skills Development, Health and Safety, Communication and Engagement” Handbook. The FORTIS project will implement continuous monitoring and guidance of activities, with a critical focus on early detection and elimination (or mitigation) of risks associated with the new technology, as well as guidance to adhere correctly with European Union safety and privacy regulations, ensuring HFI, thereby contributing to an optimized safe work environment. To achieve this, we will embed safety by design, and apply questionnaires, perform site visits, provide risk assessments, and closely track progress while suggesting and recommending best practices. The outcomes of these measures will be compiled in the project deliverable titled “Human Safety and Privacy Measures”. These projects received funding from European Union’s Horizon 2020/Horizon Europe research and innovation program under grant agreement No101092043 (AGILEHAND) and No 101135707 (FORTIS).Keywords: human factors integration, automation, digitalization, human robot interaction, industry 4.0 and 5.0
Procedia PDF Downloads 651709 Implementing Urban Rainwater Harvesting Systems: Between Policy and Practice
Authors: Natàlia Garcia Soler, Timothy Moss
Abstract:
Despite the multiple benefits of sustainable urban drainage, as demonstrated in numerous case studies across the world, urban rainwater harvesting techniques are generally restricted to isolated model projects. The leap from niche to mainstream has, in most cities, proved an elusive goal. Why policies promoting rainwater harvesting are limited in their widespread implementation has seldom been subjected to systematic analysis. Much of the literature on the policy, planning and institutional contexts of these techniques focus either on their potential benefits or on project design, but very rarely on a critical-constructive analysis of past experiences of implementation. Moreover, the vast majority of these contributions are restricted to single-case studies. There is a dearth of knowledge with respect to, firstly, policy implementation processes and, secondly, multi-case analysis. Insights from both, the authors argue, are essential to inform more effective rainwater harvesting in cities in the future. This paper presents preliminary findings from a research project on rainwater harvesting in cities from a social science perspective that is funded by the Swedish Research Foundation (Formas). This project – UrbanRain – is examining the challenges and opportunities of mainstreaming rainwater harvesting in three European cities. The paper addresses two research questions: firstly, what lessons can be learned on suitable policy incentives and planning instruments for rainwater harvesting from a meta-analysis of the relevant international literature and, secondly, how far these lessons are reflected in a study of past and ongoing rainwater harvesting projects in a European forerunner city. This two-tier approach frames the structure of the paper. We present, first, the results of the literature analysis on policy and planning issues of urban rainwater harvesting. Here, we analyze quantitatively and qualitatively the literature of the past 15 years on this topic in terms of thematic focus, issues addressed and key findings and draw conclusions on research gaps, highlighting the need for more studies on implementation factors, actor interests, institutional adaptation and multi-level governance. In a second step we focus in on the experiences of rainwater harvesting in Berlin and present the results of a mapping exercise on a wide variety of projects implemented there over the last 30 years. Here, we develop a typology to characterize the rainwater harvesting projects in terms of policy issues (what problems and goals are targeted), project design (which kind of solutions are envisaged), project implementation (how and when they were implemented), location (whether they are in new or existing urban developments) and actors (which stakeholders are involved and how), paying particular attention to the shifting institutional framework in Berlin. Mapping and categorizing these projects is based on a combination of document analysis and expert interviews. The paper concludes by synthesizing the findings, identifying how far the goals, governance structures and instruments applied in the Berlin projects studied reflect the findings emerging from the meta-analysis of the international literature on policy and planning issues of rainwater harvesting and what implications these findings have for mainstreaming such techniques in future practice.Keywords: institutional framework, planning, policy, project implementation, urban rainwater management
Procedia PDF Downloads 2871708 The Role of Urban Design in Creating Cohesive and People’s Public Spaces
Authors: Hazem Abuorf
Abstract:
From the perspective of viewing urban design as the architecture of public spaces, the latter has many advantages; for example, in achieving attractive and vibrant public spaces, ensuring safety and amenity, supporting a strong sense of place and local character. Besides all advantages, such spaces nevertheless trigger numerous dilemmas, how to design urban spaces preserving the quality of life in the long term while equally achieving cohesion between new urban developments and the already existing urban structure without causing a split in history through the cause of functional and aesthetic degradation. Analysis of this article seeks to propose a methodology deemed essential for assessing and stimulating design criteria of the public spaces when rehabilitating urban sites. The method’s utility is shown by analyzing rehabilitation projects in Gaza Strip, whose design of the public spaces has mainly focused on the physical aspect ignoring the place’s local identity, users’ needs, and history. The proposed methodology serves as a guide for municipal authorities and technical teams to deal with interventions that would rework the role of urban design towards making sense of place.Keywords: urban design, public realm, rehabilitation projects, quality of life
Procedia PDF Downloads 1601707 Uncontrolled Urbanization Leads to Main Challenge for Sustainable Development of Mongolia
Authors: Davaanyam Surenjav, Chinzolboo Dandarbaatar, Ganbold Batkhuyag
Abstract:
Primate city induced rapid urbanization has been become one of the main challenges in sustainable development in Mongolia like other developing countries since transition to market economy in 1990. According due to statistical yearbook, population number of Ulaanbaatar city has increased from 0.5 million to 1.5 million for last 30 years and contains now almost half (47%) of total Mongolian population. Rural-Ulaanbaatar and local Cities-Ulaanbaatar city migration leads to social issues like uncontrolled urbanization, income inequality, poverty, overwork of public service, economic over cost for redevelopment and limitation of transport and environmental degradation including air, noise, water and soil pollution. Most thresholds of all of the sustainable urban development main and sub-indicators over exceeded from safety level to unsafety level in Ulaanbaatar. So, there is an urgent need to remove migration pull factors including some administrative and high education functions from Ulaanbaatar city to its satellite cities or secondary cities. Moreover, urban smart transport system and green and renewable energy technologies should be introduced to urban development master plan of Ulaanbaatar city.Keywords: challenge for sustainable urban development, migration factors, primate city , urban safety thresholds
Procedia PDF Downloads 1311706 Interactive Planning of Suburban Apartment Buildings
Authors: J. Koiso-Kanttila, A. Soikkeli, A. Aapaoja
Abstract:
Construction in Finland is focusing increasingly on renovation instead of conventional new construction, and this trend will continue to grow in the coming years and decades. Renovation of the large number of suburban residential apartment buildings built in the 1960s and 1970s poses a particular challenge. However, renovation projects are demanding for the residents of these buildings, since they usually are uninitiated in construction issues. On the other hand, renovation projects generally apply the operating models of new construction. Nevertheless, the residents of an existing residential apartment building are some of the best experts on the site. Thus, in this research project we applied a relational model in developing and testing at case sites a planning process that employs interactive planning methods. Current residents, housing company managers, the city zoning manager, the contractor’s and prefab element supplier’s representatives, professional designers and researchers all took part in the planning. The entire interactive planning process progressed phase by phase as the participants’ and designers’ concerted discussion and ideation process, so that the end result was a renovation plan desired by the residents.Keywords: apartment building renovation, interactive planning, project alliance, user-orientedness
Procedia PDF Downloads 3851705 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure
Authors: Omer Livvarcin, Mary Kay Park, Michael Miles
Abstract:
The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence
Procedia PDF Downloads 3181704 Electronic Libraries and the Emergence of New Technology Paradigms
Authors: A. Basheer Ahamadhu, Kiran Kaur, Zainab Ajab Mohideen, Sukmawati Muhammad, Noor Azlinda Wan Jan
Abstract:
Library management facing favorable conditions and unexpected challenges in the century of information technology. They were having been under pressure to meet their duties to meet the information needs of customers. An information technology has brought big changes to the traditional methods of library work. Libraries need to evaluate, measuring effect information technology to them. This would equip them with the knowledge to make effective information technology to enhance their services. Recognizing the importance of development an electronic library, this research investigated their willingness to change from the traditional library based on the level of automation for the digital library initiatives, review both of the problems associated with digital library and public and terms to be considered for future growth. The main components have been inspected, such as grip library, demographic automations and digitization projects, digital library related to budgetary problems, the thought leader in the electronic library practices library, and the situation viewed for future growth. Libraries have run several digitization projects, at the level of institutions and countries but still needs more efforts in order to bring it to higher levels.Keywords: academic library, electronic library, information technology, information commons, web pages library
