8170 Dynamic Construction Site Layout Using Ant Colony Optimization

Authors: Yassir AbdelRazig

Abstract:

Evolutionary optimization methods such as genetic algorithms have been used extensively for the construction site layout problem. More recently, ant colony optimization algorithms, which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to benchmark combinatorial optimization problems. This paper proposes a formulation of the site layout problem in terms of a sequencing problem that is suitable for solution using an ant colony optimization algorithm. In the construction industry, site layout is a very important planning problem. The objective of site layout is to position temporary facilities both geographically and at the correct time such that the construction work can be performed satisfactorily with minimal costs and improved safety and working environment. During the last decade, evolutionary methods such as genetic algorithms have been used extensively for the construction site layout problem. This paper proposes an ant colony optimization model for construction site layout. A simple case study for a highway project is utilized to illustrate the application of the model.

Keywords: ant colony, construction site layout, optimization, genetic algorithms

Procedia PDF Downloads 382
8169 Towards Sustainable Construction: An Exploratory Study of the Factors Affecting the Investment on Construction and Demolition Waste in Saudi Arabia (KSA)

Authors: Mohammed Alnuwairan, Mahmoud Abdelrahman

Abstract:

Based on the sustainability concept, this paper explores the current situation of construction and demolition waste (C&D) in the Kingdom of Saudi Arabia (KSA) from the source of production to final destinations. The issues that hindered the investment of recycling C&D in the context will be studied in order to identify the challenges and opportunities to improve this sector and put forward a strategic framework to reduce, reuse, recycle and minimize the disposal of this type of waste. The research, which is exploratory in nature, identified four types of organizations that were appropriate case studies. These organizations were drawn from the municipalities, city council, recyclers and manufacturers. Secondary data collection, direct observation, and elite interviewing methods were used in the case studies to facilitate comparisons with existing literature to explore opportunities to improve sustainability practices in the buildings sector. Implementation of C&D waste management and recycling in KSA is in the early stages. Resistance of virgin building material manufacturers, free usage of landfill, culture, surpluses of natural raw material, availability of land and the cost of recycling this material compared with virgin material hinders the adoption of recycled buildings martial. Although the metal material is collected and recycled but it has the lowest percentage of C&D waste in Saudi. The findings indicate that government and industry need to collaborate more closely in order to successfully implement best practices. Economic and environmental benefits can be achieved, particularly through improvements to infrastructure and legislation. Feasible solution framework and recommendations for managing C&D waste under current situation are provided. The findings can be used to extend this framework and to enable it to be applicable in other context with emerging economies similar to that found in KSA. No study of this type has been previously carried out in KSA. The findings should prove useful in creating a future research agenda for C&D waste in KSA and, possibly, other emerging countries within a similar context.

Keywords: construction and demolition waste, recycling, reuse, sustainability

Procedia PDF Downloads 349
8168 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 193
8167 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 68
8166 Owner/Managers’ External Financing Used and Preference towards Islamic Banking

Authors: Khalid Hassan Abdesamed, Kalsom Abd Wahab

Abstract:

Economic development and growth are significantly linked to the consistent and sustainable sector of small and medium enterprises (SMEs). Banks are the frontrunners in financing and advising SMEs. The main objective of the study is to assess the tendency of SMEs to use the Islamic bank. Model was developed using quantitative method with a hypothetical-deductive testing approach. Model (N = 364) used primary data on the tendency of SMEs to use Islamic banks gathered from questionnaire. It is found by Mann-Whitney test that the tendency to use Islamic bank varies between those firms which consider formal financing with the ones relying on informal financing with the latter tends more to use Islamic bank. This study can serve academic researchers, policy makers, and developing countries as a model of SMEs’ desirability to Islamic banking.

