Search results for: research productivity
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 24743

Search results for: research productivity

24713 The Analysis Fleet Operational Performance as an Indicator of Load and Haul Productivity

Authors: Linet Melisa Daubanes, Nhleko Monique Chiloane

Abstract:

The shovel-truck system is the most prevalent material handling system used in surface mining operations. Material handling entails the loading and hauling of material from production areas to dumping areas. The material handling process has operational delays that have a negative impact on the productivity of the load and haul fleet. Factors that may contribute to operational delays include shovel-truck mismatch, haul routes, machine breakdowns, extreme weather conditions, etc. The aim of this paper is to investigate factors that contribute to operational delays affecting the productivity of the load and haul fleet at the mine. Productivity is the measure of the effectiveness of producing products from a given quantity of units, the ratio of output to inputs. Productivity can be improved by producing more outputs with the same or fewer units and/or introducing better working methods etc. Several key performance indicators (KPI) for the evaluation of productivity will be discussed in this study. These KPIs include but are not limited to hauling conditions, bucket fill factor, cycle time, and utilization. The research methodology of this study is a combination of on-site time studies and observations. Productivity can be optimized by managing the factors that affect the operational performance of the haulage fleet.

Keywords: cycle time, fleet performance, load and haul, surface mining

Procedia PDF Downloads 160
24712 Effects of Climate Change and Livelihood Diversification on Gendered Productivity Gap of Farmers in Northern Regions of Ghana

Authors: William Adzawla

Abstract:

In the midst of climate variability and change, the role of gender in ensuring food production remains vital. Therefore, this study analysed the gendered productivity among maize farmers, and the effects of climate change and variability as well as livelihood diversification on gendered productivity gap. This involved a total of 619 farmers selected through a multistage sampling procedure. The data was analysed using Oaxaca Blinder decomposition model. From the result, there is a significant productivity gap of 58.8% and 44.8% between male and female heads, and between male heads and female spouses, respectively. About 87.47% and 98.08% of the variations in gendered productivity were explained by resource endowment. While livelihood diversification significantly influenced gendered productivity through endowment and coefficient effect, climate variables significantly affect productivity gap through only coefficient effects. The study concluded that there is a substantial gendered productivity gap among farmers and this is particularly due to differences in endowment. Generally, there is a high potential of reducing gendered productivity gaps through the provision of equal diversification opportunities and reducing females’ vulnerability to climate change. Among the livelihood activities, off-farm activities such as agro-processing and shea butter processing should be promoted. Similarly, the adoption of on-farm adaptation strategies should be promoted among the farmers.

Keywords: climate change and variability, gender, livelihood diversification, oaxaca-blinder decomposition, productivity gap

Procedia PDF Downloads 143
24711 Recognizing and Prioritizing Effective Factors on Productivity of Human Resources Through Using Technique for Order of Preference by Similarity to Ideal Solution Method

Authors: Amirmehdi Dokhanchi, Babak Ziyae

Abstract:

Studying and prioritizing effective factors on productivity of human resources through TOPSIS method is the main aim of the present research study. For this reason, while reviewing concepts existing in productivity, effective factors were studied. Managers, supervisors, staff and personnel of Tabriz Tractor Manufacturing Company are considered subject of this study. Of total individuals, 160 of them were selected through the application of random sampling method as 'subject'. Two questionnaires were used for collecting data in this study. The factors, which had the highest effect on productivity, were recognized through the application of software packages. TOPSIS method was used for prioritizing recognized factors. For this reason, the second questionnaire was put available to statistics sample for studying effect of each of factors towards predetermined indicators. Therefore, decision-making matrix was obtained. The result of prioritizing factors shows that existence of accurate organizational strategy, high level of occupational skill, application of partnership and contribution system, on-the-job-training services, high quality of occupational life, dissemination of appropriate organizational culture, encouraging to creativity and innovation, and environmental factors are prioritized respectively.

Keywords: productivity of human resources, productivity indicators, TOPSIS, prioritizing factors

Procedia PDF Downloads 306
24710 Microaggressions as Hidden Barriers: The Influence on Women as Underrepresented Minority Faculty Research

Authors: Mojdeh Mardani, Robert Stupnisky

Abstract:

Microaggressions are discriminatory and degrading slights manifested from negative and often unconscious beliefs about marginalised groups, including women and people of colour. This quantitative research analyses survey data collected from 10 USA Universities. This research presents the impacts of microaggressions on productivity and motivation of Underrepresented Minority (URM) faculty, especially women and those with intersecting marginalized identities, such as women who identify with a race other than white. Results of this study revealed that on average, URM women were 50% more susceptible to gender microaggressions, which correlated negatively with autonomy and competence, and positively with a motivation.

