18114 The Choosing the Right Projects With Multi-Criteria Decision Making to Ensure the Sustainability of the Projects

Authors: Saniye Çeşmecioğlu

Abstract:

The importance of project sustainability and success has become increasingly significant due to the proliferation of external environmental factors that have decreased project resistance in contemporary times. The primary approach to forestall the failure of projects is to ensure their long-term viability through the strategic selection of projects as creating judicious project selection framework within the organization. Decision-makers require precise decision contexts (models) that conform to the company's business objectives and sustainability expectations during the project selection process. The establishment of a rational model for project selection enables organizations to create a distinctive and objective framework for the selection process. Additionally, for the optimal implementation of this decision-making model, it is crucial to establish a Project Management Office (PMO) team and Project Steering Committee within the organizational structure to oversee the framework. These teams enable updating project selection criteria and weights in response to changing conditions, ensuring alignment with the company's business goals, and facilitating the selection of potentially viable projects. This paper presents a multi-criteria decision model for selecting project sustainability and project success criteria that ensures timely project completion and retention. The model was developed using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) and was based on broadcaster companies’ expectations. The ultimate results of this study provide a model that endorses the process of selecting the appropriate project objectively by utilizing project selection and sustainability criteria along with their respective weights for organizations. Additionally, the study offers suggestions that may ascertain helpful in future endeavors.

Keywords: project portfolio management, project selection, multi-criteria decision making, project sustainability and success criteria, MACBETH

Procedia PDF Downloads 46
18113 Promoting Non-Formal Learning Mobility in the Field of Youth

Authors: Juha Kettunen

Abstract:

The purpose of this study is to develop a framework for the assessment of research and development projects. The assessment map is developed in this study based on the strategy map of the balanced scorecard approach. The assessment map is applied in a project that aims to reduce the inequality and risk of exclusion of young people from disadvantaged social groups. The assessment map denotes that not only funding but also necessary skills and qualifications should be carefully assessed in the implementation of the project plans so as to achieve the objectives of projects and the desired impact. The results of this study are useful for those who want to develop the implementation of the Erasmus+ Programme and the project teams of research and development projects.

Keywords: non-formal learning, youth work, social inclusion, innovation

Procedia PDF Downloads 280
18112 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 141
18111 The Sustainability of Human Resource Planning for Construction Projects

Authors: Adegbenga Ashiru, Adebimpe L. Ashiru

Abstract:

The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.

Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction

Procedia PDF Downloads 331
18110 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 180
18109 Soil Transmitted Helminth Infection and Associated Risk Factors among School Children in a Selected Barangay in the Philippines

Authors: Gil Soriano, Aubreyrose Casilang

Abstract:

Soil-transmitted helminth infection remains to be one of the leading public health problem worldwide, which is common in the rural developing regions especially among children. This study aimed to detect the presence of soil transmitted helminths among children and its associated transmission factors. Descriptive cross sectional research was the design used in the study and questionnaires were administered. Stool samples were collected among the samples (n=108) and were analyzed using kato thick method. Results showed that 61 out of 108 respondents are infected by soil transmitted helminth infection with A. lumbricoides the highest, followed by hookworm and T. trichuria. Parent's educational attainment, hand washing practices, and water sources were found to be associated with presence of Soil Transmitted Helminth infection.

Keywords: associated risk factors, barangay, school children, soil transmitted helminth infection

Procedia PDF Downloads 188
18108 Incidence, Pattern and Risk Factors of Congenial Heart Diseases in Neonates in a Tertiary Care Hospital, Egyptian Study

Authors: Gehan Hussein, Hams Ahmad, Baher Matta, Yasmeen Mansi, Mohamad Fawzi

Abstract:

Background: Congenital heart disease (CHD) is a common problem worldwide with variable incidence in different countries. The exact etiology is unknown, suggested to be multifactorial. We aimed to study the incidence of various CHD in a neonatal intensive care unit (NICU) in a tertiary care hospital in Egypt and the possible associations with variable risk factors. Methods: Prospective study was conducted over a period of one year (2013 /2014) at NICU KasrAlAini School of Medicine, Cairo University. Questionnaire about possible maternal and/or paternal risk factors for CHD, clinical examination, bedside echocardiography were done. Cases were classified into groups: group 1 without CHD and group 2 with CHD. Results: from 723 neonates admitted to NICU, 180 cases were proved to have CHD, 58 % of them were males. patent ductus arteriosus(PDA) was the most common CHD (70%), followed by an atrial septal defect (ASD8%), while Fallot tetralogy and single ventricle were the least common (0.45 %) for each. CHD was found in 30 % of consanguineous parents Maternal age ≥ 35 years at the time of conception was associated with increased incidence of PDA (p= 0.45 %). Maternal diabetes and insulin intake were significantly associated with cases of CHD (p=0.02 &0.001 respectively), maternal hypertension and hypothyroidism were both associated with VSD, but the difference did not reach statistical significance (P=0.36 &0.44respectively). Maternal passive smoking was significantly associated with PDA (p=0.03). Conclusion: The most frequent CHD in the studied population was PDA, followed by ASD. Maternal conditions as diabetes was associated with VSD occurrence.

Keywords: NICU, risk factors, congenital heart disease, echocardiography

Procedia PDF Downloads 168
18107 Risk Issues for Controlling Floods through Unsafe, Dual Purpose, Gated Dams

Authors: Gregory Michael McMahon

Abstract:

Risk management for the purposes of minimizing the damages from the operations of dams has met with opposition emerging from organisations and authorities, and their practitioners. It appears that the cause may be a misunderstanding of risk management arising from exchanges that mix deterministic thinking with risk-centric thinking and that do not separate uncertainty from reliability and accuracy from probability. This paper sets out those misunderstandings that arose from dam operations at Wivenhoe in 2011, using a comparison of outcomes that have been based on the methodology and its rules and those that have been operated by applying misunderstandings of the rules. The paper addresses the performance of one risk-centric Flood Manual for Wivenhoe Dam in achieving a risk management outcome. A mixture of engineering, administrative, and legal factors appear to have combined to reduce the outcomes from the risk approach. These are described. The findings are that a risk-centric Manual may need to assist administrations in the conduct of scenario training regimes, in responding to healthy audit reporting, and in the development of decision-support systems. The principal assistance needed from the Manual, however, is to assist engineering and the law to a good understanding of how risks are managed – do not assume that risk management is understood. The wider findings are that the critical profession for decision-making downstream of the meteorologist is not dam engineering or hydrology, or hydraulics; it is risk management. Risk management will provide the minimum flood damage outcome where actual rainfalls match or exceed forecasts of rainfalls, that therefore risk management will provide the best approach for the likely history of flooding in the life of a dam, and provisions made for worst cases may be state of the art in risk management. The principal conclusion is the need for training in both risk management as a discipline and also in the application of risk management rules to particular dam operational scenarios.

Keywords: risk management, flood control, dam operations, deterministic thinking

Procedia PDF Downloads 66
18106 Role of Erythrocyte Fatty Acids in Predicting Cardiometabolic Risk among the Elderly: A Secondary Analysis of the Walnut and Healthy Aging Study

Authors: Tony Jehi, Sujatha Rajaram, Nader majzoub, Joan Sabate

Abstract:

Aging significantly increases the incidence of various cardiometabolic diseases, including cardiovascular disease (CVD). To combat CVD and its associated risk factors, it is imperative to adopt a healthy dietary pattern that is rife with beneficial nutrient and non-nutrient compounds. Unsaturated fats, specifically n-3 polyunsaturated fatty acids (n-3 PUFA), have cardio-protective effects; the opposite is true for saturated fatty acids. What role, if any, does the biomarker of fatty acid intake (specific fatty acids in the erythrocyte) play in predicting cardiometabolic risk among the elderly, a population highly susceptible to increased mortality and morbidity from CVD risk factors, remains unclear. This was a secondary analysis of the Walnuts and Healthy Aging Study. Briefly, elderly (n=192, mean age 69 y) participants followed their usual diet and were randomized into two groups to either eat walnuts daily or abstain from eating walnuts for a period of 2 years. The purpose was to identify potential associations between erythrocyte membrane fatty acids and cardiometabolic risk factors (body weight, blood pressure, blood lipids, and fasting glucose). Erythrocyte n-3 PUFA were inversely associated with total cholesterol (ß = -3.83; p= 0.02), triglycerides (ß = -7.66; p= <0.01), and fasting glucose (ß = -0.19; p=0.03). Specifically, erythrocyte ALA (ß= -1.59; P = 0.04) and DPA (ß= -0.62; P=0.04) were inversely associated with diastolic blood pressure and fasting glucose, respectively. N-6 PUFAs were positively associated with systolic blood pressure (ß=1.10; P=0.02). Mono-unsaturated fatty acids were positively associated with TAG (ß = 4.16; P=0.03). Total saturated fatty acids were not associated with any cardiometabolic risk factors. No association was found between any erythrocyte fatty acid and body weight. In conclusion, erythrocyte n-3 PUFA may be used as a biomarker to predict the cardiometabolic risk among healthy elders, providing support for the American Heart Association guidelines for including n-3 PUFA for preventing CVD.

Keywords: cardiometabolic diseases, erythrocyte fatty acids, elderly, n-3 PUFA

Procedia PDF Downloads 60
18105 Enterprise Risk Management: A Future Outlook

Authors: Ruchi Agarwal, Jake Ansell

Abstract:

Austerity impacts on all aspects of society. Companies into the future will have to be more capable of dealing with the risks they face. Enterprise Risk Management (ERM) has widely been accepted in recent years as an approach to manage risks within businesses. ERM attempts to tackle risk holistically with gains from opportunities in a managing risk and reduction in the risk of failure. The paper reviews merits and demerits of approaches to risk management in regard to antifragility. A qualitative study has investigated current practices and the problems with ERM implementation by interviewing over 25 chief risk officers and senior management. The findings indicate the gap in ERM description, understanding, and implementation. The paper suggests risk learning and expertise knowledge supports development of effective enterprise risk management by designing systems with inherent resilience.

Keywords: risk management, interviews, antifragility, failure

Procedia PDF Downloads 546
18104 Market Index Trend Prediction using Deep Learning and Risk Analysis

Authors: Shervin Alaei, Reza Moradi

Abstract:

Trading in financial markets is subject to risks due to their high volatilities. Here, using an LSTM neural network, and by doing some risk-based feature engineering tasks, we developed a method that can accurately predict trends of the Tehran stock exchange market index from a few days ago. Our test results have shown that the proposed method with an average prediction accuracy of more than 94% is superior to the other common machine learning algorithms. To the best of our knowledge, this is the first work incorporating deep learning and risk factors to accurately predict market trends.

Keywords: deep learning, LSTM, trend prediction, risk management, artificial neural networks

Procedia PDF Downloads 134
18103 Perception of Risks of the Telecommunication Towers in Malaysia: A Qualitative Inquiry

Authors: Y. Kamarulzaman, A. Madun, F. D. Yusop, N. Abdullah, N. K. Hoong

Abstract:

In 2011, the Malaysian Government has initiated a nationwide project called 1BestariNet which will adopt the using of technology in teaching and learning, resulting in the construction of telecommunication towers inside the public schools’ premise. Using qualitative approach, this study investigated public perception of risks associated with the project, particularly the telecommunication towers. Data collection involved observation and in-depth interviews with 22 individuals consist of a segment of public that was anxious about the risks of radio frequency electromagnetic field (RFEMF) which include two employees of telecommunication companies (telcos) and five employees of Government agencies. Observation of the location of the towers at 10 public schools, a public forum, and media reports provide valuable information in our analysis. The study finds that the main concern is related to the health risks. This study also shows that it is not easy for the Government to manage public perception mainly because it involves public trust. We find that risk perception is related with public trust, as well as the perceived benefits and level of knowledge. Efficient communication and continuous engagement with the local communities help to build and maintain public trust, reduce public fear and anxiety, hence mitigating the risk perception among the public.

