Search results for: Total Productive Maintenance.
2584 A Case Study on Barriers in Total Productive Maintenance Implementation in the Abu Dhabi Power Industry
Authors: A. Alseiari, P. Farrell
Abstract:
Maintenance has evolved into an imperative function, and contributes significantly to efficient and effective equipment performance. Total Productive Maintenance (TPM) is an ideal approach to support the development and implementation of operation performance improvement. It systematically aims to understand the function of equipment, the service quality relationship with equipment and the probable critical equipment failure conditions. Implementation of TPM programmes need strategic planning and there has been little research applied in this area within Middle-East power plants. In the power sector of Abu Dhabi, technologically and strategically, the power industry is extremely important, and it thus needs effective and efficient equipment management support. The aim of this paper is to investigate barriers to successful TPM implementation in the Abu Dhabi power industry. The study has been conducted in the context of a leading power company in the UAE. Semi-structured interviews were conducted with 16 employees, including maintenance and operation staff, and senior managers. The findings of this research identified seven key barriers, thus: managerial; organisational; cultural; financial; educational; communications; and auditing. With respect to the understanding of these barriers and obstacles in TPM implementation, the findings can contribute towards improved equipment operations and maintenance in power organisations.
Keywords: Abu Dhabi power industry, TPM implementation, key barriers, organisational culture, critical success factors.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7802583 Improvement of Overall Equipment Effectiveness through Total Productive Maintenance
Abstract:
Frequent machine breakdowns, low plant availability and increased overtime are a great threat to a manufacturing plant as they increase operating costs of an industry. The main aim of this study was to improve Overall Equipment Effectiveness (OEE) at a manufacturing company through the implementation of innovative maintenance strategies. A case study approach was used. The paper focuses on improving the maintenance in a manufacturing set up using an innovative maintenance regime mix to improve overall equipment effectiveness. Interviews, reviewing documentation and historical records, direct and participatory observation were used as data collection methods during the research. Usually production is based on the total kilowatt of motors produced per day. The target kilowatt at 91% availability is 75 Kilowatts a day. Reduced demand and lack of raw materials particularly imported items are adversely affecting the manufacturing operations. The company had to reset its targets from the usual figure of 250 Kilowatt per day to mere 75 per day due to lower availability of machines as result of breakdowns as well as lack of raw materials. The price reductions and uncertainties as well as general machine breakdowns further lowered production. Some recommendations were given. For instance, employee empowerment in the company will enhance responsibility and authority to improve and totally eliminate the six big losses. If the maintenance department is to realise its proper function in a progressive, innovative industrial society, then its personnel must be continuously trained to meet current needs as well as future requirements. To make the maintenance planning system effective, it is essential to keep track of all the corrective maintenance jobs and preventive maintenance inspections. For large processing plants these cannot be handled manually. It was therefore recommended that the company implement (Computerised Maintenance Management System) CMMS.
Keywords: Maintenance, Manufacturing, Overall Equipment Effectiveness
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 39882582 Providing a Practical Model to Reduce Maintenance Costs: A Case Study in GeG Company
Authors: Iman Atighi, Jalal Soleimannejad, Reza Pourjafarabadi, Saeid Moradpour
Abstract:
In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increased prices. Therefore, the only way to increase profit will be to reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) and etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Iron Ore Mining & Industrial Company (GeG) was examined by using of MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs.
Keywords: GeG Company, maintainability, maintenance costs, reliability-center-maintenance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7202581 Providing a Practical Model to Reduce Maintenance Costs: A Case Study in Golgohar Company
Authors: Iman Atighi, Jalal Soleimannejad, Ahmad Akbarinasab, Saeid Moradpour
Abstract:
In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increase prices. Therefore, the only way to increase profit will be reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Company (GEG) was examined by using of MTBF (Mean Time between Failures) and MTTR (Mean Time to Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs.
