Search results for: construction workers’ safety
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7790

Search results for: construction workers’ safety

7400 A Review: Recycled Materials Used in Construction

Authors: Oghenerukome Akponovo, Lynda I. Onyebuchukwu

Abstract:

Construction waste, along with that of many other industries, contributes significantly to the world's annual solid waste totals. Most of these materials, such as ash from rice hulls, slags, cement kiln dust, tire ash, plastic waste (PW), and silica fumes, end up in landfills or waterways. Some of them might even end up polluting the air from high in the atmosphere. It's sustainable, cheap, and environmentally friendly to recycle these items into new building supplies. When constructing a "Green" structure, the materials employed have the potential to either exacerbate environmental imbalance or maintain a stable ecosystem. The purpose of this research is to take stock of what is already known about recycling's potential in the construction industry and to identify its deficiencies. Therefore, this study systematically reviews the wide range of recycled materials that go into building construction. Recognizing that the construction industry's use of recycled materials has an influence on the environment and that investigating these materials may have a substantial economic impact if they were discovered

Keywords: building, construction, recycled materials, waste management

Procedia PDF Downloads 81
7399 Growth of Public Listed Construction Companies in Malaysia

Authors: M. C. Theong, F. L. Ang, G. J. Muga

Abstract:

Growth of firms is influenced by environmental changes such as the global and national economy. On the other hand, it indicates the economic situation of a country. Therefore, it is imperative for firms to be sensitive to changes and to stay competitive and remain compatible with the environment. The Malaysian construction industry is prone to environmental changes due to its complexity. In order to survive in the construction industry, focus on the development of the firms themselves to achieve long term their long term goals is vital besides maximizing profits. The objective of this paper is to measure growth of the public listed construction companies in Malaysia and to investigate the development of the companies with highest, moderate and lowest growth. Growth is measured based on the companies' sales between year 2008 and 2012 collected via secondary data collection method. Findings show that the highest average growth created is 235.20 % while the lowest average growth is -22.75%. The construction companies remained active in the construction industry by implementing different sets of strategies and involving in several types of construction projects.

Keywords: growth, Malaysian construction industry, public listed companies, sales

Procedia PDF Downloads 352
7398 Enhancing Civil Aviation Safety and Security: A Comprehensive Approach

Authors: J. Waldon

Abstract:

The civil aviation industry plays a crucial role in global transportation, connecting people and goods across the world. Ensuring the safety and security of passengers, crew, and aircraft is of paramount importance. This paper aims to address the aspect of training and human factors, amongst others, necessary for enhancing civil aviation safety and security. In this context, we are focusing on the level of attention exhibited in the checking of luggage and travel credentials, with the aim to identify areas of improvement and avoid compromising security and safety at the Nsimalen Airport Yaoundé, Cameroon. We found that there is a lack of proper awareness among both travelers and some staff on the safety and security of goods and passengers. We suggest that improved training and handling, and sensitization in the form of legible billboards are important. Thus, we recommend refresher courses like this one for staff to keep abreast with the fast-changing security landscape in air transport as well as proper sensitization, including health-related issues. In conclusion, we established that the human factors, as well as the frequency of training and refresher courses, have a positive outlook on safety and security in air transport.

Keywords: safety, security, passengers, cargo

Procedia PDF Downloads 50
7397 Paying Less and Getting More: Evidence on the Effect of Corporate Purpose from Two Natural Field Experiments

Authors: Nikolai Brosch, Alwine Mohnen

Abstract:

Academics and business leaders increasingly call for a (re)definition of a corporate purpose beyond profit-maximization to contribute to the welfare of society. This study investigates the effect of communicating such a pro-social corporate purpose on three employee-level outcomes that constitute major cost components for most organizations: workers reservation wage, work quality, and work misbehavior. To provide causal evidence, two natural field experiments were conducted with almost 2,000 workers recruited from different online labor marketplaces. Workers were randomly assigned to treatments manipulating whether or not they received information about the employer’s corporate purpose and subsequently performed a short, real-effort task for payment. The main findings in both experiments show that receiving information about an employer’s pro-social corporate purpose causes workers to accept lower wages (9% lower in the first experiment and 28% lower in the second experiment) for the same job. Workers that personally assess high importance to organizations having a pro-social purpose are most responsive. At the same time, sacrificing wage for a corporate purpose comes at no cost of quality and even decreases the likelihood of engaging in work misbehavior. In a broader context, the results provide some evidence that the (re)definition of corporate purpose in commercial organizations is not ultimately at odds with creating profits.

