4458 Modern Construction Methods and Technologies and Their Impacts on Construction Projects

Authors: Michael Anthony Doherty

Abstract:

Modern Methods of Construction (MMC) is a significant topic in the construction industry; while reviewing (MMC) over different fields that are significant in the modern construction world, the following areas were assessed where (MMC) is developing, supply chain management, automation, digital technology, and new construction technologies. Different methods were considered as an approach to research and exploring areas highlighted within the construction industry that are making advancements using Modern Methods of Construction Methods and Technologies (MCMTs). The research was conducted using the following methodologies, literature review of academic sources, primary and secondary data sources, questionaries, and interviews. The paper is composed of two parts, firstly a literature review and secondly a questionnaire used as the basis for interviews were utilised to achieve the following key objectives: to identify (MCMTs) being implemented in the construction industry, research and compile information with regards to these methods, determine their purpose and their application in the industry, establishing what (MCMTs) are being used in the industry while also determining the success of the methods. The research considers the evolution and development of these methods in projects and within the industry itself. Major findings were as follows; automation technologies such as robotics, offsite fabrication utilising automated production lines are increasingly part of project execution, digital technologies such as AR and VR are increasingly utilised in project co-ordination, (MMCTs) are proving to be a solution to the construction industry problems such as a lack of skilled workforce, hazardous work tasks, and situations, new construction technologies are available and finding their place in mainstream construction, (SCM) and (GSCM) are evolving to new levels using new systems and technologies such as block chain technology as well as Company Size and Project size influence the use of (MMCTs) and the adoption of (MMCTS). In summary the paper endeavours to identify and detail how areas of (MMCTs) are developing and are gaining traction within mainstream construction.

Keywords: automation, digital technology, new construction technologies, supply chain management

Procedia PDF Downloads 46
4457 Blocking of Random Chat Apps at Home Routers for Juvenile Protection in South Korea

Authors: Min Jin Kwon, Seung Won Kim, Eui Yeon Kim, Haeyoung Lee

Abstract:

Numerous anonymous chat apps that help people to connect with random strangers have been released in South Korea. However, they become a serious problem for young people since young people often use them for channels of prostitution or sexual violence. Although ISPs in South Korea are responsible for making inappropriate content inaccessible on their networks, they do not block traffic of random chat apps since 1) the use of random chat apps is entirely legal. 2) it is reported that they use HTTP proxy blocking so that non-HTTP traffic cannot be blocked. In this paper, we propose a service model that can block random chat apps at home routers. A service provider manages a blacklist that contains blocked apps’ information. Home routers that subscribe the service filter the traffic of the apps out using deep packet inspection. We have implemented a prototype of the proposed model, including a centralized server providing the blacklist, a Raspberry Pi-based home router that can filter traffic of the apps out, and an Android app used by the router’s administrator to locally customize the blacklist.

Keywords: deep packet inspection, internet filtering, juvenile protection, technical blocking

Procedia PDF Downloads 324
4456 The Role of Piaget's Theory in Conjecture via Analogical Reasoning

Authors: Supratman Ahman Maedi

Abstract:

The construction of knowledge is the goal of learning. The purpose of this research is to know how the role of Piaget theory in allegation via analogy reasoning. This study uses Think out loads when troubleshooting. To explore conjecturing via analogical reasoning is given the question of open analogy. The result: conjecture via analogical reasoning has been done by students in the construction of knowledge, in conjecture there are differences in thinking flow depending on the basic knowledge of the students, in the construction of knowledge occurs assimilation and accommodation problems, strategies and relationships.

