Search results for: public/private partnerships
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6533

Search results for: public/private partnerships

6503 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 266
6502 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.

Keywords: PPP, concession, infrastructure, construction

Procedia PDF Downloads 271
6501 Building Information Modelling Based Value for Money Assessment in Public-Private Partnership

Authors: Guoqian Ren, Haijiang Li, Jisong Zhang

Abstract:

Over the past 40 years, urban development has undergone large-scale, high-speed expansion, beyond what was previously considered normal and in a manner not proportionally related to population growth or physical considerations. With more scientific and refined decision-making in the urban construction process, new urbanization approaches, aligned with public-private partnerships (PPPs) which evolved in the early 1990s, have become acceptable and, in some situations, even better solutions to outstanding urban municipal construction projects, especially in developing countries. However, as the main driving force to deal with urban public services, PPPs are still problematic regarding value for money (VFM) process in most large-scale construction projects. This paper therefore reviews recent PPP articles in popular project management journals and relevant toolkits, published in the last 10 years, to identify the indicators that influence VFM within PPPs across regions. With increasing concerns about profitability and environmental and social impacts, the current PPP structure requires a more integrated platform to manage multi-performance project life cycles. Building information modelling (BIM), a popular approach to the procurement process in AEC sectors, provides the potential to ensure VFM while also working in tandem with the semantic approach to holistically measure life cycle costs (LCC) and achieve better sustainability. This paper suggests that BIM applied to the entire PPP life cycle could support holistic decision-making regarding VFM processes and thus meet service targets.

Keywords: public-private partnership, value for money, building information modelling, semantic approach

Procedia PDF Downloads 180
6500 Imputing the Minimum Social Value of Public Healthcare: A General Equilibrium Model of Israel

Authors: Erez Yerushalmi, Sani Ziv

Abstract:

The rising demand for healthcare services, without a corresponding rise in public supply, led to a debate on whether to increase private healthcare provision - especially in hospital services and second-tier healthcare. Proponents for increasing private healthcare highlight gains in efficiency, while opponents its risk to social welfare. None, however, provide a measure of the social value and its impact on the economy in terms of a monetary value. In this paper, we impute a minimum social value of public healthcare that corresponds to indifference between gains in efficiency, with losses to social welfare. Our approach resembles contingent valuation methods that introduce a hypothetical market for non-commodities, but is different from them because we use numerical simulation techniques to exploit certain market failure conditions. In this paper, we develop a general equilibrium model that distinguishes between public-private healthcare services and public-private financing. Furthermore, the social value is modelled as a by product of healthcare services. The model is then calibrated to our unique health focused Social Accounting Matrix of Israel, and simulates the introduction of a hypothetical health-labour market - given that it is heavily regulated in the baseline (i.e., the true situation in Israel today). For baseline parameters, we estimate the minimum social value at around 18% public healthcare financing. The intuition is that the gain in economic welfare from improved efficiency, is offset by the loss in social welfare due to a reduction in available social value. We furthermore simulate a deregulated healthcare scenario that internalizes the imputed value of social value and searches for the optimal weight of public and private healthcare provision.

Keywords: contingent valuation method (CVM), general equilibrium model, hypothetical market, private-public healthcare, social value of public healthcare

Procedia PDF Downloads 117
6499 Assets Misappropriation in the Malaysian Public and Private Sectors

Authors: I. K. Norziaton, M. D. Ridhuan, A. N. Nur Adura

Abstract:

Assets misappropriation is becoming a major concern in organizations. Over the years, the Malaysian Auditor General has reported high occurrences of assets misappropriation at the federal, state and even local governments. It is surprising that assets misappropriation is not the only major concern in the public sector but it has also indicates a common sight in private sector. The current situation is rather disconcerting because employees are accountable to perform their jobs at the interest of the organizations. Various researches in the past has found that the incidence of assets misappropriation occurs when employees used the official vehicles, internet connection, computers, stationery and facilities for personal and family benefits. The issue of assets misappropriation has continue to be a major concern for organizations and its impact on the reputation and financial health can be enormous. Even though the issue seems to be trivial, yet, if it is left untreated, the symptoms will become an incurable disease that it will cause major leakages to the organizations. Hence, this paper highlights the common practices of assets misappropriation in public and private sectors. It also discusses why the acts of assets misappropriation occurs. Using the data through questionnaire survey, a total of 250 questionnaires were distributed to the private and public sectors employees. However 173 (69.2%) were returned and usable. This paper concludes that it is vital to promote awareness to the public and private sectors employees on issues of assets misappropriation. Assets misappropriation could have been avoided provided that the officers in charge are more vigilant, competent and practice high level of integrity in discharging their responsibilities towards the organizations.

