8137 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 504
8136 Evaluation of Structural Behavior of Wide Sleepers on Asphalt Trackbed Due to Embedded Shear Keys

Authors: Seong Hyeok Lee, Jin Wook Lee, Bu Seog Ju, Woo Young Jung

Abstract:

Korea Train eXpress (KTX) is now being operated, which allows Korea being one of the countries that operates the high-speed rail system. The high-speed rail has its advantage of short time transportation of population and materials, which lead to many researches performed in this matter. In the case of high speed classical trackbed system, the maintenance and usability of gravel ballast system is costly. Recently, the concrete trackbed structure has been introduced as a replacement of classical trackbed system. In this case, the sleeper plays a critical role. Current study investigated to develop the track sleepers readily applicable to the top of the asphalt trackbed, as part of the trcakbed study utilizing the asphalt material. Among many possible shapes and design of sleepers, current study proposed two types of wide-sleepers according to the shear-key installation method. The structural behavior analysis and safety evaluation on each case was conducted using Korean design standard.

Keywords: wide sleepers, asphalt, high-speed railway, shear-key

Procedia PDF Downloads 408
8135 Information System Development for Online Journal System Using Online Journal System for Journal Management of Suan Sunandha Rajabhat University

Authors: Anuphan Suttimarn, Natcha Wattanaprapa, Suwaree Yordchim

Abstract:

The aim of this study is to develop the online journal system using a web application to manage the journal service of Suan Sunandha Rajabhat University in order to improve the journal management of the university. The main structures of the system process consist of 1. journal content management system 2. membership system of the journal and 3. online submission or review process. The investigators developed the system based on a web application using open source OJS software and phpMyAdmin to manage a research database. The system test showed that this online system 'Online Journal System (OJS)' could shorten the time in the period of submission article to journal and helped in managing a journal procedure efficiently and accurately. The quality evaluation of Suan Sunandha Rajabhat online journal system (SSRUOJS) undertaken by experts and researchers in 5 aspects; design, usability, security, reducing time, and accuracy showed the highest average value (X=4.30) on the aspect of reducing time. Meanwhile, the system efficiency evaluation was on an excellent level (X=4.13).

Keywords: online journal system, Journal management, Information system development, OJS

Procedia PDF Downloads 146
8134 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 413
8133 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 131
8132 The Importance of Adopting Sustainable Practices in Power Projects

Authors: Sikander Ali Abbassi, Wazir Muhmmad Laghari, Bashir Ahmed Laghari

Abstract:

Attaining sustainable development is one of the greatest challenges facing Pakistan today. A challenge that can only be met by developing and deploying confidence among the people. Transparency in project activities at all stages and other measures will also enhance its social and economic growth. Adopting sustainable practices and sensible policies, we mean that project activity should be economically viable, socially acceptable and environment friendly. In order to achieve this objective, there must be a continued commitment to encourage and ensure the public participation in development of power projects. Since Pakistan is an energy deficient country, it has to initiate power projects on a large scale in the near future. Therefore, it is the need of the hour to tackle these projects in a sustainable way, so that it can be benefited to the maximum possible level and have the least adverse effects on people and the environment. In order to get desirable results, careful planning, efficient implementation, standardized operational practices and community participation are the key parameters which ensure the positive impacts on economy, prosperity and the well being of our people. This paper pinpoints the potential environmental hazards due to project activity and emphasizes to adopt sustainable approaches in power projects.

Keywords: environmental hazards, sustainable practices, environment friendly, power projects

Procedia PDF Downloads 359
8131 Flexicommute: A Web-Based Application to Help with Car Rental Services in the Philippines

Authors: Mico Kenshee C. Samarista, John Harvey V. Miranda, Janne Audrae Q. Lebosada, Josef Anton R. Benitez, Juan Miguel C. Rubio

Abstract:

This research paper presents the development and evaluation of a web-based application designed to simplify the process of car rental services in the Philippines. As the demand for convenient and efficient access to rental car information grows, the need for a user-friendly platform becomes increasingly crucial. The web-based application serves as a comprehensive central hub, aggregating and organizing rental car listings from various reputable websites across the Philippines. By collecting essential data through surveys and usability testing, we assess the platform's effectiveness in simplifying the rental car selection process.