Keywords: analogical reasoning, conjecturing, knowledge construction, Piaget's theory

Procedia PDF Downloads 302
4455 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 541
4454 Quantifying the Impact of Intermittent Signal Priority given to BRT on Ridership and Climate-A Case Study of Ahmadabad

Authors: Smita Chaudhary

Abstract:

Traffic in India are observed uncontrolled, and are characterized by chaotic (not follows the lane discipline) traffic situation. Bus Rapid Transit (BRT) has emerged as a viable option to enhance transportation capacity and provide increased levels of mobility and accessibility. At present in Ahmadabad there are as many intersections which face the congestion and delay at signalized intersection due to transit (BRT) lanes. Most of the intersection in spite of being signalized is operated manually due to the conflict between BRT buses and heterogeneous traffic. Though BRTS in Ahmadabad has an exclusive lane of its own but with this comes certain limitations which Ahmadabad is facing right now. At many intersections in Ahmadabad due to these conflicts, interference, and congestion both heterogeneous traffic as well as transit buses suffer traffic delays of remarkable 3-4 minutes at each intersection which has a become an issue of great concern. There is no provision of BRT bus priority due to which existing signals have their least role to play in managing the traffic that ultimately call for manual operation. There is an immense decrement in the daily ridership of BRTS because people are finding this transit mode no more time saving in their routine, there is an immense fall in ridership ultimately leading to increased number of private vehicles, idling of vehicles at intersection cause air and noise pollution. In order to bring back these commuters’ transit facilities need to be improvised. Classified volume count survey, travel time delay survey was conducted and revised signal design was done for whole study stretch having three intersections and one roundabout, later one intersection was simulated in order to see the effect of giving priority to BRT on side street queue length and travel time for heterogeneous traffic. This paper aims at suggesting the recommendations in signal cycle, introduction of intermittent priority for transit buses, simulation of intersection in study stretch with proposed signal cycle using VISSIM in order to make this transit amenity feasible and attracting for commuters in Ahmadabad.

Keywords: BRT, priority, Ridership, Signal, VISSIM

Procedia PDF Downloads 426
4453 Comparative Analysis of Traditional and Modern Roundabouts Using Sidra Intersection

Authors: Amir Mohammad Parvini, Amir Masoud Rahimi

Abstract:

Currently, most parts of the world have shifted from traditional roundabouts to modern roundabouts with respect to the role of roundabouts in reducing accidents, increasing safety, lowering the maintenance costs compared to traffic circles with their improper functional and safety experiences. In this study, field data collected from a current traditional roundabout was analyzed by the software AIMSUN and the obtained numbers were recorded. The modern roundabout was designed by changes in the traditional one, considering the geometric standards listed in regulations. Then, the modern roundabout was analyzed by applying a heterogeneous traffic by a micro-simulation software SIDRA (5.1). The function, capacity, and safety of the roundabout were analyzed assuming the superiority of modern roundabouts and acceptable LOS. The obtained results indicate that the function, capacity, and safety of modern roundabouts are better than traditional ones.

Keywords: traditional roundabout, traffic circles, modern roundabout, AIMSUN, SIDRA

Procedia PDF Downloads 371
4452 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 451
4451 Design of Low Latency Multiport Network Router on Chip

Authors: P. G. Kaviya, B. Muthupandian, R. Ganesan

Abstract:

On-chip routers typically have buffers are used input or output ports for temporarily storing packets. The buffers are consuming some router area and power. The multiple queues in parallel as in VC router. While running a traffic trace, not all input ports have incoming packets needed to be transferred. Therefore large numbers of queues are empty and others are busy in the network. So the time consumption should be high for the high traffic. Therefore using a RoShaQ, minimize the buffer area and time The RoShaQ architecture was send the input packets are travel through the shared queues at low traffic. At high load traffic the input packets are bypasses the shared queues. So the power and area consumption was reduced. A parallel cross bar architecture is proposed in this project in order to reduce the power consumption. Also a new adaptive weighted routing algorithm for 8-port router architecture is proposed in order to decrease the delay of the network on chip router. The proposed system is simulated using Modelsim and synthesized using Xilinx Project Navigator.

Keywords: buffer, RoShaQ architecture, shared queue, VC router, weighted routing algorithm

Procedia PDF Downloads 524
4450 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects

Authors: Mai Ghazal, Ahmed Hammad

Abstract:

Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.

Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management

Procedia PDF Downloads 344
4449 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 380
4448 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 30
4447 Assessing the Gap between the Policies and Existing Living Conditions of Migrant Construction Workers: A Case Study of Vijayawada

Authors: Ayushi Mishra

Abstract:

Migrant construction workers or construction labors are one of the majority of the working population in our urban and rural areas. Even after being the majority, their involvement in the upbringing of the economy is hardly ever documented or recognized. Non-permanent or migrant workers face loads of exploitations and susceptibilities than other informal sector workers in India which in turn has affected the productivity of the labors. The relation of their employment and migration and the links of these dynamics to their housing and other basic needs in the city are mostly unstated. Even the urban planning and housing policies do not make thoughtful provision for them, they forcing them to live in extremely wretched conditions. And even if the policies are made, it frequently happens that they are not implemented. As the issue is very much prevalent in today’s time in India with so many large-scale and labor extensive projects going on, this study focuses on the assessment of the gap between the existing government policies and the current scenario of the construction workers in ongoing projects of Vijayawada, Andhra Pradesh. A few of the policies for construction workers conditions a lot of things, out of which only a few are functional which makes this study to assess the reason behind the unorganized living condition and poor physical, the social and mental health of construction workers of Vijayawada. In present, the dignity of construction labors is compromised every day on construction sites, in terms of work and basic rights which leads to many other problems in future. So to work for the betterment of this community, knowledge on the differences is very much required and hence this study is a little effort to replenish the difference and compare the policies with the existing conditions of construction labors in Vijayawada.

Keywords: construction, labours, policy, productivity

Procedia PDF Downloads 309
4446 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 91
4445 South Atlantic Architects Validation of the Construction Decision Making Inventory

Authors: Tulio Sulbaran, Sandeep Langar

Abstract:

Architects are an integral part of the construction industry and are continuously incorporating decisions that influence projects during their life cycle. These decisions aim at selecting best alternative from the ones available. Unfortunately, this decision making process is mainly unexplored in the construction industry. No instrument to measure construction decision, based on knowledgebase of decision-makers, has existed. Additionally, limited literature is available on the topic. Recently, an instrument to gain an understanding of the construction decision-making process was developed by Dr. Tulio Sulbaran from the University of Texas, San Antonio. The instrument’s name is 'Construction Decision Making Inventory (CDMI)'. The CDMI is an innovative idea to measure the 'What? When? How? Moreover, Who?' of the construction decision-making process. As an innovative idea, its statistical validity (accuracy of the assessment) is yet to be assessed. Thus, the purpose of this paper is to describe the results of a case study with architects in the south-east of the United States aimed to determine the CDMI validity. The results of the case study are important because they assess the validity of the tool. Furthermore, as the architects evaluated each question within the measurements, this study is also guiding the enhancement of the CDMI.

Keywords: decision, support, inventory, architect

Procedia PDF Downloads 304
4444 The Role of Nano-Science in Construction of Civil Engineering and Environment

Authors: Mehrdad Abkenari, Naghmeh Pournayeb, Mohsen Ramezan Shirazi

Abstract:

Nano-science has been widely used in different engineering sciences. Generally, materials’ application can be determined through their chemical and physical properties. Nano-science has introduced as a new way in production systems that not only turns the materials into very small particles but also, gives them new and considerable properties. Like other fields of study, civil engineering has not been ignorant of benefits and characteristics of new nanotechnology and has used it in the construction industry and environmental engineering. Therefore, considering such chemical properties as elemental analysis and molecular or atomic structure, the present article is aimed at studying the effects of Nano-materials on different branches of civil engineering. Finally, by identifying new Nano-materials, this study attempts to introduce advantages of using these materials for increasing the strength of materials during construction as well as finding new approaches to prevent or reduce the entrance of chemical pollutants during or after construction to the environment.