Keywords: gender microaggressions, gender discrimination, underrepresented minority, female faculty, URM faculty, motivation, productivity, STEM

Procedia PDF Downloads 103
24709 Increase Productivity by Using Work Measurement Technique

Authors: Mohammed Al Awadh

Abstract:

In order for businesses to take advantage of the opportunities for expanded production and trade that have arisen as a result of globalization and increased levels of competition, productivity growth is required. The number of available sources is decreasing with each passing day, which results in an ever-increasing demand. In response to this, there will be an increased demand placed on firms to improve the efficiency with which they utilise their resources. As a scientific method, work and time research techniques have been employed in all manufacturing and service industries to raise the efficiency of use of the factors of production. These approaches focus on work and time. The goal of this research is to improve the productivity of a manufacturing industry's production system by looking at ways to measure work. The work cycles were broken down into more manageable and quantifiable components. On the observation sheet, these aspects were noted down. The operation has been properly analysed in order to identify value-added and non-value-added components, and observations have been recorded for each of the different trails.

Keywords: time study, work measurement, work study, efficiency

Procedia PDF Downloads 49
24708 Study of Some Factors Effecting on Productivity of Solar Distillers

Authors: Keshek M.H, Mohamed M.A, El-Shafey M.A

Abstract:

The aim of this research was increasing the productivity of solar distillation. In order to reach this aim, a solar distiller was created with three glass sides sloping 30o at the horizontal level, and the experiments were carried out on the solar distillation unit during the period from 24th August, 2016 till 24th May, 2017 at the Agricultural Engineering and Bio Systems Department, Faculty of Agriculture, Menoufia University. Three gap lengths were used between the water level and the inner glass cover, those were 3, 6, and 9 cm. As the result of change the gap length between the water level and the inner glass cover the total volume of basins were changed from 15.5, 13, and 11 L, respectively. The total basin volume was divided to three sections, to investigate the effect of water volume. The three water volumes were 100%, 75%, and 50%. Every section was supplied with one, two, or three heaters. The one heater power was 15 W. The results showed that, by increasing the distance between the basins edge and the inner edge of the glass cover, an increase occurs in the percentage of temperature difference with maximum value was 52% at distance 9 cm from each edge, an increase occurs in the productivity with maximum productivity was 3.3 L/m2 at distance 9 cm from each edge and an increase occurs in the efficiency with maximum efficiency was 70% at distance 9 cm from each edge.

Keywords: distillation, solar energy, still productivity, efficiency

Procedia PDF Downloads 82
24707 The Impact of Climate Change on Cropland Ecosystem in Tibet Plateau

Authors: Weishou Shen, Chunyan Yang, Zhongliang Li

Abstract:

The crop climate productivity and the distribution of cropland reflect long-term adaption of agriculture to climate. In order to fully understand the impact of climate change on cropland ecosystem in Tibet, the spatiotemporal changes of crop climate productivity and cropland distribution were analyzed with the help of GIS and RS software. Results indicated that the climate change to the direction of wet and warm in Tibet in the recent 30 years, with a rate of 0.79℃/10 yr and 23.28 mm/10yr respectively. Correspondingly, the climate productivity increased gradually, with a rate of 346.3kg/(hm2•10a), of which, the fastest-growing rate of the crop climate productivity is in Southern Tibet Mountain- plain-valley. During the study period, the total cropland area increased from 32.54 million ha to 37.13 million ha, and cropland has expanded to higher altitude area and northward. Overall, increased cropland area and crop climate productivity due to climate change plays a positive role for agriculture in Tibet.

