10353 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 278
10352 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 94
10351 Implementation of Risk Management System to Improve the Quality of Higher Education Institutes

Authors: Muhammad Wasif, Asif Ahmed Shaikh, Sarosh Hashmat Lodi, Muhammad Aslam Bhutto, Riazuddin

Abstract:

Risk Management System is quite popular in profit- based organizations, health and safety and project management fields since the last few decades. But due to rapidly changing environment and requirement of ISO 9001:2015 standards, public-sector institution, especially higher education institutes are also performing risk assessment to monitor the performance of the institution and aligning it with the latest benchmark. In this context, NED University of Engineering and Technology performed research and developed a Standard Operating Procedure (SOP) for the risk assessment, its monitoring and control. In this research, risks are broken into the four sources, namely; Internal Academics Risks, External Academics Risks, Internal Non-academic Risks, External Non-academic Risks. Risks are identified by the management at all levels. Severity and likelihood of the risks are assigned based on the previous audit results and the customer complains. Risk Ratings are calculated to orderly arrange the risk according to the Risk Rating, and controls for the risks are designed, which are assigned to the responsible person. At the end of the article, result and analysis on the different sources of risk are discussed in details and the conclusion is drawn. Discussion on few sample risks are presented in this article. Hence it is presented in the research that the Risk Management System can be applied in a Higher Education Institute to effectively control the risks which might affect the scope and Quality Management System of an organization.

Keywords: higher education, quality management system, risk assessment, risk management

Procedia PDF Downloads 269
10350 Sustainable Management Practices of International Construction Joint Ventures: A Conceptual Model for Managing Barriers and Risks

Authors: Mershack O. Tetteh, Albert P. C. Chan, Amos Darko, Gabriel Nani

Abstract:

International construction joint ventures (ICJVs) have evolved as an effective approach to sustainable development, given their myriad socio-economic and environmental benefits. Yet, they are not free of barriers and risks. In many studies, it is termed as risks for convenience’s sake. While the barriers and risks continue to affect the success of ICJVs, a systematic and reliable approach for managing them has yet to be developed. This study aims to identify and classify the barriers and risks factors affecting ICJVs through a systematic literature review. Based on a critical review of 54 papers published in peer-reviewed journals from 1990 to 2019, a conceptual framework was proposed for managing the barriers and risks in ICJV operations. The review showed that the barriers can be grouped into six including inter-organizational differences, lack of expertise and confidence, lack of effective planning and strategies, lack of knowledge of ICJV’s fundamentals, conflicts among ICJV entities, and management difficulties. The risks were also categorized into six: policy and political risks, legal risks, financial risks, management risks, project and technical risks, and market risks. The developed model would help practitioners achieve more efficient resource allocation and bring new perspectives for managerial practices in ICJVs. Moreover, it is positioned to alleviate the negligence of previous studies that combined the barriers and risks factors as one checklist.

Keywords: barriers, construction, international construction joint venture, risks, sustainable development

Procedia PDF Downloads 212
10349 Risk Management in Islamic Banks: A Case Study of the Faisal Islamic Bank of Egypt

Authors: Mohamed Saad Ahmed Hussien

Abstract:

This paper discusses the risk management in Islamic banks and aims to determine the difference in the practices and methods of risk management in those banks compared to the conventional banks, and to make a case study of the biggest Islamic bank in Egypt (Faisal Islamic Bank of Egypt) to identify the most important financial risks faced and how to manage those risks. It was found that Islamic banks face two types of risks. The first type is similar to the risks in conventional banks; the second type is the additional risks which facing the Islamic banks only as a result of some Islamic modes of financing. With regard to the risk management, Islamic banks such as conventional banks applied the regulatory rules issued by the Central Banks and the Basel Committee; Islamic banks also applied the instructions and procedures issued by the Islamic Financial Services Board (IFSB). Also, Islamic banks are similar to the conventional banks in the practices and methods which they use to manage the risks. And there are some factors that may affect the risk management in Islamic banks, such as the size of the bank and the efficiency of the administration and the staff of the bank.