Keywords: assets misappropriation, fraud, public sector, private sector

Procedia PDF Downloads 167
6498 The Nature of Problems Faced by Organization in Recruitment: A Comparative Analysis between Public and Private Sector of Russia

Authors: Zarema Urustamova, Chunsheng Shi, Ghulam Mujtaba Kayani 

Abstract:

This research paper helps to understand the comparative analysis of recruitment problems which majorly faced by HRD of Public/Semi-Govt. and private sectors of Russia. The natures of different recruitment problems faced by HRD are different in both sector of Russia. Recruitment is one of very critical and important decision taken by HR department and some recruitment problems are highly faced by HR department of public/semi Govt. sector but are not major problems for private sector. Moreover, some problems are majorly influence in private sector but are not major problems in public/semi-govt. sector of Russia in recruitment. It is also identified that some recruitment problems are majorly affect in recruitment in both sectors. This paper helps to understand the recruitment problems faced by HR department while recruiting the new employee in both sectors. This paper also identified that “environment” and “prejudice” in public sector have higher affect and considered as a major problems in employee recruitment and “reference”, “selection standards” are considered as a least affecting problems of recruitment in public sector. Further, in private sector, “prejudice” and “culture” are major issues and “selection standards” and “reference” is considered as least affecting recruitment problems in private sector of Russia. So, HR department will be able to hire right person on right time, and it is possible when different HR departments focus to overcome these recruitment problems more efficiently and effectively.

Keywords: Govt. /Semi-Govt. vs. private sector, HR department, recruitment problems, Russia

Procedia PDF Downloads 348
6497 Comparing Quality of Care in Family Planning Services in Primary Public and Private Health Care Facilities in Ethiopia

Authors: Gizachew Assefa Tessema, Mohammad Afzal Mahmood, Judith Streak Gomersall, Caroline O. Laurence

Abstract:

Introduction: Improving access to quality family planning services is the key to improving health of women and children. However, there is currently little evidence on the quality and scope of family planning services provided by private facilities, and this compares to the services provided in public facilities in Ethiopia. This is important, particularly in determining whether the government should further expand the roles of the private sector in the delivery of family planning facility. Methods: This study used the 2014 Ethiopian Services Provision Assessment Plus (ESPA+) survey dataset for comparing the structural aspects of quality of care in family planning services. The present analysis used a weighted sample of 1093 primary health care facilities (955 public and 138 private). This study employed logistic regression analysis to compare key structural variables between public and private facilities. While taking the structural variables as an outcome for comparison, the facility type (public vs private) were used as the key exposure of interest. Results: When comparing availability of basic amenities (infrastructure), public facilities were less likely to have functional cell phones (AOR=0.12; 95% CI: 0.07-0.21), and water supply (AOR=0.29; 95% CI: 0.15-0.58) than private facilities. However, public facilities were more likely to have staff available 24 hours in the facility (AOR=0.12; 95% CI: 0.07-0.21), providers having family planning related training in the past 24 months (AOR=4.4; 95% CI: 2.51, 7.64) and possessing guidelines/protocols (AOR= 3.1 95% CI: 1.87, 5.24) than private facilities. Moreover, comparing the availability of equipment, public facilities had higher odds of having pelvic model for IUD demonstration (AOR=2.60; 95% CI: 1.35, 5.01) and penile model for condom demonstration (AOR=2.51; 95% CI: 1.32, 4.78) than private facilities. Conclusion: The present study suggests that Ethiopian government needs to provide emphasis towards the private sector in terms of providing family planning guidelines and training on family planning services for their staff. It is also worthwhile for the public health facilities to allocate funding for improving the availability of basic amenities. Implications for policy and/ or practice: This study calls policy makers to design appropriate strategies in providing opportunities for training a health care providers working in private health facility.

Keywords: quality of care, family planning, public-private, Ethiopia

Procedia PDF Downloads 310
6496 Barriers to Job Localization Policy in Private Sector: Case Study from Oman

Authors: Yahya Al Nahdi

Abstract:

Even though efforts to increase the participation of nationals in the workforce have been in place for more than a decade in the Sultanate of Oman, the results are not impressive. Citizens’ workforce participation – it is argued in the literature – is hindered by institutional, as well as attitudinal concerns. The purpose of this study was to determine barriers to Omanization (employment of Omani nationals) in the private sector as perceived by the senior managers in government and private sector. Data were collected predominantly through in-depth, semi-structured interviews with managers who directly deal with Omanization policies from both the public and private sector. Results from the data analysis have shown that the majority of participants acknowledged a work preference in the movement (public sector). The private sector employees' compensation and benefits package was perceived to be less attractive than that offered in the government (public sector). The negative perceptions (stereotypes) shared by expatriates regarding work attitudes and competencies of citizens in the local labour market was also overwhelmingly perceived as a major hindrance. Furthermore, institutional issues such as, ineffectiveness of rules and regulation regarding Omanization, inappropriate quota system and lack of public awareness towards private sector’s jobs, are also perceived problematic to successful Omanization. Finally, results from the data analysis were used in recommending strategies for potential consideration in the pursuit of a successful Omanization programme.

