Search results for: oil & gas projects delays
2102 Travel Delay and Modal Split Analysis: A Case Study
Authors: H. S. Sathish, H. S. Jagadeesh, Skanda Kumar
Abstract:
Journey time and delay study is used to evaluate the quality of service, the travel time and study can also be used to evaluate the quality of traffic movement along the route and to determine the location types and extent of traffic delays. Components of delay are boarding and alighting, issue of tickets, other causes and distance between each stops. This study investigates the total journey time required to travel along the stretch and the influence the delays. The route starts from Kempegowda Bus Station to Yelahanka Satellite Station of Bangalore City. The length of the stretch is 16.5 km. Modal split analysis has been done for this stretch. This stretch has elevated highway connecting to Bangalore International Airport and the extension of metro transit stretch. From the regression analysis of total journey time it is affected by delay due to boarding and alighting moderately, Delay due to issue of tickets affects the journey time to a higher extent. Some of the delay factors affecting significantly the journey time are evident from F-test at 10 percent level of confidence. Along this stretch work trips are more prevalent as indicated by O-D study. Modal shift analysis indicates about 70 percent of commuters are ready to shift from current system to Metro Rail System. Metro Rail System carries maximum number of trips compared to private mode. Hence Metro is a highly viable choice of mode for Bangalore Metropolitan City.Keywords: delay, journey time, modal choice, regression analysis
Procedia PDF Downloads 4972101 Constructability Driven Engineering in Oil and Gas Projects
Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers
Abstract:
Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.Keywords: being competitive, collaborative engineering, constructability, cost reduction
Procedia PDF Downloads 4222100 Assessing the Social Impacts of Regional Services: The Case of a Portuguese Municipality
Authors: A. Camões, M. Ferreira Dias, M. Amorim
Abstract:
In recent years, the social economy is increasingly seen as a viable means to address social problems. Social enterprises, as well as public projects and initiatives targeted to meet social purposes, offer organizational models that assume heterogeneity, flexibility and adaptability to the ‘real world and real problems’. Despite the growing popularity of social initiatives, decision makers still face a paucity in what concerns the available models and tools to adequately assess its sustainability, and its impacts, notably the nature of its contribution to economic growth. This study was carried out at the local level, by analyzing the social impact initiatives and projects promoted by the Municipality of Albergaria-a-Velha (Câmara Municipal de Albergaria-a-Velha -CMA), a municipality of 25,000 inhabitants in the central region of Portugal. This work focuses on the challenges related to the qualifications and employability of citizens, which stands out as one of the key concerns in the Portuguese economy, particularly expressive in the context of small-scale cities and inland territories. The study offers a characterization of the Municipality, its socio-economic structure and challenges, followed by an exploratory analysis of multiple sourced data, collected from the CMA's documental sources as well as from privileged informants. The purpose is to conduct detailed analysis of the CMA's social projects, aimed at characterizing its potential impact for the model of qualifications and employability of the citizens of the Municipality. The study encompasses a discussion of the socio-economic profile of the municipality, notably its asymmetries, the analysis of the social projects and initiatives, as well as of data derived from inquiry actors involved in the implementation of the social projects and its beneficiaries. Finally, the results obtained with the Better Life Index will be included. This study makes it possible to ascertain if what is implicit in the literature goes to the encounter of what one experiences in reality.Keywords: measurement, municipalities, social economy, social impact
Procedia PDF Downloads 1352099 Cost Overrun Causes in Public Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors
Procedia PDF Downloads 4802098 Social Value of Travel Time Savings in Sub-Saharan Africa
Authors: Richard Sogah
Abstract:
The significance of transport infrastructure investments for economic growth and development has been central to the World Bank’s strategy for poverty reduction. Among the conventional surface transport infrastructures, road infrastructure is significant in facilitating the movement of human capital goods and services. When transport projects (i.e., roads, super-highways) are implemented, they come along with some negative social values (costs), such as increased noise and air pollution for local residents living near these facilities, displaced individuals, etc. However, these projects also facilitate better utilization of existing capital stock and generate other observable benefits that can be easily quantified. For example, the improvement or construction of roads creates employment, stimulates revenue generation (toll), reduces vehicle