Keywords: formal financing, informal financing, Islamic bank, SMEs

Procedia PDF Downloads 351
8165 Impact of Schools' Open and Semi-Open Spaces on Student's Studying Behavior

Authors: Chaithanya Pothuganti

Abstract:

Open and semi-open spaces in educational buildings like corridors, mid landings, seating spaces, lobby, courtyards are traditionally have been the places of social communion and interaction which helps in promoting the knowledge, performance, activeness, and motivation in students. Factors like availability of land, commercialization, of educational facilities, especially in e-techno and smart schools, led to closed classrooms to accommodate students thereby lack quality open and semi-open spaces. This insufficient attention towards open space design which is a means of informal learning misses an opportunity to encourage the student’s skill development, behavior and learning skills. The core objective of this paper is to find the level of impact on student learning behavior and to identify the suitable proportions and configuration of spaces that shape the schools. In order to achieve this, different types of open spaces in schools and their impact on student’s performance in various existing models are analysed using case studies to draw some design principles. The study is limited to indoor open spaces like corridors, break out spaces and courtyards. The expected outcome of the paper is to suggest better design considerations for the development of semi-open and open spaces which functions as an element for informal learnings. Its focus is to provide further thinking on designing and development of open spaces in educational buildings.

Keywords: configuration of spaces and proportions, informal learning, open spaces, schools, student’s behavior

Procedia PDF Downloads 309
8164 Top-Down Construction Method in Concrete Structures: Advantages and Disadvantages of This Construction Method

Authors: Hadi Rouhi Belvirdi

Abstract:

The construction of underground structures using the traditional method, which begins with excavation and the implementation of the foundation of the underground structure, continues with the construction of the main structure from the ground up, and concludes with the completion of the final ceiling, is known as the Bottom-Up Method. In contrast to this method, there is an advanced technique called the Top-Down Method, which has practically replaced the traditional construction method in large projects in industrialized countries in recent years. Unlike the traditional approach, this method starts with the construction of surrounding walls, columns, and the final ceiling and is completed with the excavation and construction of the foundation of the underground structure. Some of the most significant advantages of this method include the elimination or minimization of formwork surfaces, the removal of temporary bracing during excavation, the creation of some traffic facilities during the construction of the structure, and the possibility of using it in limited and high-traffic urban spaces. Despite these numerous advantages, unfortunately, there is still insufficient awareness of this method in our country, to the extent that it can be confidently stated that most stakeholders in the construction industry are unaware of the existence of such a construction method. However, it can be utilized as a very important execution option alongside other conventional methods in the construction of underground structures. Therefore, due to the extensive practical capabilities of this method, this article aims to present a methodology for constructing underground structures based on the aforementioned advanced method to the scientific community of the country, examine the advantages and limitations of this method and their impacts on time and costs, and discuss its application in urban spaces. Finally, some underground structures executed in the Ahvaz urban rail, which are being implemented using this advanced method to the best of our best knowledge, will be introduced.

Keywords: top-down method, bottom-up method, underground structure, construction method

Procedia PDF Downloads 11
8163 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 394
8162 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 145
8161 The Role of Building Information Modeling as a Design Teaching Method in Architecture, Engineering and Construction Schools in Brazil

Authors: Aline V. Arroteia, Gustavo G. Do Amaral, Simone Z. Kikuti, Norberto C. S. Moura, Silvio B. Melhado

Abstract:

Despite the significant advances made by the construction industry in recent years, the crystalized absence of integration between the design and construction phases is still an evident and costly problem in building construction. Globally, the construction industry has sought to adopt collaborative practices through new technologies to mitigate impacts of this fragmented process and to optimize its production. In this new technological business environment, professionals are required to develop new methodologies based on the notion of collaboration and integration of information throughout the building lifecycle. This scenario also represents the industry’s reality in developing nations, and the increasing need for overall efficiency has demanded new educational alternatives at the undergraduate and post-graduate levels. In countries like Brazil, it is the common understanding that Architecture, Engineering and Building Construction educational programs are being required to review the traditional design pedagogical processes to promote a comprehensive notion about integration and simultaneity between the phases of the project. In this context, the coherent inclusion of computation design to all segments of the educational programs of construction related professionals represents a significant research topic that, in fact, can affect the industry practice. Thus, the main objective of the present study was to comparatively measure the effectiveness of the Building Information Modeling courses offered by the University of Sao Paulo, the most important academic institution in Brazil, at the Schools of Architecture and Civil Engineering and the courses offered in well recognized BIM research institutions, such as the School of Design in the College of Architecture of the Georgia Institute of Technology, USA, to evaluate the dissemination of BIM knowledge amongst students in post graduate level. The qualitative research methodology was developed based on the analysis of the program and activities proposed by two BIM courses offered in each of the above-mentioned institutions, which were used as case studies. The data collection instruments were a student questionnaire, semi-structured interviews, participatory evaluation and pedagogical practices. The found results have detected a broad heterogeneity of the students regarding their professional experience, hours dedicated to training, and especially in relation to their general knowledge of BIM technology and its applications. The research observed that BIM is mostly understood as an operational tool and not as methodological project development approach, relevant to the whole building life cycle. The present research offers in its conclusion an assessment about the importance of the incorporation of BIM, with efficiency and in its totality, as a teaching method in undergraduate and graduate courses in the Brazilian architecture, engineering and building construction schools.

Keywords: building information modeling (BIM), BIM education, BIM process, design teaching

Procedia PDF Downloads 154
8160 Inclusive Practices in Physical Education: A Survey of Pre-Service Teachers' Attitudes and Self-Efficacy in the Context of Teachers' Training

Authors: Teresa M. Odipo

Abstract:

Inclusive physical education and an inclusive educational approach in German schools have received much attention in recent years due to the UN Convention on the rights of persons with disabilities proposals, which came into force in Germany in 2009. The aim of inclusive PE is to include children with disabilities and able bodied children, based on the idea, that all children should attend school together. While PE mostly took place in a heterogeneous environment, introducing children with all kinds of disabilities posed more challenges to the teachers, when children with disabilities were included. Therefore it is important that the educational approach should include pre-service teachers’ (PST) self-efficacy for and their attitudes towards inclusive practices. The PSTs’ self-efficacy for inclusive practices is one of the strongest predictors of the success of the inclusion reforms introduced in 2009, in order to improve PSTs’ ability to handle these very new challenges. PE stands out because the very nature of sport involves the body which means that all children, especially those with special needs should be treated in an appropriate manner. Up till now, it has been mostly English-speaking countries that have been assessed for inclusive practices in PE. Due to the lack of research in Germany, there is a strong need to question PSTs’ prepared-ness. This paper presents results from the 2016 survey conducted on around 100 PSTs by the German University of Sports in Cologne and opens up new directions within PSTs’ education, concerning their attitudes and self-efficacy towards inclusive PE. These new aspects will be included in the construction of new learning and teaching tools to improve pre-service teachers’ education for inclusive Physical Education.

Keywords: attitudes, inclusive physical education, pre-service teachers, self-efficacy

Procedia PDF Downloads 353
8159 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 234
8158 Brine Waste from Seawater Desalination in Malaysia

Authors: Cynthia Mahadi, Norhafezah Kasmuri

Abstract:

Water scarcity is a growing issue these days. As a result, saltwater is being considered a limitless supply of fresh water through the desalination process, which is likely to address the worldwide water crisis, including in Malaysia. This study aims to offer the best management practice for controlling brine discharge in Malaysia by comparing environmental regulations on brine waste management in other countries. Then, a survey was distributed to the public to acquire further information about their level of awareness of the harmful effects of brine waste and to find out their perspective on the proposed solutions to ensure the effectiveness of the measures. As a result, it has been revealed that Malaysia still lacks regulations regarding the disposal of brine waste. Thus, a recommendation based on practices in other nations has been put forth by this study. This study suggests that the government and Malaysia's environmental regulatory body should govern brine waste disposal in the Environmental Quality Act 1974. Also, to add the construction of a desalination plant in Schedule 1 of prescribed activities was necessary. Because desalination plants can harm the environment during both construction and operation, every proposal for the construction of a desalination plant should involve the submission of an environmental impact assessment (EIA).