Keywords: climate change, productivity, cropland area, Tibet plateau

Procedia PDF Downloads 341
24706 A Comparative Study on Primary Productivity in Fish Cage Culture Unit and Fish Pond in Relation to Different Level of Water Depth

Authors: Pawan Kumar Sharma, J. Stephan Sampath Kumar, D. Manikandavelu, V. Senthil Kumar

Abstract:

The total amount of productivity in the system is the gross primary productivity. The present study was carried out to understand the relationship between productivity in the cages and water depth. The experiment was conducted in the fish cages installed in the pond at the Directorate of Sustainable Aquaculture, Thanjavur, Tamil Nadu Dr. J. Jayalalithaa Fisheries University, Tamil Nadu (10° 47' 13.1964'' N; 79° 8' 16.1700''E). Primary productivity was estimated by light and dark bottle method. The measurement of primary productivity was done at different depths viz., 20 cm, 40 cm, and 60 cm. Six Biological Oxygen Demand bottles of 300 ml capacity were collected and tagged. The productivity was obtained in mg O2/l/hr. The maximum dissolved oxygen level at 20 cm depth was observed 5.62 ± 0.22 mg/l/hr in the light bottle in pond water while the minimum dissolved oxygen level at 20 cm depth in a cage was observed 3.62 ± 0.18 mg/l/hr in dark bottle. In the same way, the maximum and minimum value of dissolved oxygen was observed at 40, and 60 cm depth and results were compared. A slight change in pH was observed in the cage and pond. The maximum gross primary productivity observed was 1.97 mg/l/hr in pond at 20 cm depth while minimum gross primary productivity observed was 0.82±0.16 mg/l/hr in a cage at 60 cm depth. The community respiration was also variable with the depth in both cage and pond. Maximum community respiration was found 1.50±0.19 mg/l/hr in pond at 20 cm depth. A strong positive linear relationship was observed between primary productivity and fish yields in ponds. The pond primary productivity can contribute substantially to the nutrition of farm-raised aquaculture species, including shrimp. The growth of phytoplankton’s is dependent on the sun light, availability of primary nutrients (N, P, and K) in the water body and transparency, so to increase the primary productivity fertilization through organic manure may be done that will clean to the pond environment also.

Keywords: cage aquaculture, water depth, net primary productivity, gross primary productivity, community respiration

Procedia PDF Downloads 178
24705 Effects of Education on Farmers’ Productivity Outputs in Rural Nigeria

Authors: Thomas Ogilegwu Orohu

Abstract:

This paper highlights the effect of education on farmers’ productivity in rural Nigeria which includes potential to obtain paid employment or generate income through self-help employment using skills learnt in school. The paper emphasizes that education help farmers’ in agro-processing units in production to reduce post harvest wastage. It highlights the benefits of schooling for farmers’ productivity, particularly in terms of efficiency gains and increased farm productivity. As technological innovation spread more widely within the country, the importance of formal education in farm production ought to become more apparent. Education help farmers to improve attitudes, beliefs and habits that may lead to greater willingness to accept risk, adopts innovation, save investment and generally to embrace productive practices. Finally factors affecting farmers’ education and appropriate recommendation were given with the hope that if resolutely implemented would bring the attainment of desired farm education to farmers to improve farm productivity outputs.

Keywords: benefit, education, effect, productivity

Procedia PDF Downloads 294
24704 Optimization of Palm Oil Plantation Revitalization in North Sumatera

Authors: Juliza Hidayati, Sukardi, Ani Suryani, Sugiharto, Anas M. Fauzi

Abstract:

The idea of making North Sumatera as a barometer of national oil palm industry requires efforts commodities and agro-industry development of oil palm. One effort that can be done is by successful execution plantation revitalization. The plantation Revitalization is an effort to accelerate the development of smallholder plantations, through expansion and replanting by help of palm Estate Company as business partner and bank financed plantation revitalization fund. Business partner agreement obliged and bound to make at least the same smallholder plantation productivity with business partners, so that the refund rate to banks become larger and prosperous people as a plantation owner. Generally low productivity of smallholder plantations under normal potential caused a lot of old and damaged plants with plant material at random. The purpose of revitalizing oil palm plantations is which are to increase their competitiveness through increased farm productivity. The research aims to identify potential criteria in influencing plantation productivity improvement priorities to be observed and followed up in order to improve the competitiveness of destinations and make North Sumatera barometer of national palm oil can be achieved. Research conducted with Analytical Network Process (ANP), to find the effect of dependency relationships between factors or criteria with the knowledge of the experts in order to produce an objective opinion and relevant depict the actual situation.

Keywords: palm barometer, acceleration of plantation development, productivity, revitalization

Procedia PDF Downloads 654
24703 Productivity and Structural Design of Manufacturing Systems

Authors: Ryspek Usubamatov, Tan San Chin, Sarken Kapaeva

Abstract:

Productivity of the manufacturing systems depends on technological processes, a technical data of machines and a structure of systems. Technology is presented by the machining mode and data, a technical data presents reliability parameters and auxiliary time for discrete production processes. The term structure of manufacturing systems includes the number of serial and parallel production machines and links between them. Structures of manufacturing systems depend on the complexity of technological processes. Mathematical models of productivity rate for manufacturing systems are important attributes that enable to define best structure by criterion of a productivity rate. These models are important tool in evaluation of the economical efficiency for production systems.