Keywords: corporate purpose, natural field experiment, reservation wage, work misbehavior, work quality

Procedia PDF Downloads 208
7396 A Study of Carbon Emissions during Building Construction

Authors: Jonggeon Lee, Sungho Tae, Sungjoon Suk, Keunhyeok Yang, George Ford, Michael E. Smith, Omidreza Shoghli

Abstract:

In recent years, research to reduce carbon emissions through quantitative assessment of building life cycle carbon emissions has been performed as it relates to the construction industry. However, most research efforts related to building carbon emissions assessment have been focused on evaluation during the operational phase of a building’s life span. Few comprehensive studies of the carbon emissions during a building’s construction phase have been performed. The purpose of this study is to propose an assessment method that quantitatively evaluates the carbon emissions of buildings during the construction phase. The study analysed the amount of carbon emissions produced by 17 construction trades, and selected four construction trades that result in high levels of carbon emissions: reinforced concrete work; sheathing work; foundation work; and form work. Building materials, and construction and transport equipment used for the selected construction trades were identified, and carbon emissions produced by the identified materials and equipment were calculated for these four construction trades. The energy consumption of construction and transport equipment was calculated by analysing fuel efficiency and equipment productivity rates. The combination of the expected levels of carbon emissions associated with the utilization of building materials and construction equipment provides means for estimating the quantity of carbon emissions related to the construction phase of a building’s life cycle. The proposed carbon emissions assessment method was validated by case studies.

Keywords: building construction phase, carbon emissions assessment, building life cycle

Procedia PDF Downloads 723
7395 Establishment and Evaluation of Information System for Chemotherapy Care

Authors: Yi-Ting Liu, Pei-Ying Wen

Abstract:

In order to improve the overall safety of chemotherapy, safety-protecting net was established for the whole process from prescribing by physicians, transcribing by nurses, dispensing by pharmacists to administering by nurses. The information system was used to check and monitor whole process of administration and related sheets were computerized to simplify the paper work.

Keywords: chemotherapy, bar code medication administration, medication safety

Procedia PDF Downloads 269
7394 Comparative Life Cycle Analysis of Selected Modular Timber Construction and Assembly Typologies

Authors: Benjamin Goldsmith, Felix Heisel

Abstract:

The building industry must reduce its emissions in order to meet 2030 neutrality targets, and modular and/or offsite construction is seen as an alternative to conventional construction methods which could help achieve this goal. Modular construction has previously been shown to be less wasteful and has a lower global warming potential (GWP). While many studies have been conducted investigating the life cycle impacts of modular and conventional construction, few studies have compared different types of modular assembly and construction in order to determine which offer the greatest environmental benefits over their whole life cycle. This study seeks to investigate three different modular construction types -infill frame, core, and podium- in order to determine environmental impacts such as GWP as well as circularity indicators. The study will focus on the emissions of the production, construction, and end-of-life phases. The circularity of the various approaches will be taken into consideration in order to acknowledge the potential benefits of the ability to reuse and/or reclaim materials, products, and assemblies. The study will conduct hypothetical case studies for the three different modular construction types, and in doing so, control the parameters of location, climate, program, and client. By looking in-depth at the GWP of the beginning and end phases of various simulated modular buildings, it will be possible to make suggestions on which type of construction has the lowest global warming potential.

Keywords: modular construction, offsite construction, life cycle analysis, global warming potential, environmental impact, circular economy

Procedia PDF Downloads 146
7393 Modeling Comfort by Thermal Inertia in Eco-Construction for Low-Income People in an Aqueous Environment in the Face of Sustainable Development in Sub-Saharan Africa; Case of the City of Kinshasa, DR Congo

Authors: Mbambu K. Shaloom, Biba Kalengo, Pierre Echard, Olivier Gilson, Tshiswaka Ngalula, Léonard Kabeya Mukeba Yakasham

Abstract:

In this 21st century, while design and eco-construction continue to be governed by considerations of functionality, safety, comfort and initial investment cost. Today, the principles of sustainable development lead us to think over longer time frames, to take into account new issues and the operating costs of green energy. DR Congo (sub-Saharan Africa) still suffers from the unusability of certain bio-sourced materials (such as bamboo, branches, etc.) and the lack of energy, i.e. 9% of the population has access to electricity and 21% of access to water. Ecoconstruction involves the energy performance of buildings which carry out a dynamic thermal simulation, which targets the different assumptions and conventional parameters (weather, occupancy, materials, thermal comfort, green energies, etc.). The objective of this article is to remedy the thermal, economic and technical artisanal problems in an aqueous environment in the city of Kinshasa. In order to establish a behavioral model to mitigate environmental impacts on architectural modifications and low-cost eco-construction through the approach of innovation and design thinking.