operating costs and accidents, increases accessibility, trade expansion, safety improvement, etc. Aside from these benefits, travel time savings (TTSs) which are the major economic benefits of urban and inter-urban transport projects and therefore integral in the economic assessment of transport projects, are often overlooked and omitted when estimating the benefits of transport projects, especially in developing countries. The absence of current and reliable domestic travel data and the inability of replicated models from the developed world to capture the actual value of travel time savings due to the large unemployment, underemployment, and other labor-induced distortions has contributed to the failure to assign value to travel time savings when estimating the benefits of transport schemes in developing countries. This omission of the value of travel time savings from the benefits of transport projects in developing countries poses problems for investors and stakeholders to either accept or dismiss projects based on schemes that favor reduced vehicular operating costs and other parameters rather than those that ease congestion, increase average speed, facilitate walking and handloading, and thus save travel time. Given the complex reality in the estimation of the value of travel time savings and the presence of widespread informal labour activities in Sub-Saharan Africa, we construct a “nationally ranked distribution of time values” and estimate the value of travel time savings based on the area beneath the distribution. Compared with other approaches, our method captures both formal sector workers and individuals/people who work outside the formal sector and hence changes in their time allocation occur in the informal economy and household production activities. The dataset for the estimations is sourced from the World Bank, the International Labour Organization, etc.Keywords: road infrastructure, transport projects, travel time savings, congestion, Sub-Sahara Africa
Procedia PDF Downloads 1102097 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation
Authors: Nnadi Ezekiel Oluwaseun Ejiofor
Abstract:
The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.Keywords: cost, tetfund, construction projects, public university
Procedia PDF Downloads 592096 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects
Authors: Saleh Alzahrani, Halim Boussabaine
Abstract:
Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)
Procedia PDF Downloads 5582095 Professional Stakeholders Perspectives on Community Participation in Transit-Oriented Development Projects: A Johannesburg Case Study
Authors: Kofi Quartey, Kola Ijasan
Abstract:
Achieving densification around transit-oriented development projects has proven the most ideal way of facilitating urban sprawl whilst increasing the mobility of the majority of the urban populations, making parts of the city that were inaccessible, accessible. Johannesburg has undertaken TOD vision, which was initially called the corridors of freedom. The TOD, in line with the Sustainable Development Goal 11, seeks to establish inclusive, sustainable cities and, in line with the Joburg Growth Development Strategy, aims to create an equitable world-class African city. Equity and inclusivity should occur from the onset of planning and implementation of TOD projects through meaningful community participation. Stakeholder engagement literature from various disciplinary backgrounds has documented dissatisfaction of communities regarding the lack of meaningful participation in government-led development initiatives. The views of other project stakeholders such as project policy planners and project implementors and their challenges in undertaking community participation are, however, not taken into account in such instances, leaving room for a biased perspective. Document analysis was undertaken to determine what is expected of the Project stakeholders according to policy and whether they carried out their duties) seven interviews were also conducted with city entities and community representatives to determine their experiences and challenges with community participation in the various TOD projects attributed to the CoF vision. The findings of the study indicated that stakeholder engagement processes were best described as an ‘educative process’; where local communities were limited to being informed from the onset rather than having an active involvement in the planning processes. Most community members felt they were being informed and educated as to what was going to happen in spite of having their views and opinions collected – primarily due to project deadlines and budget constraints, as was confirmed by professional stakeholders. Some community members exhibited reluctance to change due to feelings of having projects being imposed on them, and the implications of the projects on their properties and lifestyles. It is recommended that community participation should remain a participatory and engaging process that creates an exchange of knowledge and understanding in the form of a dialogue between communities and project stakeholders until a consensus is reached.Keywords: stakeholder engagement, transit oriented development, community participation, Johannesburg
Procedia PDF Downloads 1282094 Health Care using Queuing Theory