Keywords: web, application, car, services

Procedia PDF Downloads 57
8130 A Survey on Smart Security Mechanism Using Graphical Passwords

Authors: Aboli Dhanavade, Shweta Bhimnath, Rutuja Jumale, Ajay Nadargi

Abstract:

Security to any of our personal thing is our most basic need. It is not possible to directly apply that standard Human-computer—interaction approaches. Important usability goal for authentication system is to support users in selecting best passwords. Users often select text-passwords that are easy to remember, but they are more open for attackers to guess. The human brain is good in remembering pictures rather than textual characters. So the best alternative is being designed that is Graphical passwords. However, Graphical passwords are still immature. Conventional password schemes are also vulnerable to Shoulder-surfing attacks, many shoulder-surfing resistant graphical passwords schemes have been proposed. Next, we have analyzed the security and usability of the proposed scheme, and show the resistance of the proposed scheme to shoulder-surfing and different accidental logins.

Keywords: shoulder-surfing, security, authentication, text-passwords

Procedia PDF Downloads 330
8129 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.

Keywords: arriers, feasibility studies, public construction, South Africa.

Procedia PDF Downloads 60
8128 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 266
8127 Performance Evaluation and Planning for Road Safety Measures Using Data Envelopment Analysis and Fuzzy Decision Making

Authors: Hamid Reza Behnood, Esmaeel Ayati, Tom Brijs, Mohammadali Pirayesh Neghab

Abstract:

Investment projects in road safety planning can benefit from an effectiveness evaluation regarding their expected safety outcomes. The objective of this study is to develop a decision support system (DSS) to support policymakers in taking the right choice in road safety planning based on the efficiency of previously implemented safety measures in a set of regions in Iran. The measures considered for each region in the study include performance indicators about (1) police operations, (2) treated black spots, (3) freeway and highway facility supplies, (4) speed control cameras, (5) emergency medical services, and (6) road lighting projects. To this end, inefficiency measure is calculated, defined by the proportion of fatality rates in relation to the combined measure of road safety performance indicators (i.e., road safety measures) which should be minimized. The relative inefficiency for each region is modeled by the Data Envelopment Analysis (DEA) technique. In a next step, a fuzzy decision-making system is constructed to convert the information obtained from the DEA analysis into a rule-based system that can be used by policy makers to evaluate the expected outcomes of certain alternative investment strategies in road safety.

Keywords: performance indicators, road safety, decision support system, data envelopment analysis, fuzzy reasoning

Procedia PDF Downloads 317
8126 A New Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Multi-Unit Systems; Application to Railway Track

Authors: Farzad Pargar

Abstract:

We introduce the preventive maintenance and renewal scheduling problem for a multi-unit system over a finite and discretized time horizon. Given the latest possible time for carrying out the next maintenance and renewal projects after the previous ones and considering several common set-up costs, the introduced scheduling model tries to minimize the cost of projects by grouping them and simultaneously finding the optimal balance between doing maintenance and renewal. We present a 0-1 pure integer linear programming that determines which projects should be performed together on which location and in which period (e.g., week or month). We consider railway track as a case for our study and test the performance of the proposed model on a set of test problems. The experimental results show that the proposed approach performs well.

Keywords: maintenance, renewal, scheduling, mathematical programming model

Procedia PDF Downloads 664
8125 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
8124 An Assessment on the Effect of Participation of Rural Woman on Sustainable Rural Water Supply in Yemen

Authors: Afrah Saad Mohsen Al-Mahfadi

Abstract:

In rural areas of developing countries, participation of all stakeholders in water supply projects is an important step towards further development. As most of the beneficiaries are women, it is important that they should be involved to achieve successful and sustainable water supply projects. Women are responsible for the management of water both inside and outside home, and often spend more than six-hours a day fetching drinking water from distant water sources. The problem is that rural women play a role of little importance in the water supply projects’ phases in rural Yemen. Therefore, this research aimed at analyzing the different reasons of their lack of participation in projects and in what way a full participation -if achieved- could contribute to sustainable water supply projects in the rural mountainous areas in Yemen. Four water supply projects were selected as a case study in Al-Della'a Alaala sub-district in the Al-Mahweet governorate, two of them were implemented by the Social Fund and Development (SFD), while others were implemented by the General Authority for Rural Water Supply Projects (GARWSSP). Furthermore, the successful Al-Galba project, which is located in Badan district in Ibb governorate, was selected for comparison. The rural women's active participation in water projects have potential consequences including continuity and maintenance improvement, equipment security, and improvement in the overall health and education status of these areas. The majority of respondents taking part in GARWSSP projects estimated that there is no reason to involve women in the project activities. In the comparison project - in which a woman worked as a supervisor and implemented the project – all respondents indicated that the participation of women is vital for sustainability. Therefore, the results of this research are intended to stimulate rural women's participation in the mountainous areas of Yemen.