Keywords: risk perception, risk communication, trust, telecommunication tower, radio frequency electromagnetic field (RFEMF)

Procedia PDF Downloads 303
18102 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 406
18101 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 363
18100 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 78
18099 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 238
18098 The Study of Rapid Entire Body Assessment and Quick Exposure Check Correlation in an Engine Oil Company

Authors: Mohammadreza Ashouria, Majid Motamedzadeb

Abstract:

Rapid Entire Body Assessment (REBA) and Quick Exposure Check (QEC) are two general methods to assess the risk factors of work-related musculoskeletal disorders (WMSDs). This study aimed to compare ergonomic risk assessment outputs from QEC and REBA in terms of agreement in distribution of postural loading scores based on analysis of working postures. This cross-sectional study was conducted in an engine oil company in which 40 jobs were studied. A trained occupational health practitioner observed all jobs. Job information was collected to ensure the completion of ergonomic risk assessment tools, including QEC, and REBA. The result revealed that there was a significant correlation between final scores (r=0.731) and the action levels (r =0.893) of two applied methods. Comparison between the action levels and final scores of two methods showed that there was no significant difference among working departments. Most of the studied postures acquired low and moderate risk level in QEC assessment (low risk=20%, moderate risk=50% and High risk=30%) and in REBA assessment (low risk=15%, moderate risk=60% and high risk=25%).There is a significant correlation between two methods. They have a strong correlation in identifying risky jobs and determining the potential risk for incidence of WMSDs. Therefore, there is a possibility for researchers to apply interchangeably both methods, for postural risk assessment in appropriate working environments.

Keywords: observational method, QEC, REBA, musculoskeletal disorders

Procedia PDF Downloads 348
18097 Developing an Integrated Seismic Risk Model for Existing Buildings in Northern Algeria

Authors: R. Monteiro, A. Abarca

Abstract:

Large scale seismic risk assessment has become increasingly popular to evaluate the physical vulnerability of a given region to seismic events, by putting together hazard, exposure and vulnerability components. This study, developed within the scope of the EU-funded project ITERATE (Improved Tools for Disaster Risk Mitigation in Algeria), explains the steps and expected results for the development of an integrated seismic risk model for assessment of the vulnerability of residential buildings in Northern Algeria. For this purpose, the model foresees the consideration of an updated seismic hazard model, as well as ad-hoc exposure and physical vulnerability models for local residential buildings. The first results of this endeavor, such as the hazard model and a specific taxonomy to be used for the exposure and fragility components of the model are presented, using as starting point the province of Blida, in Algeria. Specific remarks and conclusions regarding the characteristics of the Northern Algerian in-built are then made based on these results.

Keywords: Northern Algeria, risk, seismic hazard, vulnerability

Procedia PDF Downloads 188
18096 Prevalence of Pre Hypertension and Its Association to Risk Factors for Cardiovascular Diseases Among Male Undergraduate Students in Chennai

Authors: R. S. Dinesh Madhavan, M. Logaraj

Abstract:

Background: Recent studies have documented an increase in the risk of cardiovascular diseases (CVD) and a high rate of progression to hypertension in persons with pre hypertension. The risk factors for the growing burden of cardiovascular diseases especially hypertension, diabetes, overweight or obesity and waist hip ratio are increasing. Much study has not been done on cardiovascular risk factors associated with blood pressure (BP) among college students in Indian population. Objectives: The objective of our study was to estimate the prevalence of prehypertension among male students and to assess the association between prehypertension and risk factors for cardiovascular diseases. Material and Methods: A cross-sectional study was conducted among students of a university situated in the suburban area of Chennai. A total of 403 students was studied which included 200 medical and 203 engineering students. The information on selected socio-demographic variables were collected with the help of pre tested structured questionnaire. Measurements of height, weight, blood pressure and postprandial blood glucose were carried out as per standard procedure. Results: The mean age of the participants was 19.56 ± 1.67years. The mean systolic and diastolic blood pressure were 125.80±10.03 mm of Hg and 78.96 ±11.75mm of Hg. The average intake of fruits and vegetable per week were 4.34 ±3.47days and 6.55±4.39 days respectively. Use of smoke and smokeless tobacco were 27.3% and 3% respectively. About 30.3% of the students consume alcohol. Nearly 45.9 % of them did not practice regular exercise. About 29 % were overweight and 5.7% were obese, 24.8% were with waist circumference above 90 centimeters. The prevalence of pre hypertension and hypertension was 49.6% and 19.1% among male students. The prevalence of pre hypertension was higher in medical students (51.5%) compared to engineering students (47.8%). Higher risk of being pre hypertensive were noted above the age of 20 years (OR=4.32), fruit intake less than 3 days a week (OR= 1.03), smokers (OR= 1.13), alcohol intake (OR=1.56), lack of physical exercise (OR=1.90), BMI of more than 25 kg/m2 (OR=1.99). But statistically significant difference was noted between pre hypertensive and normotensive for age (p<0.0001), lack of physical exercise (p=0.004) and BMI (p=0.015). Conclusion: In conclusion nearly half of the students were pre hypertensive. Higher prevalence of smoking, alcohol intake, lack of physical exercise, overweight and increased waist circumference and postprandial blood sugar more than 140 mg/dl was noted among pre-hypertensive compared to normotensive.

Keywords: cardiovascular diseases, prehypertension, risk factors, undergraduate Students

Procedia PDF Downloads 423
18095 Development of an Image-Based Biomechanical Model for Assessment of Hip Fracture Risk

Authors: Masoud Nasiri Sarvi, Yunhua Luo

Abstract:

Low-trauma hip fracture, usually caused by fall from standing height, has become a main source of morbidity and mortality for the elderly. Factors affecting hip fracture include sex, race, age, body weight, height, body mass distribution, etc., and thus, hip fracture risk in fall differs widely from subject to subject. It is therefore necessary to develop a subject-specific biomechanical model to predict hip fracture risk. The objective of this study is to develop a two-level, image-based, subject-specific biomechanical model consisting of a whole-body dynamics model and a proximal-femur finite element (FE) model for more accurately assessing the risk of hip fracture in lateral falls. Required information for constructing the model is extracted from a whole-body and a hip DXA (Dual Energy X-ray Absorptiometry) image of the subject. The proposed model considers all parameters subject-specifically, which will provide a fast, accurate, and non-expensive method for predicting hip fracture risk.

Keywords: bone mineral density, hip fracture risk, impact force, sideways falls

Procedia PDF Downloads 519
18094 Risk Factors for Diabetic Foot: Upper Egypt Experience

Authors: Ali Kassem, Mohamed Alsenbasy, Ahmed Nagaah

Abstract:

Background: Diabetic foot is one of the often neglected complications of diabetes mellitus It was reported that patients of diabetic foot ulcer (DFU) have considerable morbidity and mortality. Due to arterial abnormalities, diabetic neuropathy, as well as the tendency to delayed wound healing, foot infection and or gangrene is relatively common in diabetic patients. Foot related problems are responsible for up to 50% of diabetic related hospital admissions. Aim of work: The aim of the present study is to assess the risk factors for DFU in diabetic patients attending Sohag University Hospitals (Upper Egypt) Material and methods: The present study includes 100 diabetic foot patients attending the diabetic outpatient clinic of Sohag University Hospitals. For all of the studied patients the following were done: Full medical history and clinical examination; thorough foot examination; Laboratory tests including: Blood glucose level, HBA1c, serum lipids and renal function tests, ECG and Echocardiography, Doppler study on the lower limbs. Results: Sixty eight percent of the affected patients were males versus 32 % female patients. All male patients and none of the female were smoker. Seventy nine percent of patients were living in rural areas versus 14 % in urban areas. Duration of diabetes was more than 12 years in 74%, less than 12 years in 26% of patients. Fifty percent of patients have associated hypertension, 46% have dyslipidemia, 18% have ischemic heart disease or old myocardial infarction and 8% have impaired renal function. History of previous foot ulcers was reported in 11 % and foot amputation in 2% of patients. Conclusion: Male gender, low socioeconomic status, smoking, long duration of diabetes, other cardiovascular risk factors particularly hypertension and previous history of foot ulceration are the major risk factors for diabetic foot in our locality.