Keywords: seawater desalination, brine waste, environmental impact assessment, fuzzy Delphi method

Procedia PDF Downloads 80
8157 Suitability of Quarry Dust as Replacement of Sand in Medium Grade Concrete

Authors: Popoola M. Oyenola

Abstract:

Concrete plays the important role and a huge percentage of concrete is being utilized in every construction practices. Natural river sand is one of the major ingredients of concrete, is becoming expensive due to excessive cost of accessibility from sources. Also large scale depletion of sources creates environmental problems. Therefore, there is a need of economic alternative materials. Quarry dust is a waste obtained during quarrying process. It has been rampantly used in different construction practices and could be used as an effective fine aggregate instead of river sand. Partial and total replacement of fine aggregate in conventional concrete with quarry dust has been empirically conducted with the view to examining primarily the compressive strength of the resulting composite and possible total utilization of quarry dust as fine aggregate in the production of medium grade concrete. The results of the study showed that its specific gravity, porosity and water absorption showed satisfactory performance. The percentage replacement of natural river sand with quarry dust for a designed strength of 25N/mm2 varied at intervals of 10% up to a maximum value of 100%. A total of 132 cubes of 150 x 150 x 150mm were cast and tested at 7, 14 and 28 days of hydration. Compressive strength increases with curing age in all the mixes. Compressive strength decreases with increase in percentage of quarry dust. Generally the compressive strength of concrete incorporating quarry dust attained strength of 22.47 N/mm2 after 28 days which makes it a suitable aggregate for the production medium grade concrete.

Keywords: quarry dust, concrete, aggregates, compressive strength

Procedia PDF Downloads 243
8156 A Case of Generalized Anxiety Disorder (GAD)

Authors: Muhammad Zeeshan

Abstract:

This case study is about a 54 years man named Mr. U, referred to Capital Hospital, Islamabad, with the presenting complaints of Generalized Anxiety Disorder (GAD). Contrary to his complaints, the client reported psychological symptoms such as restlessness, low mood and fear of darkness and fear from closed places from the last 30 days. He also had a fear of death and his existence in the grave. His sleep was also disturbed due to excessive urination due to diabetes. He was also suffering from semantic symptoms such as headache, numbness of feet and pain in the chest and blockage of the nose. A complete history was taken and informal assessment (clinical interview and MSE) and formal testing (BAI) was applied that showed the clear diagnosis of Generalized Anxiety Disorder. CBT, relaxation techniques, prayer chart and behavioural techniques were applied for the treatment purposes.

Keywords: generalized anxiety disorder, presenting complaints, formal and informal assessment, diagnosis

Procedia PDF Downloads 285
8155 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 65
8154 An Examination of the Effects of Implantable Technologies on the Practices of Governmentality

Authors: Benn Van Den Ende

Abstract:

Over the last three decades, there has been an exponential increase in developments in implantable technologies such as the cardiac pacemaker, bionic prosthesis, and implantable chips. The effect of these technologies has been well researched in many areas. However, there is a lack of critical research in security studies. This paper will provide preliminary findings to an ongoing research project which aims to examine how implantable technologies effect the practices of governmentality in the context of security. It will do this by looking at the practices and techniques of governmentality along with different implantable technologies which increase, change or otherwise affect governmental practices. The preliminary research demonstrates that implantable technologies have a profound effect on the practices of governmentality, while also paving the way for further research into a potential ‘new’ form of governmentality in relation to these implantable technologies.

