Search results for: construction of irrigation district
5544 Impact of Emerging Nano-Agrichemicals on the Simultaneous Control of Arsenic and Cadmium in Rice Paddies
Authors: Xingmao Ma, Wenjie Sun
Abstract:
Rice paddies are frequently co-contaminated by arsenic (As) and cadmium (Cd), both of which demonstrate a high propensity for accumulation in rice grains and cause global food safety and public health concern. Even though different agricultural management strategies have been explored for their simultaneous control in rice grains, a viable solution is yet to be developed. Interestingly, several nanoagrichemicals, such as the zinc nanofertilizer and copper nanopesticide have displayed strong potential to reduce As or Cd accumulation in rice tissues. In order to determine whether these nanoagrichemicals can lower the accumulation of both As and Cd in rice, a series of bench studies were performed. Our results show that zinc oxide nanoparticles at 100 mg/Kg significantly lowered both As, and Cd in rice roots and shoots in flood irrigated rice seedlings, while equivalent amount of zinc ions only reduced As concentration in rice shoots. Zinc ions significantly increased Cd concentration in rice shoots by almost 30%. The results demonstrate a unique 'nano-effect' of zinc oxide nanoparticles, which is ascribed to the slow releasing of zinc ions from nanoparticles and the formation of different transformation products in these two treatments. We also evaluated the effect of nanoscale soil amendment, silicon oxide nanoparticles (SiO₂NPs) on the simultaneous reduction in both flooding and alternate wet and dry irrigation scheme. The effect of SiO₂NPs on As and Cd accumulation in rice tissues was strongly affected by the irrigation scheme. While 2000 mg/kg of SiO₂NPs significantly reduced As in rice roots and insignificantly reduced As in rice shoots in flooded rice, it increased As concentration in rice shoots in alternate wet and dry irrigation. In both irrigation scenarios, SiO₂NPs significantly reduced Cd concentration in rice roots, but only reduced Cd concentration in rice shoots in alternate wet and dry irrigation. Our results demonstrate a marked effect of nanoagrichemicals on the accumulation of As and Cd in rice and can be a potential solution to simultaneously control both in certain conditions.Keywords: arsenic, cadmium, rice, nanoagrichemicals
Procedia PDF Downloads 1585543 Investigations into Transition from Traditional Construction to Industrial Construction in Afghanistan
Authors: A. Latif Karimi
Abstract:
Since 2001, construction works, especially the construction of new homes and residential buildings, witnessed a dramatic boom across Afghanistan. More so, the construction industry and house builders are relied upon as important players in the country’s job market, economy and infrastructural development schemes. However, a lack of innovation, quality assurance mechanism, substandard construction and market dominance by traditional methods push all the parties in house building sector to shift for more advanced construction techniques and mass production technologies to meet the rising demands for proper accommodation. Meanwhile, rapid population growth and urbanization are widening the gap between the demand and supply of new and modern houses in urban areas like Kabul, Herat, etc. This paper investigates about current condition of construction practices in house building projects, the associated challenges, and the outcomes of transition to more reasonable and sustainable building methods. It is obvious, the introduction and use of Modern Methods of Construction (MMC) can help construction industry and house builders in Afghanistan to tackle the challenges and meet the desired standards for modern houses. This paper focuses on prefabrication, a popular MMC that is becoming more common, improving in quality and available in a variety of budgets. It is revealed that this method is the way forward to improving house building practices as it has been proven to reduce construction time, minimize waste and improve environmental performance of construction developments.Keywords: modern houses, traditional construction, modern methods of construction, prefabrication, sustainable building
Procedia PDF Downloads 2875542 BIM Application and Construction Schedule Simulation for the Horizontal Work Area
Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang
Abstract:
The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.Keywords: BIM, 4D CAD, linear 4D simulation, VR
Procedia PDF Downloads 4005541 Community Opinions on Cable Car System Construction at Upper Esaan Wild Animal Adventure Park (Khon Kaen – Udon Thani) in Khao Suan Kwang District, Khon Kaen Province (Khon Kaen Zoo), Thailand
Authors: Ruchirat Patanathabutr
Abstract:
This applied research has adopted descriptive social science research methodology to interpret, analyze and assess the data and used descriptive analysis to present the research results. The objective of this research is to investigate the behaviors and opinions on the service and construction of cable car system at the Upper Esaan Wild Animal Adventure Park (Khon Kaen – Udon Thani) in Khao Suan Kwang District, Khon Kaen Province (Khon Kaen Zoo) of people in the local and distant communities as well as the service users. The research results have revealed that the main target group is the residents in the upper northeastern region of Thailand, especially those who have resided in the immediate vicinity of the cable car project and in nearby districts for more than 10 years. They are men and women at the age of 20-60 with high school diploma and higher levels of education, working as traders/entrepreneurs, government officers/state enterprise employees, and freelancers/self-employed, with the average monthly income of no more than 30,000 baht. Khon Kaen Zoo should improve its 4 organizational images as a tourist attraction, an animal display enclosure, an educational institution and as a provincial symbol; however, the zoo should mainly be presented as an important tourist attraction. The service should focus on maintaining the service standards in both the animal display area and the ocean park. The attention should also be directed at the types and numbers of animals, service quality, service fee, convenient access and transportation, promotions and the standards of other services. Regarding the community involvement in the cable car system construction project, it is strongly agreed that there should be a cable car service between the animal display area and the ocean park and a round-trip ticket should cost 20 baht, 50 baht or 100 baht, respectively. Khon Kaen Zoo or responsible entity must provide related groups of people, such as people in the local and distant communities as well as the service users, with accurate information about the community management guidelines. This is because the community opinions have showed the uncertainty about the cable car system construction at Khon Kaen Zoo and the 4 principles of management, including planning, organizing, leading and controlling, are indicated as uncertain as there is no statistically significant difference at 0.05. In addition, the social, economic, and environmental impacts of the cable car system construction at Khon Kaen Zoo on the communities must be considered carefully.Keywords: community opinion, cable car system, Khon Kaen Zoo, Thailand
Procedia PDF Downloads 3595540 Community Participation in Health Related Activities in Ignié-Ngabé-Mayama Health District, Brazzaville, Republic of Congo
Authors: Tebeu Pierre Marie
Abstract:
Introduction: WHO defines community participation as a process in which the local population, take responsibility in planning for their health, participates in the strategy’s development for implementation and accessibility to physical, moral and social well-being. For the purpose of dealing with health, the community participation is made through the organization called health Centre committee leader (HCCL/COSA) for Integrated health Center and District hospital committee leaser (HDCL/COGES) for District Hospital. Little is known about the effective participation of the community in health related activities in Ignié-Ngabé-Mayama health district. Objective: This study aimed at assessing the involvement of community in the health system running at the Ignié-Ngabé-Mayama health district. Methods: This was a qualitative cross-sectional study conducted in the Ignié-Ngabé-Mayama health district from 15 December 2020 to 30 April 2021. The study population consisted of 10 HCCL and one District hospital committee leaser (DHCL). Data were collected using a pretested questionnaire and validated by the investigating team. The variables of interest were; effective existence of HCCL/DHCL, their involvement HCCL/DHCL in health related activities, their financing management, planning of activities and leadership. Results: A total of 11 participants were interviewed, including 10 HCCL and 1 DHCL. The Sex-Ratio was 9/11; with primary level 6/11 and were mostly farmers 6/11. Analyzing the involvement of the HDCL/DHCL in health promotion and preventive activities; this was effective only for two of them (2/11). Analyzing the barriers for their involvement, the leaders reported the lack of financial support by the state, lack NGO support. Additionally, they reported to have been very active when there was Performance Based Founding Project in the District. Conclusion: Only two of the (HDCL/HCCL) out of 11 were really functioning. Reported barriers to their running were: lack of state/NGOs support and ending of PBF Project. There is a need to organize a tripartite forum including stats, NGOs and Community for boosting the community participation in health related activities in Ignié-Ngabé-Mayama health district.Keywords: health district committee, health Centre committee, community participation, Brazzaville, Congo