Keywords: localization, job security, labour force structure, Omanization, private sector, public sector

Procedia PDF Downloads 363
6495 Perception of Public Transport Quality of Service among Regular Private Vehicle Users in Five European Cities

Authors: Juan de Ona, Esperanza Estevez, Rocío de Ona

Abstract:

Urban traffic levels can be reduced by drawing travelers away from private vehicles over to using public transport. This modal change can be achieved by either introducing restrictions on private vehicles or by introducing measures which increase people’s satisfaction with public transport. For public transport users, quality of service affects customer satisfaction, which, in turn, influences the behavioral intentions towards the service. This paper intends to identify the main attributes which influence the perception private vehicle users have about the public transport services provided in five European cities: Berlin, Lisbon, London, Madrid and Rome. Ordinal logit models have been applied to an online panel survey with a sample size of 2,500 regular private vehicle users (approximately 500 inhabitants per city). To achieve a comprehensive analysis and to deal with heterogeneity in perceptions, 15 models have been developed for the entire sample and 14 user segments. The results show differences between the cities and among the segments. Madrid was taken as reference city and results indicate that the inhabitants are satisfied with public transport in Madrid and that the most important public transport service attributes for private vehicle users are frequency, speed and intermodality. Frequency is an important attribute for all the segments, while speed and intermodality are important for most of the segments. An analysis by segments has identified attributes which, although not important in most cases, are relevant for specific segments. This study also points out important differences between the five cities. Findings from this study can be used to develop policies and recommendations for persuading.

Keywords: service quality, satisfaction, public transportation, private vehicle users, car users, segmentation, ordered logit

Procedia PDF Downloads 84
6494 The Implementation of Educational Partnerships for Undergraduate Students at Yogyakarta State University

Authors: Broto Seno

Abstract:

This study aims to describe and examine more in the implementation of educational partnerships for undergraduate students at Yogyakarta State University (YSU), which is more focused on educational partnerships abroad. This study used descriptive qualitative approach. The study subjects consisted of a vice-rector, two staff education partnerships, four vice-dean, nine undergraduate students and three foreign students. Techniques of data collection using interviews and document review. Validity test of the data source using triangulation. Data analysis using flow models Miles and Huberman, namely data reduction, data display, and conclusion. Results of this study showed that the implementation of educational partnerships abroad for undergraduate students at YSU meets six of the nine indicators of the success of strategic partnerships. Six indicators are long-term, strategic, mutual trust, sustainable competitive advantages, mutual benefit for all the partners, and the separate and positive impact. The indicator has not been achieved is cooperative development, successful, and world class / best practice. These results were obtained based on the discussion of the four formulation of the problem, namely: 1) Implementation and development of educational partnerships abroad has been running good enough, but not maximized. 2) Benefits of the implementation of educational partnerships abroad is providing learning experiences for students, institutions of experience in comparison to each faculty, and improving the network of educational partnerships for YSU toward World Class University. 3) The sustainability of educational partnerships abroad is pursuing a strategy of development through improved management of the partnership. 4) Supporting factors of educational partnerships abroad is the support of YSU, YSU’s partner and society. Inhibiting factors of educational partnerships abroad is not running optimally management.

Keywords: partnership, education, YSU, institutions and faculties

Procedia PDF Downloads 306
6493 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 715
6492 A Theory of Vertical Partnerships Model as Responsive Failure in Alternative Arrangement for Infrastructural Development in the Third World Countries: A Comparative Public Administration Analysis

Authors: Cyril Ekuaze

Abstract:

This paper was instigated by a set of assumption drawn at the introduction to a research work on alternative institutional arrangements for sustaining rural infrastructure in developing countries. Of one of such assumption is the one held that, a problem facing developing countries is the sustaining of infrastructural investment long enough to allow the facility to at least repay the cost of the development as been due to insufficient maintenance. On the contrary, this work argues that, most international partnerships relation with developing nations in developing infrastructures is “vertical modeling” with the hierarchical authority and command flow from top to bottom. The work argued that where international donor partners/agencies set out infrastructural development agenda in the developing nations without cognizance of design suitability and capacity for maintenance by the recipient nations; and where public administrative capacity building in the field of science, technology and engineering requisite for design, development and sustenance of infrastructure in the recipient countries are negated, prospective output becomes problematic.

Keywords: vertical partnerships, responsive failure, infrastructural development, developing countries

Procedia PDF Downloads 286
6491 Privatization and Ensuring Accountability in the Provision of Essential Services: A Case of Water in South Africa

Authors: Odufu Ifakachukwu Clifford

Abstract:

Developing country governments are struggling to meet the basic needs and demands of citizens, especially so for the rural poor. With tightly constrained budgets, these governments have followed the lead of developed countries that have sought to restructure public service delivery through privatization, contracting out, public-private partnerships, and similar reforms. Such reforms in service delivery are generally welcomed when it is believed that private sector partners are better equipped to provide certain services than are governments. With respect to basic and essential services, however, a higher degree of uncertainty and apprehension exists as the focus shifts from simply minimizing the costs of delivering services to broadening access to all citizens. The constitution stipulates that everyone has the right to have access to sufficient food and water. Affordable and/or subsidized water, then, is not a privilege but a basic right of all citizens. Citizens elect political representatives to serve in office, with their sole mandate being to provide for the needs of the citizenry. As governments pass on some amount of responsibility for service delivery to private businesses, these governments must be able to exercise control in order to account to the people for the work done by private partners. This paper examines the legislative and policy frameworks as well as the environment within which PPPs take place in South Africa and the extent to which accountability can be strengthened in this environment. Within the aforementioned backdrop of PPPs and accountability, the constricted focus area of the paper aims to assess the extent to which the provision of clean and safe consumable water in South Africa is sustainable, cost-effective in terms of provision, and affordable to all.

