7386 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 210
7385 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 131
7384 The Impact of Project-Based Learning under Representative Minorities Students

Authors: Shwadhin Sharma

Abstract:

As there has been increasing focus on the shorter attention span of the millennials students, there is a relative absence of instructional tools on behavioral assessments in learning information technology skills within the information systems field and textbooks. This study uses project-based learning in which students gain knowledge and skills related to information technology by working on an extended project that allows students to find a real business problem design information systems based on information collected from the company and develop an information system that solves the problem of the company. Eighty students from two sections of the same course engage in the project from the first week of the class till the sixteenth week of the class to deliver a small business information system that allows them to employ all the skills and knowledge that they learned in the class into the systems they are creating. Computer Information Systems related courses are often difficult to understand and process especially for the Under Representative Minorities students who have limited computer or information systems related (academic) experiences. Project-based learning demands constant attention of the students and forces them to apply knowledge learned in the class to a project that helps retaining knowledge. To make sure our assumption is correct, we started with a pre-test and post-test to test the students learning (of skills) based on the project. Our test showed that almost 90% of the students from the two sections scored higher in post-test as compared to pre-test. Based on this premise, we conducted a further survey that measured student’s job-search preparation, knowledge of data analysis, involved with the course, satisfaction with the course, student’s overall reaction the course and students' ability to meet the traditional learning goals related to the course.

Keywords: project-based learning, job-search preparation, satisfaction with course, traditional learning goals

Procedia PDF Downloads 201
7383 Development of Cross Curricular Competences in University Classrooms: Public Speaking

Authors: M. T. Becerra, F. Martín, P. Gutiérrez, S. Cubo, E. Iglesias, A. A. Sáenz del Castillo, P. Cañamero

Abstract:

The consolidation of the European Higher Education Area (EHEA) in universities has led to significant changes in student training. This paper, part of a Teaching Innovation Project, starts from new training requirements that are fit within Undergraduate Thesis Project, a subject that culminate student learning. Undergraduate Thesis Project is current assessment system that weigh the student acquired training in university education. Students should develop a range of cross curricular competences such as public presentation of ideas, problems and solutions both orally and writing in Undergraduate Thesis Project. Specifically, we intend with our innovation proposal to provide resources that enable university students from Teacher Degree in Education Faculty of University of Extremadura (Spain) to develop the cross curricular competence of public speaking.

Keywords: interaction, public speaking, student, university

Procedia PDF Downloads 433
7382 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector

Authors: Rawan K. Al-Duaij, Salem A. Al-Salem

Abstract:

Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.

Keywords: adjustment orders, data analysis, oil and gas sector, systems management

Procedia PDF Downloads 155
7381 Human Capital Mobility of a Skilled Workforce: A Need for a Future of Europe

Authors: Tiron-Tudor Adriana, Farcas Teodora Viorica, Ciolomic Ioana Andreea

Abstract:

The issue of human capital mobility inside Europe is still an open one. Even though there were created some tools in order to better move from one country to another to work and study the number of the people doing this is very low because of various factors presented in this paper. The "rethinking educational" agenda of the European Commission has open the floor for new projects which can create steps towards a European language for skills and competences, qualifications. One of these projects is the Partnership for Exchange of experience in Student on-the-job Training. As part of this project, we are interested to see the situation of the human capital inside EU and the elements that were created until now to support this mobility. Also, the main objective of the project is to make a comparison between the four countries involved in PEST project (Romania, Hungary, Finland, and Estonia), at the education and internship level. The results are helpful for the follow of the project, for identifying where changes can be done and need to be done.

Keywords: ECVET, human capital mobility, partnership exchange, students on the job mobility, vocational education and training

Procedia PDF Downloads 417
7380 Under the 'Umbrella' Project: A Volunteer-Mentoring Approach for Socially Disadvantaged University Students

Authors: Evridiki Zachopoulou, Vasilis Grammatikopoulos, Michail Vitoulis, Athanasios Gregoriadis

Abstract:

In the last ten years, the recent economic crisis in Greece has decreased the financial ability and strength of several families when it comes to supporting their children’s studies. As a result, the number of students who are significantly delaying or even dropping out of their university studies is constantly increasing. The students who are at greater risk for academic failure are those who are facing various problems and social disadvantages, like health problems, special needs, family poverty or unemployment, single-parent students, immigrant students, etc. The ‘Umbrella’ project is a volunteer-based initiative to tackle this problem at International Hellenic University. The main purpose of the project is to provide support to disadvantaged students at a socio-emotional, academic, and practical level in order to help them complete their undergraduate studies. More specifically, the ‘Umbrella’ project has the following goals: (a) to develop a consulting-supporting network based on volunteering senior students, called ‘i-mentors’. (b) to train the volunteering i-mentors and create a systematic and consistent support procedure for students at-risk, (c), to develop a service that, parallel to the i-mentor network will be ensuring opportunities for at-risk students to find a job, (d) to support students who are coping with accessibility difficulties, (e) to secure the sustainability of the ‘Umbrella’ project after the completion of the funding of the project. The innovation of the Umbrella project is in its holistic-person-centered approach that will be providing individualized support -via the i-mentors network- to any disadvantaged student that will come ‘under the Umbrella.’

Keywords: peer mentoring, student support, socially disadvantaged students, volunteerism in higher education

Procedia PDF Downloads 226
7379 Optimal Closed-loop Input Shaping Control Scheme for a 3D Gantry Crane

Authors: Mohammad Javad Maghsoudi, Z. Mohamed, A. R. Husain

Abstract:

Input shaping has been utilized for vibration reduction of many oscillatory systems. This paper presents an optimal closed-loop input shaping scheme for control of a three dimensional (3D) gantry crane system including. This includes a PID controller and Zero Vibration shaper which consider two control objectives concurrently. The control objectives are minimum sway of a payload and fast and accurate positioning of a trolley. A complete mathematical model of a lab-scaled 3D gantry crane is simulated in Simulink. Moreover, by utilizing PSO algorithm and a proposed scheme the controller is designed to cater both control objectives concurrently. Simulation studies on a 3D gantry crane show that the proposed optimal controller has an acceptable performance. The controller provides good position response with satisfactory payload sway in both rail and trolley responses.

Keywords: 3D gantry crane, input shaping, closed-loop control, optimal scheme, PID

Procedia PDF Downloads 407
7378 Reflections of Young Language Learners’ and Teacher Candidates’ for ‘Easy English’ Project

Authors: F. Özlem Saka

Abstract:

There should be connections between universities and state schools in order to improve the quality of instruction. ELT department of Akdeniz University carries out a project named ‘Easy English’ with a state primary school in Antalya for 2 years. According to the Project requirements, junior students at university teach English to 3rd grade primary school students during the term. They are supposed to teach the topics planned before, preparing different activities for the students. This study reflects the ideas of both students at university and at state school related to the language programme carried out. Their ideas have been collected with a questionnaire consisting of similar structured questions. The result shows that both groups like the programme and evaluate it from their own perspectives. It is believed the efficient results of this project will lead to planning similar programmes for different levels. From this study, curriculum planners and teachers can get ideas to improve language teaching at primary level as both university students, being the teachers in the project and students at state primary school have positive feelings and thoughts about it.

Keywords: foreign language teacher training, games in English teaching, songs in English teaching, teaching English to young learners

Procedia PDF Downloads 195
7377 Attribution Theory and Perceived Reliability of Cellphones for Teaching and Learning

Authors: Mayowa A. Sofowora, Seraphin D. Eyono Obono

Abstract:

The use of information and communication technologies such as computers, mobile phones and the internet is becoming prevalent in today’s world; and it is facilitating access to a vast amount of data, services, and applications for the improvement of people’s lives. However, this prevalence of ICTs is hampered by the problem of low income levels in developing countries to the point where people cannot timeously replace or repair their ICT devices when damaged or lost; and this problem serves as a motivation for this study whose aim is to examine the perceptions of teachers on the reliability of cellphones when used for teaching and learning purposes. The research objectives unfolding this aim are of two types: objectives on the selection and design of theories and models, and objectives on the empirical testing of these theories and models. The first type of objectives is achieved using content analysis in an extensive literature survey, and the second type of objectives is achieved through a survey of high school teachers from the ILembe and Umgungudlovu districts in the KwaZuluNatal province of South Africa. Data collected from this questionnaire based survey is analysed in SPSS using descriptive statistics and Pearson correlations after checking the reliability and validity of the questionnaire. The main hypothesis driving this study is that there is a relationship between the demographics and the attribution identity of teachers on one hand, and their perceptions on the reliability of cellphones on the other hand, as suggested by existing literature; except that attribution identities are considered in this study under three angles: intention, knowledge and ability, and action. The results of this study confirm that the perceptions of teachers on the reliability of cellphones for teaching and learning are affected by the school location of these teachers, and by their perceptions on learners’ cellphones usage intentions and actual use.