Keywords: assessment, rural woman, sustainability, water management

Procedia PDF Downloads 651
8123 Rational Allocation of Resources in Water Infrastructure Development Projects

Authors: M. Macchiaroli, V. Pellecchia, L. Dolores

Abstract:

Within any European and world model of management of the integrated water service (in Italy only since 2012 is regulated by a national Authority, that is ARERA), a significant part is covered by the development of assets in terms of hydraulic networks and wastewater collection networks, including all their relative building works. The process of selecting the investments to be made starts from the preventive analysis of critical issues (water losses, unserved areas, low service standards, etc.) who occur in the managed territory of the Operator. Through the Program of Interventions (Provision by ARERA n. 580/2019/R/idr), the Operator provides to program the projects that can meet the emerged needs to determine the improvement of the water service levels. This phase (analyzed and solved by the author with a work published in 2019) involves the use of evaluation techniques (cost-benefit analysis, multi-criteria, and multi-objective techniques, neural networks, etc.) useful in selecting the most appropriate design answers to the different criticalities. However, at this point, the problem of establishing the time priorities between the various works deemed necessary remains open. That is, it is necessary to hierarchize the investments. In this decision-making moment, the interests of the private Operator are often opposed, which favors investments capable of generating high profitability, compared to those of the public controller (ARERA), which favors investments in greater social impact. In support of the concertation between these two actors, the protocol set out in the research has been developed, based on the AHP and capable of borrowing from the programmatic documents an orientation path for the settlement of the conflict. The protocol is applied to a case study of the Campania Region in Italy and has been professionally applied in the shared decision process between the manager and the local Authority.

Keywords: analytic hierarchy process, decision making, economic evaluation of projects, integrated water service

Procedia PDF Downloads 94
8122 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 166
8121 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 455
8120 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 58
8119 The Agency of Award Systems in Architecture: The Case of Cyprus

Authors: Christakis Chatzichristou, Elias Kranos

Abstract:

Architectural awards, especially if they are given by the state, recognize excellence in the field and, at the same time, strongly contribute to the making of the architectural culture of a place. The present research looks at the houses that have been awarded through such a system in Cyprus in order to discuss the values promoted, directly or not, by such a setup which is quite similar to other prestigious award systems such as the Mies van de Rohe Prize in Europe. In fact, many of the projects signed out through the state award system end up being selected to represent the country for the European awards. The residential architecture encouraged by such systems is quite interesting in that the most public of institutions influence how the most private unit of society is architecturally accommodated. The methodology uses both qualitative as well as quantitative research tools in order to analyze: the official state call for entries to the competition; the final report of the evaluation committee; the spatial characteristics of the houses through the Space Syntax methodology; the statements of the architects regarding their intentions and the final outcome; the feelings of the owners and users of the houses regarding the design process as well as the degree of satisfaction regarding the final product. The above-mentioned analyses allow for a more thorough discussion regarding not only the values promoted explicitly by the system through the brief that describes what the evaluation committee is looking for but also the values that are actually being promoted indirectly through the results of the actual evaluation itself. The findings suggest that: the strong emphasis in brief on bioclimatic design and issues of sustainability weakens significantly, if at all present, in the actual selection process; continuous improvement seems to be fuzzily used as a concept; most of the houses tend to have a similar spatial genotype; most of the houses have similar aesthetic qualities; discrepancies between the proposed lifestyle through the design and the actual use of the spaces do not seem to be acknowledged in the evaluation as an issue; the temporal factor seems to be ignored as the projects are required to be ‘finished projects’ as though the users and their needs do not change through time. The research suggests that, rather than preserving a critical attitude regarding the role of the architect in society, the state award system tends, like any other non-reflective social organism, to simply promote its own unexamined values as well as prejudices. This is perhaps more evident in the shared aesthetic character of the awarded houses and less so in the hidden spatial genotype to which they belong. If the design of houses is indeed a great opportunity for architecture to contribute in a more deliberate manner to the evolution of society, then what the present study shows is that this opportunity seems to be largely missed. The findings may serve better less as a verdict and more as a chance for introspection and discussion.