Keywords: thermal comfort, bio-sourced material, eco-architecture, eco-construction, squatting, design thinking

Procedia PDF Downloads 58
7392 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 355
7391 The Effect of Applying Surgical Safety Checklist on Surgical Team’s Knowledge and Performance in Operating Room

Authors: Soheir Weheida, Amal E. Shehata, Samira E. Aboalizm

Abstract:

The aim of this study was to examine the effect of surgical safety checklist on surgical team’s knowledge and performance in operating room. Subjects: A convenience sample 151 (48 head nurse, 45 nurse, 37 surgeon and 21 anesthesiologist) which available in operating room at two different hospitals was included in the study. Setting: The study was carried out at operating room in Menoufia University and Shebin Elkom Teaching Hospitals, Egypt. Tools: I: Surgical safety: Surgical team knowledge assessment structure interview schedule. II: WHO surgical safety observational Checklist. III: Post Surgery Culture Survey scale. Results: There was statistical significant improvement of knowledge mean score and performance about surgical safety especially in post and follow up than pre intervention, before patients entering the operating, before induction of anesthesia, skin incision and post skin closure and before patient leaves operating room, P values (P < 0.001). Improvement of communication post intervention than pre intervention between surgical team’s (4.74 ± 0.540). About two thirds (73.5 %) of studied sample strongly agreed on surgical safety in operating room. Conclusions: Implementation of surgical safety checklist has a positive effect on improving knowledge, performance and communication between surgical teams and these seems to have a positive effect on improve patient safety in the operating room.

Keywords: knowledge, operating room, performance, surgical safety checklist

Procedia PDF Downloads 314
7390 The Special Testimony as a Methodology for Social Workers to Ensure the Rights of Children and Adolescents Who Are Victims of Sexual Violence

Authors: Natany Rodrigues De Carvalho, Denise Bomtempo Birche De Carvalho

Abstract:

The purpose of this study is to analyze the Special Testimony as a methodology for social workers to ensure the rights of children and adolescents who are victims of sexual violence. The specific objectives are: a) to contextualize, through the specialized literature, the social history of childhood and adolescence; b) to investigate, in the scientific literature, the sexual violence against children and adolescents as an analytical category; c) identify, with the social workers, if there is any defense of children and adolescents in the special testimony. To answer the research objectives we use qualitative research, in three axes that complement each other: a) participant observation through the insertion in the research field (supervised internship I and II); b) survey of literature on the subject; c) semi-structured interviews with social workers of the TJDFT. We used content analysis to systematize and interpret the collected data. The results of the research were organized into three chapters with the following contents: a) literature review, contextualizing the social history of childhood and adolescence to the present; b) sexual violence against children and adolescents and their categories of analysis; c) understanding of the special testimony in the Federal District and Territories in guaranteeing the rights of children and adolescents, identifying their main points from the perspective of social workers. The results showed how the lack of interdisciplinarity in the Special Testimony can lead to the non-integral protection of children and adolescents victims of sexual violence.

Keywords: childhood and adolescence, sexual violence, special testimony, social work

Procedia PDF Downloads 295
7389 Cost Overrun Causes in Public Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.

Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors

Procedia PDF Downloads 448
7388 Evaluation of Traditional Methods in Construction and Their Effects on Reinforced-Concrete Buildings Behavior

Authors: E. H. N. Gashti, M. Zarrini, M. Irannezhad, J. R. Langroudi

Abstract:

Using ETABS software, this study analyzed 23 buildings to evaluate effects of mistakes during construction phase on buildings structural behavior. For modelling, two different loadings were assumed: 1) design loading and 2) loading due to the effects of mistakes in construction phase. Research results determined that considering traditional construction methods for buildings resulted in a significant increase in dead loads and consequently intensified the displacements and base-shears of buildings under seismic loads.