Keywords: productivity, structure, manufacturing systems, structural design

Procedia PDF Downloads 554
24702 Creating a Profound Sense of Comfort to Stimulate Workers Innovation and Productivity: Exploring Research and Case Study Applications

Authors: Rana Bazaid, Debajyoti Pati

Abstract:

Purpose: The aim of this research is to explore and discuss innovative workspaces, and how the design of the space has the potential to facilitate the work process and employees’ satisfaction which can lead to innovative results. Background: The relationship between the workforce and the work environment has a strong potential to enhance human capabilities associated with innovation outcomes. The need for innovation in workplaces can benefit employees’ satisfaction, health, and performance. To understand this complicated relationship, this research explores and comprehends innovative work environments. Methods: A review of 26 peer-reviewed articles, seven books, and 23 companies’ websites was conducted, along with analysis for five case studies on successful types of research and development fields to detect appropriate examples for the study. Results: The analysis of the five case studies showed the similarity-characteristics of innovation work environments among those five fields and observed what is unique about each field that makes them stand out in their industries. Conclusion: Understanding the psychological, cultural, physiological, and social needs of workers, physical workplaces, and issues found in the work environment may help enhance multifaceted innovation and productivity.

Keywords: innovation, productivity , work environment, workers satisfaction

Procedia PDF Downloads 70
24701 The Appraisal of Construction Sites Productivity: In Kendall’s Concordance

Authors: Abdulkadir Abu Lawal

Abstract:

For the dearth of reliable cardinal numerical data, the linked phenomena in productivity indices such as operational costs and company turnovers, etc. could not be investigated. This would not give us insight to the root of productivity problems at unique sites. So, ordinal ranking by professionals who were most directly involved with construction sites was applied for Kendall’s concordance. Responses gathered from independent architects, builders/engineers, and quantity surveyors were herein analyzed. They were responses based on factors that affect sites productivity, and these factors were categorized as head office factors, resource management effectiveness factors, motivational factors, and training/skill development factors. It was found that productivity is low and has to be improved in order to facilitate Nigerian efforts in bridging its infrastructure deficit. The significance of this work is underlined with the Kendall’s coefficient of concordance of 0.78, while remedial measures must be emphasized to stimulate better productivity. Further detailed study can be undertaken by using Fuzzy logic analysis on wider Delphi survey.

Keywords: factors, Kendall's coefficient of concordance, magnitude of agreement, percentage magnitude of dichotomy, ranking variables

Procedia PDF Downloads 593
24700 Testing for Endogeneity of Foreign Direct Investment: Implications for Economic Policy

Authors: Liwiusz Wojciechowski

Abstract:

Research background: The current knowledge does not give a clear answer to the question of the impact of FDI on productivity. Results of the empirical studies are still inconclusive, no matter how extensive and diverse in terms of research approaches or groups of countries analyzed they are. It should also take into account the possibility that FDI and productivity are linked and that there is a bidirectional relationship between them. This issue is particularly important because on one hand FDI can contribute to changes in productivity in the host country, but on the other hand its level and dynamics may imply that FDI should be undertaken in a given country. As already mentioned, a two-way relationship between the presence of foreign capital and productivity in the host country should be assumed, taking into consideration the endogenous nature of FDI. Purpose of the article: The overall objective of this study is to determine the causality between foreign direct investment and total factor productivity in host county in terms of different relative absorptive capacity across countries. In the classic sense causality among variables is not always obvious and requires for testing, which would facilitate proper specification of FDI models. The aim of this article is to study endogeneity of selected macroeconomic variables commonly being used in FDI models in case of Visegrad countries: main recipients of FDI in CEE. The findings may be helpful in determining the structure of the actual relationship between variables, in appropriate models estimation and in forecasting as well as economic policymaking. Methodology/methods: Panel and time-series data techniques including GMM estimator, VEC models and causality tests were utilized in this study. Findings & Value added: The obtained results allow to confirm the hypothesis states the bi-directional causality between FDI and total factor productivity. Although results differ from among countries and data level of aggregation implications may be useful for policymakers in case of providing foreign capital attracting policy.