Keywords: attribution, cellphones, e-learning, reliability

Procedia PDF Downloads 394
7376 Gender Differences in the Perception of Advertising in Postmodern Era

Authors: J. Zavodny Pospisil, L. S. Zavodna, K. Cerna

Abstract:

The goal of this paper is to identify the main differences in the way men and women perceive TV ads. This paper is based on a research project conducted partly as a review of relevant papers, which deals with gender influence on the cognitive process and postmodern perception of advertising. In addition to that, qualitative research was conducted by means of interviews and structured questionnaires. Furthermore, data acquired from the research were used to evaluate our objectives and hypotheses. The goal of this paper is to compare women's and men's perception of advertisement. Although women are able to perceive more details than men, men are more susceptible to sexual appeals in advertising. Significant differences were also found in the perception of sexual appeals in the context of gender.

Keywords: advertising, consumer, emotion, gender, psychology of advertising

Procedia PDF Downloads 425
7375 Navigating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Derrick Mirindi, Frederic Mirindi, Oluwakemi Oshineye

Abstract:

The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 69
7374 Encouraging the Development of Scientific Literacy in Early Childhood Institutions: Croatian Experience

Authors: L. Vujičić, Ž. Ivković, Ž. Boneta

Abstract:

There is a widespread belief in everyday discourse that science subjects (physics, chemistry and biology) are, along with math, the most difficult school subjects in the education of an individual. This assumption is usually justified by the following facts: low GPA in these subjects, the number of pupils who fail these subjects is high in comparison to other subjects, and the number of pupils interested in continuing their studies in the fields with a focus on science subjects is lower compared to non-science-oriented fields. From that perspective, the project: “Could it be different? How do children explore it?” becomes extremely interesting because it is focused on young children and on the introduction of new methods, with aim of arousing interest in scientific literacy development in 10 kindergartens by applying the methodology of an action research, with an ethnographic approach. We define scientific literacy as a process of encouraging and nurturing the research and explorative spirit in children, as well as their natural potential and abilities that represent an object of scientific research: to learn about exploration by conducting exploration. Upon project completion, an evaluation questionnaire was created for the parents of the children who had participated in the project, as well as for those whose children had not been involved in the project. The purpose of the first questionnaire was to examine the level of satisfaction with the project implementation and its outcomes among those parents whose children had been involved in the project (N=142), while the aim of the second questionnaire was to find out how much the parents of the children not involved (N=154) in this activity were interested in this topic.

Keywords: documenting, early childhood education, evaluation questionnaire for parents, scientific literacy development

Procedia PDF Downloads 246
7373 Educational Experience and the Investigation Results: Creation of New Healthy Products

Authors: G. Espinosa Garza, I. Loera, N. Antonyan

Abstract:

In the last decades, teaching in particular engineering subjects is going through a significative problem. A quick evaluation of the entrepreneurial surroundings makes it more difficult for students to identify the course contents with real situations related with their future professions. Proposing teaching through challenges or problem-based projects, and real-life situations is turning into an important challenge for any university-level educator. The objective of this work is to present the educational experience and the investigation results taken through the Project Viability course, done by a group of professors and students from the Technologic of Monterrey. Currently, in Mexico, the orange peels are considered a dispose and they are not being utilized as an alternative to create subproducts. However, there is a great opportunity in its use as a raw material with the goal to originate the waste from the local citric firms or business. The project challenge consisted in the development of edible products from the orange peel with the intention to generate new healthy products. With this project, apart from the obtainment of the original results, the accomplishment consisted in creating a learning atmosphere, where students together with the professors were able to plan, evaluate, and implement the project related with the creative, innovative, and sustainable processes with the goal to apply it in the development of local solutions. In the present article, the pedagogic methodologies that allowed to carry out this project will be discussed.

Keywords: engineering subjects, learning project, orange peel, sustainable process

Procedia PDF Downloads 286
7372 Evaluating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Mirindi Derrick, Mirindi Frederic, Oluwakemi Oshineye

Abstract:

Abstract: The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 39
7371 A Method for Allocation of Smart Intersections Using Traffic Information

Authors: Sang-Tae Ji, Jeong-Woo Park, Jun-Ho Park, Kwang-Woo Nam

Abstract:

This study aims is to suggest the basic factors by considering the priority of intersection in the diffusion project of Smart intersection. Busan Metropolitan City is conducting a smart intersection project for efficient traffic management. The smart intersection project aims to make breakthrough improvement of the intersection congestion by optimizing the signal system using CCTV (closed-circuit television camera) image analysis technology. This study investigated trends of existing researches and analyzed by setting three things of traffic volume, characteristics of intersection road, and whether or not to conduct the main arterial road as factors for selecting new intersection when spreading smart intersection. Using this, we presented the priority of the newly installed intersection through the present situation and analysis for the Busan Metropolitan City which is the main destination of the spreading project of the smart intersection. The results of this study can be used as a consideration in the implementation of smart intersection business.