Keywords: reinforced-concrete buildings, construction mistakes, base-shear, displacements, failure

Procedia PDF Downloads 247
7387 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 489
7386 Development of Risk-Based Dam Safety Framework in Climate Change Condition for Batu Dam, Malaysia

Authors: Wan Noorul Hafilah Binti Wan Ariffin

Abstract:

Dam safety management is the crucial infrastructure as dam failure has a catastrophic effect on the community. Dam safety management is the effective framework of key actions and activities for the dam owner to manage the safety of the dam for its entire life cycle. However, maintaining dam safety is a challenging task as there are changes in current dam states. These changes introduce new risks to the dam's safety, which had not been considered when the dam was designed. A new framework has to be developed to adapt to the changes in the dam risk and make the dams resilient. This study proposes a risk-based decision-making adaptation framework for dam safety management. The research focuses on climate change's impact on hydrological situations as it causes floods and damages the dam structure. The risk analysis framework is adopted to improve the dam management strategies. The proposed study encompasses four phases. To start with, measuring the effect by assessing the impact of climate change on embankment dam, the second phase is to analyze the potential embankment dam failures. The third is analyzing the different components of risks related to the dam and, finally, developing a robust decision-making framework.

Keywords: climate change, embankment dam, failure, risk-informed decision making

Procedia PDF Downloads 125
7385 Familiarity With Civil Engineering and Types of Construction and Its Methods

Authors: Mokhtar Nikgoo

Abstract:

Civil engineering is one of the disciplines that shows the application of science in creating construction and civil engineering. That is, everything that returns to the population of a country, such as dams, airports, roads, bridges, towers, tunnels, telecommunication towers, buildings resistant to earthquakes, floods and fires, power plants and light, cheap and quality materials for construction. And the construction is included in the scope of work of the civil engineer. Civil engineering covers a wide range of tasks. That is, for the construction of buildings, bridges, towers, tunnels, roads, silos, or sewage networks, an efficient civil engineer is needed at the beginning, in addition to complying with the technical and operational aspects, he also works economically. Because being economical is a principle in civil engineering. Is. This field at the undergraduate level has three majors: civil-building, civil-mapping and civil-water.

Keywords: civil engineering, construction, surveying, mapping, pile

Procedia PDF Downloads 55
7384 Real-Time Mine Safety System with the Internet of Things

Authors: Şakir Bingöl, Bayram İslamoğlu, Ebubekir Furkan Tepeli, Fatih Mehmet Karakule, Fatih Küçük, Merve Sena Arpacık, Mustafa Taha Kabar, Muhammet Metin Molak, Osman Emre Turan, Ömer Faruk Yesir, Sıla İnanır

Abstract:

This study introduces an IoT-based real-time safety system for mining, addressing global safety challenges. The wearable device, seamlessly integrated into miners' jackets, employs LoRa technology for communication and offers real-time monitoring of vital health and environmental data. Unique features include an LCD panel for immediate information display and sound-based location tracking for emergency response. The methodology involves sensor integration, data transmission, and ethical testing. Validation confirms the system's effectiveness in diverse mining scenarios. The study calls for ongoing research to adapt the system to different mining contexts, emphasizing its potential to significantly enhance safety standards in the industry.

Keywords: mining safety, internet of things, wearable technology, LoRa, RFID tracking, real-time safety system, safety alerts, safety measures

Procedia PDF Downloads 33
7383 Climate Change Implications on Occupational Health and Productivity in Tropical Countries: Study Results from India

Authors: Vidhya Venugopal, Jeremiah Chinnadurai, Rebekah A. I. Lucas, Tord Kjellstrom, Bruno Lemke

Abstract:

Introduction: The effects of climate change (CC) are largely discussed across the globe in terms of impacts on the environment and the general population, but the impacts on workers remain largely unexplored. The predicted rise in temperatures and heat events in the CC scenario have health implications on millions of workers in physically exerting jobs. The current health and productivity risks associated with heat exposures are characterized, future risk estimates as temperature rises and recommendations towards developing protective and preventive occupational health and safety guidelines for India are discussed. Methodology: Cross-sectional studies were conducted in several occupational sectors with workers engaged in moderate to heavy labor (n=1580). Quantitative data on heat exposures (WBGT°C), physiological heat strain indicators viz., Core temperature (CBT), Urine specific gravity (USG), Sweat rate (SwR) and qualitative data on heat-related health symptoms and productivity losses were collected. Data were analyzed for associations between heat exposures, health and productivity outcomes related to heat stress. Findings: Heat conditions exceeded the Threshold Limit Value (TLV) for safe manual work in 66% of the workers across several sectors (Avg.WBGT of 28.7°C±3.1°C). Widespread concerns about heat-related health outcomes (86%) were prevalent among workers exposed to high TLVs, with excessive sweating, fatigue and tiredness being commonly reported by workers. The heat stress indicators, core temperature (14%), Sweat rate (8%) and USG (9%), were above normal levels in the study population. A significant association was found between rise in Core Temperatures and WBGT exposures (p=0.000179) Elevated USG and SwR in the worker population indicate moderate dehydration, with potential risks of developing heat-related illnesses. In a steel industry with high heat exposures, an alarming 9% prevalence of kidney/urogenital anomalies was observed in a young workforce. Heat exposures above TLVs were associated with significantly increased odds of various adverse health outcomes (OR=2.43, 95% CI 1.88 to 3.13, p-value = <0.0001) and productivity losses (OR=1.79, 95% CI 1.32 to 2.4, p-value = 0.0002). Rough estimates for the number of workers who would be subjected to higher than TLV levels in the various RCP scenarios are RCP2.6 =79%, RCP4.5 & RCP6 = 81% and at RCP 8.5 = 85%. Rising temperatures due to CC has the capacity to further reduce already compromised health and productivity by subjecting the workers to increased heat exposures in the RCP scenarios are of concern for the country’s occupational health and economy. Conclusion: The findings of this study clearly identify that health protection from hot weather will become increasingly necessary in the Indian subcontinent and understanding the various adaptation techniques needs urgent attention. Further research with a multi-targeted approach to develop strategies for implementing interventions to protect the millions of workers is imperative. Approaches to include health aspects of climate change within sectoral and climate change specific policies should be encouraged, via a number of mechanisms, such as the “Health in All Policies” approach to avert adverse health and productivity consequences as climate change proceeds.

Keywords: heat stress, occupational health, productivity loss, heat strain, adverse health outcomes

Procedia PDF Downloads 303
7382 An Occupational Analysis on Chikankari Industry Workers in Lucknow City, India

Authors: Mahvish Anjum

Abstract:

India is a land of craftsmen and a hub of many popular embroidery clusters. Chikankari is the name given to the delicate art of hand embroidery, traditionally practiced in the city of Lucknow and its environs. Chikankari not only provide employment to 250,000 artisans of different crafts but people from non-craft base also earn their livelihood by associating themselves with this craft. People working in this sector are exploited in term of working hours, low and irregular income, unsatisfactory work conditions, no legal protection and exposed to occupational health hazards. The present paper is an attempt to analyse occupational profile of workers engaged in Chikan embroidery industry. Being an empirical study, the entire work is based upon primary sources of data which have collected through field survey. Purposive random sampling has used for selection of data. Total 150 workers have surveyed through questionnaire technique in Lucknow city during October-November, 2017. For analysis of data Z-score, ANOVA, and Pearson correlation techniques are used. The result of present study indicates that artisans are exploited by the middle man and face the problem of late payment and long working hours because they are not directly associated with the manufacturers. Work conditions of the workers are quite poor such as improper ventilation, poor light and unhygienic conditions that adversely affect the health of workers.

Keywords: artisans, socio-economic status, unorganized industry, work condition

Procedia PDF Downloads 137
7381 Occupational Exposure to Electromagnetic Fields Can Increase the Release of Mercury from Dental Amalgam Fillings

Authors: Ghazal Mortazavi, S. M. J. Mortazavi

Abstract:

Electricians, power line engineers and power station workers, welders, aluminum reduction workers, MRI operators and railway workers are occupationally exposed to different levels of electromagnetic fields. Mercury is among the most toxic metals. Dental amalgam fillings cause significant exposure to elemental mercury vapour in the general population. Today, substantial evidence indicates that mercury even at low doses may lead to toxicity. Increased release of mercury from dental amalgam fillings after exposure to MRI or microwave radiation emitted by mobile phones has been previously shown by our team. Moreover, our recent studies on the effects of stronger magnetic fields entirely confirmed our previous findings. From the other point of view, we have also shown that papers which reported no increased release of mercury after MRI, may have some methodological flaws. Over the past several years, our lab has focused on the health effects of exposure of laboratory animals and humans to different sources of electromagnetic fields such as mobile phones and their base stations, mobile phone jammers, laptop computers, radars, dentistry cavitrons, and MRI. As a strong association between exposure to electromagnetic fields and mercury level has been found in our studies, our findings lead us to this conclusion that occupational exposure to electromagnetic fields in workers with dental amalgam fillings can lead to elevated levels of mercury. Studies which reported that exposure to mercury can be a risk factor of Alzheimer’s disease (AD) due to the accumulation of amyloid beta protein (Aβ) in the brain and those reported that long-term occupational exposure to high levels of electromagnetic fields can increase the risk of Alzheimer's disease and dementia in male workers support our concept and confirm the significant role of the occupational exposure to electromagnetic fields in increasing the mercury level in workers with amalgam fillings.