Keywords: endogeneity, foreign direct investment, multi-equation models, total factor productivity

Procedia PDF Downloads 177
24699 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 219
24698 The Factors Affecting on Promoting Productivity from Nurses' View

Authors: Mahnaz Sanjari, Sedigheh Salemi, Mohammad Mirzabeigi

Abstract:

Nowadays, the world is facing a crisis of workforce and one of the most striking examples is the shortage of nurses. Nursing workforce productivity is related by various factors such as absenteeism, professional effectiveness and quality care. This cross-sectional study was conducted in 700 nurses who work in government hospitals from 35 hospitals of 9 provinces in Iran. The study was approved by the Nursing Council and was carried out with the authorization of the Research Ethics Committee. The questionnaire included 33 questions and 4 sub categories such as human resource, education and management. The reliability was evaluated by Cronbach's alpha (α=0/85). Statistical analyzes were performed, using SPSS version 16. The result showed that nurses emphasized on "respect to nurse-to-bed ratio" and less importance item was "using less experienced nurse". In addition, another important factor in clinical productivity is "Proper physical structure and amenities","good communication with colleagues" and "having good facilities". Also, "human resources at all levels of standard", "promoting on merit" and "well defined relationship in health system" are another important factors in productivity from nurse` view. The main managerial factor is "justice between employees" and the main educational component of productivity is “updating nursing knowledge”. The results show that more than half of the participants emphasized on the management and educational factors. Productivity as one of the main part of the health care quality leads to appropriate use of human and organizational resources, reduce cost services, and organizational development.

Keywords: productivity, nursing services, workforce, cost services

Procedia PDF Downloads 322
24697 The Impact of Information Technology Monitoring on Employee Theft and Productivity

Authors: Ajayi Oluwasola Felix

Abstract:

This paper examines how firm investments in technology-based employee monitoring impact both misconduct and productivity. We use unique and detailed theft and sales data from 392 restaurant locations from five firms that adopt a theft monitoring information technology (IT) product. We use difference-in-differences (DD) models with staggered adoption dates to estimate the treatment effect of IT monitoring on theft and productivity. We find significant treatment effects in reduced theft and improved productivity that appear to be primarily driven by changed worker behavior rather than worker turnover. We examine four mechanisms that may drive this productivity result: economic and cognitive multitasking, fairness-based motivation, and perceived increases of general oversight. The observed productivity results represent substantial financial benefits to both firms and the legitimate tip-based earnings of workers. Our results suggest that employee misconduct is not solely a function of individual differences in ethics or morality, but can also be influenced by managerial policies that can benefit both firms and employees.

Keywords: information technology, monitoring, misconduct, employee theft

Procedia PDF Downloads 376
24696 Anyword: A Digital Marketing Tool to Increase Productivity in Newly Launching Businesses

Authors: Jana Atteah, Wid Jan, Yara AlHibshi, Rahaf AlRougi

Abstract:

Anyword is an AI copywriting tool that helps marketers create effective campaigns for specific audiences. It offers a wide range of templates for various platforms, brand voice guidelines, and valuable analytics insights. Anyword is used by top global companies and has been recognized as one of the "Fastest Growing Products" in the 2023 software awards. A recent study examined the utilization and impact of AI-powered writing tools, specifically focusing on the adoption of AI in writing pursuits and the use of the Anyword platform. The results indicate that a majority of respondents (52.17%) had not previously used Anyword, but those who had were generally satisfied with the platform. Notable productivity improvements were observed among 13% of the participants, while an additional 34.8% reported a slight increase in productivity. A majority (47.8%) maintained a neutral stance, suggesting that their productivity remained unaffected. Only a minimal percentage (4.3%) claimed that their productivity did not improve with the usage of Anyword AI. In terms of the quality of written content generated, the participants responded positively. Approximately 91% of participants gave Anyword AI a score of 5 or higher, with roughly 17% giving it a perfect score. A small percentage (approximately 9%) gave a low score between 0-2. The mode result was a score of 7, indicating a generally positive perception of the quality of content generated using Anyword AI. These findings suggest that AI can contribute to increased productivity and positively influence the quality of written content. Further research and exploration of AI tools in writing pursuits are warranted to fully understand their potential and limitations.