Keywords: privatisation, accountability, essential services, government

Procedia PDF Downloads 28
6490 Delay in the Diagnosis of Tuberculosis and Initiation of TB Treatment in the Private and Public Health Sectors, Udaipur District, Rajasthan, India, Nov 2013

Authors: Yogita Tulsian, R. S. Gupta, K. F. Laserson

Abstract:

Background: Delays in the diagnosis and treatment of TB facilitates disease transmission in the community, so we conducted a study to evaluate the burden of and risk factors for delay in TB diagnosis and initiation of TB treatment among patients in the private and public sectors in Udaipur district, Rajasthan, India. Methods: A retrospective cohort study was conducted among 100 new sputum-positive TB. Patients were interviewed in the intensive phase of treatment September 2013-November 2013 Long total diagnosis delay (TDD) was defined as a time interval between first symptom to confirmed diagnosis > 30 days. Long health treatment delay (HTD) was defined as a time interval between confirmed diagnosis to treatment initiation > 7 days. Results: We observed a median TDD of 55 days (range: 7-136 days) in the public sector and of 92 days (11-380 days) in the private sector. Long TDD in the private sector was significantly associated with middle-higher socio-economic status (Risk Ratio (RR): 2;95% CI: 1.3-3). The reasons reported from the private sector for long TDD were suspect TB patients not advised for sputum examination (RR: 42; 95% CI:2.6-660), practise of self-medication (RR: 17.4; 95% CI: 1.1-267), or lack of awareness (RR: 9.7;95% CI: 0.6-145). The median HTD in the public sector was 3 days (range: 0-14 days), and in the private sector, 2 days (range: 0-11 days) (non-significant difference). Conclusions: Long TDD in private sector may be improved through sputum referral for all suspect TB cases and better education to all regarding TB.

Keywords: diagnosis delay, treatment delay, privatesector, public sector

Procedia PDF Downloads 394
6489 Public and Private Involvement in Agricultural Extension Services: Factors of Farmers’ Preference in Southwestern Nigeria

Authors: S. O. Ayansina, O. A. Adekunle

Abstract:

There is an increasing demand for a functional extension delivery services in Nigeria with a view to meet up with the food and fiber needs of the ever growing population of human and animal respectively. The study was therefore designed to examine the farmers’ preference for public and private extension services in Southwestern Nigeria, specifically to determine the farmers’ level of participation in the two types of organizations involved and also to evaluate the Performance level of personnel in the two organizations in order to ascertain the beneficiaries’ satisfaction. A multi-stage random sampling technique was used to samples 30 respondents from each of the three selected organizations in each of the three states sampled in Southwestern Nigeria. Hence, 270 respondents were sampled for the study. Data collected were analyzed with Kruskal Wallis one-way Analysis of variance to test the difference between the participation of beneficiaries in the public and private extension services and the level of benefit accrued from the two organizations involved in the study. Results generally revealed that private organizations were performing better and were more preferred by the beneficiaries. Results of the tested hypotheses as shown by Kruskal Wallis test of difference (x2=0.709) indicates no significant difference between farmers’ participation in the extension services of public and private organizations but however shows significant difference (X2=12.074) in the benefits achieved by respondents in the two organizations, such benefits include: increased quantity of Crop produced, farm income, skill acquisition, and improved Education in private extension organizations. Based on this result, it could be inferred that beneficiaries generally preferred private extension organizations because of their effectiveness and vibrancy in programme administration. Public extension is therefore recommended for general overhauling and possibly “merging” of public and private sectors in order to cater for teeming population of farmers demanding for efficient and functional extension services to better their lots both in production and processing.