Keywords: critical security studies, governmentality, security theory, political theory, Foucault

Procedia PDF Downloads 189
8153 The Impact of Floods and Typhoons on Housing Welfare: Case Study of Thua Thien Hue Province, Vietnam

Authors: Seyeon Lee, Suyeon Lee, Julia Rogers

Abstract:

This research investigates and records post-flood and typhoon conditions of low income housing in the Thua Thien Hue Province, Vietnam; area prone to extreme flooding in Central Vietnam. The cost of rebuilding houses after flood and typhoon has been always a burden for low income households. These costs often lead to the elimination of essential construction practices for disaster resistance. Despite relief efforts from international non-profit organizations and Vietnam government, the impacts of flood and typhoon damages to residential construction has been reoccurring to the same neighborhood annually. Notwithstanding its importance, this topic has not been systematically investigated. The study is limited to assistance provided to low income households documenting existing conditions of low income homes impacted by post flood and typhoon conditions in the Thua Thien Hue Province. The research identifies leading causes of the building failure from the natural disasters. Relief efforts and progress made since the last typhoon is documented. The quality of construction and repairs are assessed based on Home Builders Guide to Coastal Construction by Federal Emergency Management Agency. Focus group discussions and individual interviews with local residents from four different communities were conducted to get incites on repair effort by the non-profit organizations and Vietnam government, and their needs post flood and typhoon. The findings from the field study informed that many of the local people are now aware of the importance of improving housing conditions as one of the key coping strategies to withstand flood and typhoon events as it makes housing and community more resilient to future events. While there has been a remarkable improvement of housing and infrastructure with the support from the local government as well as the non-profit organizations, many households in the study areas are found to still live in weak and fragile housing conditions without gaining access to the aid to repair and strengthen the houses. Given that the major immediate recovery action taken by the local people tends to focus on repairing damaged houses, and on this ground, low-income households spend a considerable amount of their income on housing repair, providing proper and applicable construction practices will not only improve the housing condition, but also contribute to reducing poverty in Vietnam.

Keywords: disaster coping mechanism, housing welfare, low-income housing, recovery reduction

Procedia PDF Downloads 271
8152 Analysis of Construction Waste Generation and Its Effect in a Construction Site

Authors: R. K. D. G. Kaluarachchi

Abstract:

The generation of solid waste and its effective management are debated topics in Sri Lanka as well as in the global environment. It was estimated that the most of the waste generated in global was originated from construction and demolition of buildings. Thus, the proportion of construction waste in solid waste generation cannot be underestimated. The construction waste, which is the by-product generated and removed from work sites is collected in direct and indirect processes. Hence, the objectives of this research are to identify the proportion of construction waste which can be reused and identify the methods to reduce the waste generation without reducing the quality of the process. A 6-storey building construction site was selected for this research. The site was divided into six zones depending on the process. Ten waste materials were identified by considering the adverse effects on safety and health of people and the economic value of them. The generated construction waste in each zone was recorded per week for a period of five months. The data revealed that sand, cement, wood used for form work and rusted steel rods were the generated waste which has higher economic value in all zones. Structured interviews were conducted to gather information on how the materials are categorized as waste and the capability of reducing, reusing and recycling the waste. It was identified that waste is generated in following processes; ineffective storage of material for a longer time and improper handling of material during the work process. Further, the alteration of scheduled activities of construction work also yielded more waste. Finally, a proper management of construction waste is suggested to reduce and reuse waste.