Procedia PDF Downloads 4761703 Re-Thinking Design/Build Curriculum in a Virtual World
Authors: Bruce Wrightsman
Abstract:
Traditionally, in architectural education, we develop studio projects with learning agendas that try to minimize conflict and reveal clear design objectives. Knowledge is gleaned only tacitly through confronting the reciprocity of site and form, space and light, structure and envelope. This institutional reality can limit student learning to the latent learning opportunities they will have to confront later in practice. One intent of academic design-build projects is to address the learning opportunities which one can discover in the messy grey areas of design. In this immersive experience, students confront the limitations of classroom learning and are exposed to challenges that demand collaborative practice. As a result, design-build has been widely adopted in an attempt to address perceived deficiencies in design education vis a vis the integration of building technology and construction. Hands-on learning is not a new topic, as espoused by John Dewey, who posits a debate between static and active learning in his book Democracy and Education. Dewey espouses the concept that individuals should become participants and not mere observers of what happens around them. Advocates of academic design-build programs suggest a direct link between Dewey’s speculation. These experiences provide irreplaceable life lessons: that real-world decisions have real-life consequences. The goal of the paper is not to confirm or refute the legitimacy and efficacy of online virtual learning. Rather, the paper aims to foster a deeper, honest discourse on the meaning of ‘making’ in architectural education and present projects that confronted the burdens of a global pandemic and developed unique teaching strategies that challenged design thinking as an observational and constructive effort to expand design student’s making skills and foster student agency.Keywords: design/build, making, remote teaching, architectural curriculum
Procedia PDF Downloads 801702 Strategic Citizen Participation in Applied Planning Investigations: How Planners Use Etic and Emic Community Input Perspectives to Fill-in the Gaps in Their Analysis
Authors: John Gaber
Abstract:
Planners regularly use citizen input as empirical data to help them better understand community issues they know very little about. This type of community data is based on the lived experiences of local residents and is known as "emic" data. What is becoming more common practice for planners is their use of data from local experts and stakeholders (known as "etic" data or the outsider perspective) to help them fill in the gaps in their analysis of applied planning research projects. Utilizing international Health Impact Assessment (HIA) data, I look at who planners invite to their citizen input investigations. Research presented in this paper shows that planners access a wide range of emic and etic community perspectives in their search for the “community’s view.” The paper concludes with how planners can chart out a new empirical path in their execution of emic/etic citizen participation strategies in their applied planning research projects.Keywords: citizen participation, emic data, etic data, Health Impact Assessment (HIA)
Procedia PDF Downloads 4841701 Conservation and Restoration of Biodiversity in Khagrachari
Authors: Anima Ashraf
Abstract:
Over the past few decades biodiversity has become the issue of global concern for its rapid reduction worldwide. Bangladesh is no exception. The country is exceptionally endowed with a vast variety of flora and fauna, but due to tremendous population pressure, rural poverty and unemployment it has been decreased alarmingly. Since, both biodiversity and sustainable development are the part of human life in modern era and both work together to make our life safer and comfortable therefore balance should be kept in development and biodiversity conservation and priority should be given to alternative and sustainable development paths. This paper is based on study of two projects undertaken by Arannayk Foundation jointly with its local NGO partners. The aim was to understand previous, current and future scenarios for the hilly biodiversity of Khagrachari in the Chittagong Hill Tracts (CHT) of Bangladesh. It is also observed how alternative income generating activities (AIGA) improve livelihood of the tribal inhabitants of the area, decrease their dependency on forest resources and also aid conservation activities. Intensive field visits were made and interviews were conducted with key informants to see the progress and achievements of local NGOs working with the tribal community for the past seven years to restore the denuded hills of Khagrachari. The paper also covers the impacts and interventions of the projects and the methods used to aid conservation activities. Raising awareness among the villagers has reduced extraction of forests resources by 47% and granting funds and access to microcredit to adopt AIGAs have increased their average annual income by 25%. Finally, the paper concludes that effective community-based conservation practices are fundamental to ensure biodiversity conservation in the Chittagong Hill Tracts. In order to conserve biodiversity and restore the forests of CHT, livelihood development of the villagers has to be considered as the main component of the projects undertaken by all NGOs and the Government.Keywords: biodiversity, conservation, forests, livelihood
