Search results for: construction safety practices
10569 Historiography of Wood Construction in Portugal
Authors: João Gago dos Santos, Paulo Pereira Almeida
Abstract:
The present study intends to deepen and understand the reasons that led to the decline and disappearance of wooden construction systems in Portugal, for that reason, its use in history must be analyzed. It is observed that this material was an integral part of the construction systems in Europe and Portugal for centuries, and it is possible to conclude that its decline happens with the appearance of hybrid construction and later with the emergence and development of reinforced concrete technology. It is also verified that wood as a constructive element, and for that reason, an element of development had great importance in national construction, with its peak being the Pombaline period, after the 1755 earthquake. In this period, the great scarcity of materials in the metropolis led to the import wood from Brazil for the reconstruction of Lisbon. This period is linked to an accentuated exploitation of forests, resulting in laws and royal decrees aimed at protecting them, guaranteeing the continued existence of profitable forests, crucial to the reconstruction effort. The following period, with the gradual loss of memory of the catastrophe, resulted in a construction that was weakened structurally as a response to a time of real estate speculation and great urban expansion. This was the moment that precluded the inexistence of the use of wood in construction. At the beginning of the 20th century and in the 30s and 40s, with the appearance and development of reinforced concrete, it became part of the great structures of the state, and it is considered a versatile material capable of resolving issues throughout the national territory. It is at this point that the wood falls into disuse and practically disappears from the new works produced.Keywords: construction history, construction in portugal, construction systems, wood construction
Procedia PDF Downloads 12410568 Determination of Safety Distance Around Gas Pipelines Using Numerical Methods
Authors: Omid Adibi, Nategheh Najafpour, Bijan Farhanieh, Hossein Afshin
Abstract:
Energy transmission pipelines are one of the most vital parts of each country which several strict laws have been conducted to enhance the safety of these lines and their vicinity. One of these laws is the safety distance around high pressure gas pipelines. Safety distance refers to the minimum distance from the pipeline where people and equipment do not confront with serious damages. In the present study, safety distance around high pressure gas transmission pipelines were determined by using numerical methods. For this purpose, gas leakages from cracked pipeline and created jet fires were simulated as continuous ignition, three dimensional, unsteady and turbulent cases. Numerical simulations were based on finite volume method and turbulence of flow was considered using k-ω SST model. Also, the combustion of natural gas and air mixture was applied using the eddy dissipation method. The results show that, due to the high pressure difference between pipeline and environment, flow chocks in the cracked area and velocity of the exhausted gas reaches to sound speed. Also, analysis of the incident radiation results shows that safety distances around 42 inches high pressure natural gas pipeline based on 5 and 15 kW/m2 criteria are 205 and 272 meters, respectively.Keywords: gas pipelines, incident radiation, numerical simulation, safety distance
Procedia PDF Downloads 33210567 Using Data Mining in Automotive Safety
Authors: Carine Cridelich, Pablo Juesas Cano, Emmanuel Ramasso, Noureddine Zerhouni, Bernd Weiler
Abstract:
Safety is one of the most important considerations when buying a new car. While active safety aims at avoiding accidents, passive safety systems such as airbags and seat belts protect the occupant in case of an accident. In addition to legal regulations, organizations like Euro NCAP provide consumers with an independent assessment of the safety performance of cars and drive the development of safety systems in automobile industry. Those ratings are mainly based on injury assessment reference values derived from physical parameters measured in dummies during a car crash test. The components and sub-systems of a safety system are designed to achieve the required restraint performance. Sled tests and other types of tests are then carried out by car makers and their suppliers to confirm the protection level of the safety system. A Knowledge Discovery in Databases (KDD) process is proposed in order to minimize the number of tests. The KDD process is based on the data emerging from sled tests according to Euro NCAP specifications. About 30 parameters of the passive safety systems from different data sources (crash data, dummy protocol) are first analysed together with experts opinions. A procedure is proposed to manage missing data and validated on real data sets. Finally, a procedure is developed to estimate a set of rough initial parameters of the passive system before testing aiming at reducing the number of tests.Keywords: KDD process, passive safety systems, sled test, dummy injury assessment reference values, frontal impact
Procedia PDF Downloads 38210566 The Role of Nutrition and Food Engineering in Promoting Sustainable Food Systems