Keywords: CCTV, GIS, ICT, Smart City, smart intersection

Procedia PDF Downloads 380
7370 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 303
7369 Team Teaching versus Traditional Pedagogical Method

Authors: L. M. H. Mustonen, S. A. Heikkilä

Abstract:

The focus of the paper is to describe team teaching as a HAMK’s pedagogical method, and its impacts to the teachers work. Background: Traditionally it is thought that teaching is a job where one mostly works alone. More and more teachers feel that their work is getting more stressful. Solutions to these problems have been sought in Häme University of Applied sciences’ (From now on referred to as HAMK). HAMK has made a strategic change to move to the group oriented working of teachers. Instead of isolated study courses, there are now larger 15 credits study modules. Implementation: As examples of the method, two cases are presented: technical project module and summer studies module, which was integrated into the EU development project called Energy Efficiency with Precise Control. In autumn 2017, technical project will be implemented third time. There are at least three teachers involved in it and it is the first module of the new students. Main focus is to learn the basic skills of project working. From communicational viewpoint, they learn the basics of written and oral reporting and the basics of video reporting skills. According to our quality control system, the need for the development is evaluated in the end of the module. There are always some differences in each implementation but the basics are the same. The other case summer studies 2017 is new and part of a larger EU project. For the first time, we took a larger group of first to third year students from different study programmes to the summer studies. The students learned professional skills and also skills from different fields of study, international cooperation, and communication skills. Benefits and challenges: After three years, it is possible to consider what the changes mean in the everyday work of the teachers - and of course – what it means to students and the learning process. The perspective is HAMK’s electrical and automation study programme: At first, the change always means more work. The routines born after many years and the course material used for years may not be valid anymore. Teachers are teaching in modules simultaneously and often with some subjects overlapping. Finding the time to plan the modules together is often difficult. The essential benefit is that the learning outcomes have improved. This can be seen in the feedback given by both the teachers and the students. Conclusions: A new type of working environment is being born. A team of teachers designs a module that matches the objectives and ponders the answers to such questions as what are the knowledge-based targets of the module? Which pedagogical solutions will achieve the desired results? At what point do multiple teachers instruct the class together? How is the module evaluated? How can the module be developed further for the next execution? The team discusses openly and finds the solutions. Collegiate responsibility and support are always present. These are strengthening factors of the new communal university teaching culture. They are also strong sources of pleasure of work.

Keywords: pedagogical development, summer studies, team teaching, well-being at work

Procedia PDF Downloads 100
7368 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 325
7367 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: tunnelling, geology, HRT, rockmass

Procedia PDF Downloads 247
7366 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project

Authors: Balázs Kulcsár

Abstract:

Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.

Keywords: sustainability, ecosystem service, land use conflict, landscape utilization

Procedia PDF Downloads 157
7365 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage

Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek

Abstract:

This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.

Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS

Procedia PDF Downloads 414
7364 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches

Authors: Maria Ledinskaya

Abstract:

This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: project management, conservation, waterfall, agile, lean, hybrid

Procedia PDF Downloads 92
7363 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 93
7362 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 290
7361 Continuous Improvement in Emerging Economies: Insights from a Multi-Case Analysis

Authors: Luis A. Paipa-Galeano, Yavar Jarrah-Nezhad, César A. Bernal-Torres

Abstract:

This paper presents a case study of four companies in an emerging economy to identify the key success factors and barriers to sustaining continuous improvement practices. The study analyzes the empirical evidence and compares it to the literature review to provide insights for companies looking to increase their maturity level in this area. The five success factors identified are the availability of resources, commitment and support from management, participation of employees in identifying tasks to improve, clear and realistic objectives for continuous improvement, and the existence of a leader or responsible for continuous improvement. The major barriers to success are a lack of alignment between the organization’s strategic objectives and continuous improvement objectives, a lack of motivation in the team, and resistance to change. The paper concludes with recommendations for companies to reduce the risk of improvement failure and increase their maturity level in continuous improvement.