Keywords: Golgohar Iron Ore Mining & Industrial Company, maintainability, maintenance costs, reliability-center-maintenance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6572580 Research on Maintenance Design Method based Virtual Maintenance
Authors: Yunbin Yang, Liangli He, Fengjun Wang
Abstract:
The essentiality of maintenance assessment and maintenance optimization in design stage is analyzed, and the existent problems of conventional maintenance design method are illuminated. MDMVM (Maintenance Design Method based Virtual Maintenance) is illuminated, and the process of MDMVM established, and the MDMVM architecture is given out. The key techniques of MDMVM are analyzed, and include maintenance design based KBE (Knowledge Based Engineering) and virtual maintenance based physically attribute. According to physical property, physically based modeling, visual object movement control, the simulation of operation force and maintenance sequence planning method are emphatically illuminated. Maintenance design system based virtual maintenance is established in foundation of maintenance design method.Keywords: Digital mock-up, virtual maintenance, knowledge engineering, maintenance sequence planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13652579 The Role of Social and Technical Lean Implementation in Improving Operational Performance: Insights from the Pharmaceutical Industry
Authors: M. Bernasconi, M. Grothkopp, T. Friedli
Abstract:
The objective of this paper is to examine the relationships between technical and social lean bundles as well as operational performance in the context of the pharmaceutical industry. We investigate the direct and mediating effects of the lean bundles Total Productive Maintenance (TPM), Total Quality Management (TQM), Just-In-Time (JIT), and Human Resource Management (HRM) on operational performance. Our analysis relies on 113 manufacturing facilities from the St.Gallen OPEX benchmarking database. The results show that HRM has a positive indirect effect on operational performance mediated by the technical lean bundles.
Keywords: Human resource management, operational performance, pharmaceutical industry, technical lean practices.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5912578 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management
Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan
Abstract:
During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.
Keywords: Aircraft maintenance, downtime, downtime cost, maintenance cost.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 44262577 Effectiveness of Lean Manufacturing Technologies on Improving Business Performance: A Study of Indian Manufacturing Industries
Authors: Saumyaranjan Sahoo, Sudhir Yadav
Abstract:
Indian manufacturing firms operating in rapidly changing and highly competitive market, over the last few decades, have embraced organization-wide transformation to achieve cultural and operational excellence. In recent years, numerous approaches have been proposed to improve business and manufacturing performance. Lean practices in particular, Total Productive Management (TPM) and Total Quality Management (TQM) have received considerable attention, as they being adopted and adapted for raising the performance standard of Indian manufacturing firms to world class levels. The complementary nature of TPM and TQM is being practiced in many companies to achieve synergy. Specifically, this research investigates whether joint TPM-TQM implementation contribute to higher business performance when compared to individual implementation. Data from 160 manufacturing firms were analyzed that demonstrate synergetic implementation of both TPM-TQM practices over a reasonable period of time, contributed in delivering better business performance as compared to individual implementation strategy.Keywords: Total productive management, total quality management, Indian manufacturing firms, business performance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19852576 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System
Authors: Vuk M. Popovic, Dunja D. Popovic
Abstract:
Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.
Keywords: Laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11282575 An Integrated Logistics Model of Spare Parts Maintenance Planning within the Aviation Industry
Authors: Roy Fritzsche, Rainer Lasch
Abstract:
Avoidable unscheduled maintenance events and unnecessary spare parts deliveries are mostly caused by an incorrect choice of the underlying maintenance strategy. For a faster and more efficient supply of spare parts for aircrafts of an airline we examine options for improving the underlying logistics network integrated in an existing aviation industry network. This paper presents a dynamic prediction model as decision support for maintenance method selection considering requirements of an entire flight network. The objective is to guarantee a high supply of spare parts by an optimal interaction of various network levels and thus to reduce unscheduled maintenance events and minimize total costs. By using a prognostics-based preventive maintenance strategy unscheduled component failures are avoided for an increase in availability and reliability of the entire system. The model is intended for use in an aviation company that utilizes a structured planning process based on collected failures data of components.Keywords: Aviation industry, Prognosis, Reliability, Preventive maintenance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 45382574 The Role of Object Oriented Simulation F Modeling in Maintenance Processes
Authors: Abdulsalam A. Al-Sudairi
Abstract:
Object-oriented simulation is considered one of the most sophisticated techniques that has been widely used in planning, designing, executing and maintaining construction projects. This technique enables the modeler to focus on objects which is extremely important for thorough understanding of a system. Thus, identifying an object is an essential point of building a successful simulation model. In a maintenance process an object is a maintenance work order (MWO). This study demonstrates a maintenance simulation model for the building maintenance division of Saudi Consolidated Electric Company (SCECO) in Dammam, Saudi Arabia. The model focused on both types of maintenance processes namely: (1) preventive maintenance (PM) and (2) corrective maintenance (CM). It is apparent from the findings that object-oriented simulation is a good diagnostic and experimental tool. This is because problems, limitations, bottlenecks and so forth are easily identified. These features are very difficult to obtain when using other tools.
Keywords: Object oriented, simulation, maintenance, process, work orders
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14972573 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities
Authors: J. Kaabi, Y. Harrath
Abstract:
This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm.