Keywords: conventional banks, Faisal Islamic Bank of Egypt, Islamic banks, risk management

Procedia PDF Downloads 426
10348 Risks in the Islamic Banking Model and Methods Adopted to Manage Them

Authors: K. P. Fasalu Rahman

Abstract:

The financial services industry of Islam include large number of institutions, such as investment banks and commercial banks, investment companies and mutual insurance companies. All types of these financial institutions should have to deal with many issues and risks in their field of work. Islamic banks should expect to face two types of risks: risks that are similar to those faced by conventional financial intermediaries and risks that are unique to the Islamic Banks due to their compliance with the Shariah. The use of financial services and products that comply with the Shariah principles cause special issues for supervision and risk management. Risks are uncertain future events that could influence the achievement of the bank’s objectives, including strategic, operational, financial and compliance objectives. In Islamic banks, effective risk management deserves special attention. As an operational problem, risk management is the classification and identification of methods, processes, and risks in banks to supervise, monitor and measure them. In comparison to conventional banks, Islamic banks face big difficulties in identifying and managing risks due to bigger complexities emerging from the profit loss sharing (PLS) concept and nature of particular risks of Islamic financing. As the developing of managing risks tool becomes very essential, especially in Islamic banking as most of the products are depending on PLS principle, identifying and measuring each type of risk is highly important and critical in any Islamic finance based systems. This paper highlights the special and general risks surrounding Islamic banking. And it investigates in detail the need for risk management in Islamic banks. In addition to analyzing the effectiveness of risk management strategies adopted by Islamic financial institutions at present, this research is also suggesting strategies for improving risk management process of Islamic banks in future.

Keywords: Islamic banking, management, risk, risk management

Procedia PDF Downloads 118
10347 Appraisal of Humanitarian Supply Chain Risks Using Best-Worst Method

Authors: Ali Mohaghar, Iman Ghasemian Sahebi, Alireza Arab

Abstract:

In the last decades, increasing in human and natural disaster occurrence had very irreparable effects on human life. Hence, one of the important issues in humanitarian supply chain management is identifying and prioritizing the different risks and finding suitable solutions for encountering them at the time of disaster occurrence. This study is an attempt to provide a comprehensive review of humanitarian supply chain risks in a case study of Tehran Red Crescent Societies. For this purpose, Best-Worst method (BWM) has been used for analyzing the risks of the humanitarian supply chain. 22 risks of the humanitarian supply chain were identified based on the literature and interviews with four experts. According to BWM method, the importance of each risk was calculated. The findings showed that culture contexts, little awareness of people, and poor education system are the most important humanitarian supply chain risks. This research provides a useful guideline for managers so that they can benefit from the results to prioritize their solutions.

Keywords: Best-Worst Method, humanitarian logistics, humanitarian supply chain, risk management

Procedia PDF Downloads 283
10346 Provisions for Risk in Islamic Banking and Finance in Comparison to the Conventional Banks in Malaysia

Authors: Rashid Masoud Ali Al-Mazrui, Ramadhani Mashaka Shabani

Abstract:

Islamic banks and financial institutions are exposed to the same risks as conventional banking. These risks include the rate return risk, credit or market risk, liquidity risk, and operational risk among others. However, being a financial institution that operates Islamic banking and finance operations, there is additional risk associated with its operations different from conventional finance, such as displacing commercial risk. They face Shari'ah compliance risks because of their failure to follow Shari'ah principles. To have proper mitigation and risk management, banks should have proper risk management policies to mitigate risks. This paper aims to study the risk management taken by Islamic banks in comparison with conventional banks. Also, the study evaluates the provisions for risk management taken by selected Islamic banks and conventional banks. The study employs qualitative analysis using secondary data by applying a content analysis approach with a sample size of 4 Islamic banks and four conventional banks ranging from 2010 to 2020. We find that these banks all use the same technique, except for the associated risk. The extra ways are used, but only for additional risks that are available to Islamic banking and finance.