Keywords: construction-waste, effective management, reduce, reuse

Procedia PDF Downloads 200
8151 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 83
8150 Construction of Wind Tunnel for Aerodynamic

Authors: Elmo Thiago Lins Cöuras Ford, Valentina Alessandra Carvalho do Vale, José Ubiragi de Lima Mendes

Abstract:

The study of the aerodynamics is related to the improvement in the acting of airplanes and automobiles with the objective of being reduced the effect of the attrition of the air on structures, providing larger speeds and smaller consumption of fuel. The application of the knowledge of the aerodynamics not more limits to the aeronautical and automobile industries. In that way, being tried the new demands with relationship to the aerodynamic study in the most several areas of the engineering, this work presents the stages of the project and construction of a wind tunnel for application in aerodynamic rehearsals. Among the several configurations of existent wind tunnels, opted to build open circuit, due to smaller construction complexity and installation; operational simplicity and cost reduced. Belonging to the type blower, to take advantage of a larger efficiency of the motor; and with diffusion so that flowed him of air it wins speed before reaching the section of rehearsals. The guidelines for project were: didactic practices: study of the layer it limits and analyze of the drainages on proof bodies with different geometries. For the pressure variation in the test section a connected manometer used a pitot tube. Quantitative and qualitative results showed to be satisfactory.

Keywords: wind tunnel, aerodynamics, air, airplane

Procedia PDF Downloads 486
8149 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 247
8148 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 55
8147 Study on the Model Predicting Post-Construction Settlement of Soft Ground

Authors: Pingshan Chen, Zhiliang Dong

Abstract:

In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.

Keywords: prediction, model, post-construction settlement, soft ground

Procedia PDF Downloads 425
8146 Building Information Models Utilization for Design Improvement of Infrastructure

Authors: Keisuke Fujioka, Yuta Itoh, Masaru Minagawa, Shunji Kusayanagi

Abstract:

In this study, building information models of the underground temporary structures and adjacent embedded pipes were constructed to show the importance of the information on underground pipes adjacent to the structures to enhance the productivity of execution of construction. Next, the bar chart used in actual construction process were employed to make the Gantt chart, and the critical pass analysis was carried out to show that accurate information on the arrangement of underground existing pipes can be used for the enhancement of the productivity of the construction of underground structures. In the analyzed project, significant construction delay was not caused by unforeseeable existence of underground pipes by the management ability of the construction manager. However, in many cases of construction executions in the developing countries, the existence of unforeseeable embedded pipes often causes substantial delay of construction. Design change based on uncertainty on the position information of embedded pipe can be also important risk for contractors in domestic construction. So CPM analyses were performed by a project-management-software to the situation that influence of the tasks causing construction delay was assumed more significant. Through the analyses, the efficiency of information management on underground pipes and BIM analysis in the design stage for workability improvement was indirectly confirmed.

Keywords: building-information modelling, construction information modelling, design improvement, infrastructure

Procedia PDF Downloads 308
8145 Street Begging: A Loss of Human Resource in Nigeria

Authors: Sulaiman Kassim Ibrahim

Abstract:

Human Resource is one of the most important elements in any country. They are very important in actualizing the potential of every sector in the country, i.e Agric, Education, Finance, Judiciary and all formal and informal sectors. The purpose of this study is to investigate the loss of human resource in Nigeria through street begging. The study used intensive literature review. Finding from the review indicate that a significant number of human resource are into street begging in the country undeveloped and untapped. The paper recommend that policy should be initiated to discourage street begging, develop this resource through education and empowerment, stop rural-urban migration by providing infrastructure in the rural areas and abolish informal (Almajiri or beggars school) and transform it into formal school.

Keywords: human resource, street begging, Nigeria, Almajiri

Procedia PDF Downloads 255
8144 Application of Support Vector Machines in Forecasting Non-Residential

Authors: Wiwat Kittinaraporn, Napat Harnpornchai, Sutja Boonyachut

Abstract:

This paper deals with the application of a novel neural network technique, so-called Support Vector Machine (SVM). The objective of this study is to explore the variable and parameter of forecasting factors in the construction industry to build up forecasting model for construction quantity in Thailand. The scope of the research is to study the non-residential construction quantity in Thailand. There are 44 sets of yearly data available, ranging from 1965 to 2009. The correlation between economic indicators and construction demand with the lag of one year was developed by Apichat Buakla. The selected variables are used to develop SVM models to forecast the non-residential construction quantity in Thailand. The parameters are selected by using ten-fold cross-validation method. The results are indicated in term of Mean Absolute Percentage Error (MAPE). The MAPE value for the non-residential construction quantity predicted by Epsilon-SVR in corporation with Radial Basis Function (RBF) of kernel function type is 5.90. Analysis of the experimental results show that the support vector machine modelling technique can be applied to forecast construction quantity time series which is useful for decision planning and management purpose.