Keywords: Flow shop scheduling, maintenance, genetic algorithm, priority rules.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19242572 Dynamic Risk Identification Using Fuzzy Failure Mode Effect Analysis in Fabric Process Industries: A Research Article as Management Perspective
Authors: A. Sivakumar, S. S. Darun Prakash, P. Navaneethakrishnan
Abstract:
In and around Erode District, it is estimated that more than 1250 chemical and allied textile processing fabric industries are affected, partially closed and shut off for various reasons such as poor management, poor supplier performance, lack of planning for productivity, fluctuation of output, poor investment, waste analysis, labor problems, capital/labor ratio, accumulation of stocks, poor maintenance of resources, deficiencies in the quality of fabric, low capacity utilization, age of plant and equipment, high investment and input but low throughput, poor research and development, lack of energy, workers’ fear of loss of jobs, work force mix and work ethic. The main objective of this work is to analyze the existing conditions in textile fabric sector, validate the break even of Total Productivity (TP), analyze, design and implement fuzzy sets and mathematical programming for improvement of productivity and quality dimensions in the fabric processing industry. It needs to be compatible with the reality of textile and fabric processing industries. The highly risk events from productivity and quality dimension were found by fuzzy systems and results are wrapped up among the textile fabric processing industry.
Keywords: Break Even Point, Fuzzy Crisp Data, Fuzzy Sets, Productivity, Productivity Cycle, Total Productive Maintenance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19042571 A Study of Current Maintenance Strategies and the Reliability of Critical Medical Equipment in Hospitals in Relation to Patient Outcomes
Authors: Khelood A. Mkalaf, Peter Gibson, John Flanagan
Abstract:
This study investigates the relationship between the reliability of critical medical equipment (CME) and the effectiveness of CME maintenance management strategies in relation to patient outcomes in 84 public hospitals of a top 20 OECD country. The work has examined the effectiveness of CME maintenance management strategies used by the public hospital system of a large state run health organization. The conceptual framework was designed to examine the significance of the relationship between six variables: (1) types of maintenance management strategies, (2) maintenance services, (3) maintenance practice, (4) medical equipment reliability, (5) maintenance costs and (6) patient outcomes. The results provide interesting insights into the effectiveness of the maintenance strategies used. For example, there appears to be about a 1 in 10 000 probability of failure of anesthesia equipment, but these seem to be confined to specific maintenance situations. There are also some findings in relation to outsourcing of maintenance. For each of the variables listed, results are reported in relation to the various types of maintenance strategies and services. Decision-makers may use these results to evaluate more effective maintenance strategies for their CME and generate more effective patient outcomes.
Keywords: Critical medical equipment, maintenance strategy, patient outcomes, reliability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 49162570 Strategic Maintenance Management of Built Facilities in an Organisation
Authors: Anita D. Adamu, Winston M. W. Shakantu
Abstract:
Maintenance management is no longer a stand-alone activity. It has now assumed a strategic position in many organisations that have recognised its importance in achieving primary goals and a key aspect of effective management of facilities. This paper aims at providing an understanding of the role and function of strategic management in creating and sustaining an effective maintenance management system in an organisation. The background provides an articulated concept and principles of strategic management. The theoretical concepts paved way for a conceptual framework for which strategic management can be integrated into the maintenance management system of an organisation to improve effectiveness in the maintenance of facilities.
Keywords: Facilities, maintenance management, organisations, strategic management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 27602569 Sustainable Maintenance Model for Infrastructure in Egypt
Authors: S. Hasan, I. Beshara
Abstract:
Infrastructure maintenance is a great challenge facing sustainable development of infrastructure assets due to the high cost of passive implementation of a sustainable maintenance plan. An assessment model of sustainable maintenance for highway infrastructure projects in Egypt is developed in this paper. It helps in improving the implementation of sustainable maintenance criteria. Thus, this paper has applied the analytical hierarchy processes (AHP) to rank and explore the weight of 26 assessment indicators using three hierarchy levels containing the main sustainable categories and subcategories with related indicators. Overall combined weight of each indicator for sustainable maintenance evaluation has been calculated to sum up to a sustainable maintenance performance index (SMI). The results show that the factor "Preventive maintenance cost" has the highest relative contribution factor among others (13.5%), while two factors of environmental performance have the least weights (0.7%). The developed model aims to provide decision makers with information about current maintenance performance and support them in the decision-making process regarding future directions of maintenance activities. It can be used as an assessment performance tool during the operation and maintenance stage. The developed indicators can be considered during designing the maintenance plan. Practices for successful implementation of the model are also presented.