Keywords: public and private involvement, extension services, farmers’ preferences, Kruskal Wallis Test

Procedia PDF Downloads 304
6488 Conflicts of Interest in the Private Sector and the Significance of the Public Interest Test

Authors: Opemiposi Adegbulu

Abstract:

Conflicts of interest is an elusive, diverse and engaging subject, a cross-cutting problem of governance; all levels of governance, ranging from local to global, public to corporate or financial sectors. In all these areas, its mismanagement could lead to the distortion of decision-making processes, corrosion of trust and the weakening of administration. According to Professor Peters, an expert in the area, conflict of interest, a problem at the root of many scandals has “become a pervasive ethical concern in our professional, organisational, and political life”. Conflicts of interest corrode trust, and like in the public sector, trust is mandatory for the market, consumers/clients, shareholders and other stakeholders in the private sector. However, conflicts of interest in the private sector are distinct and must be treated in like manner when regulatory efforts are made to address them. The research looks at identifying conflicts of interest in the private sector and differentiating them from those in the public sector. The public interest is submitted as a criterion which allows for such differentiation. This is significant because it would for the use of tailor-made or sector-specific approaches to addressing this complex issue. This is conducted through extensive review of literature and theories on the definition of conflicts of interest. This study will employ theoretical, doctrinal and comparative methods. The nature of conflicts of interest in the private sector will be explored, through an analysis of the public sector where the notion of conflicts of interest appears more clearly identified, reasons, why they are of business ethics concern, will be advanced, and then, once again, looking at public sector solutions and other solutions, the study will identify ways of mitigating and managing conflicts in the private sector. An exploration of public sector conflicts of interest and solutions will be carried out because the typologies of conflicts of interest in both sectors appear very similar at the core and thus, lessons can be learnt with regards to the management of these issues in the private sector. Conflicts of interest corrode trust, and like in the public sector, trust is mandatory for the market, consumers/clients, shareholders and other stakeholders in the private sector. This research will then focus on some specific challenges to understanding and identifying conflicts of interest in the private sector; origin, diverging theories, the psychological barrier to the definition, similarities with public sector conflicts of interest due to the notions of corrosion of trust, ‘being in a particular kind of situation,’ etc. The notion of public interest will be submitted as a key element at the heart of the distinction between public sector and private sector conflicts of interests. It will then be proposed that the appreciation of the notion of conflicts of interest differ according to sector, country to country, based on the public interest test, using the United Kingdom (UK), the United States of America (US), France and the Philippines as illustrations.

Keywords: conflicts of interest, corporate governance, global governance, public interest

Procedia PDF Downloads 361
6487 A Framework for Analyzing Public Interaction of Saudi Universities on Twitter

Authors: Sahar Al-Qahtani, Rabeeh Ayaz Abbasi, Naif Radi Aljohani

Abstract:

Many universities use social media platforms as new communication channels to disseminate information and promptly communicate with their audience. As Twitter is one of the widely used social media platforms, this research aims to explore the adaption and utilization of Twitter by universities. We propose a framework called 'Social Network Analysis for Universities on Twitter' (SNAUT) to analyze the usage of Twitter by universities and to measure their interaction with public. The study includes a sample of around 110,000 tweets from 36 Saudi universities, including both public and private universities. Using SNAUT, we can (1) investigate the purpose of using Twitter by universities, (2) determine the broad topics discussed by them, and (3) identify the groups closely associated with the universities. The results show that most of the Saudi universities (whether public or private) actively use Twitter. Results also reveal that public universities respond to public queries more frequently, but private universities stand out more in terms of information dissemination using retweets and diverse hashtags. Finally, we develop a ranking mechanism in SNAUT for ranking universities based on their social interaction with the public on Twitter.

Keywords: social media, twitter, social network analysis, universities, higher education, Saudi Arabia

Procedia PDF Downloads 103
6486 Comparative Analysis of Teachers’ Performance in Private and Public Primary Schools in Oyo State

Authors: Babajide Solomon Faloore

Abstract:

This study on the comparative analysis of the performance of teachers in private and public schools was carried out in Ibadan North West Local Government Area of Oyo State. This study examined the justification for the claim that there is a difference in the performance of teachers in private and public primary schools and at the same time identified factors responsible for the difference in the performance of these teachers. A descriptive survey research design was used for the study. Data generated were analyzed using t-test and regression analysis. The findings of the study revealed that there is significance difference in the performance of teachers in private and private primary schools in Ibadan North West Local Government Area of Oyo State( t=64.09; df=459; p,.05). The findings also revealed that the method of teaching in private primary schools is significantly different from the method of teaching in public primary schools in Ibadan North West Local Government Area of Oyo State (t=73.08; df=459; p,.05). Findings revealed that school leadership and management have a significant contribution on the performance of private and public primary school teachers in Ibadan North West Local Area of Oyo State. Based on the finding, the following recommendations were made: Primary school teachers need to be motivated and rewarded for excellent performance. Primary schools should be properly equipped with teaching–aid facilities, laboratories, and libraries. The government should use the findings of this study to improve on teaching materials provided to the primary school teachers in Nigeria. Public primary schools should be designed by education planners, administrators, and government. Headmasters, proprietors, and teachers of primary schools should look inward and give a performance appraisal and evaluation of themselves from time to time based on the subject they taught. Finally, school administrators should be conscious of the way they manage the teachers in schools not only in informal situations but also in formal settings.