Keywords: emerging risk, risk management, Islamic banking, conventional bank

Procedia PDF Downloads 39
10345 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 300
10344 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: supervision software, risk management, industrial supervision, project management

Procedia PDF Downloads 325
10343 Classifying ERP Implementation’s Risks in Banking Sectors Based on Different Implementation Phases

Authors: Farnaz Farzadnia, Ahmad Alibabaei

Abstract:

Enterprise Resource Planning (ERP) systems are considered as complicated information systems. Many organizations failed implementing ERP systems because it is a very difficult, time-consuming and expensive process. Enterprise resource planning system is appropriate for organizations in all economic sectors. As banking is currently considered a non-typical area for ERP usage, there are very little studies on ERP implementation in banking. This paper presents a general risks taxonomy. In this research, after identifying implementation risks, a process quality management method has been applied to identify relations between risks of implementation ERP in banking sectors and implementation phases. Oracle application implementation method titled as AIM used in this research for classifying the risks. These findings will help managers to develop better strategies for supervising and controlling ERP implementation projects.

Keywords: AIM implementation, bank, enterprise resource planning, risk, process quality management method

Procedia PDF Downloads 507
10342 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 263
10341 Planning and Strategies for Risks Prevention, Mitigating, and Recovery of Ancient Theatres Heritage: Investigation and Recommendations

Authors: Naif A. Haddad

Abstract:

Greek, Hellenistic and Roman theatre heritage are exposed to multiple risks at varied times or simultaneously. There is no single reason why a theatre building becomes ‘at risk’, as each case has different circumstances which have led to the theatre building decay. There are complicated processes of destruction and distress that show divergence in theatre building materials' decay. Theatre modern use for cultural performances causes much of the risks concerning the physical structure and authenticity of theatre sites. In addition, there are some deterioration and deformations due to previous poor quality restorations and interventions through related excavation and conservation programmes as also risks to authenticity due to new additions. For preventive conservation, theatre natural and anthropogenic risks management can provide a framework for decision making. These risks to ancient theatre heritage may stem from exposure to one or more risk or synergy of many factors. We, therefore, need to link the theatre natural risks to the risks that come from anthropogenic factors associated with social and economic development. However, this requires a holistic approach, and systematic methodology for understanding these risks from various sources while incorporating specific actions, planning and strategies for each specific risk. Elaborating on recent relevant studies, and ERATO and ATHENA EU projects for ancient theaters and odea and general surveys, this paper attempts to discuss the main aspects of the ancient Greek, Hellenistic and Roman theatres risk related issues. Relevant case studies shall also be discussed and investigated to examine frameworks for risk mitigation, and related guidelines and recommendations that provide a systematic approach for sustainable management and planning in relation mainly to ‘compatible use’ of theatre sites.

Keywords: cultural heritage management, European ancient theatres projects, Anthropogenic risks mitigation, sustainable management and planning, preventive conservation, modern use, compatible use

Procedia PDF Downloads 270
10340 Enterprise Risk Management: A Future Outlook

Authors: Ruchi Agarwal, Jake Ansell

Abstract:

Austerity impacts on all aspects of society. Companies into the future will have to be more capable of dealing with the risks they face. Enterprise Risk Management (ERM) has widely been accepted in recent years as an approach to manage risks within businesses. ERM attempts to tackle risk holistically with gains from opportunities in a managing risk and reduction in the risk of failure. The paper reviews merits and demerits of approaches to risk management in regard to antifragility. A qualitative study has investigated current practices and the problems with ERM implementation by interviewing over 25 chief risk officers and senior management. The findings indicate the gap in ERM description, understanding, and implementation. The paper suggests risk learning and expertise knowledge supports development of effective enterprise risk management by designing systems with inherent resilience.