Keywords: civil, nano-science, construction, environment

Procedia PDF Downloads 392
4443 An Estimation Process for Progress Rate Based on Labor-Quantity in Republic of Korea

Authors: Dong-Ho Kim, Zheng-Xun Jin, Yong-Woon Cha, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

As construction is a labor-intensive industry, it is important to identify and manage labor quantities for accurate progress management of the construction project. However, the progress management that focuses on construction cost calculated based on materials rather than labor quantities has led to a difference in the implementation of cost and progress of the actual construction. In addition, since it is not easy to predict accurate labor quantities in the estimation of labor quantity-based progress rate, there have been limited researches into the progress rate estimation based on labor quantity. Accordingly, this study proposed a process for labor quantity-based progress rate estimation using a standard of estimate to predict accurate progress rate of the construction project in Republic Korea. It is expected that the utilization of the proposed process will help to identify the progress rate closer to that of the actual site management and adjust the workforce in each construction type, thereby contributing to improving construction efficiency.

Keywords: labor based, labor cost, progress management, progress rate, progress payment

Procedia PDF Downloads 316
4442 Safety Management on Construction Sites

Authors: Jonathan Doku

Abstract:

The study's goal was to evaluate construction site safety management in Ghana. The construction sector has long been seen as a high-risk business. It entails a variety of hazardous and challenging labor duties, such as lifting and working at a height, among others. The accident rate is a standard indicator for comparing the safety performance of construction projects. Because of its high-risk and fast-changing work environment, the construction business is regarded as one of the industries with the highest accident rates in the world. Many mishaps and work-related diseases have occurred there, and construction workers are particularly vulnerable to catastrophic calamities such as falls, collapses, and burial. The study's main goals were to discover characteristics that have a substantial impact on construction site safety, to evaluate the safety management methods utilized on construction sites, and to assess the obstacles associated with construction site safety management. The study was conducted using a quantitative research method and a purposive sampling strategy. Google forms were used to distribute self-administered surveys to 85 responders. 72 of the 85 questionnaires were completed and submitted for analysis, accounting for 84.7 percent of the total. The variables were analyzed using descriptive statistics, mean score ranking, and Cronbach's Alpha Coefficient to ensure the scale's reliability. The formal safety organization structure and the Safety checklist were identified as the key practices of safety management on site as part of the study goals. In addition, it was discovered that the most serious problem with safety management is ineffective supervision. To guarantee efficient monitoring and proper implementation of health and safety rules on building sites, management must be on the ball.

Keywords: construction, safety, risk, management

Procedia PDF Downloads 53
4441 Impact of Ship Traffic to PM 2.5 and Particle Number Concentrations in Three Port-Cities of the Adriatic/Ionian Area

Authors: Daniele Contini, Antonio Donateo, Andrea Gambaro, Athanasios Argiriou, Dimitrios Melas, Daniela Cesari, Anastasia Poupkou, Athanasios Karagiannidis, Apostolos Tsakis, Eva Merico, Rita Cesari, Adelaide Dinoi

Abstract:

Emissions of atmospheric pollutants from ships and harbour activities are a growing concern at International level given their potential impacts on air quality and climate. These close-to-land emissions have potential impact on local communities in terms of air quality and health. Recent studies show that the impact of maritime traffic to atmospheric particulate matter concentrations in several coastal urban areas is comparable with the impact of road traffic of a medium size town. However, several different approaches have been used for these estimates making difficult a direct comparison of results. In this work an integrated approach based on emission inventories and dedicated measurement campaigns has been applied to give a comparable estimate of the impact of maritime traffic to PM2.5 and particle number concentrations in three major harbours of the Adriatic/Ionian Seas. The influences of local meteorology and of the logistic layout of the harbours are discussed.