Keywords: award systems, houses, spatial genotype, aesthetic qualities

Procedia PDF Downloads 40
8118 Meeting the Health Needs of Adolescents and Young Adults: Developing and Evaluating an Electronic Questionnaire and Health Report Form, for the Health Assessment at Youth Health Clinics – A Mixed Methods Project

Authors: P.V. Lostelius, M.Mattebo, E. Thors Adolfsson, A. Söderlund, Å. Revenäs

Abstract:

Adolescents are vulnerable in healthcare settings. Early detection of poor health in young people is important to support a good quality of life and adult social functioning. Youth Health Clinics (YHCs) in Sweden provide healthcare for young people ages 13-25 years old. Using an overall mixed methods approach, the project’s main objective was to develop and evaluate an electronic health system, including a health questionnaire, a case report form, and an evaluation questionnaire to assess young people’s health risks in early stages, increase health, and quality of life. In total, 72 young people, 16-23 years old, eleven healthcare professionals and eight researchers participated in the three project studies. Results from interviews with fifteen young people gave that an electronic health questionnaire should include questions about physical-, mental-, sexual health and social support. It should specifically include questions about self-harm and suicide risk. The young people said that the questionnaire should be appealing, based on young people’s needs and be user-friendly. It was important that young people felt safe when responding to the questions, both physically and electronically. Also, they found that it had the potential to support the face-to face-meeting between young people and healthcare professionals. The electronic health report system was developed by the researchers, performing a structured development of the electronic health questionnaire, construction of a case report form to present the results from the health questions, along with an electronic evaluation questionnaire. An Information Technology company finalized the development by digitalizing the electronic health system. Four young people, three healthcare professionals and seven researchers evaluated the usability using interviews and a usability questionnaire. The electronic health questionnaire was found usable for YHCs but needed some clarifications. Essentially, the system succeeded in capturing the overall health of young people; it should be able to keep the interest of young people and have the potential to contribute to health assessment planning and young people’s self-reflection, sharing vulnerable feelings with healthcare professionals. In advance of effect studies, a feasibility study was performed by collecting electronic questionnaire data from 54 young people and interview data from eight healthcare professionals to assess the feasibility of the use of the electronic evaluation questionnaire, the case report form, and the planned recruitment method. When merging the results, the research group found that the evaluation questionnaire and the health report were feasible for future research. However, the COVID-19 pandemic, commitment challenges and drop-outs affected the recruitment of young people. Also, some healthcare professionals felt insecure about using computers and electronic devices and worried that their workload would increase. This project contributes knowledge about the development and use of electronic health tools for young people. Before implementation, clinical routines need for using the health report system need to be considered.

Keywords: adolescent health, developmental studies, electronic health questionnaire, mixed methods research

Procedia PDF Downloads 66
8117 Airport Investment Risk Assessment under Uncertainty

Authors: Elena M. Capitanul, Carlos A. Nunes Cosenza, Walid El Moudani, Felix Mora Camino

Abstract:

The construction of a new airport or the extension of an existing one requires massive investments and many times public private partnerships were considered in order to make feasible such projects. One characteristic of these projects is uncertainty with respect to financial and environmental impacts on the medium to long term. Another one is the multistage nature of these types of projects. While many airport development projects have been a success, some others have turned into a nightmare for their promoters. This communication puts forward a new approach for airport investment risk assessment. The approach takes explicitly into account the degree of uncertainty in activity levels prediction and proposes milestones for the different stages of the project for minimizing risk. Uncertainty is represented through fuzzy dual theory and risk management is performed using dynamic programming. An illustration of the proposed approach is provided.

Keywords: airports, fuzzy logic, risk, uncertainty

Procedia PDF Downloads 372
8116 Thermodynamic Evaluation of Coupling APR-1400 with a Thermal Desalination Plant

Authors: M. Gomaa Abdoelatef, Robert M. Field, Lee, Yong-Kwan

Abstract:

Growing human populations have placed increased demands on water supplies and a heightened interest in desalination infrastructure. Key elements of the economics of desalination projects are thermal and electrical inputs. With growing concerns over the use of fossil fuels to (indirectly) supply these inputs, coupling of desalination with nuclear power production represents a significant opportunity. Individually, nuclear and desalination technologies have a long history and are relatively mature. For desalination, Reverse Osmosis (RO) has the lowest energy inputs. However, the economically driven output quality of the water produced using RO, which uses only electrical inputs, is lower than the output water quality from thermal desalination plants. Therefore, modern desalination projects consider that RO should be coupled with thermal desalination technologies (MSF, MED, or MED-TVC) with attendant steam inputs to permit blending to produce various qualities of water. A large nuclear facility is well positioned to dispatch large quantities of both electrical and thermal power. This paper considers the supply of thermal energy to a large desalination facility to examine heat balance impact on the nuclear steam cycle. The APR1400 nuclear plant is selected as prototypical from both a capacity and turbine cycle heat balance perspective to examine steam supply and the impact on electrical output. Extraction points and quantities of steam are considered parametrically along with various types of thermal desalination technologies to form the basis for further evaluations of economically optimal approaches to the interface of nuclear power production with desalination projects. In our study, the thermodynamic evaluation will be executed by DE-TOP which is the IAEA desalination program, it is approved to be capable of analyzing power generation systems coupled to desalination systems through various steam extraction positions, taking into consideration the isolation loop between the APR-1400 and the thermal desalination plant for safety concern.