Procedia PDF Downloads 1705539 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects
Authors: Faraz Ali Memon
Abstract:
Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.Keywords: stakeholders, UK construction, project management, cost and time
Procedia PDF Downloads 1055538 Optimization of Agricultural Water Demand Using a Hybrid Model of Dynamic Programming and Neural Networks: A Case Study of Algeria
Authors: M. Boudjerda, B. Touaibia, M. K. Mihoubi
Abstract:
In Algeria agricultural irrigation is the primary water consuming sector followed by the domestic and industrial sectors. Economic development in the last decade has weighed heavily on water resources which are relatively limited and gradually decreasing to the detriment of agriculture. The research presented in this paper focuses on the optimization of irrigation water demand. Dynamic Programming-Neural Network (DPNN) method is applied to investigate reservoir optimization. The optimal operation rule is formulated to minimize the gap between water release and water irrigation demand. As a case study, Foum El-Gherza dam’s reservoir system in south of Algeria has been selected to examine our proposed optimization model. The application of DPNN method allowed increasing the satisfaction rate (SR) from 12.32% to 55%. In addition, the operation rule generated showed more reliable and resilience operation for the examined case study.Keywords: water management, agricultural demand, dam and reservoir operation, Foum el-Gherza dam, dynamic programming, artificial neural network
Procedia PDF Downloads 1155537 Lean Construction Techniques in Construction Projects of Pakistan
Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund
Abstract:
Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan
Procedia PDF Downloads 2875536 Planning of Construction Material Flow Using Hybrid Simulation Modeling
Authors: A. M. Naraghi, V. Gonzalez, M. O'Sullivan, C. G. Walker, M. Poshdar, F. Ying, M. Abdelmegid
Abstract:
Discrete Event Simulation (DES) and Agent Based Simulation (ABS) are two simulation approaches that have been proposed to support decision-making in the construction industry. Despite the wide use of these simulation approaches in the construction field, their applications for production and material planning is still limited. This is largely due to the dynamic and complex nature of construction material supply chain systems. Moreover, managing the flow of construction material is not well integrated with site logistics in traditional construction planning methods. This paper presents a hybrid of DES and ABS to simulate on-site and off-site material supply processes. DES is applied to determine the best production scenarios with information of on-site production systems, while ABS is used to optimize the supply chain network. A case study of a construction piling project in New Zealand is presented illustrating the potential benefits of using the proposed hybrid simulation model in construction material flow planning. The hybrid model presented can be used to evaluate the impact of different decisions on construction supply chain management.Keywords: construction supply-chain management, simulation modeling, decision-support tools, hybrid simulation
Procedia PDF Downloads 2075535 Stress Variation of Underground Building Structure during Top-Down Construction
Authors: Soo-yeon Seo, Seol-ki Kim, Su-jin Jung
Abstract:
In the construction of a building, it is necessary to minimize construction period and secure enough work space for stacking of materials during the construction especially in city area. In this manner, various top-down construction methods have been developed and widely used in Korea. This paper investigates the stress variation of underground structure of a building constructed by using SPS (Strut as Permanent System) known as a top-down method in Korea through an analytical approach. Various types of earth pressure distribution related to ground condition were considered in the structural analysis of an example structure at each step of the excavation. From the analysis, the most high member force acting on beams was found when the ground type was medium sandy soil and a stress concentration was found in corner area.Keywords: construction of building, top-down construction method, earth pressure distribution, member force, stress concentration
Procedia PDF Downloads 3055534 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 755533 Environmental Issues in Construction Projects in India
Authors: Gurbir Singh Khaira, Anmoldeep Singh Kang
Abstract:
Exposures to environmental pollution remain a major source of health risk throughout the world, though risks are generally higher in developing countries, where poverty, lack of investment in modern technology and weak environmental legislation combine to cause high pollution levels. This paper will tell us about the environment is threatened severely by so many problems, some of which are caused by the activities of Construction Projects. The research reveals major environmental impacts of building construction projects to include environmental pollution, resource depletion and habitat destruction causing Destruction of ecosystem, Desertification, Soil Erosion and increasing Material Wastage. Construction is considered as one of the main sources of environmental pollution in the world, the level of knowledge and awareness of project participants, especially project managers, with regards to environmental impacts of construction processes needs to be enhanced. It was found that ‘Transportation Resource’, ‘Noise Pollution’, and ‘Dust Generation with Construction Machinery’ are the greatest environmental impacts in INDIA respectively. The results of this study are useful for construction managers and other participants in construction sites to become aware of construction processes impacts on the environment.Keywords: construction projects, environmental impacts, material waste age, awareness
Procedia PDF Downloads 3825532 A Preliminary Study of Urban Resident Space Redundancy in the Context of Rapid Urbanization: Based on Urban Research of Hongkou District of Shanghai
Authors: Ziwei Chen, Yujiang Gao
Abstract:
The rapid urbanization has caused the massive physical space in Chinese cities to be in a state of duplication and dislocation through the rapid development, forming many daily spaces that cannot be standardized, typed, and identified, such as illegal construction. This phenomenon is known as urban spatial redundancy and is often excluded from mainstream architectural discussions because of its 'remaining' and 'excessive' derogatory label. In recent years, some practice architects have begun to pay attention to this phenomenon and tried to tap the value behind it. In this context, the author takes the redundancy phenomenon of resident space as the research object and explores the inspiration to the urban architectural renewal and the innovative residential area model, based on the urban survey of redundant living space in Hongkou District of Shanghai. On this basis, it shows that the changes accumulated in the long-term use of the building can be re-applied to the goals before the design, which is an important link and significance of the existence of an architecture.Keywords: rapid urbanization, living space redundancy, architectural renewal, residential area model
Procedia PDF Downloads 1355531 Labor Productivity in the Construction Industry: Factors Influencing the Spanish Construction Labor Productivity
Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes
Abstract:
This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.Keywords: construction management, factors, improvement, labor productivity, lean construction
Procedia PDF Downloads 2925530 Spatial Evaluations of Haskoy: The Emperial Village
Authors: Yasemin Filiz-Kuruel, Emine Koseoglu
Abstract:
This study aims to evaluate Haskoy district of Beyoglu town of Istanbul. Haskoy is located in Halic region, between Kasimpasa district and Kagithane district. After the conquest of Istanbul, Fatih Sultan Mehmet (the Conqueror) set up his tent here. Therefore, the area gets its name as Haskoy, 'imperial village' that means a village which is special for Sultan. Today, there are shipyard and ateliers in variable sizes in Haskoy. In this study, the legibility of Haskoy streets is investigated comparatively. As a research method, semantic differential scale is used. The photos of the streets, which contain specific criteria, are chosen. The questionnaire is directed to first and third grade architecture students. The spatial evaluation of Haskoy streets is done through the survey.Keywords: Haskoy, legibility, semantic differential scale, urban streets
Procedia PDF Downloads 5665529 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria
Authors: Md. Aftabuzzaman, Md. Kamruzzaman
Abstract:
Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority
Procedia PDF Downloads 1295528 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases
Authors: Abdullah Mohammed Alshehri
Abstract:
The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.Keywords: construction, conflict causes, levels, interaction, phases
Procedia PDF Downloads 1795527 Building a Lean Construction Body of Knowledge
Authors: Jyoti Singh, Ahmed Stifi, Sascha Gentes
Abstract:
The process of construction significantly contributes to high level of risks, complexity and uncertainties leading to cost and time overrun, customer dissatisfaction etc. lean construction is important as it is a comprehensive system of tools and concepts focusing on moving closer to customer satisfaction by understanding the process, identifying the waste and eliminating it. The proposed work includes identification of knowledge areas from lean perspective, lean tools/concepts used in lean construction and establishing a relationship matrix between knowledge areas and lean tools/concepts, thus developing and building up a lean construction body of knowledge (LCBOK), i.e. a guide to lean construction, aiming to provide guidelines to manage individual projects and also helping construction industry to minimise waste and maximize value to the customer. In this study, we identified 8 knowledge areas and 62 lean tools/concepts from lean perspective and also one tool can help to manage two or more knowledge areas.Keywords: knowledge areas, lean body matrix, lean construction, lean tools
Procedia PDF Downloads 4365526 Past, Present, and Future of Robotics Technology in Construction Industry (Literature Review)
Authors: Samira Haghbin, Behnam Daryayelaal, Zeinab Amiri
Abstract:
As a result of rapid progress of technology in various industries, the only way to survive in a competitive market of business is to update one's situation along with the said developments. During recent decades, Robotics and automation of the construction operation has emerged as one of the important technologies grabbing the attention of various industries and specially the construction industry. Because of the coming labor shortage of the aging society in the near future, robots will be used in construction fields more than ever. By predicting the condition of Robotics in world's future construction industry, we can make necessary preparations to face with needs imposed by the time and stay ahead. This article takes a library study approach and presents a literature review of existing studies with an aim to investigate the use of robotics in past, present and future of construction industry and make predictions on its' growth and change process. Therefore, to make familiar with this kind of technology and its' requirements in the construction industry, the status of Robotics in construction industry of different countries of the world has been studied and necessary context for its' future progress is expressed. It is hoped that identifying needs and required contexts will facilitate further development of advanced technologies such as robotics industry and lead to more preparation for future.Keywords: future of robotics, construction industry, construction automation, trends of automation
Procedia PDF Downloads 3915525 Hidden Critical Risk in the Construction Industry’s Technological Adoption: Cybercrime
Authors: Nuruddeen Usman, Usman Mohammed Gidado, Muhammad Ahmad Ibrahim
Abstract:
Construction industry is one of the sectors that are eyeing adoption of ICT for its development due to the advancement in technology. Though, many manufacturing sectors had been using it, but construction industry was left behind, especially in the developing nation like Nigeria. On account of that, the objective of this study is to conceptually and quantitatively synthesise whether the slow adoption of ICT by the construction industries can be attributable to cybercrime threats. The result of the investigation found that, the risk of cybercrime, and lack of adequate cyber security policies that can enforce and punish defaulters are among the things that hinder ICT adoption of the Nigerian construction industries. Therefore, there is need for the nations to educate their citizens on cybercrime risk, and to establish cybercrime police units that can be monitoring and controlling all online communications.Keywords: construction industry, cybercrime, information and communication technology adoption, risk
Procedia PDF Downloads 5095524 Managing Construction Wastes in Nigeria for Sustainable Development
Authors: Ezekiel Ejiofor Nnadi
Abstract:
Nigeria construction industry is known for its active construction activities. This has earmarked the industry to be the key to economic growth of the nation. It has largest employer of labour and gives sustenance to other industries like manufacturing industry. While this is a sign of growth and prosperity; the waste generated by the industry has always been a problem and a serious concern. It results in wastage of economic gain and has resultant health effect on the populace apart from injury being sustained on sites. This work provides a platform to learn more about construction waste, its management strategy and how to reduce waste production in Nigeria construction industry. Construction sites, waste management authority and public health institutions in Lagos as the centre of most construction activities in Nigeria were selected, and a set of questionnaire was administered to using the systematic sampling technique. Descriptive statistics and relative importance index (RII) technique were employed for the analysis of the data gathered. The findings of the analysis show that excessive wastes reduce contractors’ profit margin and also that some construction wastes contain hazardous and toxic elements such as lead, asbestos or radioactive materials which required proper handling and effective disposal. The conclusion was drawn that the check on waste on construction sites starts with the designers to the contractors who execute on site.Keywords: construction cost, construction industry, economic growth, materials wastes