Keywords: ship emissions, PM2.5, particle number concentrations, impact of shipping to atmospheric aerosol

Procedia PDF Downloads 730
4440 Fuzzy Inference System for Determining Collision Risk of Ship in Madura Strait Using Automatic Identification System

Authors: Emmy Pratiwi, Ketut B. Artana, A. A. B. Dinariyana

Abstract:

Madura Strait is considered as one of the busiest shipping channels in Indonesia. High vessel traffic density in Madura Strait gives serious threat due to navigational safety in this area, i.e. ship collision. This study is necessary as an attempt to enhance the safety of marine traffic. Fuzzy inference system (FIS) is proposed to calculate risk collision of ships. Collision risk is evaluated based on ship domain, Distance to Closest Point of Approach (DCPA), and Time to Closest Point of Approach (TCPA). Data were collected by utilizing Automatic Identification System (AIS). This study considers several ships’ domain models to give the characteristic of marine traffic in the waterways. Each encounter in the ship domain is analyzed to obtain the level of collision risk. Risk level of ships, as the result in this study, can be used as guidance to avoid the accident, providing brief description about safety traffic in Madura Strait and improving the navigational safety in the area.

Keywords: automatic identification system, collision risk, DCPA, fuzzy inference system, TCPA

Procedia PDF Downloads 530
4439 A POX Controller Module to Prepare a List of Flow Header Information Extracted from SDN Traffic

Authors: Wisam H. Muragaa, Kamaruzzaman Seman, Mohd Fadzli Marhusin

Abstract:

Software Defined Networking (SDN) is a paradigm designed to facilitate the way of controlling the network dynamically and with more agility. Network traffic is a set of flows, each of which contains a set of packets. In SDN, a matching process is performed on every packet coming to the network in the SDN switch. Only the headers of the new packets will be forwarded to the SDN controller. In terminology, the flow header fields are called tuples. Basically, these tuples are 5-tuple: the source and destination IP addresses, source and destination ports, and protocol number. This flow information is used to provide an overview of the network traffic. Our module is meant to extract this 5-tuple with the packets and flows numbers and show them as a list. Therefore, this list can be used as a first step in the way of detecting the DDoS attack. Thus, this module can be considered as the beginning stage of any flow-based DDoS detection method.

Keywords: matching, OpenFlow tables, POX controller, SDN, table-miss

Procedia PDF Downloads 178
4438 The Impact of Digital Transformation on the Construction Industry in Kuwait

Authors: M. Aladwani, Y. Alarfaj

Abstract:

The construction industry is currently experiencing a shift towards digitisation. This transformation is driven by adopting technologies like Building Information Modelling (BIM), drones, and augmented reality (AR). These advancements are revolutionizing the process of designing, constructing, and operating projects. BIM, for instance, is a new way of communicating and exploiting technology such as software and machinery. It enables the creation of a replica or virtual model of buildings or infrastructure projects. It facilitates simulating construction procedures, identifying issues beforehand, and optimizing designs accordingly. Drones are another tool in this revolution, as they can be utilized for site surveys, inspections, and even deliveries. Moreover, AR technology provides real-time information to workers involved in the project. Implementing these technologies in the construction industry has brought about improvements in efficiency, safety measures, and sustainable practices. BIM helps minimize rework and waste materials, while drones contribute to safety by reducing workers' exposure to areas. Additionally, AR plays a role in worker safety by delivering instructions and guidance during operations. Although the digital transformation within the construction industry is still in its early stages, it holds the potential to reshape project delivery methods entirely. By embracing these technologies, construction companies can boost their profitability while simultaneously reducing their environmental impact and ensuring safer practices.

Keywords: BIM, digital construction, construction technologies, digital transformation

Procedia PDF Downloads 63
4437 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 332
4436 Roadway Infrastructure and Bus Safety

Authors: Richard J. Hanowski, Rebecca L. Hammond

Abstract:

Very few studies have been conducted to investigate safety issues associated with motorcoach/bus operations. The current study investigates the impact that roadway infrastructure, including locality, roadway grade, traffic flow and traffic density, have on bus safety. A naturalistic driving study was conducted in the U.S.A that involved 43 motorcoaches. Two fleets participated in the study and over 600,000 miles of naturalistic driving data were collected. Sixty-five bus drivers participated in this study; 48 male and 17 female. The average age of the drivers was 49 years. A sophisticated data acquisition system (DAS) was installed on each of the 43 motorcoaches and a variety of kinematic and video data were continuously recorded. The data were analyzed by identifying safety critical events (SCEs), which included crashes, near-crashes, crash-relevant conflicts, and unintentional lane deviations. Additionally, baseline (normative driving) segments were also identified and analyzed for comparison to the SCEs. This presentation highlights the need for bus safety research and the methods used in this data collection effort. With respect to elements of roadway infrastructure, this study highlights the methods used to assess locality, roadway grade, traffic flow, and traffic density. Locality was determined by manual review of the recorded video for each event and baseline and was characterized in terms of open country, residential, business/industrial, church, playground, school, urban, airport, interstate, and other. Roadway grade was similarly determined through video review and characterized in terms of level, grade up, grade down, hillcrest, and dip. The video was also used to make a determination of the traffic flow and traffic density at the time of the event or baseline segment. For traffic flow, video was used to assess which of the following best characterized the event or baseline: not divided (2-way traffic), not divided (center 2-way left turn lane), divided (median or barrier), one-way traffic, or no lanes. In terms of traffic density, level-of-service categories were used: A1, A2, B, C, D, E, and F. Highlighted in this abstract are only a few of the many roadway elements that were coded in this study. Other elements included lighting levels, weather conditions, roadway surface conditions, relation to junction, and roadway alignment. Note that a key component of this study was to assess the impact that driver distraction and fatigue have on bus operations. In this regard, once the roadway elements had been coded, the primary research questions that were addressed were (i) “What environmental condition are associated with driver choice of engagement in tasks?”, and (ii) “what are the odds of being in a SCE while engaging in tasks while encountering these conditions?”. The study may be of interest to researchers and traffic engineers that are interested in the relationship between roadway infrastructure elements and safety events in motorcoach bus operations.

Keywords: bus safety, motorcoach, naturalistic driving, roadway infrastructure

Procedia PDF Downloads 163
4435 Microsimulation of Potential Crashes as a Road Safety Indicator

Authors: Vittorio Astarita, Giuseppe Guido, Vincenzo Pasquale Giofre, Alessandro Vitale

Abstract:

Traffic microsimulation has been used extensively to evaluate consequences of different traffic planning and control policies in terms of travel time delays, queues, pollutant emissions, and every other common measured performance while at the same time traffic safety has not been considered in common traffic microsimulation packages as a measure of performance for different traffic scenarios. Vehicle conflict techniques that were introduced at intersections in the early traffic researches carried out at the General Motor laboratory in the USA and in the Swedish traffic conflict manual have been applied to vehicles trajectories simulated in microscopic traffic simulators. The concept is that microsimulation can be used as a base for calculating the number of conflicts that will define the safety level of a traffic scenario. This allows engineers to identify unsafe road traffic maneuvers and helps in finding the right countermeasures that can improve safety. Unfortunately, most commonly used indicators do not consider conflicts between single vehicles and roadside obstacles and barriers. A great number of vehicle crashes take place with roadside objects or obstacles. Only some recent proposed indicators have been trying to address this issue. This paper introduces a new procedure based on the simulation of potential crash events for the evaluation of safety levels in microsimulation traffic scenarios, which takes into account also potential crashes with roadside objects and barriers. The procedure can be used to define new conflict indicators. The proposed simulation procedure generates with the random perturbation of vehicle trajectories a set of potential crashes which can be evaluated accurately in terms of DeltaV, the energy of the impact, and/or expected number of injuries or casualties. The procedure can also be applied to real trajectories giving birth to new surrogate safety performance indicators, which can be considered as “simulation-based”. The methodology and a specific safety performance indicator are described and applied to a simulated test traffic scenario. Results indicate that the procedure is able to evaluate safety levels both at the intersection level and in the presence of roadside obstacles. The procedure produces results that are expressed in the same unity of measure for both vehicle to vehicle and vehicle to roadside object conflicts. The total energy for a square meter of all generated crash can be used and is shown on the map, for the test network, after the application of a threshold to evidence the most dangerous points. Without any detailed calibration of the microsimulation model and without any calibration of the parameters of the procedure (standard values have been used), it is possible to identify dangerous points. A preliminary sensitivity analysis has shown that results are not dependent on the different energy thresholds and different parameters of the procedure. This paper introduces a specific new procedure and the implementation in the form of a software package that is able to assess road safety, also considering potential conflicts with roadside objects. Some of the principles that are at the base of this specific model are discussed. The procedure can be applied on common microsimulation packages once vehicle trajectories and the positions of roadside barriers and obstacles are known. The procedure has many calibration parameters and research efforts will have to be devoted to make confrontations with real crash data in order to obtain the best parameters that have the potential of giving an accurate evaluation of the risk of any traffic scenario.