Keywords: artificial intelligence, marketing platforms, productivity, user interface

Procedia PDF Downloads 28
24695 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 326
24694 Total Productive Maintenance (TPM) as a Strategy for Competitiveness

Authors: Ignatio Madanhire, Charles Mbohwa

Abstract:

This research examines the effect of a human resource strategy and the overall equipment effectiveness as well as assessing how the combination of the two can increase a firm’s productivity. The human resource aspect is looked at in detail to assess motivation of operators through training to reduce wastage on the manufacturing shop floor. The waste was attributed to operators, maintenance personal, idle machines, idle manpower and break downs. This work seeks to investigate the concept of Total Productive Maintenance (TPM) in addressing these short comings in the manufacturing case study. The impact of TPM to increase production while, as well as increasing employee morale and job satisfaction is assessed. This can be resource material for practitioners who seek to improve overall equipment efficiency (OEE) to achieve higher level productivity and competitiveness.

Keywords: maintenance, TPM, efficiency, productivity, strategy

Procedia PDF Downloads 391
24693 Hierarchy and Weight of Influence Factors on Labor Productivity in the Construction Industry of the Nepal

Authors: Shraddha Palikhe, Sunkuk Kim

Abstract:

The construction industry is the most labor intensive in Nepal. It is obvious that construction is a major sector and any productivity enhancement activity in this sector will have a positive impact in the overall improvement of the national economy. Previous studies have stated that Nepal has poor labor productivity among other south Asian countries. Though considerable research has been done on productivity factors in other countries, no study has addressed labor productivity issues in Nepal. Therefore, the main objective of this study is to identify and hierarchy the influence factors for poor labor productivity. In this study, a questionnaire approach is chosen as a method of the survey from thirty experts involved in the construction industry, such as Architects, Civil Engineers, Project Engineers and Site Engineers. A survey was conducted in Nepal, to identify the major factors impacting construction labor productivity. Analytic Hierarchy Process (AHP) analysis method was used to understand the underlying relationships among the factors, categorized into five groups, namely (1) Labor-management group; (2) Material management group; (3) Human labor group; (4) Technological group and (5) External group and was divided into 33 subfactors. AHP was used to establish the relative importance of the criteria. The AHP makes pairwise comparisons of relative importance between hierarchy elements grouped by labor productivity decision criteria. Respondents were asked to answer based on their experience of construction works. On the basis of the respondent’s response, weight of all the factors were calculated and ranked it. The AHP results were tabulated based on weight and ranking of influence factors. AHP model consists of five main criteria and 33 sub-criteria. Among five main criteria, the scenario assigns a weight of highest influential factor i.e. 26.15% to human labor group followed by 23.01% to technological group, 22.97% to labor management group, 17.61% material management group and 10.25% to external group. While in 33 sub-criteria, the most influential factor for poor productivity in Nepal are lack of monetary incentive (20.53%) for human labor group, unsafe working condition (17.55%) for technological group, lack of leadership (18.43%) for labor management group, unavailability of tools at site (25.03%) for material management group and strikes (35.01%) for external group. The results show that AHP model associated criteria are helpful to predict the current situation of labor productivity. It is essential to consider these influence factors to improve the labor productivity in the construction industry of Nepal.

Keywords: construction, hierarchical analysis, influence factors, labor productivity

Procedia PDF Downloads 376
24692 The Effect of Microfinance on Labor Productivity of SME - The Case of Iran

Authors: Sayyed Abdolmajid Jalaee Esfand Abadi, Sepideh Samimi

Abstract:

Since one of the major difficulties to develop small manufacturing enterpriser in developing countries is the limitations of financing activities, this paper want to answer the question: “what is the role and status of micro finance in improving the labor productivity of small industries in Iran?” The results of panel data estimation show that micro finance in Iran has not yet been able to work efficiently and provide the required credit and investment. Also, reducing economy’s dependence on oil revenues reduced and increasing its reliance on domestic production and exports of industrial production can increase the productivity of workforce in Iranian small industries.

Keywords: microfinance, small manufacturing enterprises (SME), workforce productivity, Iran, panel data

Procedia PDF Downloads 391
24691 Comparative Study of Experimental and Theoretical Convective, Evaporative for Two Model Distiller

Authors: Khaoula Hidouri, Ali Benhmidene, Bechir Chouachi

Abstract:

The purification of brackish seawater becomes a necessity and not a choice against demographic and industrial growth especially in third world countries. Two models can be used in this work: simple solar still and simple solar still coupled with a heat pump. In this research, the productivity of water by Simple Solar Distiller (SSD) and Simple Solar Distiller Hybrid Heat Pump (SSDHP) was determined by the orientation, the use of heat pump, the simple or double glass cover. The productivity can exceed 1.2 L/m²h for the SSDHP and 0.5 L/m²h for SSD model. The result of the global efficiency is determined for two models SSD and SSDHP give respectively 30%, 50%. The internal efficiency attained 35% for SSD and 60% of the SSDHP models. Convective heat coefficient can be determined by attained 2.5 W/m²°C and 0.5 W/m²°C respectively for SSDHP and SSD models.