Authors: Sara Khan Mohammadi
Abstract:
The world is facing a major challenge of feeding a growing population while ensuring the sustainability of food systems. The United Nations estimates that the global population will reach 9.7 billion by 2050, which means that food production needs to increase by 70% to meet the demand. However, this increase in food production should not come at the cost of environmental degradation, loss of biodiversity, and climate change. Therefore, there is a need for sustainable food systems that can provide healthy and nutritious food while minimizing their impact on the environment. Nutrition and Food Engineering: Nutrition and food engineering play a crucial role in promoting sustainable food system. Nutrition is concerned with the study of nutrients in foods, their absorption, metabolism, and their effects on health. Food engineering involves the application of engineering principles to design, develop, and optimize food processing operations. Together, nutrition and food engineering can help to create sustainable food systems by: 1. Developing Nutritious Foods: Nutritionists and food engineers can work together to develop foods that are rich in nutrients such as vitamins, minerals, fiber, and protein. These foods can be designed to meet the nutritional needs of different populations while minimizing waste. 2. Reducing Food Waste: Food waste is a major problem globally as it contributes to greenhouse gas emissions and wastes resources such as water and land. Nutritionists and food engineers can work together to develop technologies that reduce waste during processing, storage, transportation, and consumption. 3. Improving Food Safety: Unsafe foods can cause illnesses such as diarrhea, cholera, typhoid fever among others which are major public health concerns globally. Nutritionists and food engineers can work together to develop technologies that improve the safety of foods from farm to fork. 4. Enhancing Sustainability: Sustainable agriculture practices such as conservation agriculture can help reduce soil erosion while improving soil fertility. Nutritionists and food engineers can work together to develop technologies that promote sustainable agriculture practices.Keywords: sustainable food, developing food, reducing food waste, food safety
Procedia PDF Downloads 8810565 Optimizing Design Works in Construction Consultant Company: A Knowledge-Based Application
Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai
Abstract:
The optimal construction design used during the execution of a construction project is a key factor in determining high productivity and customer satisfaction, however, this management process sometimes is carried out without care and the systematic method that it deserves, bringing negative consequences. This study proposes a knowledge management (KM) approach that will enable the intelligent use of experienced and acknowledged engineers to improve the management of construction design works for a project. Then a knowledge-based application to support this decision-making process is proposed and described. To define and design the system for the application, semi-structured interviews were conducted within five construction consulting organizations with the purpose of studying the way that the method’ optimizing process is implemented in practice and the knowledge supported with it. A system of an optimizing construction design works (OCDW) based on knowledge was developed then validated with construction experts. The OCDW was liked as a valuable tool for construction design works’ optimization, by supporting organizations to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The benefits are described as provided by the performance support system, reducing costs and time, improving product design quality, satisfying customer requirements, expanding the brand organization.Keywords: optimizing construction design work, construction consultant organization, knowledge management, knowledge-based application
Procedia PDF Downloads 13010564 Application of Agile Project Management to Construction Projects: Case Study
Authors: Ran Etgar, Sarit Freund
Abstract:
Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.Keywords: agile project management, construction, information systems, project management
Procedia PDF Downloads 13010563 Advancing Veterinary Health through Sustainable Solutions
Authors: Abdelkader Mohamed Abdelkader Mohamed Gaballah
Abstract:
This study addresses advancements in veterinary health and their significance in enhancing animal care. The primary objective is to meet the increasing needs of veterinarians and farmers by offering sustainable and effective veterinary medicines that comply with safety and efficacy standards. The methodology involves a comprehensive selection process to source high-quality veterinary products from trusted manufacturers while ensuring adherence to environmental sustainability principles. The findings demonstrate that these products significantly contribute to improving animal health, reducing the prevalence of diseases, and supporting sustainable farming practices. In conclusion, the study emphasizes the importance of collaborative efforts within the veterinary pharmaceutical industry to meet global demands and promote sustainable practices in animal care.Keywords: veterinary medicine, animal health, veterinary pharmaceuticals, livestock management, animal science and care, veterinary drug development, animal nutrition, wellness