Keywords: Analytical Hierarchy Process, AHP, assessment performance model, KPIs for sustainable maintenance, sustainable maintenance index.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5902568 Creating Maintenance Cost Model for University Buildings
Authors: AbdulLateef A. Olanrewaju, Arazi Idrus, Mohd F. Khamidi
Abstract:
Maintenance costs incurred on building differs. The difference can be as results of the types, functions, age, building health index, size, form height, location and complexity of the building. These are contributing to the difficulty in maintenance development of deterministic maintenance cost model. This paper is concerns with reporting the preliminary findings on the creation of building maintenance cost distributions for universities in Malaysia. This study is triggered by the need to provide guides on maintenance costs distributions for decision making. For this purpose, a survey questionnaire was conducted to investigate the distribution of maintenance costs in the universities. Altogether, responses were received from twenty universities comprising both private and publicly owned. The research found that engineering services, roofing and finishes were the elements contributing the larger segment of the maintenance costs. Furthermore, the study indicates the significance of maintenance cost distribution as decision making tool towards maintenance management.Keywords: Performance matrix, university buildings, costmodel, Malaysia
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20382567 Development of Maintenance Schedule and Root Cause Analysis Based on Computerized Maintenance Management System for a Fertilizer Plant
Authors: Sanjeev Kumar
Abstract:
This paper deals with development of Computerized Maintenance Management System (CMMS) for a fertilizer plant. The software is advanced, easy to use, less complex, less expensive and also less time consuming. It consists of number of modules like detailed information of equipment, maintenance procedures, work order and employees detail. The objectives of CMMS are to reduce overall downtime, overall yearly maintenance cost and occurrence of failures of the equipment and to get day-by-day maintenance plan and strategy. In this regard, the behavioral chart for urea prilling unit at Fertilizer plant has been developed in form of Root Cause Analysis (RCA). Besides this, a maintenance program has also been proposed and used for the purpose of maintenance planning of the urea prilling unit. The outcome of software has been consulted with the concerned plant individuals and found to be extremely favorable for improving the performance level of the concerned plant.
Keywords: Computerized maintenance management system, root cause analysis, maintenance schedule, urea prilling system.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11902566 Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling
Authors: Hun Go, Ji-Su Kim, Dong-Ho Lee
Abstract:
This study considers the problem of determining operation and maintenance schedules for a containership equipped with components during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies work time of each component, determines the due-date of each maintenance activity, and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are component requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the problem complexity, we suggest a heuristic for the objective of minimizing the sum of earliness and tardiness between the due-date and the starting time of each maintenance activity. Computational experiments were done on various test instances and the results are reported.Keywords: Containerships, operation and preventive maintenance schedules, integer programming, heuristic
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16152565 Total and Partial Factor Productivity Analysis of Irrigated Wheat in Iran by Separate of Exploitation Scales
Authors: Hassan Masoumi, Rashed Alavi
Abstract:
Wheat is one of the strategic crops in Iran, on which the household food basket is highly dependent. Although this crop is cultivated and produced in almost all provinces of the country, its production efficiency is lower than the global and regional averages due to the lack of optimal use of allocated resources. In this research, which was carried out with a documentary and library method, first, the total and partial productivity indices of irrigated wheat production were calculated in large, medium and small exploitation scales in different provinces of the country, and then the provinces were clustered in terms of these indices. The results showed that the total productivity of production factors had a direct correlation with the scale of exploitation, so that with the increase in the size of exploitations, the total productivity index increased. On the scale of small exploitations, North Khorasan, Zanjan, Chaharmahal and Bakhtiari Province, on a medium scale, Chaharmahal and Bakhtiari Province and on the scale of large exploitations, Zanjan, Chaharmahal and Bakhtiari provinces, Kohkiloyeh and Boyer Ahmad and North Khorasan, with better use of production resources compared to other provinces, were placed in the best cluster in terms of total productivity index. The high total productivity index in Zanjan, Chaharmahal and Bakhtiari Province is related to the higher productivity of factors such as mechanization and land in these provinces. Finally, the methods of using these factors in productive provinces, along with technical and specialized regional guidelines, can facilitate the improvement of productivity in less productive provinces.