Keywords: occupational exposure, electromagnetic fields, workers, mercury release, dental amalgam, restorative dentistry

Procedia PDF Downloads 401
7380 Work Related and Psychosocial Risk Factors for Musculoskeletal Disorders among Workers in an Automated flexible Assembly Line in India

Authors: Rohin Rameswarapu, Sameer Valsangkar

Abstract:

Background: Globally, musculoskeletal disorders are the largest single cause of work-related illnesses accounting for over 33% of all newly reported occupational illnesses. Risk factors for MSD need to be delineated to suggest means for amelioration. Material and methods: In this current cross-sectional study, the prevalence of MSDs among workers in an electrical company assembly line, the socio-demographic and job characteristics associated with MSD were obtained through a semi-structured questionnaire. A quantitative assessment of the physical risk factors through the Rapid Upper Limb Assessment (RULA) tool, and measurement of psychosocial risk factors through a Likert scale was obtained. Statistical analysis was conducted using Epi-info software and descriptive and inferential statistics including chi-square and unpaired t test were obtained. Results: A total of 263 workers consented and participated in the study. Among these workers, 200 (76%) suffered from MSD. Most of the workers were aged between 18–27 years and majority of the workers were women with 198 (75.2%) of the 263 workers being women. A chi square test was significant for association between male gender and MSD with a P value of 0.007. Among the MSD positive group, 4 (2%) had a grand score of 5, 10 (5%) had a grand score of 6 and 186 (93%) had a grand score of 7 on RULA. There were significant differences between the non-MSD and MSD group on five out of the seven psychosocial domains, namely job demand, job monotony, co-worker support, decision control and family and environment domains. Discussion: The current cross-sectional study demonstrates a high prevalence of MSD among assembly line works with inherent physical and psychosocial risk factors and recommends that not only physical risk factors, addressing psychosocial risk factors through proper ergonomic means is also essential to the well-being of the employee.

Keywords: musculoskeletal disorders, India, occupational health, Rapid Upper Limb Assessment (RULA)

Procedia PDF Downloads 334
7379 Portfolio Management for Construction Company during Covid-19 Using AHP Technique

Authors: Sareh Rajabi, Salwa Bheiry

Abstract:

In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.

Keywords: portfolio management, risk management, COVID-19, analytical hierarchy process technique

Procedia PDF Downloads 90
7378 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 147
7377 Creation of Processes for a Safety Element Out of Context for an Actuator Circuit Control Module

Authors: Hassan Noun, Christian Urban-Seelmann, Mohamed Abdelfattah, Guillaume Zeller, Rajesh G., Iryna Mozgova, Roland Lachmayer

Abstract:

Several modules in automotive are usually modified and adapted for various project-specific applications. Due to a standardized safety concept, high reusability is accessible. A safety element out of context (SEooC) according to ISO 26262 can be a suitable approach. Based on the same safety concept and analysis, common modules can reach high usability. For developing according to a module out of context, an appropriate and detailed development approach is required. This paper shows how to derive these development processes for platform modules. Therefore, the detailed approach to the safety element out of context is derived. The aim is to create a detailed workflow for all phases of the development and integration of any kind of system modules. As an application example, an automotive project for an actuator control module is considered.

Keywords: functional safety, engineering processes, system engineering, electronic engineering

Procedia PDF Downloads 125
7376 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach

Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis

Abstract:

The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.

Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company

Procedia PDF Downloads 91
7375 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 404
7374 The Cost and Benefit on the Investment in Safety and Health of the Enterprises in Thailand

Authors: Charawee Butbumrung

Abstract:

The purpose of this study is to evaluate the monetary worthiness of investment and the usefulness of risk estimation as a tool employed by a production section of an electronic factory. This study employed the case study of accidents occurring in production areas. Data is collected from interviews with six production of safety coordinators and collect the information from the relevant section. The study will present the ratio of benefits compared with the operation costs for investment. The result showed that it is worthwhile for investment with the safety measures. In addition, the organizations must be able to analyze the causes of accidents about the benefits of investing in protective working process. They also need to quickly provide the manual for the staff to learn how to protect themselves from accidents and how to use all of the safety equipment.