Keywords: risk management, interviews, antifragility, failure

Procedia PDF Downloads 520
10339 Partners Sharing Resources, Costs, and Risks

Authors: Lee Li

Abstract:

The strategic management literature posits that the major motive of strategic alliances is to share resources, costs and risks. However, the literature also indicates that such sharing leads to transaction costs which are positively correlated with environmental dynamism. As such, it is not clear why firms are willing to cover high transaction costs for sharing resources, costs and risks. This study categorizes resources into firm-specific and general resource; costs into accounting and non-accounting cost; and risks into visible and invisible risks. Using data from 167 Canadian firms in technology industries, we find that sharing firm-specific resources and non-accounting costs are negatively correlated with environmental dynamism but sharing general resources, accounting costs and visible risks are positively correlated with environmental dynamism. Findings suggest that sharing certain resources, costs and risks do not necessarily incur high transaction costs.

Keywords: environmental dynamism, strategic alliances, resource/cost/risk sharing

Procedia PDF Downloads 337
10338 Analysis of Supply Chain Risk Management Strategies: Case Study of Supply Chain Disruptions

Authors: Marcelo Dias Carvalho, Leticia Ishikawa

Abstract:

Supply Chain Risk Management refers to a set of strategies used by companies to avoid supply chain disruption caused by damage at production facilities, natural disasters, capacity issues, inventory problems, incorrect forecasts, and delays. Many companies use the techniques of the Toyota Production System, which in a way goes against a better management of supply chain risks. This paper studies key events in some multinationals to analyze the trade-off between the best supply chain risk management techniques and management policies designed to create lean enterprises. The result of a good balance of these actions is the reduction of losses, increased customer trust in the company and better preparedness to face the general risks of a supply chain.

Keywords: just in time, lean manufacturing, supply chain disruptions, supply chain management

Procedia PDF Downloads 308
10337 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 183
10336 An Overview of Risk Types and Risk Management Strategies to Improve Financial Performance

Authors: Azar Baghtaghi

Abstract:

Financial risk management is critically important as it enables companies to maintain stability and profitability amidst market fluctuations and unexpected events. It involves the precise identification of risks that could impact investments, assets, and potential revenues. By implementing effective risk management strategies, companies can insure themselves against adverse market changes and prevent potential losses. In today's era, where markets are highly complex and influenced by various factors such as macroeconomic policies, exchange rate fluctuations, and natural disasters, the need for meticulous planning to cope with these uncertainties is more pronounced. Ultimately, financial risk management means being prepared for the future and the ability to sustain business in changing environments. A company capable of managing its risks not only achieves sustainable profitability but also gains the confidence of shareholders, investors, and business partners, enhancing its competitive position in the market. In this article, the types of financial risk and risk management strategies for improving financial performance were investigated. By identifying the risks stated in this article and their evaluation techniques, it is possible to improve the organization's financial performance.

Keywords: strategy, risk, risk management, financial performance

Procedia PDF Downloads 12
10335 Risks of Climate Change on Buildings

Authors: Yahya N. Alfraidi, Abdel Halim Boussabaine

Abstract:

Climate change risk impacts are one of the most challenging aspects that faces the built environment now and the near future. The impacts of climate change on buildings are considered in four different dimensions: physical, economic, social, and management. For each of these, the risks are discussed as they arise from various effects linked to climate change, including windstorms, precipitation, temperature change, flooding, and sea-level rise. For example, building assets in cities will be exposed to extreme hot summer days and nights due to the urban heat island effect and pollution. Buildings also could be vulnerable to water, electricity, gas, etc., scarcity. Building materials, fabric and systems could also be stressed by the emerging climate risks. More impotently the building users might experience extreme internal and extern comfort conditions leading to lower productivity, wellbeing and health problems. Thus, the main aim of this paper to document the emerging risks from climate change on building assets. An in-depth discussion on the consequences of these climate change risk is provided. It is expected that the outcome of this research will be a set of risk design indicators for developing and procuring resilient building assets.

Keywords: climate change, risks of climate change, risks on building from climate change, buildings

Procedia PDF Downloads 595
10334 Poor Medical Waste Management (MWM) Practices and Its Risks to Human Health and the Environment

Authors: Babanyara Y. Y., Ibrahim D. B., Garba T., Bogoro A. G., Abubakar, M. Y.

