Search results for: stakeholders of project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6293

Search results for: stakeholders of project

6053 Patient Advocates to Improve Access to Justice in Involuntary Hospitalisation

Authors: Zuzana Durajova, Natasa Diatkova, Shreya Bhardwaj

Abstract:

This paper introduces the project START, its activities, goals, evaluation and final results. Over the past few decades, the legal discourse surrounding mental health has resulted in improvement in patient rights (in Netherlands, etc.), the appointment of Ombudspersons for psychiatric patients (in Austria, Sweden) and facilitating the participation of patients in decision-making processes. Czech legislation already recognizes the position of “patient’s advocate” as a person of trust. However, this instrument is not very widely known and rarely used in practice. In the pilot study of the project, legal training for patient advocacy is provided to persons with experience with mental health problems/psychiatric hospitalization chosen from a Czech-based NGO. These persons (patient advocates) visit patients in involuntary hospitalization in one closed ward in the chosen psychiatric institution. During visits, the patient advocates inform patients about their legal standing, their procedural rights and also offer them individual support in contacting their counsel, family members etc. To understand the effect of the intervention, qualitative interviews and participant observations are conducted with the patients, advocates, the hospital management and staff and other identifiable stakeholders, such as government officials responsible for mental health care reform. The interviews are held before, during and after the intervention (support from patient advocates in hospitals). Given the ethical quandaries arising from using psychiatric wards as a field setting, we assume a participatory approach to ensure respect for patient boundaries and dignity. Through this project, we seek to establish a profession of patient advocates based on professional standards.

Keywords: patient advocacy, involuntary hospitalization, Czech Republic, patient Rights, professionalization

Procedia PDF Downloads 164
6052 Examining the Perceptions of Religious Stakeholders Towards Religious Tourism Development

Authors: Sotiroula Liasidou, Katerina Pericleous, Zanete Garanti,

Abstract:

Traveling for religious and pilgrimage purposes consists of an early-stage motivation for the historical development of tourism. Sacred places have become important attractions for local and foreign visitors, and many countries invest in the development of religious and pilgrimage tourism. Cyprus has a rich tradition as an important place for the establishment and diffusion of the Christian Orthodox Religion (Greek). Being considered the ‘island of Saints’, Cyprus sets strong foundations to be recognised as a spiritual destination of devotion for visitors interested in discovering the roots and the spiritual essence of the Christian Orthodox Religion. The paper elucidates on bringing together the fact of whether tourism in sacred places affects spirituality and religiosity. Thus, the aim is to consider the perceptions of the main religious stakeholders, including monastery abbots, in relation to the development of religious tourism. The aim of the study is fulfilled by incorporating questionnaires targeting the responses of the involved religious key players and stakeholders. The results of the study are indicative and provide an understanding in terms of religious tourism as an important product by interpreting the stance of religious stakeholders. In general, religious leaders support tourism in religious sites and argue that spirituality and holiness can be maintained as long there is a policy that is followed both by religious and tourism policymakers. Undoubtedly, establishing Cyprus as a religious tourism destination would bring many economic and social benefits.

Keywords: religious tourism, pilgrimage, Cyprus, Christian Orthodox Religion, sacred places, monasteries

Procedia PDF Downloads 116
6051 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation

Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho

Abstract:

This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.

Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles

Procedia PDF Downloads 344
6050 Machine Learning Based Digitalization of Validated Traditional Cognitive Tests and Their Integration to Multi-User Digital Support System for Alzheimer’s Patients

Authors: Ramazan Bakir, Gizem Kayar

Abstract:

It is known that Alzheimer and Dementia are the two most common types of Neurodegenerative diseases and their visibility is getting accelerated for the last couple of years. As the population sees older ages all over the world, researchers expect to see the rate of this acceleration much higher. However, unfortunately, there is no known pharmacological cure for both, although some help to reduce the rate of cognitive decline speed. This is why we encounter with non-pharmacological treatment and tracking methods more for the last five years. Many researchers, including well-known associations and hospitals, lean towards using non-pharmacological methods to support cognitive function and improve the patient’s life quality. As the dementia symptoms related to mind, learning, memory, speaking, problem-solving, social abilities and daily activities gradually worsen over the years, many researchers know that cognitive support should start from the very beginning of the symptoms in order to slow down the decline. At this point, life of a patient and caregiver can be improved with some daily activities and applications. These activities include but not limited to basic word puzzles, daily cleaning activities, taking notes. Later, these activities and their results should be observed carefully and it is only possible during patient/caregiver and M.D. in-person meetings in hospitals. These meetings can be quite time-consuming, exhausting and financially ineffective for hospitals, medical doctors, caregivers and especially for patients. On the other hand, digital support systems are showing positive results for all stakeholders of healthcare systems. This can be observed in countries that started Telemedicine systems. The biggest potential of our system is setting the inter-user communication up in the best possible way. In our project, we propose Machine Learning based digitalization of validated traditional cognitive tests (e.g. MOCA, Afazi, left-right hemisphere), their analyses for high-quality follow-up and communication systems for all stakeholders. R. Bakir and G. Kayar are with Gefeasoft, Inc, R&D – Software Development and Health Technologies company. Emails: ramazan, gizem @ gefeasoft.com This platform has a high potential not only for patient tracking but also for making all stakeholders feel safe through all stages. As the registered hospitals assign corresponding medical doctors to the system, these MDs are able to register their own patients and assign special tasks for each patient. With our integrated machine learning support, MDs are able to track the failure and success rates of each patient and also see general averages among similarly progressed patients. In addition, our platform also supports multi-player technology which helps patients play with their caregivers so that they feel much safer at any point they are uncomfortable. By also gamifying the daily household activities, the patients will be able to repeat their social tasks and we will provide non-pharmacological reminiscence therapy (RT – life review therapy). All collected data will be mined by our data scientists and analyzed meaningfully. In addition, we will also add gamification modules for caregivers based on Naomi Feil’s Validation Therapy. Both are behaving positively to the patient and keeping yourself mentally healthy is important for caregivers. We aim to provide a therapy system based on gamification for them, too. When this project accomplishes all the above-written tasks, patients will have the chance to do many tasks at home remotely and MDs will be able to follow them up very effectively. We propose a complete platform and the whole project is both time and cost-effective for supporting all stakeholders.

Keywords: alzheimer’s, dementia, cognitive functionality, cognitive tests, serious games, machine learning, artificial intelligence, digitalization, non-pharmacological, data analysis, telemedicine, e-health, health-tech, gamification

Procedia PDF Downloads 106
6049 What Happens When We Try to Bridge the Science-Practice Gap? An Example from the Brazilian Native Vegetation Protection Law

Authors: Alice Brites, Gerd Sparovek, Jean Paul Metzger, Ricardo Rodrigues

Abstract:

The segregation between science and policy in decision making process hinders nature conservation efforts worldwide. Scientists have been criticized for not producing information that leads to effective solutions for environmental problems. In an attempt to bridge this gap between science and practice, we conducted a project aimed at supporting the implementation of the Brazilian Native Vegetation Protection Law (NVPL) implementation in São Paulo State (SP), Brazil. To do so, we conducted multiple open meetings with the stakeholders involved in this discussion. Throughout this process, we raised stakeholders' demands for scientific information and brought feedbacks about our findings. However, our main scientific advice was not taken into account during the NVPL implementation in SP. The NVPL has a mechanism that exempts landholders who converted native vegetation without offending the legislation in place at the time of the conversion from restoration requirements. We found out that there were no accurate spatialized data for native vegetation cover before the 1960s. Thus, the initial benchmark for the mechanism application should be the 1965 Brazilian Forest Act. Even so, SP kept the 1934 Brazilian Forest Act as the initial legal benchmark for the law application. This decision implies the use of a probabilistic native vegetation map that has uncertainty and subjectivity as its intrinsic characteristics, thus its use can lead to legal queries, corruption, and an unfair benefit application. But why this decision was made even after the scientific advice was vastly divulgated? We raised some possible reasons to explain it. First, the decision was made during a government transition, showing that circumstantial political events can overshadow scientific arguments. Second, the debate about the NVPL in SP was not pacified and powerful stakeholders could benefit from the confusion created by this decision. Finally, the native vegetation protection mechanism is a complex issue, with many technical aspects that can be hard to understand for a non-specialized courtroom, such as the one that made the final decision at SP. This example shows that science and decision-makers still have a long way ahead to improve their way to interact and that science needs to find its way to be heard above the political buzz.

Keywords: Brazil, forest act, science-based dialogue, science-policy interface

Procedia PDF Downloads 99
6048 The Mashishing Marking Memories Project: A Culture-Centered Approach to Participation

Authors: Nongcebo Ngcobo

Abstract:

This research explores the importance of including a multitude of voices in the cultural heritage narrative, particularly in South Africa. The Mashishing project is an extension of and builds on the existing ‘Biesje Poort project’ which is a rock art project that was funded by the National Heritage Council in 2010 - 2013. Hence, the Mashishing marking memories project applies comparable Biesje Poort project objectives, though in a different geographical area. The wider project objectives are to transfer skills, promote social cohesion and empowerment, and lastly to add to the knowledge base of the Mashishing region and the repository of the local museum in the Lydenburg museum. This study is located in the Mashishing area, in Mpumalanga, South Africa. In this area, there were no present multi-vocal heritage projects. This research assesses the Mashishing marking memories project through the culture-centered approach for communication for social change, which examines the impact that the diverse participants have on the operations of the Mashishing project and also investigates whether the culturally diverse participants facilitates or hinders effective participation within the project. Key findings of this research uncovered the significance of participation and diverse voices in the cultural heritage field. Furthermore, this study highlights how unequal power relations affect effective participation. As a result, this study encourages the importance of bringing the researcher and the participant in a safe space to facilitate mutual learning. It also encourages an exchange of roles, where the researcher shifts from being an authoritarian figure to being in the role of a listener.

Keywords: culture, heritage, participation, social change

Procedia PDF Downloads 93
6047 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
6046 Improving Internal Efficiency of Local Universities and Colleges: Asseessing the Impact of the 085 Project in Shanghai

Authors: Qing Hui Wang, You Lin Fang, Min Chen

Abstract:

In 2003 the percentage of students in Shanghai taking part in tertiary education reached 53% of the age cohort, which is at the universal level according to Trow's typology. This achievement led to a conscientious effort by the government to improve internal efficiency of local universities and colleges through a series of programs, the most important of which is the 085 Project. This paper considers the effects of the 085 Project- the 5 initiatives launched in 2008 on increasing the investment to improve institutional overall visibilities, teaching excellence, knowledge innovation, faculty development as well as internationalization. Using the approach of ERC (a theory of equality, reciprocity, and competition) model, it was found that the initiatives helped the lower tier universities and colleges make full play in the aspects of strategic planning and identifying themselves. It was also found that the rate of growth of social resources for universities as a whole increased more quickly after the implementation of the 085 Project.

Keywords: 085 Project, impact, internal efficiency, local universities and colleges

Procedia PDF Downloads 426
6045 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 69
6044 A Comparative Analysis of Safety Orientation and Safety Performance in Organizations: A Project Management Perspective

Authors: Dina Alfreahat, Zoltan Sebestyen

Abstract:

Safety is considered as one of the project’s success factors. Poor safety management may result in accidents that impact human, economic, and legal issues. Therefore, it is necessary to consider safety and health as a project success factor along with other project success factors, such as time, cost, and quality. Organizations have a knowledge deficit of the implementation of long-term safety practices, and due to cost control, safety problems tend to receive the least priority. They usually assume that safety management involves expenditures unrelated to production goals, thereby considering it unnecessary for profitability and competitiveness. The purpose of this study is to introduce, analysis and identify the correlation between the orientation of the public safety procedures of an organization and the public safety standards applied in the project. Therefore, the authors develop the process and collect the possible mathematical-statistical tools supporting the previously mentioned goal. The result shows that the adoption of management to safety is a major factor in implementing the safety standard in the project and thereby improving safety performance. It may take time and effort to adopt the mindset of safety orientation service development, but at the same time, the higher organizational investment in safety and health programs will contribute to the loyalty of staff to safety compliance.

Keywords: project management perspective, safety orientation, safety performance, safety standards

Procedia PDF Downloads 145
6043 Sukh Initiative: A Family Planning Reproductive Health Project for Squatter Settlement of Karachi, Pakistan

Authors: Arshad Hussain

Abstract:

Background: Sukh Initiative is a multi-donor funded, family planning and reproductive health project, primed by Aman Healthcare Services; implemented through a consortium of local and international organizations, in a selected one million underserved peri-urban population of Karachi, Sindh; which aims at increasing modern contraceptive prevalence rate by 15 percentage point. Objective: To empower women to access contraception by increasing knowledge, improving quality of services and expanding the basket of choices; contributing to the goals of FP2020. Methods: A five years project has a multi-pronged approach with door to door services by LHWs and CHWs in an LHWs covered population and provision of quality FP/RH services both at public and private health care facilities. The project engages youth (12-16 years) both with community and at secondary schools to mentor them for responsible adulthood with life skilled base initiative. A 24/7 availability of youth and FP helpline service provides counselling, referrals in addition with a follow-up mechanism. Results: 131,810 MWRAs were reached by 191 community health workers through 29,693 of community support group meetings and 166,775 house hold visits. These MWRAs were counselled on FP related myths and misconception and referred to 216 providers trained for quality family planning services and maintaining average 64% quality scores in 43 public health and 35 private facilities in the project area. Of those referred 26% MWRAs opted modern contraception with 17.56% in LARCs and 41% PPFP as compared to baseline. Aman TeleHealth is linked with 24/7 counselling, referrals and post services follow-ups to clients, showing 14% proportion of FP call volume. Sukh has a unique role in engaging all partners on youth SRHR issues through family life education sessions, 30 higher sec. schools in Sukh area have been provided LSBE to 16,000 students (aged 15-17), and in community approximately 10, 496 girls and boys have received SRHR information. Conclusion: Through individual counselling, access to quality family planning services and involvement of stakeholders, Suk created an enabling environment to rapid increase in family planning in the project intervention area.