Keywords: emerging economies, Kaizen, continuous improvement sustainability, maturity model

Procedia PDF Downloads 58
7360 Developing Geriatric Oral Health Network is a Public Health Necessity for Older Adults

Authors: Maryam Tabrizi, Shahrzad Aarup

Abstract:

Objectives- Understanding the close association between oral health and overall health for older adults at the right time and right place, a person, focus treatment through Project ECHO telementoring. Methodology- Data from monthly ECHO telementoring sessions were provided for three years. Sessions including case presentations, overall health conditions, considering medications, organ functions limitations, including the level of cognition. Contributions- Providing the specialist level of providing care to all elderly regardless of their location and other health conditions and decreasing oral health inequity by increasing workforce via Project ECHO telementoring program worldwide. By 2030, the number of adults in the USA over the age of 65 will increase more than 60% (approx.46 million) and over 22 million (30%) of 74 million older Americans will need specialized geriatrician care. In 2025, a national shortage of medical geriatricians will be close to 27,000. Most individuals 65 and older do not receive oral health care due to lack of access, availability, or affordability. One of the main reasons is a significant shortage of Oral Health (OH) education and resources for the elderly, particularly in rural areas. Poor OH is a social stigma, a thread to quality and safety of overall health of the elderly with physical and cognitive decline. Poor OH conditions may be costly and sometimes life-threatening. Non-traumatic dental-related emergency department use in Texas alone was over $250 M in 2016. Most elderly over the age of 65 present with at least one or multiple chronic diseases such as arthritis, diabetes, heart diseases, and chronic obstructive pulmonary disease (COPD) are at higher risk to develop gum (periodontal) disease, yet they are less likely to get dental care. In addition, most older adults take both prescription and over-the-counter drugs; according to scientific studies, many of these medications cause dry mouth. Reduced saliva flow due to aging and medications may increase the risk of cavities and other oral conditions. Most dental schools have already increased geriatrics OH in their educational curriculums, but the aging population growth worldwide is faster than growing geriatrics dentists. However, without the use of advanced technology and creating a network between specialists and primary care providers, it is impossible to increase the workforce, provide equitable oral health to the elderly. Project ECHO is a guided practice model that revolutionizes health education and increases the workforce to provide best-practice specialty care and reduce health disparities. Training oral health providers for utilizing the Project ECHO model is a logical response to the shortage and increases oral health access to the elderly. Project ECHO trains general dentists & hygienists to provide specialty care services. This means more elderly can get the care they need, in the right place, at the right time, with better treatment outcomes and reduces costs.

Keywords: geriatric, oral health, project echo, chronic disease, oral health

Procedia PDF Downloads 168
7359 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 51
7358 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.

Keywords: strategy, project management, strategy implementation, agile

Procedia PDF Downloads 111
7357 Anatomy of the Challenges, Problems and Prospects of Polytechnic Administration in North-Central Nigeria

Authors: A. O. Osabo

Abstract:

Polytechnic education is often described as the only sustainable academic institution that can propel massive industrial and technological growth and development in all sectors of the Nigerian economy. Because of its emphasis on science and technology, practical demonstration of skills and pivotal role in the training of low-and-high-cadre technologists and technocrats to man critical sectors of the economy, the administration of polytechnics needs to be run according to global best standards and practices in order to achieve their goals and objectives. Besides, the polytechnics need to be headed by seasoned and academically sound professionals to pursue the goals and objectives of the schools as centres of technology, learning and academic excellence. Over the years, however, polytechnics in Nigeria have suffered a wide myriad of administrative problems and challenges which have prevented them from achieving their basic goals and objectives. Apart from regulatory problems and challenges, some heads of polytechnics do not demonstrate leadership and management skills in bringing the desired innovations in the management of the polytechnics under them. These have resulted, in most cases, to the polytechnics not performing optimally in its mandate. This paper examines the administrative problems, challenges and prospects of polytechnics education in north-central Nigeria. Using a total of 97 questionnaires consisting of semi-structured interviews of yes-or-no questions shared among staff and students of the selected polytechnics and a descriptive statistical method of analysis, the study found that the inability of the polytechnics to meet their goals and objectives is caused by administrative and organizational problems and challenges, bordering on funding, accreditation, manpower, corruption and maladministration, among others. The paper thus suggests that the leadership of the polytechnics must rise up to the demands of the time in order to deal with the administrative problems and challenges affecting them and fulfill the goals and objectives for which the schools were established.

Keywords: education, administration, polytechnic, accreditation, Nigerian

Procedia PDF Downloads 259