Authors: S. Vadivukkarasi, K. Karthi, M. Karthick, C. Dinesh, S. Santhosh, A. Yogaraj
Abstract:
The appointment system was designed to minimize patient’s idle time overlooking patients waiting time in hospitals. This is no longer valid in today’s consumer oriented society. Long waiting times for treatment in the outpatient department followed by short consultations has long been a complaint. Nowadays, customers use waiting time as a decisive factor in choosing a service provider. Queuing theory constitutes a very powerful tool because queuing models require relatively little data and are simple and fast to use. Because of this simplicity and speed, modelers can be used to quickly evaluate and compare various alternatives for providing service. The application of queuing models in the analysis of health care systems is increasingly accepted by health care decision makers. Timely access to care is a key component of high-quality health care. However, patient delays are prevalent throughout health care systems, resulting in dissatisfaction and adverse clinical consequences for patients as well as potentially higher costs and wasted capacity for providers. Arguably, the most critical delays for health care are the ones associated with health care emergencies. The allocation of resources can be divided into three general areas: bed management, staff management, and room facility management. Effective and efficient patient flow is indicated by high patient throughput, low patient waiting times, a short length of stay at the hospital and overtime, while simultaneously maintaining adequate staff utilization rates and low patient’s idle times.Keywords: appointment system, patient scheduling, bed management, queueing calculation, system analysis
Procedia PDF Downloads 3002093 Matlab Method for Exclusive-or Nodes in Fuzzy GERT Networks
Authors: Roland Lachmayer, Mahtab Afsari
Abstract:
Research is the cornerstone for advancement of human communities. So that it is one of the indexes for evaluating advancement of countries. Research projects are usually cost and time-consuming and do not end in result in short term. Project scheduling is one of the integral parts of project management. The present article offers a new method by using C# and Matlab software to solve Fuzzy GERT networks for Exclusive-OR kind of nodes to schedule the network. In this article we concentrate on flowcharts that we used in Matlab to show how we apply Matlab to schedule Exclusive-OR nodes.Keywords: research projects, fuzzy GERT, fuzzy CPM, CPM, α-cuts, scheduling
Procedia PDF Downloads 3992092 Web-GIS Technology: A Tool for Farm-to-Market Road Project Profiling and Proposal Prioritization of the Philippines’ Department of Agriculture
Authors: Elbert S. Moyon, Edsel Matt O. Morales, Jaymer M. Jayoma, Kent C. Espejon, Jayson C. Dollete, Mark Phil B. Pacot
Abstract:
This research paper focuses on the potential of using Web-GIS technology in prioritizing farm-to-market road projects by the Philippines’ Department of Agriculture (DA). The study aimed to explore the benefits of Web-GIS in addressing the limitations faced by the DA in terms of Farm to Market Road profiling and project prioritization, which include a lack of access to updated data, limited spatial analysis capabilities, and difficulties in sharing information between stakeholders. The research methodology involves a comprehensive literature review and a case study of a Web-GIS application developed for the DA, which was used to profile and prioritize farm-to-market road projects in the Philippines. The results showed that the Web-GIS technology provides the DA with an effective tool for analyzing and visualizing data, which can help in profiling and prioritizing road projects based on various criteria such as economic, social, and environmental impacts. The study also showed that Web-GIS technology could help in reducing the time and effort required for road project prioritization and improve communication between stakeholders.Keywords: GIS, web application, farm-to-market road, FMR prioritization, Django, GeoServer
Procedia PDF Downloads 832091 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India
Authors: Shankha Pratim Bhattacharya
Abstract:
In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair
Procedia PDF Downloads 2512090 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects
Abstract:
Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation
Procedia PDF Downloads 1812089 Risk Assessment on Construction Management with “Fuzzy Logy“
Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi
Abstract:
Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.Keywords: fuzzy logy, risk, prioritization, assessment
Procedia PDF Downloads 5952088 Combustion Improvements by C4/C5 Bio-Alcohol Isomer Blended Fuels Combined with Supercharging and EGR in a Diesel Engine
Authors: Yasufumi Yoshimoto, Enkhjargal Tserenochir, Eiji Kinoshita, Takeshi Otaka
Abstract:
Next generation bio-alcohols produced from non-food based sources like cellulosic biomass are promising renewable energy sources. The present study investigates engine performance, combustion characteristics, and emissions of a small single cylinder direct injection diesel engine fueled by four kinds of next generation bio-alcohol isomer and diesel fuel blends with a constant blending ratio of 3:7 (mass). The tested bio-alcohol isomers here are n-butanol and iso-butanol (C4 alcohol), and n-pentanol and iso-pentanol (C5 alcohol). To obtain simultaneous reductions in NOx and smoke emissions, the experiments employed supercharging combined with EGR (Exhaust Gas Recirculation). The boost pressures were fixed at two conditions, 100 kPa (naturally aspirated operation) and 120 kPa (supercharged operation) provided with a roots blower type supercharger. The EGR rates were varied from 0 to 25% using a cooled EGR technique. The results showed that both with and without supercharging, all the bio-alcohol blended diesel fuels improved the trade-off relation between NOx and smoke emissions at all EGR rates while maintaining good engine performance, when compared with diesel fuel operation. It was also found that regardless of boost pressure and EGR rate, the ignition delays of the tested bio-alcohol isomer blends are in the order of iso-butanol > n-butanol > iso-pentanol > n-pentanol. Overall, it was concluded that, except for the changes in the ignition delays the influence of bio-alcohol isomer blends on the engine performance, combustion characteristics, and emissions are relatively small.Keywords: alternative fuel, butanol, diesel engine, EGR (Exhaust Gas Recirculation), next generation bio-alcohol isomer blended fuel, pentanol, supercharging
Procedia PDF Downloads 1692087 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry
Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba
Abstract:
The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.Keywords: black business forums, construction mafia, emergence, implication
Procedia PDF Downloads 1372086 Education for Sustainability Using PBL on an Engineering Course at the National University of Colombia
Authors: Hernán G. Cortés-Mora, José I. Péna-Reyes, Alfonso Herrera-Jiménez
Abstract:
This article describes the implementation experience of Project-Based Learning (PBL) in an engineering course of the Universidad Nacional de Colombia, with the aim of strengthening student skills necessary for the exercise of their profession under a sustainability framework. Firstly, we present a literature review on the education for sustainability field, emphasizing the skills and knowledge areas required for its development, as well as the commitment of the Faculty of Engineering of the Universidad Nacional de Colombia, and other engineering faculties of the country, regarding education for sustainability. This article covers the general aspects of the course, describes how students team were formed, and how their experience was during the first semester of 2017. During this period two groups of students decided to develop their course project aiming to solve a problem regarding a Non-Governmental Organization (NGO) that works with head-of-household mothers in a low-income neighborhood in Bogota (Colombia). Subsequently, we show how sustainability is involved in the course, how tools are provided to students, and how activities are developed as to strengthen their abilities, which allows them to incorporate sustainability in their projects while also working on the methodology used to develop said projects. Finally, we introduce the results obtained by the students who sent the prototypes of their projects to the community they were working on and the conclusions reached by them regarding the course experience.Keywords: sustainability, project-based learning, engineering education, higher education for sustainability
Procedia PDF Downloads 3542085 Progress and Challenges of Smart Cities in India: An Exploratory Study
Authors: Sushil K. Sharma, Jeff Zhang, Saeed Tabar
Abstract:
Worldwide, several governments are utilizing the Internet of Things (IoT) and other information and communication technologies (ICTs) to create smart city infrastructures to improve both the quality of government services and citizen welfare. Over 700 cities from around the world have already started implementing their smart city projects. Smart City utilizes the network of connected things, or the Internet of Things (IoT), that interconnects devices and various components across city infrastructure, making them work together seamlessly to enhance the quality, performance, and interactivity of urban services, optimize resources, and reduce costs. Without developing smart cities, the accelerating growth of cities, and their disproportionate consumption of physical and social resources are unsustainable. In 2016, the Indian Government released a list of 100 cities with the intention of kick-starting the process of developing them into 'smart cities’ as part of the Smart Cities Mission. This study reports the progress and challenges of Smart City projects in India. The data were collected through the city/state government websites, media reports, and focus group discussions/interviews. The preliminary results indicate that smart city projects are not only behind in their implementation and scope but also lacks the sincerity for its implementation.Keywords: smart city, smart government, Internet of Things, digital government
Procedia PDF Downloads 1852084 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria
Authors: Nuruddeen Usman, Mohammad Sani
Abstract:
The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.Keywords: construction size, contracting system, direct labour, effect