Keywords: family planning and reproductive health, married women with reproductive age, urban squatter, Pakistan

Procedia PDF Downloads 285
6042 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 355
6041 Experiences and Challenges of Community Participation in Urban Renewal Projects: A Case Study of Bhendi Bazzar, Mumbai, India

Authors: Madhura Yadav

Abstract:

Urban redevelopment planning initiatives in developing countries have been largely criticised due to top-down planning approach and lack of involvement of the targeted beneficiaries which have led to a challenging situation which is contrary to the perceived needs of beneficiaries. Urban renewal projects improve the lives of people and meaningful participation of community plays a pivotal role. Public perceptions on satisfaction and participation have been given less priority in the investigation, which hinders effective planning and implementation of urban renewal projects. Moreover, challenges of community participation in urban renewal projects are less documented, particularly in relation to public participation and satisfaction. There is a need for new paradigm shift focusing on community participatory approach in urban renewal projects. The over 125-year-old Bhendi Bazar in Mumbai, India is the country’s first ever cluster redevelopment project, popularly known as Bhendi Bazaar redevelopment and it will be one of the largest projects for urban rejuvenation of one of Mumbai’s oldest and dying inner city areas. The project is led by the community trust, inputs were taken from various stakeholders, including residents, commercial tenants and expert consultants to shape the master plan and design of the project. The project started in 2016 but there is a significant delay in implementing the project. The study aimed at studying and assessing public perceptions on satisfaction and the relationship between community participation and community satisfaction in Bhendi Bazaar of Mumbai, India. Furthermore, the study will outline the challenges and problems of community participation in urban renewal projects and it suggests recommendations for the future. The qualitative and quantitative methods such as reconnaissance survey, key informant interviews, focus group discussions, walking interviews, a narrative inquiry is used for analysis of data. Preliminary findings revealed that all tenants are satisfied for the redevelopment of an area but the willingness of residential tenants to move in transit accommodation has made the projects successful and reductant of some residential and commercial tenants, regulatory provisions rising to face challenges in implementation. Experiences from the case study can help to understand dynamics behind public participation and government. At the same time, they serve as an inspiration and learning opportunity for future projects to ensure that they are sustainable not only from an economic standpoint but also, a social perspective.

Keywords: urban renewal, Bhendi Bazaar, community participation, satisfaction, social perspective

Procedia PDF Downloads 144
6040 Leadership and Corporate Social Responsibility: The Role of Spiritual Intelligence

Authors: Meghan E. Murray, Carri R. Tolmie

Abstract:

This study aims to identify potential factors and widely applicable best practices that can contribute to improving corporate social responsibility (CSR) and corporate performance for firms by exploring the relationship between transformational leadership, spiritual intelligence, and emotional intelligence. Corporate social responsibility is when companies are cognizant of the impact of their actions on the economy, their communities, the environment, and the world as a whole while executing business practices accordingly. The prevalence of CSR has continuously strengthened over the past few years and is now a common practice in the business world, with such efforts coinciding with what stakeholders and the public now expect from corporations. Because of this, it is extremely important to be able to pinpoint factors and best practices that can improve CSR within corporations. One potential factor that may lead to improved CSR is spiritual intelligence (SQ), or the ability to recognize and live with a purpose larger than oneself. Spiritual intelligence is a measurable skill, just like emotional intelligence (EQ), and can be improved through purposeful and targeted coaching. This research project consists of two studies. Study 1 is a case study comparison of a benefit corporation and a non-benefit corporation. This study will examine the role of SQ and EQ as moderators in the relationship between the transformational leadership of employees within each company and the perception of each firm’s CSR and corporate performance. Project methodology includes creating and administering a survey comprised of multiple pre-established scales on transformational leadership, spiritual intelligence, emotional intelligence, CSR, and corporate performance. Multiple regression analysis will be used to extract significant findings from the collected data. Study 2 will dive deeper into spiritual intelligence itself by analyzing pre-existing data and identifying key relationships that may provide value to companies and their stakeholders. This will be done by performing multiple regression analysis on anonymized data provided by Deep Change, a company that has created an advanced, proprietary system to measure spiritual intelligence. Based on the results of both studies, this research aims to uncover best practices, including the unique contribution of spiritual intelligence, that can be utilized by organizations to help enhance their corporate social responsibility. If it is found that high spiritual and emotional intelligence can positively impact CSR effort, then corporations will have a tangible way to enhance their CSR: providing targeted employees with training and coaching to increase their SQ and EQ.