Keywords: private education, public education, school leadership, school management, teachers performance

Procedia PDF Downloads 354
6485 Impacts of Public Insurance on Health Access and Outcomes: Evidence from India

Authors: Titir Bhattacharya, Tanika Chakraborty, Prabal K. De

Abstract:

Maternal and child health continue to be a significant policy focus in developing countries, including India. An emerging model in health care is the creation of public and private partnerships. Since the construction of physical infrastructure is costly, governments at various levels have tried to implement social health insurance schemes where a trust calculates insurance premiums and medical payments. Typically, qualifying families get full subsidization of the premium and get access to private hospitals, in addition to low cost public hospitals, for their tertiary care needs. We analyze one such pioneering social insurance scheme in the Indian state of Andhra Pradesh (AP). The Rajiv Aarogyasri program (RA) was introduced by the Government of AP on a pilot basis in 2007 and implemented in 2008. In this paper, we first examine the extent to which access to reproductive health care changed. For example, the RA scheme reimburses hospital deliveries leading us to expect an increase in institutional deliveries, particularly in private hospitals. Second, we expect an increase in institutional deliveries to also improve child health outcomes. Hence, we estimate if the program improved infant and child mortality. We use District Level Health Survey data to create annual birth cohorts from 2000-2015. Since AP was the only state in which such a state insurance program was implemented, the neighboring states constituted a plausible control group. Combined with the policy timing, and the year of birth, we employ a difference-indifference strategy to identify the effects of RA on the residents of AP. We perform several checks against threats to identification, including testing for pre-treatment trends between the treatment and control states. We find that the policy significantly lowered infant and child mortality in AP. We also find that deliveries in private hospitals increased, and government hospitals decreased, showing a substitution effect of the relative price change. Finally, as expected, out-of-pocket costs declined for the treatment group. However, we do not find any significant effects for usual preventive care such as vaccination, showing that benefits of insurance schemes targeted at the tertiary level may not trickle down to the primary care level.

Keywords: public health insurance, maternal and child health, public-private choice

Procedia PDF Downloads 45
6484 Comparative Analysis of Teachers’ Performance in Private and Public Primary Schools in Oyo State, Nigeria

Authors: Oyetunji John Adenuga

Abstract:

This study on the comparative analysis of the performance of teachers in private and public schools was carried out in Ibadan North West Local Government Area of Oyo State. This study examined the justification for the claim that there is difference in the performance of teachers in private and public primary schools and at the same time identified factors responsible for the difference in the performance of these teachers. A descriptive survey research design was used for the study. Data generated were analysed using t-test and regression analysis. The findings of the study revealed that there is significant difference in the performance of teachers in private and private primary schools in Ibadan North West Local Government Area of Oyo State (t=64.09; df=459; p,.05). The findings also revealed that the method of teaching in private primary schools is significantly different from the method of teaching in public primary schools in Ibadan North West Local Government Area of Oyo State (t=73.08; df=459; p,.05). Findings revealed that school leadership and management have significant contribution on the performance of private and public primary school teachers in Ibadan North West Local Area of Oyo State. Based on the finding, the following recommendations were made: Primary school teachers need to be motivated and rewarded for excellent performance. Primary schools should be properly equipped with teaching-aid facilities, laboratories and libraries. Government should use the findings of this study to improve on teaching materials provided to the primary school teachers in Nigeria. Public primary schools should be designed by education planners, administrators and government. Headmasters, proprietors and teachers of primary schools should look inward and give a performance appraisal and evaluation of themselves form time to time based on subject they taught. Finally, school administrators should be conscious of the way they manage the teachers in schools not only in informal situations but also in formal settings.

Keywords: private education, public education, school leadership, school management, teachers performance

Procedia PDF Downloads 308
6483 Analysis of Farmer's Involvement in Public and Private Extension Services in Southwestern Nigeria

Authors: S. O. Ayansina, R. A. Oyeyinka, K. K. Bolarinwa

Abstract:

There is an increasing demand for a functional extension delivery services in Nigeria with a view to meet up with the food and fiber needs of the ever growing population of human and animal respectively. This study was designed to examine farmers’ involvement in public and private extension services in southwestern Nigeria, specifically to explore the farmers’ participation in the two types of organizations involved. It also evaluates the performances of personnel in the organizations. A multi-stage random sampling technique was used to select 30 respondents from each of the three selected organizations in Ogun, Osun and Oyo states in Southwestern Nigeria. Data was collected with interview schedule and analyzed both at descriptive and inferential levels. Kruskal Wallis one-way Analysis of variance was used to test the differences between the participation of beneficiaries who are farmers under the public and private extension services and the level of benefit accrued to them from the various extension organizations involved in the study. Results revealed that private extension organizations were performing better and were more preferred by the beneficiaries. Results of the tested hypotheses as shown by Kruskal Wallis test of difference (x2 = 0.709) S no significant difference between farmers’ participation in the extension services of public and private organizations but however showed significant difference (X2 =12.074) in the benefits achieved by respondents in the two organizations. These include: increased quantity of crop produced, farm income, skill acquisition, and improved education in private extension organizations. Based on this result, it could be inferred that beneficiaries generally preferred private extension organizations because of their effectiveness and vibrancy in programme administration. Public extension is therefore recommended for general overhauling and possibly privatization in order to cater for teeming population of farmers demanding for efficient and functional extension services to better their lots in production, processing and marketing of agricultural produce.