Keywords: cost and benefit, enterprises in Thailand, investment in safety and health, risk estimation

Procedia PDF Downloads 242
7373 Retirement Planning and Job Satisfaction: Cushion to Avoid Bridge Employment?

Authors: Zaiton Osman, Imbarine Bujang, Azaze-Azizi Abdul Adis, Grace Phang Ing, Mohd Rizwan Abdul Majid, Izyanti Awang Razli

Abstract:

Retirement forces older workers to disconnect with their previous behavioural patterns and economic position. Transition and adjustment from working life to retirement places create psychological pressure and financial distress on older workers, especially those with dependent children. Bridge employment provides a solution for older workers to continue working after retirement while transitioning into retirement slowly and smoothly. As losing the job role has a significant impact on the psychological well-being of retirees, engageing in bridge employment helps to fulfill the important psychological functions of older workers by providing an adaptive style to retirement. This study investigates the influence of retirement planning and job satisfaction on bridge employment. A self-administered questionnaire was used in this study and a total of 523 samples were collected for nine major district in Sabah. Data were analysed using Partial Least Square (PLS) method wersion 2.0. The result shows a significant relationship between retirement planning and job satisfaction on bridge employment, explaining 4.7% the variance in bridge employment and job satisfaction was found to be the strongest predictor of bridge employment.

Keywords: ageing population, retirement planning, job satisfaction, bridge employment

Procedia PDF Downloads 333
7372 Necessity of Using Cellular Lightweights Concrete in Construction Sector

Authors: Soner Guler, Fuat Korkut

Abstract:

Recently, the using of lightweights concretes in construction sector is rapidly increasing all over the world. Faster construction, low density and thermal transmitting coefficient and high fire resistance are the remarkable characteristics of the lightweight concretes. Lightweight concrete can be described as a type of concrete which enhance the volume of the mixture while giving additional advantages such as to reduce the dead weight of the structures. It is lighter than the conventional concrete. The use of lightweight concrete has been widely spread across countries such as USA, United Kingdom, and Sweden. In this study, the necessity of the using of lightweights concretes in the construction sector is emphasized and evaluated briefly for the architectures and civil engineers.

Keywords: lightweights concretes, low density, low thermal coefficient, construction sector

Procedia PDF Downloads 494
7371 The Role and Challenges of Social Workers in Child Protection: The Case of Indonesia

Authors: B. Rusyidi

Abstract:

Since 2009, the Indonesian Ministry of Social Affairs has been implementing Program Kesejahteraan Sosial Anak (PKSA) (Child Welfare Program) a conditional cash transfer program that targets neglected children, children with disabilities, street children, children in conflict with the law, and children in need of special protection, all from poor households. PKSA integrates three elements: Transfer of cash, care and social services through social workers, and institutional childcare assistance. This qualitative study analyzed the roles and the challenges of social workers in implementing PKSA and lays out recommendations to inform policy changes. Data were collected in late 2014 from national and local government and non-government child welfare agencies, social workers, and childcare institution representatives through interviews and Focused Group Discussions (FGDs). Field work took place in six districts in the provinces of Jakarta, Central Java and South Sulawesi. The study found that the social workers’ role was significant in facilitating cash transfer, providing education and guidance, and linking children and families to basic social services. This improved utilization of basic social services enhanced children and families’ behaviors and contributed to the well being of the children. However, only a small number of childcare institutions have social workers, leaving many children and families without care and social service linkages, depriving them of rehabilitative components to help them regain their social functions. Some social workers reported their struggles with heavy workloads, lack of professional competencies and training, limited job security, and inadequate professional acknowledgment from other professions. Parts of those challenges were due to the centralized nature of the program and the lack of shared vision and commitment about the child protection system among related government agencies both at the national and local levels. The study highlights the necessity to implement an integrated child protection system, decentralize the PKSA program, and increase the number, competence, case management, and management and monitoring of social workers. The most recent progress of the program and its impacts on social workers are also discussed.

Keywords: child protection, conditional cash transfer, program decentralization, social worker, working conditions

Procedia PDF Downloads 199