Keywords: corporate social responsibility, CSR, corporate performance, emotional intelligence, EQ, spiritual intelligence, SQ, transformational leadership

Procedia PDF Downloads 99
6039 Grid Architecture Model for Smart Grid

Authors: Nick Farid, Roghoyeh Salmeh

Abstract:

The planning and operation of the power grid is becoming much more complex because of the introduction of renewable energy resources, the digitalization of the electricity industry, as well as the coupling of efficiency and greener energy trends. These changes, along with new trends, make interactions between grid users and the other stakeholders more complex. This paper focuses on the main “physical” and “logical” interactions between grid users and the grid stakeholders, both from power system equipment and information management standpoints, and proposes a new interoperability model for Smart Grids.

Keywords: user interface, interoperability layers, grid architecture framework, smart grid

Procedia PDF Downloads 62
6038 Hindrances to Effective Delivery of Infrastructural Development Projects in Nigeria’s Built Environment

Authors: Salisu Gidado Dalibi, Sadiq Gumi Abubakar, JingChun Feng

Abstract:

Nigeria’s population is about 190 million and is on the increase annually making it the seventh most populated nation in the world and first in Africa. This population growth comes with its prospects, needs, and challenges especially on the existing and future infrastructure. Infrastructure refers to structures, systems, and facilities serving the economy of a country, city, town, businesses, industries, etc. These include roads, railways lines, bridges, tunnels, ports, stadiums, dams and water projects, power generation plants and distribution grids, information, and communication technology (ICT), etc. The Nigerian government embarked on several infrastructural development projects (IDPs) to address the deficit as the present infrastructure cannot cater to the needs nor sustain the country. However, delivering such IDPs have not been smooth; comes with challenges from within and outside the project; frequent delays and abandonment. Thus, affecting all the stakeholders involved. Hence, the aim of this paper is to identify and assess the factors that are hindering the effective delivery of IDPs in Nigeria’s built environment with the view to offer more insight into such factors, and ways to address them. The methodology adopted in this study involves the use of secondary sources of data from several materials (official publications, journals, newspapers, internet, etc.) were reviewed within the IDPs field by laying more emphasis on Nigeria’s cases. The hindrance factors in this regard were identified which forms the backbone of the questionnaire. A pilot survey was used to test its suitability; after which it was randomly administered to various project professionals in Nigeria’s construction industry using a 5-point Likert scale format to ascertain the impact of these hindrances. Cronbach’s Alpha reliability test, mean item score computations, relative importance indices, T-test, Chi-Square statistics were used for data analyses. The results outline the impact of various internal, external and project related factors that are hindering IDPs within Nigeria’s built environment.

Keywords: built environment, development, factors, hindrances, infrastructure, Nigeria, project

Procedia PDF Downloads 139
6037 The Academic Achievement of Writing via Project-Based Learning

Authors: Duangkamol Thitivesa

Abstract:

This paper focuses on the use of project work as a pretext for applying the conventions of writing, or the correctness of mechanics, usage, and sentence formation, in a content-based class in a Rajabhat University. Its aim was to explore to what extent the student teachers’ academic achievement of the basic writing features against the 70% attainment target after the use of project is. The organization of work around an agreed theme in which the students reproduce language provided by texts and instructors is expected to enhance students’ correct writing conventions. The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test and student writing works. The scores in the summative achievement test were analyzed by mean score, standard deviation, and percentage. It was found that the student teachers do more achieve of practicing mechanics and usage, and less in sentence formation. The students benefited from the exposure to texts during conducting the project; however, their automaticity of how and when to form phrases and clauses into simple/complex sentences had room for improvement.

Keywords: project-based learning, project work, writing conventions, academic achievement

Procedia PDF Downloads 305
6036 Enhancing Construction Project Management through Cognitive Science and Neuroimaging: A Comprehensive Literature Review

Authors: Krishna Kisi, Tulio Sulbaran

Abstract:

This literature review offers valuable insights into integrating cognitive science and neuroimaging with project management practices, presenting a crucial resource for leadership within the construction industry. This paper highlights the significant benefits of applying interdisciplinary approaches to enhance project management effectiveness and project outcomes by exploring the intricate connections between cognitive processes, decision-making, and project management. Key findings emphasize the critical role of cognitive status in determining the performance and project outcomes of construction workers, underlining the necessity for leadership to prioritize cognitive well-being and mental health as central components of project management strategies. The review identifies a gap in current practices, particularly the need for more objective tools for assessing cognitive status within the construction sector, and proposes the adoption of neuroimaging technologies to bridge this gap. The study highlights how integrating cognitive psychology and neuroscience clarifies decision-making processes, aiding leaders in comprehending the mental constraints and biases that influence project decisions. By integrating neuroscientific insights with traditional management practices, leaders can enhance their strategies for training, team dynamics, and risk assessment, ultimately leading to more informed, efficient, and productive construction project management. This comprehensive literature review underscores the importance of adopting an interdisciplinary approach to leadership and management within high-risk industries. It provides a foundation for construction project managers to leverage cognitive science and neuroimaging advancements to improve efficiency, productivity, and decision-making in construction projects' complex and dynamic environments.

Keywords: decision making, literature review, neuroimaging, project management

Procedia PDF Downloads 9
6035 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 24
6034 Influence of Procurement Methods on Cost Performance of Building Projects in Gombe State, Nigeria

Authors: S. U. Kunya, S. Abdulkadir, M. A. Anas, L. Z. Adam

Abstract:

Procurement methods is described as systems of contractual arrangements used by the contractor in order to secure the design and construction services based on the stipulated cost and within the required time and quality. Despite that, major projects in the Nigerian construction industry failed because of wrong procurement methods with major consequences leads to cost overrun which needs to find lasting solution. The aim of the study is to evaluate the influence of procurement methods on cost performance of building projects in Gombe State, Nigeria. Study adopts descriptive and explorative design approach. Data were collected through administering of one hundred questionnaire using convenient sampling techniques. Data analyses using percentages, mean value and Anova analysis. Major finding show that more than fifty percent (50%) of procurement methods available are mainly utilized in the study area and the top procurement methods that have high impacts on cost performance as compare with the other methods is project management and direct labour procurement methods. The results of hypothesis’ tests with pvalue 0.12 and 0.07 validated that there was no significant variation in the perception of stakeholders’ on the impacts of procurements methods on cost performance. Therefore, the study concluded that projects management and direct labour are the most appropriate procurement methods that will ensure successful completion of project at stipulated cost in building projects.

Keywords: cost, effects, performance, procurement, projects

Procedia PDF Downloads 197
6033 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods

Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal

Abstract:

Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.

Keywords: cost forecasting, earned value management, project control, project management, risk analysis, simulation

Procedia PDF Downloads 361
6032 To Improve or Not to Improve Reflections from Jerash Urban Improvement Project, Jordan

Authors: Dina Dahood Dabash

Abstract:

Palestine Refugee Camps have never been settings that can be overlooked; they even became (as physical settings) a cornerstone topic of negotiations whenever Palestinian matters are on the table (specifically in Jordan). Consequently, maintaining the familiar face of the camp with its dilapidated shelters and narrow streets that rarely allowed its residents to extinguish a fire or evacuate a building safely has become a fundamental method to protect the “right of the return” from the perspective of various stakeholders. When the Infrastructure and Camp Improvement Programme (ICIP) was established in 2007 as an additional UNRWA program, some concerns were raised around the newly established section, mainly due to its direct impact on the “image” of the camp through a provision of a relatively nonconventional service that differs from what the Agency used to provide in the past seventy years. By presenting the Urban Improvement Project in Jerash camp (UIP) -Jordan, this paper aims to contribute to the ongoing discussion around enduring the improvement of Palestine refugee camps “programmatically” in UNRWA or not. The UIP as a co-product by UNRWA and the camp’s community within one of the most vulnerable refugee camps in Jordan offers a remarkable opportunity to excerpt lessons that can contribute to the strategic shaping of the ICIP. The paper concludes with five mine uptakes mainly related to community engagement, power structures and UNRWA's role in camps.

Keywords: camp improvement program, Jerash camp, Palestine refugee camps, UNRWA.

Procedia PDF Downloads 178
6031 Stakeholder-Driven Development of a One Health Platform to Prevent Non-Alimentary Zoonoses

Authors: A. F. G. Van Woezik, L. M. A. Braakman-Jansen, O. A. Kulyk, J. E. W. C. Van Gemert-Pijnen

Abstract:

Background: Zoonoses pose a serious threat to public health and economies worldwide, especially as antimicrobial resistance grows and newly emerging zoonoses can cause unpredictable outbreaks. In order to prevent and control emerging and re-emerging zoonoses, collaboration between veterinary, human health and public health domains is essential. In reality however, there is a lack of cooperation between these three disciplines and uncertainties exist about their tasks and responsibilities. The objective of this ongoing research project (ZonMw funded, 2014-2018) is to develop an online education and communication One Health platform, “eZoon”, for the general public and professionals working in veterinary, human health and public health domains to support the risk communication of non-alimentary zoonoses in the Netherlands. The main focus is on education and communication in times of outbreak as well as in daily non-outbreak situations. Methods: A participatory development approach was used in which stakeholders from veterinary, human health and public health domains participated. Key stakeholders were identified using business modeling techniques previously used for the design and implementation of antibiotic stewardship interventions and consisted of a literature scan, expert recommendations, and snowball sampling. We used a stakeholder salience approach to rank stakeholders according to their power, legitimacy, and urgency. Semi-structured interviews were conducted with stakeholders (N=20) from all three disciplines to identify current problems in risk communication and stakeholder values for the One Health platform. Interviews were transcribed verbatim and coded inductively by two researchers. Results: The following key values were identified (but were not limited to): (a) need for improved awareness of veterinary and human health of each other’s fields, (b) information exchange between veterinary and human health, in particularly at a regional level; (c) legal regulations need to match with daily practice; (d) professionals and general public need to be addressed separately using tailored language and information; (e) information needs to be of value to professionals (relevant, important, accurate, and have financial or other important consequences if ignored) in order to be picked up; and (f) need for accurate information from trustworthy, centrally organised sources to inform the general public. Conclusion: By applying a participatory development approach, we gained insights from multiple perspectives into the main problems of current risk communication strategies in the Netherlands and stakeholder values. Next, we will continue the iterative development of the One Health platform by presenting key values to stakeholders for validation and ranking, which will guide further development. We will develop a communication platform with a serious game in which professionals at the regional level will be trained in shared decision making in time-critical outbreak situations, a smart Question & Answer (Q&A) system for the general public tailored towards different user profiles, and social media to inform the general public adequately during outbreaks.

Keywords: ehealth, one health, risk communication, stakeholder, zoonosis

Procedia PDF Downloads 255
6030 Through Integrated Project Management and Systems Engineering to Support System Design Development: A Project Management-based Systems Engineering Approach

Authors: Xiaojing Gao, James Njuguna

Abstract:

This paper emphasizes the importance of integrating project management and systems engineering for innovative system design and production development. The research highlights the need for a flexible approach that unifies these disciplines, as their isolation often leads to communication challenges and complexity within multidisciplinary teams. The paper aims to elucidate the intricate relationship between project management and systems engineering, recommending the consolidation of engineering disciplines into a single lifecycle for improved support of the design and development process. The research identifies a synergy between these disciplines, focusing on streamlining information communication during product design and development. The insights gained from this process can lead to product design optimization. Additionally, the paper introduces a proposed Project Management-Based Systems Engineering (PMBSE) framework, emphasizing effective communication, efficient processes, and advanced tools to enhance product development outcomes within the product lifecycle.

Keywords: system engineering, product design and development, project management, cross-disciplinary

Procedia PDF Downloads 40
6029 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 15
6028 The Emergence of Cold War Heritage: United Kingdom Cold War Bunkers and Sites

Authors: Peter Robinson, Milka Ivanova

Abstract:

Despite the growing interest in the Cold War period and heritage, little attention has been paid to the presentation and curatorship of Cold War heritage in eastern or western Europe. In 2021 Leeds Beckett University secured a British Academy Grant to explore visitor experiences, curatorship, emotion, and memory at Cold War-related tourist sites, comparing the perspectives of eastern and western European sites through research carried out in the UK and Bulgaria. The research explores the themes of curatorship, experience, and memory. Many of the sites included in the research in the UK-based part of the project are nuclear bunkers that have been decommissioned and are now open to visitors. The focus of this conference abstract is one of several perspectives drawn from a British Academy Grant-funded project exploring curatorship, visitor experience and nostalgia and memory in former cold war spaces in the UK, bringing together critical comparisons between western and eastern European sites. The project identifies specifically the challenges of ownership, preservation and presentation and discusses the challenges facing those who own, manage, and provide access to cold war museums and sites. The research is underpinned by contested issues of authenticity and ownership, discussing narrative accounts of those involved in caring for and managing these sites. The research project draws from interviews with key stakeholders, site observations, visitor surveys, and content analysis of Trip advisor posts. Key insights from the project include the external challenges owners and managers face from a lack of recognition of and funding for important Cold War sites in the UK that are at odds with interest shown in cold war sites by visitors to Cold War structures and landmarks. The challenges center on the lack of consistent approaches toward cold war heritage conservation, management, and ownership, lack of curatorial expertise and over-reliance on no-expert interpretation and presentation of heritage, the effect of the passage of time on personal connections to cold war heritage sites, the dissipating technological knowledge base, the challenging structure that does not lend themselves easily as visitor attractions or museums, the questionable authenticity of artifacts, the limited archival material, and quite often limited budgets. A particularly interesting insight focusing on nuclear bunkers has been on the difficulties in site reinterpretation because of the impossibility of fully exploring the enormity of nuclear war as a consistent threat of the Cold War. Further insights from the research highlight the secrecy of many of the sites as a key marketing strategy, particularly in relation to the nuclear bunker sites included in the project.