Keywords: public and private involvement, extension services, farmers' participation

Procedia PDF Downloads 375
6482 Public-Private Partnership for Community Empowerment and Sustainability: Exploring Save the Children’s 'School Me' Project in West Africa

Authors: Gae Hee Song

Abstract:

This paper aims to address the evolution of public-private partnerships for mainstreaming an evaluation approach in the community-based education project. It examines the distinctive features of Save the Children’s School Me project in terms of empowerment evaluation principles introduced by David M. Fetterman, especially community ownership, capacity building, and organizational learning. School Me is a Save the Children Korea funded-project, having been implemented in Cote d’Ivoire and Sierra Leone since 2016. The objective of this project is to reduce gender-based disparities in school completion and learning outcomes by creating an empowering learning environment for girls and boys. Both quasi-experimental and experimental methods for impact evaluation have been used to explore changes in learning outcomes, gender attitudes, and learning environments. To locate School Me in the public-private partnership framework for community empowerment and sustainability, the data have been collected from School Me progress/final reports, baseline, and endline reports, fieldwork observations, inter-rater reliability of baseline and endline data collected from a total of 75 schools in Cote d’Ivoire and Sierra Leone. The findings of this study show that School Me project has a significant evaluation component, including qualitative exploratory research, participatory monitoring, and impact evaluation. It strongly encourages key actors, girls, boys, parents, teachers, community leaders, and local education authorities, to participate in the collection and interpretation of data. For example, 45 community volunteers collected baseline data in Cote d’Ivoire; on the other hand, three local government officers and fourteen enumerators participated in the follow-up data collection of Sierra Leone. Not only does this public-private partnership improve local government and community members’ knowledge and skills of monitoring and evaluation, but the evaluative findings also help them find their own problems and solutions with a strong sense of community ownership. Such community empowerment enables Save the Children country offices and member offices to gain invaluable experiences and lessons learned. As a result, empowerment evaluation leads to community-oriented governance and the sustainability of the School Me project.

Keywords: community empowerment, Cote d’Ivoire, empowerment evaluation, public-private partnership, save the children, school me, Sierra Leone, sustainability

Procedia PDF Downloads 100
6481 Social Impact Bonds in the US Context

Authors: Paula M. Lantz

Abstract:

In the United States, significant socioeconomic and racial inequalities exist in many population-based indicators of health and social welfare. Although a number of effective prevention programs and interventions are available, local and state governments often do not pursue prevention in the face of budgetary constraints and more acute problems. There is growing interest in and excitement about Pay for Success” (PFS) strategies, also referred to as social impact bonds, as an approach to financing and implementing promising prevention programs and services that help the public sector either save money or achieve greater value for an investment. The PFS finance model implements evidence-based interventions using capital from investors who only receive a return on their investment from the government if agreed-upon, measurable outcomes are achieved. This paper discusses the current landscape regarding social impact bonds in the U.S., and their potential and challenges in addressing serious health and social problems. The paper presents an analysis of a number of social science issues that are fundamental to the potential for social impact bonds to successfully address social inequalities in health and social welfare. This includes: a) the economics of the intervention and a potential public payout; b) organizational and management issues in intervention implementation; c) evaluation research design and methods; d) legal/regulatory issues in public payouts to investors; e) ethical issues in the design of social impact bond deals and their evaluation; and f) political issues. Despite significant challenges in the U.S. context, there is great potential for social impact bonds as a type of social impact investing to encourage private investments in evidence-based interventions that address important public health and social problems in underserved populations and provide a return on investment.

Keywords: pay for success, public/private partnerships, social impact bonds, social impact investing

Procedia PDF Downloads 272
6480 Impact of Sovereign Debt Risk and Corrective Austerity Measures on Private Sector Borrowing Cost in Euro Zone

Authors: Syed Noaman Shah

Abstract:

The current paper evaluates the effect of external public debt risk on the borrowing cost of private non-financial firms in euro zone. Further, the study also treats the impact of austerity measures on syndicated-loan spreads of private firm followed by euro area member states to revive the economic growth in the region. To test these hypotheses, we follow multivariate ordinary least square estimation method to assess the effect of external public debt on the borrowing cost of private firms. By using foreign syndicated-loan issuance data of non-financial private firms from 2005 to 2011, we attempt to gauge how the private financing cost varies with high levels of sovereign external debt prevalent in the euro zone. Our results suggest significant effect of external public debt on the borrowing cost of private firm. In particular, an increase in external public debt by one standard deviation from its sample mean raises syndicated-loan spread by 89 bps. Furthermore, weak creditor rights protection prevalent in member states deepens this effect. However, we do not find any significant effect of domestic public debt on the private sector borrowing cost. In addition, the results show significant effect of austerity measures on private financing cost, both in normal and in crisis period in the euro zone. In particular, one standard deviation change in fiscal consolidation conditional mean reduces the syndicated-loan spread by 22 bps. In turn, it indicates strong presence of credibility channel due to austerity measures in euro area region.