Keywords: productivity, efficiency, convective heat coefficient, SSD model, SSDHPmodel

Procedia PDF Downloads 187
24690 Window Analysis and Malmquist Index for Assessing Efficiency and Productivity Growth in a Pharmaceutical Industry

Authors: Abbas Al-Refaie, Ruba Najdawi, Nour Bata, Mohammad D. AL-Tahat

Abstract:

The pharmaceutical industry is an important component of health care systems throughout the world. Measurement of a production unit-performance is crucial in determining whether it has achieved its objectives or not. This paper applies data envelopment (DEA) window analysis to assess the efficiencies of two packaging lines; Allfill (new) and DP6, in the Penicillin plant in a Jordanian Medical Company in 2010. The CCR and BCC models are used to estimate the technical efficiency, pure technical efficiency, and scale efficiency. Further, the Malmquist productivity index is computed to measure then employed to assess productivity growth relative to a reference technology. Two primary issues are addressed in computation of Malmquist indices of productivity growth. The first issue is the measurement of productivity change over the period, while the second is to decompose changes in productivity into what are generally referred to as a ‘catching-up’ effect (efficiency change) and a ‘frontier shift’ effect (technological change). Results showed that DP6 line outperforms the Allfill in technical and pure technical efficiency. However, the Allfill line outperforms DP6 line in scale efficiency. The obtained efficiency values can guide production managers in taking effective decisions related to operation, management, and plant size. Moreover, both machines exhibit a clear fluctuations in technological change, which is the main reason for the positive total factor productivity change. That is, installing a new Allfill production line can be of great benefit to increasing productivity. In conclusions, the DEA window analysis combined with the Malmquist index are supportive measures in assessing efficiency and productivity in pharmaceutical industry.

Keywords: window analysis, malmquist index, efficiency, productivity

Procedia PDF Downloads 584
24689 Water Productivity and Sensitivity Tolerance Stress Indices in Five Soybean Cultivars (Glycine max L.) at Different Levels of Water Deficit

Authors: Hassan Masoumi, Rashed Alavi, Mahmoud Reza Khorshidian

Abstract:

In order to measure the water deficit stress effects on seed yield and water productivity of soybean cultivars, a two field experiments wad conducted out via split plot in a randomized complete block design with four replications in 2011 and 2012. Irrigation treatments were three levels (S1; 50, S2; 62.5 and S3; 150 mm) that applied based on evaporation from the ‘class A’ pan. Cultivars were L17, Clean, T.M.S, Williams×Chippewa and M9, too. The results showed that, only extreme water deficit stresses (S3) was reduced number of pods per plants, dry weight, seed yield and also water productivity and water economic productivity, significantly. Among cultivars and at the first and second levels of irrigation (S1, S2) cultivar of L17 and at the third level (S3) cultivar of Wiiliams*Chippwea had the highest seed yield, water productivity and water economic productivity. There were observed a positive and significant correlation between seed yield with number of pods per plants and plants dry weight, too. Also, despite the reduction in water consumption at level of S2 than S1 and due to the lack of a significant reduction in seed yield, water productivity and water economic productivity was also increased, significantly (P < 0.01). All indices of sensitivity and tolerance (SSI, STI and GMP) investigated in this study showed that at the moderate and extreme water deficit stresses (S2, S3), the cultivars of L17 and Wiiliams * Chippwea had the highest tolerance and lowest sensitivity among the cultivars.

Keywords: drought, sensitivity indices, yield components, seed

Procedia PDF Downloads 381
24688 Collective Bargaining Agreement with Its Related Factors and Employees’ Perceived Productivity: The Case of an Academic Institution in Davao City, Philippines

Authors: Amylyn F. Labasano, M. S. Econ

Abstract:

The study predicts the impact of collective bargaining agreement and its related factors on employees’ perceived productivity in terms of union-management relation’s climate, income, fringe benefits, and job satisfaction of the employees. It also determines whether there are significant differences in the employees’ perceived productivity based on the demographic characteristics of the respondents. The results revealed that the relationship climate which exists between the union and the management is found to have significant adverse effect on the average unpaid hours spent by employees working within the college. On the other hand, the total monthly wage earnings of employees have negative effect on the average hours an employee spent in bringing his work home while job satisfaction positively influences the overall productivity level of employees. The result further shows significant differences in the productivity level of employees across civil status and current designation.