Keywords: diabetic foot, diabetic neuropathy, foot gangrene, risk factors for diabetic complications

Procedia PDF Downloads 359
18093 Prevalence, Associated Risk Factors, and Bacterial Pathogens in Dairy Camels: A Review

Authors: Djeddi Khaled, Houssou Hind, Miloudi Abdelatif, Rabah Siham

Abstract:

Camels play a vital role as multipurpose animals, providing milk meat and serving as a means of transportation. They serve as a financial reserve for pastoralists and hold significant cultural and social value. Camel milk, known for its exceptional nutritional properties, is considered a valuable substitute for human milk. However, udder infections, particularly mastitis, pose significant challenges to camel farming. Clinical and subclinical mastitis can lead to substantial economic losses. Mastitis, especially the subclinical form, is a persistent and prevalent condition affecting milk hygiene and quality in dairy camels. This review offers insights into the prevalence and risk factors associated with subclinical mastitis in camels. The prevalence of subclinical mastitis in dairy camels was found to range from 9.28% to 87.78%. Major pathogens responsible for camel mastitis include Staphylococcus aureus, Coagulase-negative Staphylococcus, Streptococcus agalactiae, Streptococcus dysgalactiae, Escherichia coli, Micrococcus spp, Pasteurella haemolytica and Corynebacterium spp. The study outlines key risk factors contributing to camel mastitis, emphasizing factors such as severe tick infestation, age, stage of lactation, parity, body condition score, skin lesion on the teats or udders, anti-suckling devices, previous history of the udder, conformation of the udder, breed, unhygienic milking practices, production system, amongst others have been reported to be important in the prevalence of subclinical mastitis. This comprehensive overview provides valuable insights into the multifaceted aspects of camel mastitis, encompassing prevalent bacterial pathogens and diverse risk factors. The findings underscore the importance of holistic management practices, emphasizing hygiene, health monitoring, and targeted interventions to ensure the well-being and productivity of camels in various agro-pastoral contexts.

Keywords: bacterial pathogens, camel, mastitis, risk factors

Procedia PDF Downloads 60
18092 Explaining the Impact of Poverty Risk on Frailty Trajectories in Old Age Using Growth Curve Models

Authors: Erwin Stolz, Hannes Mayerl, Anja Waxenegger, Wolfgang Freidl

Abstract:

Research has often found poverty associated with adverse health outcomes, but it is unclear which (interplay of) mechanisms actually translate low economic resources into poor physical health. The goal of this study was to assess the impact of educational, material, psychosocial and behavioural factors in explaining the poverty-health association in old age. We analysed 28,360 observations from 11,390 community-dwelling respondents (65+) from the Survey of Health, Ageing and Retirement in Europe (SHARE, 2004-2013, 10 countries). We used multilevel growth curve models to assess the impact of combined income- and asset poverty risk on old age frailty index levels and trajectories. In total, 61.8% of the variation of poverty risk on frailty levels could be explained by direct and indirect effects, thereby highlighting the role of material and particularly psychosocial factors, such as perceived control and social isolation. We suggest strengthening social policy and public health efforts in order to fight poverty and its deleterious effects from early age on and to broaden the scope of interventions with regard to psychosocial factors.

Keywords: frailty, health inequality, old age, poverty

Procedia PDF Downloads 314
18091 Landslide Hazard Zonation and Risk Studies Using Multi-Criteria Decision-Making and Slope Stability Analysis

Authors: Ankit Tyagi, Reet Kamal Tiwari, Naveen James

Abstract:

In India, landslides are the most frequently occurring disaster in the regions of the Himalayas and the Western Ghats. The steep slopes and land use in these areas are quite apprehensive. In the recent past, many landslide hazard zonation (LHZ) works have been carried out in the Himalayas. However, the preparation of LHZ maps considering temporal factors such as seismic ground shaking, seismic amplification at surface level, and rainfall are limited. Hence this study presents a comprehensive use of the multi-criteria decision-making (MCDM) method in landslide risk assessment. In this research, we conducted both geospatial and geotechnical analysis to minimize the danger of landslides. Geospatial analysis is performed using high-resolution satellite data to produce landslide causative factors which were given weightage using the MCDM method. The geotechnical analysis includes a slope stability check, which was done to determine the potential landslide slope. The landslide risk map can provide useful information which helps people to understand the risk of living in an area.