Procedia PDF Downloads 2761700 Scoping Review of the Potential to Embed Mental Health Impact in Global Challenges Research
Authors: Netalie Shloim, Brian Brown, Siobhan Hugh-Jones, Jane Plastow, Diana Setiyawati, Anna Madill
Abstract:
In June 2021, the World Health Organization launched its guidance and technical packages on community mental health services, stressing a human rights-based approach to care. This initiative stems from an increasing acknowledgment of the role mental health plays in achieving the Sustainable Development Goals. Nevertheless, mental health remains a relatively neglected research area and the estimates for untreated mental disorders in low-and-middle-income countries (LMICs) are as high as 78% for adults. Moreover, the development sector and research programs too often side-line mental health as a privilege in the face of often immediate threats to life and livelihood. As a way of addressing this problem, this study aimed to examine past or ongoing GCRF projects to see if there were opportunities where mental health impact could have been achieved without compromising a study's main aim and without overburdening a project. Projects funded by the UKRI Global Challenges Research Fund (GCRF) were analyzed. This program was initiated in 2015 to support cutting-edge research that addresses the challenges faced by developing countries. By the end of May 2020, a total of 15,279 projects were funded of which only 3% had an explicit mental health focus. A sample of 36 non-mental-health-focused projects was then sampled for diversity across research council, challenge portfolio and world region. Each of these 36 projects was coded by two coders for opportunities to embed mental health impact. To facilitate coding, the literature was inspected for dimensions relevant to LMIC settings. Three main psychological and three main social dimensions were identified: promote a positive sense of self; promote positive emotions, safe expression and regulation of challenging emotions, coping strategies, and help-seeking; facilitate skills development; and facilitate community-building; preserve sociocultural identity; support community mobilization. Coding agreement was strong on missed opportunities for mental health impact on the three social dimensions: support community mobilization (92%), facilitate community building (83%), preserve socio-cultural identity (70%). Coding agreement was reasonably strong on missed opportunities for mental health impact on the three psychological dimensions: promote positive emotions (67%), facilitate skills development (61%), positive sense of self (58%). In order of frequency, the agreed perceived opportunities from the highest to lowest are: support community mobilization, facilitate community building, facilitate skills development, promote a positive sense of self, promote positive emotions, preserve sociocultural identity. All projects were considered to have an opportunity to support community mobilization and to facilitate skills development by at least one coder. Findings provided support that there were opportunities to embed mental health impact in research across the range of development sectors and identifies what kind of missed opportunities are most frequent. Hence, mainstreaming mental health has huge potential to tackle the lack of priority and funding it has attracted traditionally. The next steps are to understand the barriers to mainstreaming mental health and to work together to overcome them.Keywords: GCRF, mental health, psychosocial wellbeing, LMIC
Procedia PDF Downloads 1741699 Machine Learning-Based Workflow for the Analysis of Project Portfolio
Authors: Jean Marie Tshimula, Atsushi Togashi
Abstract:
We develop a data-science approach for providing an interactive visualization and predictive models to find insights into the projects' historical data in order for stakeholders understand some unseen opportunities in the African market that might escape them behind the online project portfolio of the African Development Bank. This machine learning-based web application identifies the market trend of the fastest growing economies across the continent as well skyrocketing sectors which have a significant impact on the future of business in Africa. Owing to this, the approach is tailored to predict where the investment needs are the most required. Moreover, we create a corpus that includes the descriptions of over more than 1,200 projects that approximately cover 14 sectors designed for some of 53 African countries. Then, we sift out this large amount of semi-structured data for extracting tiny details susceptible to contain some directions to follow. In the light of the foregoing, we have applied the combination of Latent Dirichlet Allocation and Random Forests at the level of the analysis module of our methodology to highlight the most relevant topics that investors may focus on for investing in Africa.Keywords: machine learning, topic modeling, natural language processing, big data
Procedia PDF Downloads 1681698 Investment Projects Selection Problem under Hesitant Fuzzy Environment
Authors: Irina Khutsishvili
Abstract:
In the present research, a decision support methodology for the multi-attribute group decision-making (MAGDM) problem is developed, namely for the selection of investment projects. The objective of the investment project selection problem is to choose the best project among the set of projects, seeking investment, or to rank all projects in descending order. The project selection is made considering a set of weighted attributes. To evaluate the attributes in our approach, expert assessments are used. In the proposed methodology, lingual expressions (linguistic terms) given by all experts are used as initial attribute evaluations, since they are the most natural and convenient representation of experts' evaluations. Then lingual evaluations are converted into trapezoidal fuzzy numbers, and the aggregate trapezoidal hesitant fuzzy decision matrix will be built. The case is considered when information on the attribute weights is completely unknown. The attribute weights are identified based on the De Luca and Termini information entropy concept, determined in the context of hesitant fuzzy sets. The decisions are made using the extended Technique for Order Performance by Similarity to Ideal Solution (TOPSIS) method under a hesitant fuzzy environment. Hence, a methodology is based on a trapezoidal valued hesitant fuzzy TOPSIS decision-making model with entropy weights. The ranking of alternatives is performed by the proximity of their distances to both the fuzzy positive-ideal solution (FPIS) and the fuzzy negative-ideal solution (FNIS). For this purpose, the weighted hesitant Hamming distance is used. An example of investment decision-making is shown that clearly explains the procedure of the proposed methodology.Keywords: In the present research, a decision support methodology for the multi-attribute group decision-making (MAGDM) problem is developed, namely for the selection of investment projects. The objective of the investment project selection problem is to choose the best project among the set of projects, seeking investment, or to rank all projects in descending order. The project selection is made considering a set of weighted attributes. To evaluate the attributes in our approach, expert assessments are used. In the proposed methodology, lingual expressions (linguistic terms) given by all experts are used as initial attribute evaluations since they are the most natural and convenient representation of experts' evaluations. Then lingual evaluations are converted into trapezoidal fuzzy numbers, and the aggregate trapezoidal hesitant fuzzy decision matrix will be built. The case is considered when information on the attribute weights is completely unknown. The attribute weights are identified based on the De Luca and Termini information entropy concept, determined in the context of hesitant fuzzy sets. The decisions are made using the extended Technique for Order Performance by Similarity to Ideal Solution (TOPSIS) method under a hesitant fuzzy environment. Hence, a methodology is based on a trapezoidal valued hesitant fuzzy TOPSIS decision-making model with entropy weights. The ranking of alternatives is performed by the proximity of their distances to both the fuzzy positive-ideal solution (FPIS) and the fuzzy negative-ideal solution (FNIS). For this purpose, the weighted hesitant Hamming distance is used. An example of investment decision-making is shown that clearly explains the procedure of the proposed methodology.
Procedia PDF Downloads 1171697 Systems Engineering and Project Management Process Modeling in the Aeronautics Context: Case Study of SMEs
Authors: S. Lemoussu, J. C. Chaudemar, R. A. Vingerhoeds
Abstract:
The aeronautics sector is currently living an unprecedented growth largely due to innovative projects. In several cases, such innovative developments are being carried out by Small and Medium sized-Enterprises (SMEs). For instance, in Europe, a handful of SMEs are leading projects like airships, large civil drones, or flying cars. These SMEs have all limited resources, must make strategic decisions, take considerable financial risks and in the same time must take into account the constraints of safety, cost, time and performance as any commercial organization in this industry. Moreover, today, no international regulations fully exist for the development and certification of this kind of projects. The absence of such a precise and sufficiently detailed regulatory framework requires a very close contact with regulatory instances. But, SMEs do not always have sufficient resources and internal knowledge to handle this complexity and to discuss these issues. This poses additional challenges for those SMEs that have system integration responsibilities and that must provide all the necessary means of compliance to demonstrate their ability to design, produce, and operate airships with the expected level of safety and reliability. The final objective of our research is thus to provide a methodological framework supporting SMEs in their development taking into account recent innovation and institutional rules of the sector. We aim to provide a contribution to the problematic by developing a specific Model-Based Systems Engineering (MBSE) approach. Airspace regulation, aeronautics standards and international norms on systems engineering are taken on board to be formalized in a set of models. This paper presents the on-going research project combining Systems Engineering and Project Management process modeling and taking into account the metamodeling problematic.Keywords: aeronautics, certification, process modeling, project management, SME, systems engineering
Procedia PDF Downloads 166