Procedia PDF Downloads 4592083 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects
Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima
Abstract:
Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.Keywords: continuous improvement, critical success factors (csf), lean thinking, project management
Procedia PDF Downloads 3642082 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study
Authors: Arsany Philip Fawzy
Abstract:
This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).Keywords: clearance, quality, cost, variation, claim
Procedia PDF Downloads 1032081 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects
Authors: Saleh Alzahrani, Halim Boussabaine
Abstract:
The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price
Procedia PDF Downloads 5672080 Learners as Consultants: Knowledge Acquisition and Client Organisations-A Student as Producer Case Study
Authors: Barry Ardley, Abi Hunt, Nick Taylor
Abstract:
As a theoretical and practical framework, this study uses the student-as-producer approach to learning in higher education, as adopted by the Lincoln International Business School, University of Lincoln, UK. Students as producer positions learners as skilled and capable agents, able to participate as partners with tutors in live research projects. To illuminate the nature of this approach to learning and to highlight its critical issues, the authors report on two guided student consultancy projects. These were set up with the assistance of two local organisations in the city of Lincoln, UK. Using the student as a producer model to deliver the projects enabled learners to acquire and develop a range of key skills and knowledge not easily accessible in more traditional educational settings. This paper presents a systematic case study analysis of the eight organising principles of the student-as-producer model, as adopted by university tutors. The experience of tutors implementing students as producers suggests that the model can be widely applied to benefit not only the learning and teaching experiences of higher education students and staff but additionally a university’s research programme and its community partners.Keywords: consultancy, learning, student as producer, research
Procedia PDF Downloads 792079 Willingness to Pay for the Preservation of Geothermal Areas in Iceland: The Contingent Valuation Studies of Eldvörp and Hverahlíð
Authors: David Cook, Brynhildur Davidsdottir, Dadi. M. Kristofersson
Abstract:
The approval of development projects with significant environmental impacts implies that the economic costs of the affected environmental resources must be less than the financial benefits, but such irreversible decisions are frequently made without ever attempting to estimate the monetary value of the losses. Due to this knowledge gap in the processes informing decision-making, development projects are commonly approved despite the potential for social welfare to be undermined. Heeding a repeated call by the OECD to commence economic accounting of environmental impacts as part of the cost-benefit analysis process for Icelandic energy projects, this paper sets out the results pertaining to the nation’s first two contingent valuation studies of geothermal areas likely to be developed in the near future. Interval regression using log-transformation was applied to estimate willingness to pay (WTP) for the preservation of the high-temperature Eldvörp and Hverahlíð fields. The estimated mean WTP was 8,333 and 7,122 ISK for Eldvörp and Hverahlíð respectively. Scaled up to the Icelandic population of national taxpayers, this equates to estimated total economic value of 2.10 and 1.77 billion ISK respectively. These results reinforce arguments in favour of accounting for the environmental impacts of Iceland’s future geothermal power projects as a mandatory component of the exploratory and production license application process. Further research is necessary to understand the economic impacts to specific ecosystem services associated with geothermal environments, particularly connected to changes in recreational amenity. In so doing, it would be possible to gain greater comprehension of the various components of total economic value, evolving understanding of why one geothermal area – in this case, Eldvörp – has a higher preservation value than another.Keywords: decision-making, contingent valuation, geothermal energy, preservation
Procedia PDF Downloads 2142078 Exploring the Role of Building Information Modeling for Delivering Successful Construction Projects
Authors: Muhammad Abu Bakar Tariq
Abstract:
Construction industry plays a crucial role in the progress of societies and economies. Furthermore, construction projects have social as well as economic implications, thus, their success/failure have wider impacts. However, the industry is lagging behind in terms of efficiency and productivity. Building Information Modeling (BIM) is recognized as a revolutionary development in Architecture, Engineering and Construction (AEC) industry. There are numerous interest groups around the world providing definitions of BIM, proponents describing its advantages and opponents identifying challenges/barriers regarding adoption of BIM. This research is aimed at to determine what actually BIM is, along with its potential role in delivering successful construction projects. The methodology is critical analysis of secondary data sources i.e. information present in public domain, which include peer reviewed journal articles, industry and government reports, conference papers, books, case studies etc. It is discovered that clash detection and visualization are two major advantages of BIM. Clash detection option identifies clashes among structural, architectural and MEP designs before construction actually commences, which subsequently saves time as well as cost and ensures quality during execution phase of a project. Visualization is a powerful tool that facilitates in rapid decision-making in addition to communication and coordination among stakeholders throughout project’s life cycle. By eliminating inconsistencies that consume time besides cost during actual construction, improving collaboration among stakeholders throughout project’s life cycle, BIM can play a positive role to achieve efficiency and productivity that consequently deliver successful construction projects.Keywords: building information modeling, clash detection, construction project success, visualization
Procedia PDF Downloads 2612077 Integrating Experiential Real-World Learning in Undergraduate Degrees: Maximizing Benefits and Overcoming Challenges
Authors: Anne E. Goodenough
Abstract:
One of the most important roles of higher education professionals is to ensure that graduates have excellent employment prospects. This means providing students with the skills necessary to be immediately effective in the workplace. Increasingly, universities are seeking to achieve this by moving from lecture-based and campus-delivered curricula to more varied delivery, which takes students out of their academic comfort zone and allows them to engage with, and be challenged by, real world issues. One popular approach is integration of problem-based learning (PBL) projects into curricula. However, although the potential benefits of PBL are considerable, it can be difficult to devise projects that are meaningful, such that they can be regarded as mere ‘hoop jumping’ exercises. This study examines three-way partnerships between academics, students, and external link organizations. It studied the experiences of all partners involved in different collaborative projects to identify how benefits can be maximized and challenges overcome. Focal collaborations included: (1) development of real-world modules with novel assessment whereby the organization became the ‘client’ for student consultancy work; (2) frameworks where students collected/analyzed data for link organizations in research methods modules; (3) placement-based internships and dissertations; (4) immersive fieldwork projects in novel locations; and (5) students working as partners on staff-led research with link organizations. Focus groups, questionnaires and semi-structured interviews were used to identify opportunities and barriers, while quantitative analysis of students’ grades was used to determine academic effectiveness. Common challenges identified by academics were finding suitable link organizations and devising projects that simultaneously provided education opportunities and tangible benefits. There was no ‘one size fits all’ formula for success, but careful planning and ensuring clarity of roles/responsibilities were vital. Students were very positive about collaboration projects. They identified benefits to confidence, time-keeping and communication, as well as conveying their enthusiasm when their work was of benefit to the wider community. They frequently highlighted employability opportunities that collaborative projects opened up and analysis of grades demonstrated the potential for such projects to increase attainment. Organizations generally recognized the value of project outputs, but often required considerable assistance to put the right scaffolding in place to ensure projects worked. Benefits were maximized by ensuring projects were well-designed, innovative, and challenging. Co-publication of projects in peer-reviewed journals sometimes gave additional benefits for all involved, being especially beneficial for student curriculum vitae. PBL and student projects are by no means new pedagogic approaches: the novelty here came from creating meaningful three-way partnerships between academics, students, and link organizations at all undergraduate levels. Such collaborations can allow students to make a genuine contribution to knowledge, answer real questions, solve actual problems, all while providing tangible benefits to organizations. Because projects are actually needed, students tend to engage with learning at a deep level. This enhances student experience, increases attainment, encourages development of subject-specific and transferable skills, and promotes networking opportunities. Such projects frequently rely upon students and staff working collaboratively, thereby also acting to break down the traditional teacher/learner division that is typically unhelpful in developing students as advanced learners.Keywords: higher education, employability, link organizations, innovative teaching and learning methods, interactions between enterprise and education, student experience
Procedia PDF Downloads 1842076 Transformer Life Enhancement Using Dynamic Switching of Second Harmonic Feature in IEDs
Authors: K. N. Dinesh Babu, P. K. Gargava