Keywords: perceived productivity, collective bargaining agreement, union, union-management relations climate, income, fringe benefits, job satisfaction

Procedia PDF Downloads 310
24687 Regulating Green Roofs: A Review of the Relation between Current International Regulations and Economic, Environmental and Social Effects

Authors: Marianna Nigra, Maicol Negrello

Abstract:

Efficiency, productivity, and sustainability are important factors for structure and the application of processes in green building. Various previous studies have addressed efficiency, productivity, and sustainability separately. This research study aims to investigate the implications of these three factors taking together. Frequency analysis and the ranking techniques are carried out to explore the connection between these factors. The interconnection matrix has been developed and functional grouping is made based upon data from expert opinion and field professionals. The existence of a relationship, the type of relationship and the scaled impact have been drawn. Additionally, a system diagram has been developed to show the variable correlation. The results of expert opinion show that efficiency, productivity, and sustainability have a stronger impact on green buildings.

Keywords: green roof regulation, architecture, climate adaptation, resilience, innovation management

Procedia PDF Downloads 82
24686 The Impact of Electronic Commerce on Organisational Efectiveness: A Study of Zenith Bank Plc

Authors: Olusola Abiodun Arinde

Abstract:

This research work was prompted by the very important role e-commerce plays in every organization, be it private or public. The underlying objective of this study is to have a critical appraisal of the extent to which e-commerce impacts on organizational effectiveness. This research was carried out using Zenith Bank Plc as a case study. Relevant data were collected through structured questionnaire, oral interview, journals, newspapers, and textbooks. The data collected were analyzed and hypotheses were tested. Based on the result of the hypotheses, it was observed that e-commerce is significant to every organization. Through e-commerce, fast services delivery would be guaranteed to customers, this would lead to higher productivity and profit for organizations. E-commerce should be managed in such a way that it does not alienate customers; it should also prevent enormous risks that are associated with e-commerce.

Keywords: e-commerce, fast service, productivity, profit

Procedia PDF Downloads 216
24685 The Investigation of Green Building Certification on the Productivity and Mental and Physical Health of Building's Occupants in Tehran, Iran

Authors: Armin Samarghandi, Amirreza Jafari, Mohamad Ghiasi

Abstract:

Numerous assertions and some empirical evidence imply that 'green' buildings ought to be more productive and healthier (mentally and physiologically) than conventional structures. Since then, empirical data has been equivocal, indicating either that the studies are inaccurate or that the research has just scratched the surface of green buildings in offices, accommodation, and hospital settings and not taken the aforementioned holistically. This study compared four green-certified buildings -one residential green building, one green hospital, and one green school- with conventional structures in Tehran, Iran, by means of a questionnaire spread among those utilizing these buildings, and assessing their productivity and health rate as opposed to the time they resided, worked in conventional buildings. The results demonstrated higher scores pertaining to productivity and physical and mental wellness as a consequence of better indoor environmental quality (IEQ), natural lighting, design, and sustainability of these buildings against non-green buildings. In addition, ancillary matters -environmental, financial, intellectual, emotional, social, and spiritual dimensions of participants- were indirectly evaluated, and the same results were produced.

Keywords: green building, LEED, productivity, physical and mental health, indoor environmental quality

Procedia PDF Downloads 89
24684 The Design Process of an Interactive Seat for Improving Workplace Productivity

Authors: Carlos Ferreira, Paulo Freitas, Valentim Freitas

Abstract:

Creative industries’ workers are becoming more prominent as countries move towards intellectual-based economies. Consequently, the nature and essence of the workplace needs to be reconfigured so that creativity and productivity can be better promoted at these spaces. Using a multidisciplinary approach and a user-centered methodology, combining product design, electronic engineering, software and human-computer interaction, we have designed and developed a new seat that uses embedded sensors and actuators to increase the overall well-being of its users, their productivity and their creativity. Our contribution focuses on the parameters that most affect the user’s work on these kinds of spaces, which are, according to our study, noise and temperature. We describe the design process for a new interactive seat targeted at improving workspace productivity.

Keywords: human-computer interaction, usability, user interface, creativity, ergonomics

Procedia PDF Downloads 192