Keywords: corporate debt, fiscal consolidation, sovereign debt, syndicated-loan spread

Procedia PDF Downloads 373
6479 A Study on Websites of Public and Private Hospitals in Konya

Authors: H. Nur Görkemli, Mehmet Fidan

Abstract:

After the first acquaintance with internet in April 1993, number of internet users increased rapidly in Turkey. According to Turkish Statistical Institute’s 2013 data, internet usage in Turkey between 16-74 age group is 48,9%. Hospitals are one of the areas where internet is being intensively used like many other businesses. As a part of public relations application, websites are important tools for hospitals to reach a wide range of target audience within and outside the organization. With their websites, hospitals have opportunities to give information about their organization, strengthen their image, compete with their rivals, interact with shareholders, reflect their transparency and meet with new audiences. This study examines web sites of totally 31 hospitals which are located in Konya. Institutions are categorized as public and private hospitals and then three main research categories are determined: content, visual and technical. Main and sub categories are examined by using content analysis method. Results are interpreted in terms of public and private institutions.

Keywords: websites, hospital, health communication, internet, webpages

Procedia PDF Downloads 349
6478 Public-Private Partnership Transportation Projects: An Exploratory Study in the US

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.

Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation

Procedia PDF Downloads 140
6477 Strategic Partnerships for Sustainable Tourism Development in Papua New Guinea

Authors: Zainab Olabisi Tairu

Abstract:

Strategic partnerships are a core requirement in delivering sustainable tourism for development in developing nations like Papua New Guinea. This paper unveils the strategic partnerships for sustainable tourism development in Papua New Guinea. Much emphasis is made among tourism stakeholders, on the importance of strategic partnership and positioning in developing sustainable tourism development. This paper engages stakeholders’ ecotourism differentiation and power relations in the discussion of the paper through interviews and observations with tourism stakeholders in Papua New Guinea. Collaborative approaches in terms of sustaining the tourism industry, having a milestone of achieved plans, are needed for tourism growth and development. This paper adds a new insight to the body of knowledge on stakeholders’ identification, formation, power relations and an integrated approach to successful tourism development. In order to achieve responsible tourism planning and management outcomes, partnerships must be holistic in perspective and based on sustainable development principles.

Keywords: stakeholders, sustainable tourism, Papua New Guinea, partnerships

Procedia PDF Downloads 624
6476 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 153
6475 Student Researchers and Industry Partnerships Improve Health Management with Data Driven Decisions

Authors: Carole A. South-Winter

Abstract:

Research-based learning gives students the opportunity to experience problems that require critical thinking and idea development. The skills they gain in working through these problems 'hands-on,' develop into attributes that benefit their careers in the professional field. The partnerships developed between students and industries give advantages to both sides. The students gain knowledge and skills that will increase their likelihood of success in the future and the industries are given research on new advancements that will give them a competitive advantage in their given field of work. The future of these partnerships is dependent on the success of current programs, enabling the enhancement and improvement of the research efforts. Once more students can complete research, there will be an increase in reliability of the results for each industry. The overall goal is to continue the support for research-based learning and the partnerships formed between students and industries.

Keywords: global healthcare, industry partnerships, research-driven decisions, short-term study abroad

Procedia PDF Downloads 92
6474 Message Authentication Scheme for Vehicular Ad-Hoc Networks under Sparse RSUs Environment

Authors: Wen Shyong Hsieh, Chih Hsueh Lin

Abstract:

In this paper, we combine the concepts of chameleon hash function (CHF) and identification based cryptography (IBC) to build a message authentication environment for VANET under sparse RSUs. Based on the CHF, TA keeps two common secrets that will be embedded to all identities to be as the evidence of mutual trusting. TA will issue one original identity to every RSU and vehicle. An identity contains one public ID and one private key. The public ID, includes three components: pseudonym, random key, and public key, is used to present one entity and can be verified to be a legal one. The private key is used to claim the ownership of the public ID. Based on the concept of IBC, without any negotiating process, a CHF pairing key multiplied by one private key and other’s public key will be used for mutually trusting and to be utilized as the session key of secure communicating between RSUs and vehicles. To help the vehicles to do message authenticating, the RSUs are assigned to response the vehicle’s temple identity request using two short time secretes that are broadcasted by TA. To light the loading of request information, one day is divided into M time slots. At every time slot, TA will broadcast two short time secretes to all valid RSUs for that time slot. Any RSU can response the temple identity request from legal vehicles. With the collected announcement of public IDs from the neighbor vehicles, a vehicle can set up its neighboring set, which includes the information about the neighbor vehicle’s temple public ID and temple CHF pairing key that can be derived by the private key and neighbor’s public key and will be used to do message authenticating or secure communicating without the help of RSU.

Keywords: Internet of Vehicles (IOV), Vehicular Ad-hoc Networks (VANETs), Chameleon Hash Function (CHF), message authentication

Procedia PDF Downloads 359