Keywords: forecasting, non-residential, construction, support vector machines

Procedia PDF Downloads 434
8143 The Social Enterprise Model And Its Beneficiaries

Authors: Lorryn Williams

Abstract:

This study will explore how the introduction of the for-profit social enterprise model affects the real lives of the individuals and communities that this model aims to help in South Africa. The congruence between organisational need construction and the real needs of beneficiaries, and whether the adoption of a profit driven model, such as social entrepreneurship, supports or discards these needs is key to answering the former question. By making use of qualitative methods, the study aims to collect empirical evidence that either supports the social entrepreneurship approach when compared to other programs such as vocational training programs or rejects it as less beneficial. It is the objective of this research to provide an answer to the question of whether the social enterprise model of conducting charity leaves the beneficiaries of non-profit organisations in a generally better or worse off position. The study will specifically explore the underlying assumptions the social entrepreneurship model makes, since the assumptions made concerning the uplifting effects it has on its beneficiaries may produce either real or assumed change for beneficiaries. The meaning of social cohesion and social capital for these organisations, the construction of beneficiary dependence and independence, the consideration of formal and informal economies beneficiaries engage in, and the extent to which sustainability is used as a brand, will be investigated. Through engaging the relevant literature, experts in the field of non-profit donorship and need implementation, organisations who have both adopted social enterprise programs and not, and most importantly, the beneficiaries themselves, it will be possible to provide answers to questions this study aims to answer.

Keywords: social enterprise, beneficiaries, profit driven model, non-profit organizations

Procedia PDF Downloads 140
8142 Sustainability as a Platform in Microfinance Industry for Developing Countries

Authors: Nor Azlina Ab.Rahman, Salwana Hassan, Zuraeda Ibrahim, Normah Omar, Jamaliah Said

Abstract:

Revolution in the business environment has crucial growing changes on most globalized markets. Numerous of organizations are necessitating towards producing more proactive entrepreneurs with a dynamic teams, who can run and steer their business to victory. Revolutionizing on business strategy and entrepreneurial skills, also implementing innovation and practices to enhance its performance is necessary for these organizations to be more cost-efficient and increase their efficiency. The study aims to clarify issues of whether measurement has a positive effect on different aspects of innovation and best practices. The study contributes to the current understanding in three ways; first by presenting the important aspects of organizational innovation and best practices. Second by showing the importance of measurement in promoting different aspects of innovation and best practices. Third is to examine the link between innovation, best practices and sustainability in microfinance. The study has been executed by conducting a qualitative study toward the microfinance industry. A representative of management and employees in each company was selected through an invitation to participate in getting information for data collection purpose in the study. The study contains a comprehensive description of the impacts of measurement on different aspects of innovation and best practices towards sustainability in both microfinance industries and SMEs. Findings from this study shows that performance measurement has positive effects on issues related to innovation and best practices. The measurement for several aspects of innovation and best practices is good potential in microfinance industries. Additionally, measurement on innovation and best practices shows a positively related with each other to enhance organization performance. The study suggests that both academics and practitioners should focus on the development of new methods and practices to describe and scrutinize further understanding for measuring issues which is related to innovation and best practices, in order to better develop innovation and best practices towards sustainability. This effort would not only contribute to firm’s success, but also toward the development of the nation in the developing countries.

Keywords: best practices, innovation, microfinance, sustainability

Procedia PDF Downloads 522
8141 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 127