Abstract:

Medical care is vital for our life, health, and well-being. However, the waste generated from medical activities can be hazardous, toxic, and even lethal because of their high potential for diseases transmission. The hazardous and toxic parts of waste from healthcare establishments comprising infectious, medical, and radioactive material as well as sharps constitute a grave risks to mankind and the environment, if these are not properly treated/disposed or are allowed to be mixed with other municipal waste. In Nigeria, practical information on this aspect is inadequate and research on the public health implications of poor management of medical wastes is few and limited in scope. Findings drawn from Literature particularly in the third world countries highlights financial problems, lack of awareness of risks involved in MWM, lack of appropriate legislation and lack of specialized MWM staff. The paper recommends how MWM practices can be improved in medical facilities.

Keywords: environmental pollution, infectious, management, medical waste, public health

Procedia PDF Downloads 277
10333 Application of Forward Contract and Crop Insurance as Risk Management Tools of Agriculture: A Case Study in Bangladesh

Authors: M. Bokhtiar Hasan, M. Delowar Hossain, Abu N. M. Wahid

Abstract:

The principal aim of the study is to find out a way to effectively manage the agricultural risks like price volatility, weather risks, and fund shortage. To hedge price volatility, farmers sometimes make contracts with agro-traders but fail to protect themselves effectively due to not having legal framework for such contracts. The study extensively reviews existing literature and find evidence that the majority studies either deal with price volatility or weather risks. If we could address these risks through a single model, it would be more useful to both the farmers and traders. Intrinsically, the authors endeavor in this regard, and the key contribution of this study basically lies in it. Initially, we conduct a small survey aspiring to identify the shortcomings of existing contracts. Later, we propose a model encompassing forward and insurance contracts together where forward contract will be used to hedge price volatility and insurance contract will be used to protect weather risks. Contribution/Originality: The study adds to the existing literature through proposing an integrated model comprising of forward contract and crop insurance which will support both farmers and traders to cope with the agricultural risks like price volatility, weather hazards, and fund shortage. JEL Classifications: O13, Q13

Keywords: agriculture, forward contract, insurance contract, risk management, model

Procedia PDF Downloads 123
10332 Prioritization Assessment of Housing Development Risk Factors: A Fuzzy Hierarchical Process-Based Approach

Authors: Yusuf Garba Baba

Abstract:

The construction industry and housing subsector are fraught with risks that have the potential of negatively impacting on the achievement of project objectives. The success or otherwise of most construction projects depends to large extent on how well these risks have been managed. The recent paradigm shift by the subsector to use of formal risk management approach in contrast to hitherto developed rules of thumb means that risks must not only be identified but also properly assessed and responded to in a systematic manner. The study focused on identifying risks associated with housing development projects and prioritisation assessment of the identified risks in order to provide basis for informed decision. The study used a three-step identification framework: review of literature for similar projects, expert consultation and questionnaire based survey to identify potential risk factors. Delphi survey method was employed in carrying out the relative prioritization assessment of the risks factors using computer-based Analytical Hierarchical Process (AHP) software. The results show that 19 out of the 50 risks significantly impact on housing development projects. The study concludes that although significant numbers of risk factors have been identified as having relevance and impacting to housing construction projects, economic risk group and, in particular, ‘changes in demand for houses’ is prioritised by most developers as posing a threat to the achievement of their housing development objectives. Unless these risks are carefully managed, their effects will continue to impede success in these projects. The study recommends the adoption and use of the combination of multi-technique identification framework and AHP prioritization assessment methodology as a suitable model for the assessment of risks in housing development projects.

Keywords: risk management, risk identification, risk analysis, analytic hierarchical process

Procedia PDF Downloads 85
10331 Theoretical Discussion on the Classification of Risks in Supply Chain Management

Authors: Liane Marcia Freitas Silva, Fernando Augusto Silva Marins, Maria Silene Alexandre Leite

Abstract:

The adoption of a network structure, like in the supply chains, favors the increase of dependence between companies and, by consequence, their vulnerability. Environment disasters, sociopolitical and economical events, and the dynamics of supply chains elevate the uncertainty of their operation, favoring the occurrence of events that can generate break up in the operations and other undesired consequences. Thus, supply chains are exposed to various risks that can influence the profitability of companies involved, and there are several previous studies that have proposed risk classification models in order to categorize the risks and to manage them. The objective of this paper is to analyze and discuss thirty of these risk classification models by means a theoretical survey. The research method adopted for analyzing and discussion includes three phases: The identification of the types of risks proposed in each one of the thirty models, the grouping of them considering equivalent concepts associated to their definitions, and, the analysis of these risks groups, evaluating their similarities and differences. After these analyses, it was possible to conclude that, in fact, there is more than thirty risks types identified in the literature of Supply Chains, but some of them are identical despite of be used distinct terms to characterize them, because different criteria for risk classification are adopted by researchers. In short, it is observed that some types of risks are identified as risk source for supply chains, such as, demand risk, environmental risk and safety risk. On the other hand, other types of risks are identified by the consequences that they can generate for the supply chains, such as, the reputation risk, the asset depreciation risk and the competitive risk. These results are consequence of the disagreements between researchers on risk classification, mainly about what is risk event and about what is the consequence of risk occurrence. An additional study is in developing in order to clarify how the risks can be generated, and which are the characteristics of the components in a Supply Chain that leads to occurrence of risk.

Keywords: sisks classification, survey, supply chain management, theoretical discussion

Procedia PDF Downloads 597
10330 Optimal Diversification and Bank Value Maximization

Authors: Chien-Chih Lin

Abstract:

This study argues that the optimal diversifications for the maximization of bank value are asymmetrical; they depend on the business cycle. During times of expansion, systematic risks are relatively low, and hence there is only a slight effect from raising them with a diversified portfolio. Consequently, the benefit of reducing individual risks dominates any loss from raising systematic risks, leading to a higher value for a bank by holding a diversified portfolio of assets. On the contrary, in times of recession, systematic risks are relatively high. It is more likely that the loss from raising systematic risks surpasses the benefit of reducing individual risks from portfolio diversification. Consequently, more diversification leads to lower bank values. Finally, some empirical evidence from the banks in Taiwan is provided.

Keywords: diversification, default probability, systemic risk, banking, business cycle

Procedia PDF Downloads 401
10329 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 82
10328 Improving the Quantification Model of Internal Control Impact on Banking Risks

Authors: M. Ndaw, G. Mendy, S. Ouya

Abstract:

Risk management in banking sector is a key issue linked to financial system stability and its importance has been elevated by technological developments and emergence of new financial instruments. In this paper, we improve the model previously defined for quantifying internal control impact on banking risks by automatizing the residual criticality estimation step of FMECA. For this, we defined three equations and a maturity coefficient to obtain a mathematical model which is tested on all banking processes and type of risks. The new model allows an optimal assessment of residual criticality and improves the correlation rate that has become 98%.

Keywords: risk, control, banking, FMECA, criticality

Procedia PDF Downloads 290
10327 Exploring the Association between Risks Emerging from Climate Change Scenarios and the Built Environment

Authors: Abdullah M. Alzahrani, Abdel Halim Boussabaine

Abstract:

There is an international consensus on the climate change in the entire world and this is as a result of the combination of the natural factors, such as volcanoes and hurricanes with increased of human activity on the earth, such as industrial renaissance. Where this solidarity increases emissions of greenhouse gases GHGs that considered as the main driver of climate change scenarios and related emerging risks and impacts on buildings. These climatic risks including damages, disruption and disquiet are set to increase and it is considered as the main challenges and difficulties facing built environment due to major implications on assets sector. Consequently, the threat from climate change patterns has a significant impact on a variety of complex human decisions, which affect all aspects of living. Understanding the relationship between buildings and such risks arising from climate change scenarios on buildings are the key in insuring the optimal timing and design of policies and systems, which affect all aspects of the built environment. This paper will uncovering this correlation between emerging climate change risks and the building assets. In addition, how these emerging risks can be classified in practical way in terms of their impact type on buildings. Hence, this mapping will assist professionals and interested parties in the building sector to cope with such risks in several systematic ways including development and designing of mitigation and adaptation strategies and processes of design, specification, construction, and operation; all these leads to successful management of assets.