Keywords: landslide hazard zonation, PHA, AHP, GIS

Procedia PDF Downloads 175
18090 Awareness on Risk Factors of Cardiovascular Disease among Patients with Diabetes Mellitus Attending Diabetic Clinic of B. P. Koirala Institute of Health Sciences

Authors: Ram Sharan Mehta, Dina Khanal, Pushpa Parajuli, Gayanand Mandal, Bijaya Bartuala

Abstract:

Background: Cardiovascular disease (CVD) is the leading cause of death worldwide. Adequate awareness of risk factors of CVD is the first step towards effective preventive strategies to combat the CVD burden in diabetes patients.This study aims to assess the awareness on risk factors of CVD among patients with diabetes mellitus attending diabetic clinic of BPKIHS and to find the association between awareness with their selected socio demographic variables. Methods and Material: A descriptive cross sectional study was conducted among 112 patients with diabetes in diabetic clinic of BPKIHS. Convenient sampling technique was used for data collection over duration of one month using interview schedule by HDFQ II tool. Data were analyzed by using descriptive and inferential statistics. (Chi square). Results: The mean age of respondents was 55.4±12.13 years. That mean HDFQ score was 14.31± 5.08. Only 33% of the respondents had adequate level of awareness whereas majority of the respondents (67%) had inadequate level of awareness. Majority of the respondent (83.9%) were aware about smoking, (78.6%) physical activity, (75%) increasing age, (75.9%) high blood pressure, (71.4%) overweight respectively. Whereas most of the respondents were not aware of high cholesterol, fatty diet, preventive strategies and association of diabetes with CVD. Awareness was statistically significant with (p=0.043) educational status, (p=0.025) monthly income, (p=0.05) residence, (p=0.006) CVD information received and (p=0.022) co morbid condition as a heart disease. Conclusion: The findings of this study concluded most of the respondents had an inadequate level of awareness on risk factors of CVD. So Effective education and appropriate preventive strategies of CVD are indeed important to reduce CVD burden in diabetes patients.

Keywords: cardiovascular disease, awareness, diabetes patients, risk

Procedia PDF Downloads 119
18089 Development of a Geomechanical Risk Assessment Model for Underground Openings

Authors: Ali Mortazavi

Abstract:

The main objective of this research project is to delve into a multitude of geomechanical risks associated with various mining methods employed within the underground mining industry. Controlling geotechnical design parameters and operational factors affecting the selection of suitable mining techniques for a given underground mining condition will be considered from a risk assessment point of view. Important geomechanical challenges will be investigated as appropriate and relevant to the commonly used underground mining methods. Given the complicated nature of rock mass in-situ and complicated boundary conditions and operational complexities associated with various underground mining methods, the selection of a safe and economic mining operation is of paramount significance. Rock failure at varying scales within the underground mining openings is always a threat to mining operations and causes human and capital losses worldwide. Geotechnical design is a major design component of all underground mines and basically dominates the safety of an underground mine. With regard to uncertainties that exist in rock characterization prior to mine development, there are always risks associated with inappropriate design as a function of mining conditions and the selected mining method. Uncertainty often results from the inherent variability of rock masse, which in turn is a function of both geological materials and rock mass in-situ conditions. The focus of this research is on developing a methodology which enables a geomechanical risk assessment of given underground mining conditions. The outcome of this research is a geotechnical risk analysis algorithm, which can be used as an aid in selecting the appropriate mining method as a function of mine design parameters (e.g., rock in-situ properties, design method, governing boundary conditions such as in-situ stress and groundwater, etc.).