Keywords: APR-1400, desalination, DE-TOP, IAEA, MSF, MED, MED-TVC, RO

Procedia PDF Downloads 503
8115 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 127
8114 Analysis Mechanized Boring (TBM) of Tehran Subway Line 7

Authors: Shahin Shabani, Pouya Pourmadadi

Abstract:

Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and water diversion. Several mining projects have seen the successful and economic beneficial use of TBMs, and there is an increasing awareness of the benefits of TBMs for mining projects. Key technical considerations for the use of TBMs for the construction of tunnels for mining projects include geological issues (rock type, rock alteration, rock strength, rock abrasivity, durability, ground water inflows), depth of cover and the potential for overstressing/rockbursts, site access and terrain, portal locations, TBM constraints, minimum tunnel size, tunnel support requirements, contractor and labor experience, and project schedule demands. This study focuses on tunnelling mining, with the goal to develop methods and tools to be used to gain understanding of these processes, and to analyze metro of Tehran. The Metro Line 7 of Tehran is one of the Longest (26 Km) and deepest (27m) of projects that’s under implementation. Because of major differences like passing under all geotechnical layers of the town and encountering part of it with underground water table and also using mechanized excavation system, is one of special metro projects.

Keywords: TBM, tunnel boring machines economic, metro, line 7

Procedia PDF Downloads 353
8113 Development of a Triangular Evaluation Protocol in a Multidisciplinary Design Process of an Ergometric Step

Authors: M. B. Ricardo De Oliveira, A. Borghi-Silva, E. Paravizo, F. Lizarelli, L. Di Thomazzo, D. Braatz

Abstract:

Prototypes are a critical feature in the product development process, as they help the project team visualize early concept flaws, communicate ideas and introduce an initial product testing. Involving stakeholders, such as consumers and users, in prototype tests allows the gathering of valuable feedback, contributing for a better product and making the design process more participatory. Even though recent studies have shown that user evaluation of prototypes is valuable, few articles provide a method or protocol on how designers should conduct it. This multidisciplinary study (involving the areas of physiotherapy, engineering and computer science) aims to develop an evaluation protocol, using an ergometric step prototype as the product prototype to be assessed. The protocol consisted of performing two tests (the 2 Minute Step Test and the Portability Test) to allow users (patients) and consumers (physiotherapists) to have an experience with the prototype. Furthermore, the protocol contained four Likert-Scale questionnaires (one for users and three for consumers), that inquired participants about how they perceived the design characteristics of the product (performance, safety, materials, maintenance, portability, usability and ergonomics), in their use of the prototype. Additionally, the protocol indicated the need to conduct interviews with the product designers, in order to link their feedback to the ones from the consumers and users. Both tests and interviews were recorded for further analysis. The participation criteria for the study was gender and age for patients, gender and experience with 2 Minute Step Test for physiotherapists and involvement level in the product development project for designers. The questionnaire's reliability was validated using Cronbach's Alpha and the quantitative data of the questionnaires were analyzed using non-parametric hypothesis tests with a significance level of 0.05 (p <0.05) and descriptive statistics. As a result, this study provides a concise evaluation protocol which can assist designers in their development process, collecting quantitative feedback from consumer and users, and qualitative feedback from designers.