Procedia PDF Downloads 2725523 Species Diversity of Migratory Birds along Boat Touring Routes in Klong Kone Sub-District, Muang District, Samut Songkram Province, Thailand
Authors: P. Chitman, N. Charoenpokaraj
Abstract:
This research aims to study the species, feeding behavior and activity characteristics of birds which reap benefits from the research area in boat touring routes in Klong Kone Sub-district, Muang District, Samut Songkram Province, Thailand from October 2013 – May 2014. The results from the survey of birds on all three routes found that there are 11 families and 22 species. Route 1 (Klong Kone canal) had the most species, 20 species. According to feeding behavior, there were insectivorous, piscivorous and aquatic invertebrate feeder birds. Activity characteristics of birds which reap benefits from the research were finding food, nesting and raise nestlings along boat touring routes.Keywords: bird species diversity, boat touring routes, Samut Songkram, feeding behavior
Procedia PDF Downloads 3285522 Recovery of Local Materials in Pavements in Areas with an Arid Climate
Authors: Hocini Yousra, Medjnoun Amal, Khiatine Mohamed, Bahar Ramdane
Abstract:
The development of the regions of southern Algeria require the construction of numerous road, rail, and airport infrastructures. However, this development is very expensive given the very severe climatic conditions, the difficulty of reusing local materials, and the unavailability of water on the project sites; these regions are characterized by an arid or semi-arid climate, which means that water sources are very limited. The climatic conditions and the scarcity of water make soil compaction work very difficult and excessively expensive. These constraints related to the supply of water for irrigation of these construction sites make it necessary to examine the solution of compaction with low water content. This work studies the possibility of improving the compaction with a low water content of the soils of southern Algeria and this by using natural or recycled ecological materials. Local soils are first subjected to a series of laboratory characterization tests, then mixed with varying amounts of natural additives. The new materials are, in turn, subjected to road tests.Keywords: compaction, low water content, sand, natural materials
Procedia PDF Downloads 1215521 Challenges Affecting the Livelihoods of Small-Scale, Aggregate Miners, Vhembe District, Limpopo Province, South Africa
Authors: Ndivhudzannyi Rembuluwani, Francis Dacosta, Emmanuel Mhlongo
Abstract:
The small-scale rock aggregate sector of the mining industry is a major source of employment for a significant number of people, particularly in remote rural areas, where alternative livelihoods are rare. It contributes to local economy by generating income and producing major and essential materials for the building, construction, and other industries. However, the sector is confronted with many challenges that hamper productivity and growth. The problems that confront this sector includes: health and safety, environmental impacts, low production and low adherence to mining legislations. This study investigated the challenges confronting selected small-scale rock aggregate mines in the Vhembe District of Limpopo province of South Africa, assesses the health, safety, low production and environmental impacts associated with aggregate production and to develop an integrated approach of addressing the multi-faceted challenges.Keywords: health and safety, legislative framework, productivity, rock aggregate, small-scale mining
Procedia PDF Downloads 5035520 Timber Urbanism: Assessing the Carbon Footprint of Mass-Timber, Steel, and Concrete Structural Prototypes for Peri-Urban Densification in the Hudson Valley’s Urban Fringe
Authors: Eleni Stefania Kalapoda
Abstract:
The current fossil-fuel based urbanization pattern and the estimated human population growth are increasing the environmental footprint on our planet’s precious resources. To mitigate the estimated skyrocketing in greenhouse gas emissions associated with the construction of new cities and infrastructure over the next 50 years, we need a radical rethink in our approach to construction to deliver a net zero built environment. This paper assesses the carbon footprint of a mass-timber, a steel, and a concrete structural alternative for peri-urban densification in the Hudson Valley's urban fringe, along with examining the updated policy and the building code adjustments that support synergies between timber construction in city making and sustainable management of timber forests. By quantifying the carbon footprint of a structural prototype for four different material assemblies—a concrete (post-tensioned), a mass timber, a steel (composite), and a hybrid (timber/steel/concrete) assembly applicable to the three updated building typologies of the IBC 2021 (Type IV-A, Type IV-B, Type IV-C) that range between a nine to eighteen-story structure alternative—and scaling-up that structural prototype to the size of a neighborhood district, the paper presents a quantitative and a qualitative approach for a forest-based construction economy as well as a resilient and a more just supply chain framework that ensures the wellbeing of both the forest and its inhabitants.Keywords: mass-timber innovation, concrete structure, carbon footprint, densification
Procedia PDF Downloads 1085519 A Tale of Seven Districts: Reviewing The Past, Present and Future of Patent Litigation Filings to Form a Two-Step Burden-Shifting Framework for 28 U.S.C. § 1404(a)
Authors: Timothy T. Hsieh
Abstract:
Current patent venue transfer laws under 28 U.S.C. § 1404(a) e.g., the Gilbert factors from Gulf Oil Corp. v. Gilbert, 330 U.S. 501 (1947) are too malleable in that they often lead to frequent mandamus orders from the U.S. Court of Appeals for the Federal Circuit (“Federal Circuit”) overturning district court rulings on venue transfer motions. Thus, this paper proposes a more robust two-step burden-shifting framework that replaces the eight Gilbert factors. Moreover, a brief history of venue transfer patterns in the seven most active federal patent district courts is covered, with special focus devoted to the venue transfer orders from Judge Alan D Albright of the U.S. District Court for the Western District of Texas. A comprehensive data summary of 45 case sets where the Federal Circuit ruled on writs of mandamus involving Judge Albright’s transfer orders is subsequently provided, with coverage summaries of certain cases including four precedential ones from the Federal Circuit. This proposed two-step burden shifting framework is then applied to these venue transfer cases, as well as Federal Circuit mandamus orders ruling on those decisions. Finally, alternative approaches to remedying the frequent reversals for venue transfer will be discussed, including potential legislative solutions, adjustments to common law framework approaches to venue transfer, deference to the inherent powers of Article III U.S. District Judge, and a unified federal patent district court. Overall, this paper seeks to offer a more robust and consistent three-step burden-shifting framework for venue transfer and for the Federal Circuit to follow in administering mandamus orders, which might change somewhat in light of Western District of Texas Chief Judge Orlando Garcia’s order on redistributing Judge Albright’s patent cases.Keywords: Patent law, venue, judge Alan Albright, minimum contacts, western district of Texas
Procedia PDF Downloads 1095518 Quantification of Effect of Linear Anionic Polyacrylamide on Seepage in Irrigation Channels
Authors: Hamil Uribe, Cristian Arancibia
Abstract:
In Chile, the water for irrigation and hydropower generation is delivery essentially through unlined channels on earth, which have high seepage losses. Traditional seepage-abatement technologies are very expensive. The goals of this work were to quantify water loss in unlined channels and select reaches to evaluate the use of linear anionic polyacrylamide (LA-PAM) to reduce seepage losses. The study was carried out in Maule Region, central area of Chile. Water users indicated reaches with potential seepage losses, 45 km of channels in total, whose flow varied between 1.07 and 23.6 m³ s⁻¹. According to seepage measurements, 4 reaches of channels, 4.5 km in total, were selected for LA-PAM application. One to 4 LA-PAM applications were performed at rates of 11 kg ha⁻¹, considering wet perimeter area as basis of calculation. Large channels were used to allow motorboat moving against the current to carry-out LA-PAM application. For applications, a seeder machine was used to evenly distribute granulated polymer on water surface. Water flow was measured (StreamPro ADCP) upstream and downstream in selected reaches, to estimate seepage losses before and after LA-PAM application. Weekly measurements were made to quantify treatment effect and duration. In each case, water turbidity and temperature were measured. Channels showed variable losses up to 13.5%. Channels showing water gains were not treated with PAM. In all cases, LA-PAM effect was positive, achieving average loss reductions of 8% to 3.1%. Water loss was confirmed and it was possible to reduce seepage through LA-PAM applications provided that losses were known and correctly determined when applying the polymer. This could allow increasing irrigation security in critical periods, especially under drought conditions.Keywords: canal seepage, irrigation, polyacrylamide, water management