Keywords: geomechanical risk assessment, rock mechanics, underground mining, rock engineering

Procedia PDF Downloads 128
18088 Sensitivity of Credit Default Swaps Premium to Global Risk Factor: Evidence from Emerging Markets

Authors: Oguzhan Cepni, Doruk Kucuksarac, M. Hasan Yilmaz

Abstract:

Risk premium of emerging markets are moving altogether depending on the momentum and shifts in the global risk appetite. However, the magnitudes of these changes in the risk premium of emerging market economies might vary. In this paper, we focus on how global risk factor affects credit default swaps (CDS) premiums of emerging markets using principal component analysis (PCA) and rolling regressions. PCA results indicate that the first common component accounts for almost 76% of common variation in CDS premiums of emerging markets. Additionally, the explanatory power of the first factor seems to be high over sample period. However, the sensitivity to the global risk factor tends to change over time and across countries. In this regard, fixed effects panel regressions are employed to identify the macroeconomic factors driving the heterogeneity across emerging markets. There are two main macroeconomic variables that affect the sensitivity; government debt to GDP and international reserves to GDP. The countries with lower government debt and higher reserves tend to be less subject to the variations in the global risk appetite.

Keywords: emerging markets, principal component analysis, credit default swaps, sovereign risk

Procedia PDF Downloads 366
18087 Corporate Cautionary Statement: A Genre of Professional Communication

Authors: Chie Urawa

Abstract:

Cautionary statements or disclaimers in corporate annual reports need to be carefully designed because clear cautionary statements may protect a company in the case of legal disputes and may undermine positive impressions. This study compares the language of cautionary statements using two corpora, Sony’s cautionary statement corpus (S-corpus) and Panasonic’s cautionary statement corpus (P-corpus), illustrating the differences and similarities in relation to the use of meaningful cautionary statements and critically analyzing why practitioners use the way. The findings describe the distinct differences between the two companies in the presentation of the risk factors and the way how they make the statements. The word ability is used more for legal protection in S-corpus whereas the word possibility is used more to convey a better impression in P-corpus. The main similarities are identified in the use of lexical words and pronouns, and almost the same wordings for eight years. The findings show how they make the statements unique to the company in the presentation of risk factors, and the characteristics of specific genre of professional communication. Important implications of this study are that more comprehensive approach can be applied in other contexts, and be used by companies to reflect upon their cautionary statements.

Keywords: cautionary statements, corporate annual reports, corpus, risk factors

Procedia PDF Downloads 154
18086 Ideation, Plans, and Attempts for Suicide among Adolescents with Disability

Authors: Nyla Anjum, Humaira Bano

Abstract:

Disability, regardless of its type and nature limits one or two significant life activities. These limitations constitute risk factors for suicide. Rate and intensity of problem upsurges in critical age of adolescence. Researches in the field of mental health over look problem of suicide among persons with disability. Aim of the study was to investigate prevalence and risk factors for suicide among adolescents with disability. The study constitutes purposive sample of 106 elements of both gender with four major categories of disability: hearing impairment, physical impairment, visual impairment and intellectual disabilities. Face to face interview technique was opted for data collection. Other variable are: socio-economic status, social and family support, provision of services for persons with disability, education and employment opportunities. For data analysis independent sample t-test was applied to find out significant differences in gender and One Way Analysis of variance was run to find out differences among four types of disability. Major predictors of suicide were identified with multiple regression analysis. It is concluded that ideation, plans and attempts of suicide among adolescents with disability is a multifaceted and imperative concern in the area of mental health. Urgent research recommendations contains valid measurement of suicide rate and identification of more risk factors for suicide among persons with disability. Study will also guide towards prevention of this pressing problem and will bring message of happy and healthy life not only for persons with disability but also for their families. It will also help to reduce suicide rate in society.

Keywords: suicide, risk factors, adolescent, disability, mental health

Procedia PDF Downloads 367
18085 Analyzing Competition in Public Construction Projects

Authors: Khaled Hesham Hyari, Amjad Almani

Abstract:

Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.

Keywords: construction projects, competitive bidding, public construction, competition

Procedia PDF Downloads 317