Keywords: Clustering, Irrigated wheat, Iran, total productivity.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1712564 Towards an Integrated Proposal for Performance Measurement Indicators (Financial and Operational) in Advanced Production Practices
Authors: José A. D. Machuca, Bernabé Escobar-Pérez, Pedro Garrido Vega, Darkys E. Lujan García
Abstract:
Starting with an analysis of the financial and operational indicators that can be found in the specialised literature, this study aims to contribute to improvements in the performance measurement systems used when the unit of analysis is the manufacturing plant. For this a search was done in the highest impact Journals of Production and Operations Management and Management Accounting , with the aim of determining the financial and operational indicators used to evaluate performance when Advanced Production Practices have been implemented, more specifically when the practices implemented are Total Quality Management, JIT/Lean Manufacturing and Total Productive Maintenance. This has enabled us to obtain a classification of the two types of indicators based on how much each is used. For the financial indicators we have also prepared a proposal that can be adapted to manufacturing plants- accounting features. In the near future we will propose a model that links practices implementation with financial and operational indicators and these two last with each other. We aim to will test this model empirically with the data obtained in the High Performance Manufacturing Project.Keywords: Advanced Production Practices, Financial Indicators, Non-Financial Indicators
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15072563 Educational Plan and Program of the Subject Maintenance of Electric Power Equipment
Authors: Rade Ciric, Sasa Mandic
Abstract:
Students of Higher Education Technical School of Professional Studies in Novi Sad follow the subject ‘Maintenance of Electric Power Equipment’ at the Electrotechnical Department. This paper presents educational plan and program of the subject Maintenance of Electric Power Equipment. The course deals with the problems of preventive and investing maintenance of transformer stations (TS), performing and maintenance of grounding of TS and pillars, as well as tracing and detection the location of the cables failure. There is a special elaborated subject concerning the safe work conditions for the electrician during network maintenance, as well as the basics of making and keeping technical documentation of the equipment.
Keywords: Educational plan and program, electric power equipment, maintenance, technical documentation, safe work.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13702562 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks
Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari
Abstract:
With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.Keywords: Water pipe networks, maintenance management, reliability analysis, optimum maintenance plan.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12562561 Implementation of CMMS Software for a Maintenance Plan in a Manufacturing Industry
Authors: Abimbola O. Aniki, Esther T. Akinlabi
Abstract:
This paper proposes an effective maintenance method by considering the implementation of the Computerized Maintenance Management System (CMMS) software to plan a maintenance activity in a manufacturing industry. Globally, maintenance is a very important activity in the manufacturing sector to prolong the life span of equipment and machinery; it is also applicable to all household items. It is obvious and well known that apart from giving long life to equipment, it reduces the substantial financial losses for repairs and save the production downtime. In some cases, appropriate maintenance of plant equipment and machinery reduces the tendencies of injuries to personnel in the job floor. But before the maintenance process can be carried out, proper and effective work order planning and scheduling must be in place in other to achieve the set goals and objectives of a maintenance shop. Brief reviews of common planning tools which include the Computerized Maintenance Management System (CMMS) are presented. An interesting outline of analyses on planning and scheduling for effective job planning in a typical manufacturing industry using the CMMS is also presented and discussed. Finally, the steps to adhere to in making job planning effective in a manufacturing industry are also highlighted.
Keywords: Advanced Downtime Analysis Programme (ADAP), Computerized Maintenance Management System (CMMS), Corrective Maintenance (CM), Executing Department (ED), Maintenance Department (MD), Preventive Maintenance (PM).
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 34242560 Optimal Maintenance Clustering for Rail Track Components Subject to Possession Capacity Constraints
Authors: Cuong D. Dao, Rob J.I. Basten, Andreas Hartmann
Abstract:
This paper studies the optimal maintenance planning of preventive maintenance and renewal activities for components in a single railway track when the available time for maintenance is limited. The rail-track system consists of several types of components, such as rail, ballast, and switches with different preventive maintenance and renewal intervals. To perform maintenance or renewal on the track, a train free period for maintenance, called a possession, is required. Since a major possession directly affects the regular train schedule, maintenance and renewal activities are clustered as much as possible. In a highly dense and utilized railway network, the possession time on the track is critical since the demand for train operations is very high and a long possession has a severe impact on the regular train schedule. We present an optimization model and investigate the maintenance schedules with and without the possession capacity constraint. In addition, we also integrate the social-economic cost related to the effects of the maintenance time to the variable possession cost into the optimization model. A numerical example is provided to illustrate the model.