Procedia PDF Downloads 1745517 The Effect of Biological Fertilizers on Yield and Yield Components of Maize with Different Levels of Chemical Fertilizers in Normal and Difficit Irrigation Conditions
Authors: Felora Rafiei, Shahram Shoaei
Abstract:
The aim of this studies was to evaluate effect of nitroxin, super nitro plus and biophosphorus on yield and yield components of maize (Zea mays) under different levels of chemical fertilizers in the condition of normal and difficiet irrigation. Experiment laid out as split plot factorial based on randomized complete block design with three replications. Main plots includes two irrigation treatments of 70 (I1), 120(I2) mm evaporation from class A pan. Sub plots were biological fertilizer and chemical fertilizer as factorial biological fertilizer consisting of nitroxin: Azospirillium lipoferum, Azospirillium brasilens, Azotobacter chroococcum Azotobacter agilis (108 CFU ml-1) (B1), super nitro plus (Azospirillium spp, + Pseudomonas fluorescence + Bacillus subtilis (108 CFU ml-1) + biological fungicide) (B2), biophosphorus (Pseudomonas spp + Bacillus spp (107 CFU ml-1) (B3), and chemical fertilizer consisting of NPK (C1), N5oP5oK5o (C2) and NoPoKo (C3).The results showed that usage of biological fertilizer have positive effects on chemical fertilizers use efficiency and tolerance to drought stress in maize. Also with use of biological fertilizer can decrease usage of chemical fertilizers.Keywords: biological fertilizer, chemical fertilizer, yield component, yield, corn
Procedia PDF Downloads 3665516 Study of the Clogging of Localized Irrigation Pipelines at the Agricultural Region of Agadir
Authors: Ali Driouiche, Abdallah Hadfi
Abstract:
During this work on scaling phenomenon observed in the irrigation water pipes in the agricultural region of Greater Agadir, a follow-up was carried out during a year of the physico-chemical quality of these waters. Sampling was conducted from 120 sampling points, well distributed in the study area and involved 120 water samples. The parameters measured for each sample are temperature, pH, conductivity, total hardness and the concentrations of the ions HCO₃₋, Ca²⁺, Mg²⁺, Na⁺, K⁺, SO₄₋, NO₃₋, Cl₋ and OH₋. Indeed, the monitoring of the physico-chemical quality shows that the total hardness varies between 20 and 65 °F and the complete alkalimetric title varies from 14 °F to 42 °F. For the kinetic study of the scaling power, an object of this work, 6 samples which have high hardness were selected from the 120 samples analyzed. This study was carried out using the controlled degassing method Laboratoire de Chimie et de Génie de l’Environnement (LCGE) where it was developed) and showed that the studied waters are calcifying. The germination time Tg varies between 16 and 34 minutes. The highlighting of new scale inhibitors to prevent the formation of scale in the pipelines of the agricultural sector of Greater Agadir will also be discussed.Keywords: agadir, clogging pipes, localized irrigation, scaling power
Procedia PDF Downloads 1215515 Innovation in Lean Thinking to Achieve Rapid Construction
Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof
Abstract:
Lean thinking holds the potential for improving the construction sector, and therefore, it is a concept that should be adopted by construction sector players and academicians in the real industry. Bridging from that, a learning process for construction sector players regarding this matter should be the agenda in gaining the knowledge in preparation for their career. Lean principles offer opportunities for reducing lead times, eliminating non-value adding activities, reducing variability, and are facilitated by methods such as pull scheduling, simplified operations and buffer reduction. Thus, the drive for rapid construction, which is a systematic approach in enhancing efficiency to deliver a project using time reduction, while lean is the continuous process of eliminating waste, meeting or exceeding all customer requirements, focusing on the entire value stream and pursuing perfection in the execution of a constructed project. The methodology presented is shown to be valid through literature, interviews and questionnaire. The results show that the majority of construction sector players unfamiliar with lean thinking and they agreed that it can improve the construction process flow. With this background knowledge established and identified, best practices and recommended action are drawn.Keywords: construction improvement, rapid construction, time reduction, lean construction
Procedia PDF Downloads 373