Keywords: Product Design, Product Evaluation, Prototypes, Step

Procedia PDF Downloads 95
8112 Healthy and Smart Building Projects

Authors: Ali A. Karakhan

Abstract:

Stakeholders in the architecture, engineering, and construction (AEC) industry have been always searching for strategies to develop, design, and construct healthy and smart building projects. Healthy and smart building projects require that the building process including design and construction be altered and carefully implemented in order to bring about sustainable outcomes throughout the facility lifecycle. Healthy and smart building projects are expected to positively influence organizational success and facility performance across the project lifecycle leading to superior outcomes in terms of people, economy, and the environment. The present study aims to identify potential strategies that AEC organizations can implement to achieve healthy and smart building projects. Drivers and barriers for healthy and smart building features are also examined. The study findings indicate that there are three strategies to advance the development of healthy and smart building projects: (1) the incorporation of high-quality products and low chemical-emitting materials, (2) the integration of innovative designs, methods, and practices, and (3) the adoption of smart technology throughout the facility lifecycle. Satisfying external demands, achievement of a third-party certification, obtaining financial incentives, and a desire to fulfill professional duty are identified as the key drivers for developing healthy and smart building features; whereas, lack of knowledge and training, time/cost constrains, preference for/adherence to customary practices, and unclear business case for why healthy buildings are advantageous are recognized as the primary barriers toward a wider diffusion of healthy and smart building projects. The present study grounded in previous engineering, medical, and public health research provides valuable technical and practical recommendations for facility owners and industry professionals interested in pursuing sustainable, yet healthy and smart building projects.

Keywords: healthy buildings, smart construction, innovative designs, sustainable projects

Procedia PDF Downloads 128
8111 Assessment Methodology of E-government Projects for the Regions of Georgia

Authors: Tina Melkoshvili

Abstract:

Drastic development of information and communication technologies in Georgia has led to the necessity of launching conceptually new, effective, flexible, transparent and society oriented form of government that is e-government. Through applying information technologies, the electronic system enables to raise the efficacy of state governance and increase citizens’ participation in the process. Focusing on the topic of e-government allows us to analyze success stories, attributed benefits and, at the same time, observes challenges hampering the government development process. There are number of methodologies elaborated to study the conditions in the field of electronic governance. They enable us to find out if the government is ready to apply broad opportunities of information and communication technologies and if the government is apt to improve the accessibility and quality of delivering mainly social services. This article seeks to provide comparative analysis of widely spread methodologies used for Electronic government projects’ assessment. It has been concluded that applying current methods of assessment in Georgia is related to difficulties due to inaccessible data and the necessity of involving number of experts. The article presents new indicators for e-government development assessment that reflect efficacy of e-government conception realization in the regions of Georgia and enables to provide quantitative evaluation of regional e-government projects including all significant aspects of development.

Keywords: development methodology, e-government in Georgia, information and communication technologies, regional government

Procedia PDF Downloads 246
8110 The Importance of Localization in Large Constraction Projects

Authors: Ali Mohammadi

Abstract:

The basis for the construction of any project is a map, a map where the surveyor can determine the coordinates of the points on the ground by using the coordinates and using the total station, projects such as dams, roads, tunnels and pipelines, if the base points are determined using GPS prepared can create challenges for the surveyor to control. First, we will examine some map projection on which the maps are designed, and a summary of their differences and the challenges that surveyors face in order to control them, because in order to build projects, we need real lengths and angles, so we have to use coordinates that provide us with the results of the calculations. We will examine some examples to understand the concept of localization so that the surveyor knows if he is facing a challenge or not and if he is faced with this challenge, how should he solve this problem.

Keywords: UTM, scale factor, cartesian, traverse

Procedia PDF Downloads 45
8109 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 252
8108 Chongqing's Urban Regeneration for Maintaining the Historic Urban Landscape: Success and Failure of Achieving Sustainable Development

Authors: Hanyu Wei

Abstract:

The last two decades have witnessed a significant number of regeneration practices in historical Chinese cities with the context of rapid urbanisation and economic development. As a response to the possible loss of place identity in the redevelopment process, city makers recognise the potentials of places with cultural significance for maintaining the original landscape. In Chongqing, the prosperities of human settlement history together with the anti-war and post-industrial culture bring this riverside city with its unique urban landscape. Great amounts of historical sites are identified and subjected to conservation planning approaches for urban revitalisation while also maintaining the historic urban landscape. This paper reviews three practices of cultural-led regeneration projects (Hongyadong, Ciqikou, Danzishi) in Chongqing, detailing the urban design and planning principals for the case sites. The paper also presents the conflicting opinions from groups with different interests. By carrying a systematical sustainability evaluation assessment on those projects, the paper critically analyzes the influence of these projects on the broad socio-economic aspects. Although these regeneration cases are thought to achieve the general success in abstaining economic benefits, they are criticised for the over-tourism issues and damages on the authenticity, which further fails to achieve sustainable development.

Keywords: Chongqing, historic urban landscape, sustainable development, urban regeneration

Procedia PDF Downloads 194