Procedia PDF Downloads 210562 SCM Challenges and Opportunities in the Timber Construction Sector
Authors: K. Reitner, F. Staberhofer, W. Ortner, M. Gerschberger
Abstract:
The purpose of this paper is to identify the main challenges faced by companies in the timber construction sector and to provide improvement opportunities that can be implemented on a short-, medium- and long-term basis. To identify the challenges and propose actions for each company a literature review and a multiple case research were conducted using the Quick Scan Audit Methodology. Finally, the findings and outcomes are compared with each other to support companies in the timer construction sector when implementing and restructuring their day-to-day activities.Keywords: supply chain management, supply chain challenges and opportunities, timber construction sector
Procedia PDF Downloads 25010561 Accounting Performance of the Leading Companies in the Construction Sector in Brazil during the Period 2009-2012
Authors: Fabrício José Piacente, Vanessa de Cillos Silva, Thiago Luiz Mello Melato
Abstract:
The construction industry has been demonstrating increased growth and importance in Brazil’s national economic development. This study aims to evaluate the financial performance of the leading companies in the construction sector in Brazil in the period from 2009 to 2012. An analysis is made of the capital structure, liquidity, and profitability of the six largest companies in the construction sector in Brazil: Brookfield, Cyrela, Gafisa, MRV, PDG and Rossi. The results are then compared with standard industry ratios. It was found that among the companies analyzed, MRV and Cyrela showed the best relative performance in the period under consideration.Keywords: accounting ratios, construction, financial performance, Brazil
Procedia PDF Downloads 43410560 The City Ecological Corridor Construction Based on the Concept Of "Sponge City"(Case Study: Lishui)
Authors: Xu Mengyuan, Xu Lei
Abstract:
Behind the rapid development of Chinese city, the contradiction of frequent urban waterlogging and the shortage of water resources is deepening. In order to solve this problem, introduce the low impact development "sponge city" construction mode in the process of the construction of new urbanization in China, make our city " resilience to adapt" environmental change and natural disaster. Firstly this paper analyses the basic reason of urban waterlogging, then introduces the basic connotation and realization approach of “sponge city”. Finally, study on the project in Lishui Guazhou, focuses on the analysis of the "urban ecological corridor" construction strategy and the positive impact on city in the construction of “sponge city”. Meanwhile, we put forward the ”local conditions” and ”sustainable” as the construction ideas, make use of ecological construction leading city development, explore the ecological balance through the city to enhance the regional value, and providing reference and reflection for the development and future of the “sponge city” in China.Keywords: urban water logging, sponge city, urban ecological corridor, sustainable development, China
Procedia PDF Downloads 64110559 Digitalization of Functional Safety - Increasing Productivity while Reducing Risks
Authors: Michael Scott, Phil Jarrell
Abstract:
Digitalization seems to be everywhere these days. So if one was to digitalize Functional Safety, what would that require: • Ability to directly use data from intelligent P&IDs / process design in a PHA / LOPA • Ability to directly use data from intelligent P&IDs in the SIS Design to support SIL Verification Calculations, SRS, C&Es, Functional Test Plans • Ability to create Unit Operation / SIF Libraries to radically reduce engineering manhours while ensuring consistency and improving quality of SIS designs • Ability to link data directly from a PHA / LOPA to SIS Designs • Ability to leverage reliability models and SRS details from SIS Designs to automatically program the Safety PLC • Ability to leverage SIS Test Plans to automatically create Safety PLC application logic Test Plans for a virtual FAT • Ability to tie real-time data from Process Historians / CMMS to assumptions in the PHA / LOPA and SIS Designs to generate leading indicators on protection layer health • Ability to flag SIS bad actors for proactive corrective actions prior to a near miss or loss of containment event What if I told you all of this was available today? This paper will highlight how the digital revolution has revolutionized the way Safety Instrumented Systems are designed, configured, operated and maintained.Keywords: IEC 61511, safety instrumented systems, functional safety, digitalization, IIoT
Procedia PDF Downloads 18210558 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey
Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali
Abstract:
Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling
Procedia PDF Downloads 24410557 Probabilistic Safety Assessment of Koeberg Spent Fuel Pool
Authors: Sibongiseni Thabethe, Ian Korir
Abstract:
The effective management of spent fuel pool (SFP) safety has been raised as one of the emerging issues to further enhance nuclear installation safety after the Fukushima accident on March 11, 2011. Before then, SFP safety-related issues have been mainly focused on (a) controlling the configuration of the fuel assemblies in the pool with no loss of pool coolants and (b) ensuring adequate pool storage space to prevent fuel criticality owing to chain reactions of the fission products and the ability for neutron absorption to keep the fuel cool. A probabilistic safety (PSA) assessment was performed using the systems analysis program for hands-on integrated reliability evaluations (SAPHIRE) computer code. Event and fault tree analysis was done to develop a PSA model for the Koeberg SFP. We present preliminary PSA results of events that lead to boiling and cause fuel uncovering, resulting in possible fuel damage in the Koeberg SFP.Keywords: computer code, fuel assemblies, probabilistic risk assessment, spent fuel pool
Procedia PDF Downloads 17210556 BIM4Cult Leveraging BIM and IoT for Enhancing Fire Safety in Historical Buildings
Authors: Anastasios Manos, Despina Elisabeth Filippidou
Abstract:
Introduction: Historical buildings are an inte-gral part of the cultural heritage of every place, and beyond the obvious need for protection against risks, they have specific requirements regarding the handling of hazards and disasters such as fire, floods, earthquakes, etc. Ensuring high levels of protection and safety for these buildings is impera-tive for two distinct but interconnected reasons: a) they themselves constitute cultural heritage, and b) they are often used as museums/cultural spaces, necessitating the protection of both human life (vis-itors and workers) and the cultural treasures they house. However, these buildings present serious constraints in implementing the necessary measures to protect them from destruction due to their unique architecture, construction methods, and/or the structural materials used in the past, which have created an existing condition that is sometimes challenging to reshape and operate within the framework of modern regulations and protection measures. One of the most devastating risks that threaten historical buildings is fire. Catastrophic fires demonstrate the need for timely evaluation of fire safety measures in historical buildings. Recog-nizing the criticality of protecting historical build-ings from the risk of fire, the Confederation of Fire Protection Associations in Europe (CFPA E) issued specific guidelines in 2013 (CFPA-E Guideline No 30:2013 F) for the fire protection of historical buildings at the European level. However, until now, few actions have been implemented towards leveraging modern technologies in the field of con-struction and maintenance of buildings, such as Building Information Modeling (BIM) and the Inter-net of Things (IoT), for the protection of historical buildings from risks like fires, floods, etc. The pro-ject BIM4Cult has bee developed in order to fill this gap. It is a tool for timely assessing and monitoring of the fire safety level of historical buildings using BIM and IoT technologies in an integrated manner. The tool serves as a decision support expert system for improving the fire safety of historical buildings by continuously monitoring, controlling and as-sessing critical risk factors for fire.Keywords: Iot, fire, BIM, expert system
Procedia PDF Downloads 7110555 Safe Routes to Schools (SRTS): Children’ Safety Improvement Under COVID-19 Pandemic Conditions in Jordan
Authors: Khair Jadaan, Qasem Alqasem
Abstract:
School children are vulnerable road user groups and are particularly at high risk calling for the need to improve their safety. Safe Routes to Schools (SRTS) concept is considered as one safety improvement approach that would effectively help improve school children’s safety. This paper aims to determine the best practice SRTS for Jordan based on the international experience attained through extensive and selected literature review falling under the 5 E’s and additionally on information/data collected through a survey performed using an online predesigned questionnaire to investigate the reactions and attitudes of students and their parents towards the proposed SRTS program. Data are analyzed using SPSS and MS software, especially Excel, in addition to some literature reviews inserted in this study. The results represent some recommendations that are strongly believed to help decision makers to develop the current safety conditions of the school routes. The challenges that the implementation of this program would face including COVID-19 protection for teachers and students are addressed.Keywords: children, COVID-19, Jordan, safety, school, SRTS, 5 E’s
Procedia PDF Downloads 11210554 A New Suburb Renovation Concept
Authors: Anu Soikkelii, Laura Sorri
Abstract:
Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated
Procedia PDF Downloads 33510553 Design of Functional Safe Motor Control Systems in Automotive Applications
Authors: Jae-Woo Kim, Kyung-Jung Lee, Hyun-Sik Ahn
Abstract:
This paper presents a design methodology for the motor driven automotive subsystems with the consideration of the functional safety. There are many such modules in vehicles which use DC/AC motors for an electronic throttle control system, a motor driven power steering, a motor driven seat belt systems and for HVAC systems. The functional safety for the automotive electrical and electronic parts are standardized as ISO 26262, but the development procedure is very complex to be followed. We focus on the functional safe motor controller design process and show the designed motor controller hardware satisfies the required safety integrity level by using metric calculations with the safety mechanism.Keywords: AUTOSAR, MDPS, Simulink, software component