Keywords: road safety, traffic, traffic safety, traffic simulation

Procedia PDF Downloads 118
4434 A Study of Ocular Morbidity in Road Traffic Accidents

Authors: Nikhat Iqbal Tamboli

Abstract:

INTRODUCTION: road traffic accidents (RTAs) are one of the leading and common causes of ocular injuries especially in developing countries like India which are preventable with certain measures and so it is of public health importance. AIM: To study incidence and clinical presentation of ocular morbidity in road traffic accidents. METHOD: Prospective cross-sectional study was conducted on 360 patients reported in department of ophthalmology. Detailed ocular examination and relevant investigations done. RESULTS: Incidence of ocular injuries is 23%. male:female ratio is 4.5:1.Cases having Sub conjunctival haemorrhage [74].eccymosis[217]. lid lcerations [164]orbital fracture[12] corneal tear [7]corneal abrasion[2] sclera tear[6] hyphaema[4] traumatic mydriasis [7]traumatic cataract [2]vitreous haemorrhage [1]traumatic optic neuropathy[1].Maximum cases in age group 20-40 years, with two wheeler vehicles 94.7% .Under influence of alcohol 13.3%. CONCLUSION: Younger age group with male preponderance is involved in ocular trauma due to road traffic accidents .maximum cases reported are with anterior segment injuries. Alcohol and two wheeler vehicles are common risk factors. Injuries involving cornea had bad prognosis and involving retina had worst prognosis.

Keywords: ocular morbidity, eye trauma, RTA, eye injury

Procedia PDF Downloads 49
4433 Applying an Application-Based Knowledge Capturing and Reusing for Construction Consultant Organizations Applying

Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai

Abstract:

Knowledge Management effectively is critical to the survival and advance of a company, especially in company-based industries such as construction. Knowledge management practice is crucial to the survival and progress of a company, especially company-based knowledge such as construction consultancy. Effective knowledge management practices are very significant to the competitive and development of a consulting organization. Hence, the success of knowledge management implementation depends on knowledge capturing and reusing effectively. In this paper, a survey was carried out of engineers and managers with experience in seven construction consulting organizations that provide services on the north-central coast of Vietnam. The main objectives of the survey to finding out how these organizations capture and reuse knowledge and significant barriers to the implementation of knowledge management. A conceptual framework based-on Trello application is proposed to formalize the knowledge-capturing and reusing process within construction consulting companies. It is showed that the conceptual framework could be used to manage both implicit and explicit knowledge effectively in construction consultant organizations.

Keywords: knowledge management, construction consultant organization, knowledge capturing, reusing knowledge, application-based technology

Procedia PDF Downloads 106
4432 An Evaluation of the Lae City Road Network Improvement Project

Authors: Murray Matarab Konzang

Abstract:

Lae Port Development Project, Four Lane Highway and other development in the extraction industry which have direct road link to Lae City are predicted to have significant impact on its road network system. This paper evaluates Lae roads improvement program with forecast on planning, economic and the installation of bypasses to ease congestion, effective and convenient transport service for bulk goods and reduce travel time. Land-use transportation study and plans for local area traffic management scheme will be considered. City roads are faced with increased number of traffic and some inadequate road pavement width, poor transport plans, and facilities to meet this transportation demand. Lae also has drainage system which might not hold a 100 year flood. Proper evaluation, plan, design and intersection analysis is needed to evaluate road network system thus recommend improvement and estimate future growth. Repetitive and cyclic loading by heavy commercial vehicles with different axle configurations apply on the flexible pavement which weakens and tear the pavement surface thus small cracks occur. Rain water seeps through and overtime it creates potholes. Effective planning starts from experimental research and appropriate design standards to enable firm embankment, proper drains and quality pavement material. This paper will address traffic problems as well as road pavement, capacities of intersections, and pedestrian flow during peak hours. The outcome of this research will be to identify heavily trafficked road sections and recommend treatments to reduce traffic congestions, road classification, and proposal for bypass routes and improvement. First part of this study will describe transport or traffic related problems within the city. Second part would be to identify challenges imposed by traffic and road related problems and thirdly to recommend solutions after the analyzing traffic data that will indicate current capacities of road intersections and finally recommended treatment for improvement and future growth.

Keywords: Lae, road network, highway, vehicle traffic, planning

Procedia PDF Downloads 334
4431 Strategic Alliances of US Engineering and Construction Companies in China

Authors: Zonggui Chen, Yuhong Wang, Yun Le

Abstract:

U.S. engineering and construction companies have increased their presence in China. A strategy for them to enter and operate in China is to forge strategic alliances with local firms. Managing the differences in motives and cultures and using proper controls are essential for a productive strategic alliance. Based on literature and in-depth interviews, this paper examines the differences in motives and cultures within Sino–U.S. strategic alliances and the impacts of the differences on control mechanisms. This paper not only contributes to a better understanding of cross-border strategic alliances in construction, but also facilitates the operation of the alliances.

Keywords: strategic alliance, Chinese construction industry, motives, cultural differences

Procedia PDF Downloads 303
4430 Impact of Unbalanced Urban Structure on the Traffic Congestion in Biskra, Algeria

Authors: Khaled Selatnia

Abstract:

Nowadays, the traffic congestion becomes increasingly a chronic problem. Sometimes, the cause is attributed to the recurrent road works that create barriers to the efficient movement. But congestion, which usually occurs in cities, can take diverse forms and magnitudes. The case study of Biskra city in Algeria and the diagnosis of its road network show that throughout all the micro regional system, the road network seems at first quite dense. However, this density although it is important, does not cover all areas. A major flow is concentrated in the axis Sidi Okba – Biskra – Tolga. The largest movement of people in the Wilaya (prefecture) revolves around these three centers and their areas of influence. Centers farthest from the trio are very poorly served. This fact leads us to ask questions about the extent of congestion in Biskra city and its relationship to the imbalance of the urban framework. The objective of this paper is to highlight the impact of the urban fact on the traffic congestion.

Keywords: congestion, urban framework, regional, urban and regional studies

Procedia PDF Downloads 602
4429 Reduce, Reuse and Recycle: Grand Challenges in Construction Recovery Process

Authors: Abioye A. Oyenuga, Rao Bhamidiarri

Abstract:

Hurling a successful Construction and Demolition Waste (C&DW) recycling operation around the globe is a challenge today, predominantly because secondary materials markets are yet to be integrated. Reducing, Reusing and recycling of (C&DW) have been employed over the years, and various techniques have been investigated. However, the economic and environmental viability of its application seems limited. This paper discusses the costs and benefits in using secondary materials and focus on investigating reuse and recycling process for five major types of construction materials: concrete, metal, wood, cardboard/paper, and plasterboard. Data obtained from demolition specialist and contractors are considered and evaluated. With the date source, the research paper found that construction material recovery process fully incorporate the 3R’s process and shows how energy recovery by means of 3R's principles can be evaluated. This scrutiny leads to the empathy of grand challenges in construction material recovery process. Recommendations to deepen material recovery process are also discussed.

Keywords: construction and demolition waste (C&DW), 3R concept, recycling, reuse, waste management, UK