Abstract:
Energization of a transformer results in sudden flow of current which is an effect of core magnetization. This current will be dominated by the presence of second harmonic, which in turn is used to segregate fault and inrush current, thus guaranteeing proper operation of the relay. This additional security in the relay sometimes obstructs or delays differential protection in a specific scenario, when the 2nd harmonic content was present during a genuine fault. This kind of scenario can result in isolation of the transformer by Buchholz and pressure release valve (PRV) protection, which is acted when fault creates more damage in transformer. Such delays involve a huge impact on the insulation failure, and chances of repairing or rectifying fault of problem at site become very dismal. Sometimes this delay can cause fire in the transformer, and this situation becomes havoc for a sub-station. Such occurrences have been observed in field also when differential relay operation was delayed by 10-15 ms by second harmonic blocking in some specific conditions. These incidences have led to the need for an alternative solution to eradicate such unwarranted delay in operation in future. Modern numerical relay, called as intelligent electronic device (IED), is embedded with advanced protection features which permit higher flexibility and better provisions for tuning of protection logic and settings. Such flexibility in transformer protection IEDs, enables incorporation of alternative methods such as dynamic switching of second harmonic feature for blocking the differential protection with additional security. The analysis and precautionary measures carried out in this case, have been simulated and discussed in this paper to ensure that similar solutions can be adopted to inhibit analogous issues in future.Keywords: differential protection, intelligent electronic device (IED), 2nd harmonic inhibit, inrush inhibit
Procedia PDF Downloads 3002075 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 752074 Analysis of Organizational Hybrid Agile Methods Environments: Frameworks, Benefits, and Challenges
Authors: Majid Alsubaie, Hamed Sarbazhosseini
Abstract:
Many working environments have experienced increased uncertainty due to the fast-moving and unpredictable world. IT systems development projects, in particular, face several challenges because of their rapidly changing environments and emerging technologies. Information technology organizations within these contexts adapt systems development methodology and new software approaches to address this issue. One of these methodologies is the Agile method, which has gained huge attention in recent years. However, due to failure rates in IT projects, there is an increasing demand for the use of hybrid Agile methods among organizations. The scarce research in the area means that organizations do not have solid evidence-based knowledge for the use of hybrid Agile. This research was designed to provide further insights into the development of hybrid Agile methods within systems development projects, including how frameworks and processes are used and what benefits and challenges are gained and faced as a result of hybrid Agile methods. This paper presents how three organizations (two government and one private) use hybrid Agile methods in their Agile environments. The data was collected through interviews and a review of relevant documents. The results indicate that these organizations do not predominantly use pure Agile. Instead, they are waterfall organizations by virtue of systems nature and complexity, and Agile is used underneath as the delivery model. Prince2 Agile framework, SAFe, Scrum, and Kanban were the identified models and frameworks followed. This study also found that customer satisfaction and the ability to build quickly are the most frequently perceived benefits of using hybrid Agile methods. In addition, team resistance and scope changes are the common challenges identified by research participants in their working environments. The findings can help to understand Agile environmental conditions and projects that can help get better success rates and customer satisfaction.Keywords: agile, hybrid, IT systems, management, success rate, technology
Procedia PDF Downloads 1082073 Project Management Tools within SAP S/4 Hana Program Environment
Authors: Jagoda Bruni, Jan Müller-Lucanus, Gernot Stöger-Knes
Abstract:
The purpose of this article is to demonstrate modern project management approaches in the SAP S/R Hana surrounding a programming environment composed of multiple focus-diversified projects. We would like to propose innovative and goal-oriented management standards based on the specificity of the SAP transformations and customer-driven expectations. Due to the regular sprint-based controlling and management tools' application, it has been data-proven that extensive analysis of productive hours of the employees as much as a thorough review of the project progress (per GAP, per business process, and per Lot) within the whole program, can have a positive impact on customer satisfaction and improvement for projects' budget. This has been a collaborative study based on real-life experience and measurements in collaboration with our customers.Keywords: project management, program management, SAP, controlling
Procedia PDF Downloads 93