Procedia PDF Downloads 41410552 Waste Generation in Iranian Building Industry: Addressing a Theory
Authors: Golnaz Moghimi, Alireza Afsharghotli, Alireza Rezaei
Abstract:
Construction waste has been gradually increased as a result of upsizing construction projects which are occurred within the lifecycle of buildings. Since waste management is a major priority and has profound impacts on the volume of waste generated in construction stage, the majority of efforts have been attempted to reuse, recycle and reduce waste. However, there is still room to study on lack of sufficient knowledge about waste management in construction industry. This paper intends to provide an insight into the effect of project management knowledge areas on waste management solely on construction stage. To this end, a survey among Iranian building construction industry contractors was conducted to identify the effectiveness of project management knowledge areas on three jobsite key factors including ‘Site activity’, ‘Training’, and ‘Awareness’. As a result, four management disciplines were identified as most influential ones on amount of construction waste. These disciplines were Project Cost Management, Quality Management, Human Resource Management, and Integration Management. Based on the research findings, a new model was presented to develop effective construction waste strategies.Keywords: awareness, PMBOK, site activity, training, waste management
Procedia PDF Downloads 36010551 Investigating Conflict Between Traditional Cultural Practices for Women and South African Government Laws
Authors: Hebert Sihle Ntuli
Abstract:
Traditional cultural practices mirror or replicate the values and beliefs held by members of the community. Throughout the world, every social grouping has specific traditional practices, some of which are beneficial to all, while others have become harmful to specific group such as women. Like in some African states, these traditional cultural practices are performed in South Africa and are violating women’s rights. Women’s rights are human rights. The South African Constitution is one of the most progressive in the world, and notable includes the Bill of Rights which provides protection of socio-economic and cultural rights. Cultural rights are protected in Section 30 and 31 of the constitution, although such protection is not without limitation. This highly complex interplay and competition between human rights and cultural rights, which are manifested through cultural practices, is the golden thread that traces through this paper. The paper argues that there is conflict and the lack of balance between diverse cultural and legal or constitutional framework which promotes the value of human dignity and equality, especially for women. These practices are reviewed in connection with the South African government laws. This work adopted qualitative research method.Keywords: cultural practices, conflict, South African constitution, laws
Procedia PDF Downloads 11310550 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution
Authors: Hsin-Hung Lai, Wei Lo
Abstract:
Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation
Procedia PDF Downloads 34810549 Managing Uncertainty in Unmanned Aircraft System Safety Performance Requirements Compliance Process
Authors: Achim Washington, Reece Clothier, Jose Silva
Abstract:
System Safety Regulations (SSR) are a central component to the airworthiness certification of Unmanned Aircraft Systems (UAS). There is significant debate on the setting of appropriate SSR for UAS. Putting this debate aside, the challenge lies in how to apply the system safety process to UAS, which lacks the data and operational heritage of conventionally piloted aircraft. The limited knowledge and lack of operational data result in uncertainty in the system safety assessment of UAS. This uncertainty can lead to incorrect compliance findings and the potential certification and operation of UAS that do not meet minimum safety performance requirements. The existing system safety assessment and compliance processes, as used for conventional piloted aviation, do not adequately account for the uncertainty, limiting the suitability of its application to UAS. This paper discusses the challenges of undertaking system safety assessments for UAS and presents current and envisaged research towards addressing these challenges. It aims to highlight the main advantages associated with adopting a risk based framework to the System Safety Performance Requirement (SSPR) compliance process that is capable of taking the uncertainty associated with each of the outputs of the system safety assessment process into consideration. Based on this study, it is made clear that developing a framework tailored to UAS, would allow for a more rational, transparent and systematic approach to decision making. This would reduce the need for conservative assumptions and take the risk posed by each UAS into consideration while determining its state of compliance to the SSR.Keywords: Part 1309 regulations, risk models, uncertainty, unmanned aircraft systems