Keywords: Rail-track components, maintenance, optimal clustering, possession capacity.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9962559 Hybrid Minimal Repair for a Serial System
Authors: Ellysa Nursanti, Anas Ma'ruf, Tota Simatupang, Bermawi P. Iskandar
Abstract:
This study proposes a hybrid minimal repair policy which combines periodic maintenance policy with age-based maintenance policy for a serial production system. Parameters of such policy are defined as and which indicate as hybrid minimal repair time and planned preventive maintenance time respectively . Under this hybrid policy, the system is repaired minimally if it fails during ,. A perfect repair is conducted on the first failure after at any machines. At the same time, we take opportunity to advance the preventive maintenance of other machines simultaneously. If the system is still operating properly up to , then the preventive maintenance is carried out as its predetermined schedule. For a given , we obtain the optimal value which minimizes the expected cost per time unit. Numerical example is presented to illustrate the properties of the optimal solution.Keywords: Hybrid minimal repair, opportunistic maintenance, preventive maintenance, series system
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16612558 A Review of Critical Success Factor in Building Maintenance Management Practice for University Sector
Authors: S.H. Zulkarnain, E.M.A Zawawi, M.Y. A. Rahman, N.K.F. Mustafa
Abstract:
Building maintenance plays an important role among other activities in building operation. Building defect and damages are part of the building maintenance 'bread and butter' as their input indicated in the building inspection is very much justified, particularly as to determine the building performance. There will be no escape route or short cut from building maintenance work. This study attempts to identify a competitive performance that translates the Critical Success Factor achievements and satisfactorily meet the university-s expectation. The quality and efficiency of maintenance management operation of building depends, to some extent, on the building condition information, the expectation from the university sector and the works carried out for each maintenance activity. This paper reviews the critical success factor in building maintenance management practice for university sectors from four (4) perspectives which include (1) customer (2) internal processes (3) financial and (4) learning and growth perspective. The enhancement of these perspectives is capable to reach the maintenance management goal for a better living environment in university campus.
Keywords: Building maintenance, Critical Success Factor, Management, University
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 56972557 Increasing the Capacity of Plant Bottlenecks by Using of Improving the Ratio of Mean Time between Failures to Mean Time to Repair
Authors: Jalal Soleimannejad, Mohammad Asadizeidabadi, Mahmoud Koorki, Mojtaba Azarpira
Abstract:
A significant percentage of production costs is the maintenance costs, and analysis of maintenance costs could to achieve greater productivity and competitiveness. With this is mind, the maintenance of machines and installations is considered as an essential part of organizational functions and applying effective strategies causes significant added value in manufacturing activities. Organizations are trying to achieve performance levels on a global scale with emphasis on creating competitive advantage by different methods consist of RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance) etc. In this study, increasing the capacity of Concentration Plant of Golgohar Iron Ore Mining & Industrial Company (GEG) was examined by using of reliability and maintainability analyses. The results of this research showed that instead of increasing the number of machines (in order to solve the bottleneck problems), the improving of reliability and maintainability would solve bottleneck problems in the best way. It should be mention that in the abovementioned study, the data set of Concentration Plant of GEG as a case study, was applied and analyzed.
Keywords: Bottleneck, Golgohar Iron Ore Mining and Industrial Company, maintainability, maintenance costs, reliability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9562556 A Condition-Based Maintenance Policy for Multi-Unit Systems Subject to Deterioration
Authors: Nooshin Salari, Viliam Makis
Abstract:
In this paper, we propose a condition-based maintenance policy for multi-unit systems considering the existence of economic dependency among units. We consider a system composed of N identical units, where each unit deteriorates independently. Deterioration process of each unit is modeled as a three-state continuous time homogeneous Markov chain with two working states and a failure state. The average production rate of units varies in different working states and demand rate of the system is constant. Units are inspected at equidistant time epochs, and decision regarding performing maintenance is determined by the number of units in the failure state. If the total number of units in the failure state exceeds a critical level, maintenance is initiated, where units in failed state are replaced correctively and deteriorated state units are maintained preventively. Our objective is to determine the optimal number of failed units to initiate maintenance minimizing the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. A numerical example is developed to demonstrate the proposed policy and the comparison with the corrective maintenance policy is presented.Keywords: Reliability, production, maintenance optimization, Semi-Markov Decision Process.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8132555 Application of IED to Condition Based Maintenance of Medium Voltage GCB/VCB
Authors: Ming-Ta Yang, Jyh-Cherng Gu, Chun-Wei Huang, Jin-Lung Guan
Abstract:
Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.
Keywords: Circuit breaker, Condition base maintenance, Intelligent electronic device, Time base maintenance, SCADA.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2288