Keywords: cold war, curatorship, heritage, nuclear bunkers.

Procedia PDF Downloads 53
6027 Conceptual Understanding for the Adoption of Energy Assessment Methods in the United Arab Emirates Built Environment

Authors: Amna I. Shibeika, Batoul Y. Hittini, Tasneem B. Abd Bakri

Abstract:

Regulation and integration of public policy, economy, insurance industry, education, and construction stakeholders are the main contributors to achieve sustainable development. Building environmental assessment methods were introduced in the field to address issues such as global warming and conservation of natural resources. In the UAE, Estidama framework with its associated Pearl Building Rating System (PBRS) has been introduced in 2010 to address and spread sustainability practices within the country’s fast-growing built environment. Based on literature review of relevant studies investigating different project characteristics that influence sustainability outcomes, this paper presents a conceptual framework for understanding the adoption of PBRS in UAE projects. The framework also draws on Diffusion of Innovations theory to address the questions of how the assessment method is chosen in the first place and what is the impact of PBRS on the multi-disciplinary design and construction processes. The study highlights the mandatory nature of the adoption of PBRS for government buildings as well as imbedding Estidama principles within Abu Dhabi building codes as key factors for raising awareness about sustainable practices. Moreover, several project-related elements are addressed to understand their relationship with the adoption process, including project team collaboration; communication and coordination; levels of commitment and engagement; and the involvement of key actors as sustainability champions. This conceptualization of the adoption of PBRS in UAE projects contributes to the growing literature on the adoption of energy assessment tools and addresses the UAE vision is to be at the forefront of innovative sustainable development by 2021.

Keywords: adoption, building assessment, design management, innovation, sustainability

Procedia PDF Downloads 120
6026 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 39
6025 Enhance Concurrent Design Approach through a Design Methodology Based on an Artificial Intelligence Framework: Guiding Group Decision Making to Balanced Preliminary Design Solution

Authors: Loris Franchi, Daniele Calvi, Sabrina Corpino

Abstract:

This paper presents a design methodology in which stakeholders are assisted with the exploration of a so-called negotiation space, aiming to the maximization of both group social welfare and single stakeholder’s perceived utility. The outcome results in less design iterations needed for design convergence while obtaining a higher solution effectiveness. During the early stage of a space project, not only the knowledge about the system but also the decision outcomes often are unknown. The scenario is exacerbated by the fact that decisions taken in this stage imply delayed costs associated with them. Hence, it is necessary to have a clear definition of the problem under analysis, especially in the initial definition. This can be obtained thanks to a robust generation and exploration of design alternatives. This process must consider that design usually involves various individuals, who take decisions affecting one another. An effective coordination among these decision-makers is critical. Finding mutual agreement solution will reduce the iterations involved in the design process. To handle this scenario, the paper proposes a design methodology which, aims to speed-up the process of pushing the mission’s concept maturity level. This push up is obtained thanks to a guided negotiation space exploration, which involves autonomously exploration and optimization of trade opportunities among stakeholders via Artificial Intelligence algorithms. The negotiation space is generated via a multidisciplinary collaborative optimization method, infused by game theory and multi-attribute utility theory. In particular, game theory is able to model the negotiation process to reach the equilibria among stakeholder needs. Because of the huge dimension of the negotiation space, a collaborative optimization framework with evolutionary algorithm has been integrated in order to guide the game process to efficiently and rapidly searching for the Pareto equilibria among stakeholders. At last, the concept of utility constituted the mechanism to bridge the language barrier between experts of different backgrounds and differing needs, using the elicited and modeled needs to evaluate a multitude of alternatives. To highlight the benefits of the proposed methodology, the paper presents the design of a CubeSat mission for the observation of lunar radiation environment. The derived solution results able to balance all stakeholders needs and guaranteeing the effectiveness of the selection mission concept thanks to its robustness in valuable changeability. The benefits provided by the proposed design methodology are highlighted, and further development proposed.

Keywords: concurrent engineering, artificial intelligence, negotiation in engineering design, multidisciplinary optimization

Procedia PDF Downloads 103
6024 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 27