Procedia PDF Downloads 18710548 Investigation of Occupational Health and Safety of Bakeries in Izmir, Turkey
Authors: Pinar Ercan, Bulut Mert
Abstract:
The baking industry is prone to occupational health challenges like other industries. Workers in bakeries face many hazards in their work environment; hazards have the potential for causing injury, illness or work accidents. Most of these hazards are preventable and arise from the neglect of occupational safety measures. Some bakeries in Izmır Turkey was evaluated according to occupational health and safety. First of all, the production process was evaluated. The survey was administered to a total of 50 employees. The survey consisted of two sections. The first one comprised only demographic questions and items related to job characteristics. The remaining section was assessing the satisfaction and confidence about occupational health and safety in terms of employees consist of a 10-item questionnaire by using HSE (2010) survey with some modifications. Also, hazards, risks and control measures in the bakeries were determined. Risk assessment has been done by the use of '5x5 Risk Assessment Table' for this purpose.Keywords: bakeries, occupational health and safety, hazards, risks, risk assessment
Procedia PDF Downloads 36810547 Exploring the Application of Human Resource Management Bundles: A Case Study
Authors: Maniam Kaliannan
Abstract:
Studies on best practice or “bundles” of human resource management aims at providing a ‘universal solution’ to organizations yet critics challenge this view and place importance on the architecture of human resource processes in response to the dynamic needs of organizations. This paper identifies these best practices and explores how the applications of selected human resource management practices to a case study help solved their human resource problems. The case study includes insights on the problems faced; the approach taken to identify its root causes and explores how selected human resource management practices helped managed the overall predicament. The case study results supports the importance of aligning ‘bundles’ of practices with organizational architecture and ensuring that the architecture of human resource practices evolve with the changing needs of organizations. In addition, a framework based on the events of the case study is proposed to systematically manage their human resourcesKeywords: bundles, best practices, human resource management, organizational architecture, framework
Procedia PDF Downloads 42710546 Effects of Safety Intervention Program towards Behaviors among Rubber Wood Processing Workers Using Theory of Planned Behavior
Authors: Junjira Mahaboon, Anongnard Boonpak, Nattakarn Worrasan, Busma Kama, Mujalin Saikliang, Siripor Dankachatarn
Abstract:
Rubber wood processing is one of the most important industries in southern Thailand. The process has several safety hazards for example unsafe wood cutting machine guarding, wood dust, noise, and heavy lifting. However, workers’ occupational health and safety measures to promote their behaviors are still limited. This quasi-experimental research was to determine factors affecting workers’ safety behaviors using theory of planned behavior after implementing job safety intervention program. The purposes were to (1) determine factors affecting workers’ behaviors and (2) to evaluate effectiveness of the intervention program. The sample of study was 66 workers from a rubber wood processing factory. Factors in the Theory of Planned Behavior model (TPB) were measured before and after the intervention. The factors of TPB included attitude towards behavior, subjective norm, perceived behavioral control, intention, and behavior. Firstly, Job Safety Analysis (JSA) was conducted and Safety Standard Operation Procedures (SSOP) were established. The questionnaire was also used to collect workers’ characteristics and TPB factors. Then, job safety intervention program to promote workers’ behavior according to SSOP were implemented for a four month period. The program included SSOP training, personal protective equipment use, and safety promotional campaign. After that, the TPB factors were again collected. Paired sample t-test and independent t-test were used to analyze the data. The result revealed that attitude towards behavior and intention increased significantly after the intervention at p<0.05. These factors also significantly determined the workers’ safety behavior according to SSOP at p<0.05. However, subjective norm, and perceived behavioral control were not significantly changed nor related to safety behaviors. In conclusion, attitude towards behavior and workers’ intention should be promoted to encourage workers’ safety behaviors. SSOP intervention program e.g. short meeting, safety training, and promotional campaign should be continuously implemented in a routine basis to improve workers’ behavior.Keywords: job safety analysis, rubber wood processing workers, safety standard operation procedure, theory of planned behavior
Procedia PDF Downloads 19510545 Case Study of Human Factors and Ergonomics in the Design and Use of Harness-Embedded Costumes in the Entertainment Industry
Authors: Marielle Hanley, Brandon Takahashi, Gerry Hanley, Gabriella Hancock
Abstract:
Safety harnesses and their protocols are very common within the construction industry, and the Occupational Safety and Health Administration has provided extensive guidelines with protocols being constantly updated to ensure the highest level of safety within construction sites. There is also extensive research on harnesses that are meant to keep people in place in moving vehicles, such as seatbelts. Though this research is comprehensive in these areas, the findings and recommendations are not generally applicable to other industry sectors where harnesses are used, such as the entertainment industry. The focus of this case study is on the design and use of harnesses used by theme park employees wearing elaborate costumes in parades and performances. The key factors of posture, kinesthetic factors, and harness engineering interact in significantly different ways when the user is performing repetitive choreography with 20 to 40 lbs. of apparatus connected to harnesses that need to be hidden from the audience’s view. Human factors and ergonomic analysis take into account the required performers’ behaviors, the physical and mental preparation and posture of the performer, the design of the harness-embedded costume, and the environmental conditions during the performance (e.g., wind) that can determine the physical stresses placed on the harness and performer. The uniqueness and expense of elaborate costumes frequently result in one or two costumes created for production, and a variety of different performers need to fit into the same costume. Consequently, the harnesses should be adjustable if they are to minimize the physical and cognitive loads on the performer, but they are frequently more a “one-size fits all”. The complexity of human and technology interactions produces a range of detrimental outcomes, from muscle strains to nerve damage, mental and physical fatigue, and reduced motivation to perform at peak levels. Based on observations conducted over four years for this case study, a number of recommendations to institutionalize the human factors and ergonomic analyses can significantly improve the safety, reliability, and quality of performances with harness-embedded costumes in the entertainment industry. Human factors and ergonomic analyses can be integrated into the engineering design of the performance costumes with embedded harnesses, the conditioning and training of the performers using the costumes, the choreography of the performances within the staged setting and the maintenance of the harness-embedded costumes. By applying human factors and ergonomic methodologies in the entertainment industry, the industry management and support staff can significantly reduce the risks of injury, improve the longevity of unique performers, increase the longevity of the harness-embedded costumes, and produce the desired entertainment value for audiences.Keywords: ergonomics in entertainment industry, harness-embedded costumes, performer safety, injury prevention
Procedia PDF Downloads 9410544 Identifying the Level of Awareness on Value Management Practice amongst Construction Practitioners in Nigeria
Authors: Alhassan Dahiru
Abstract:
Value management is widely accepted technique of eliminating unnecessary cost at different stages of project development that maximizes the functional value of a project by managing its evolution and development from concept to completion. Many construction industry practitioners are not aware of Value Management practice, and its use is less widespread in Nigeria. The aim of this research is to identify the level of awareness on value management practice amongst construction practitioners with a view to contribute to the improvement of the implementation of value management practice in the Nigerian construction industry. In this study, construction practitioners have been chosen as respondents from the 6 geopolitical zones of the federation including FCT Abuja. Through the survey, a total number of 360 semi-structured questionnaires were administered and 284 were returned and remained good for the analysis. The results indicate that most of the respondents were aware of the value management concept and issues surrounding construction industry in Nigeria, while about 32% of the respondents were not aware of its potential benefits. Therefore, organisations should review their techniques and processes from time to time for improvement on effective service delivery. Additionally, a change management strategy should also be part of every organization to ease the introduction of new techniques such as value management. There is also the need for more value management training workshops and seminars in order to enlighten the participants of the construction industry on the principles, concept, and techniques involved in the value management process.Keywords: sustainability, value management, construction practitioners, Nigeria
Procedia PDF Downloads 23410543 The Connection between Required Safe Egress Time and Occupant Fire Safety Training
Authors: Christina Knorr
Abstract:
Analysis of the evacuation of occupants of a building plays a significant role in Fire Safety Engineering. One of the tools used for the analysis is the concept of the Required Safe Egress Time (RSET). It is generally accepted that RSET is measured from the time the fire ignites until the time that all occupants have evacuated to a safe location. Instructions on how RSET is determined can be found in both the International Fire Engineering Guidelines and, more recently, in the Australian Fire Engineering Guidelines. The guidelines also specify measures that could be applied to reduce the RSET and hence improve the performance of fire-safety measures of a building. Further, it is suggested that the delay period can be reduced through “training programs.” This study examined the overall level of fire-safety awareness among occupants of residential apartment buildings in Australia and investigated the possible effects of fire-safety training on the delay period and, hence, the RSET. A questionnaire, interviews, and an experiment were conducted to collect data about people’s fire-safety knowledge, people’s behaviour and nature, and the duration of activities people are likely to undertake in the event of a fire. The study led to an investigation into the delay and response time approximations and the development of a new equation to incorporate the impact of training into the RSET calculations for the general use of the fire engineering community. Regardless of the RSET, it can be concluded that fire-safety education and training for residents of apartment buildings have a direct impact on improving their behaviour and firefighting equipment usage in a fire incident.Keywords: fire safety engineering, fire safety training, occupant evacuation behaviour, required safe egress time
Procedia PDF Downloads 4010542 Combined Safety and Cybersecurity Risk Assessment for Intelligent Distributed Grids
Authors: Anders Thorsén, Behrooz Sangchoolie, Peter Folkesson, Ted Strandberg
Abstract:
As more parts of the power grid become connected to the internet, the risk of cyberattacks increases. To identify the cybersecurity threats and subsequently reduce vulnerabilities, the common practice is to carry out a cybersecurity risk assessment. For safety classified systems and products, there is also a need for safety risk assessments in addition to the cybersecurity risk assessment in order to identify and reduce safety risks. These two risk assessments are usually done separately, but since cybersecurity and functional safety are often related, a more comprehensive method covering both aspects is needed. Some work addressing this has been done for specific domains like the automotive domain, but more general methods suitable for, e.g., intelligent distributed grids, are still missing. One such method from the automotive domain is the Security-Aware Hazard Analysis and Risk Assessment (SAHARA) method that combines safety and cybersecurity risk assessments. This paper presents an approach where the SAHARA method has been modified in order to be more suitable for larger distributed systems. The adapted SAHARA method has a more general risk assessment approach than the original SAHARA. The proposed method has been successfully applied on two use cases of an intelligent distributed grid.Keywords: intelligent distribution grids, threat analysis, risk assessment, safety, cybersecurity
Procedia PDF Downloads 15310541 Evidence Based Practice for Oral Care in Children
Authors: T. Turan, Ç. Erdoğan
Abstract:
As far as is known, general nursing care practices do not include specific evidence-based practices related to oral care in children. This study aimed to evaluate the evidence based nursing practice for oral care in children. This article is planned as a review article by searching the literature in this field. According to all age groups and the oral care in various specific situations located evidence in the literature were examined. It has been determined that the methods and frequency used in oral care practices performed by nurses in clinics differ from one hospital to another. In addition, it is seen that different solutions are used in basic oral care, oral care practices to prevent ventilator-associated pneumonia and evidence-based practice in mucositis management in children. As a result, a standard should be established in oral care practices for children and education for children is recommended.Keywords: evidence-based practice, oral care, nursing, children
Procedia PDF Downloads 29410540 Communication and Devices: Face to Face Communication versus Communication with Mobile Technologies
Authors: Nuran Öze
Abstract:
With the rapid changes occurring in the last twenty five years, mobile phone technology has influenced every aspect of life. Technological developments within the Internet and mobile phone areas have not only changed communication practices; it has also changed the everyday life practices of individuals. This article has focused on understanding how people’s communication practices and everyday life practices have changed with the smartphone usage. The study was conducted by using in-depth interview method and the research was conducted on twenty Turkish Cypriots who live in Northern Cyprus. According to the research results, communicating via Internet has rapidly replaced face to face communication in recent years. However, results have changed according to generations. Younger generations can easily adapt themselves to technological changes because they are already gaining everyday life practices right now. However, the older generations practices are already present in their everyday life.Keywords: face to face communication, internet, mobile technologies, north Cyprus
Procedia PDF Downloads 397