Keywords: climate change, climate change risks, built environment, building sector, impacts

Procedia PDF Downloads 323
10326 Evaluation of European Surveys in the Area of Health and Safety at Work and Identification of New Risks in the Labor Environment

Authors: Alena Dadova, Katarina Holla, Anna Cidlinova, Linda Makovicka Osvaldova, Jiri Vala, Samuel Kockar

Abstract:

Occupational health and safety (ASH) is an area in which procedures and applications are constantly evolving and changing through legislation and new directives and guidelines. In this way, the relevant organizations strive to ensure continuous progress and the advantage of up-to-date information to ensure safety and prevent occupational accidents. Three ESENER surveys have been carried out in the European Union, led by the Agency for Safety and Health at Work (EU-OSHA). On the basis of surveys, it was determined how European workplaces manage risks and how they manage the field of safety and health protection at work. Thousands of companies and organizations in the European Union were involved in the surveys. Organizations and businesses were presented with a questionnaire that focused on the following topics: the impact of general risks on the field of OSH and the possibility of their management, psychosocial risks and other factors such as stress, harassment and bullying, and employee participation in OSH procedures. The article is dedicated to the fundamental conclusions from these surveys and their subsequent connection with the strategic intent of the Strategic Framework of European Union for the years 2021 - 2027. In the conclusion, emerging risks are identified and EU will soon have to deal with them.

Keywords: ESENER, emerging risks, strategic framework in OSH, EU

Procedia PDF Downloads 74
10325 Developing Measurement Instruments for Enterprise Resources Planning (ERP) Post-Implementation Failure Model

Authors: Malihe Motiei, Nor Hidayati Zakaria, Davide Aloini

Abstract:

This study aims to present a method to develop the failure measurement model for ERP post-implementation. To achieve this outcome, the study firstly evaluates the suitability of Technology-Organization-Environment framework for the proposed conceptual model. This study explains how to discover the constructs and subsequently to design and evaluate the constructs as formative or reflective. Constructs are used including reflective and purely formative. Then, the risk dimensions are investigated to determine the instruments to examine the impact of risk on ERP failure after implementation. Two construct as formative constructs consist inadequate implementation and poor organizational decision making. Subsequently six construct as reflective construct include technical risks, operational risks, managerial risks, top management risks, lack of external risks, and user’s inefficiency risks. A survey was conducted among Iranian industries to collect data. 69 data were collected from manufacturing sectors and the data were analyzed by Smart PLS software. The results indicated that all measurements included 39 critical risk factors were acceptable for the ERP post-implementation failure model.

Keywords: critical risk factors (CRFs), ERP projects, ERP post-implementation, measurement instruments, ERP system failure measurement model

Procedia PDF Downloads 335
10324 Requirement Analysis for Emergency Management Software

Authors: Tomáš Ludík, Jiří Barta, Sabina Chytilová, Josef Navrátil

Abstract:

Emergency management is a discipline of dealing with and avoiding risks. Appropriate emergency management software allows better management of these risks and has a direct influence on reducing potential negative impacts. Although there are several emergency management software products in the Czech Republic, they cover user requirements from the emergency management field only partially. Therefore, the paper focuses on the issues of requirement analysis within development of emergency management software. Analysis of the current state describes the basic features and properties of user requirements for software development as well as basic methods and approaches for gathering these requirements. Then, the paper presents more specific mechanisms for requirement analysis based on chosen software development approach: structured, object-oriented or agile. Based on these experiences it is designed new methodology for requirement analysis. Methodology describes how to map user requirements comprehensively in the field of emergency management and thus reduce misunderstanding between software analyst and emergency manager. Proposed methodology was consulted with department of fire brigade and also has been applied in the requirements analysis for their current emergency management software. The proposed methodology has general character and can be used also in other specific areas during requirement analysis.

Keywords: emergency software, methodology, requirement analysis, stakeholders, use case diagram, user stories

Procedia PDF Downloads 509