10918 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.

Keywords: PPP, concession, infrastructure, construction

Procedia PDF Downloads 271
10917 Analysis of the Spatial Distribution of Public Girls’ and Boys’ Secondary Schools in Riyadh

Authors: Nasser Marshad Alzeer

Abstract:

This study examines the spatial distribution of secondary schools in Riyadh. It considers both public girls and boys sector provision and assesses the efficiency of the spatial distribution of secondary schools. Since the establishment of the Ministry of Education (MOE) in 1953 and General Presidency for Female Education, (GPFE) in 1960, there has been a great expansion of education services in Saudi Arabia, particularly during the 1980s. However, recent years have seen much slower rates of increase in the public education sector but the population continues to grow rapidly. This study investigates the spatial distribution of schools through the use of questionnaire surveys and applied GIS. Overall, the results indicate a shortage of public secondary schools, especially in the north of the city. It is clear that there is overcrowding in the majority of secondary schools. The establishment of new schools has been suggested to solve the problem of overcrowding. A number of socio-economic and demographic factors are associated with differences in the utilization of the public secondary schools. A GIS was applied in this study in order to assess the spatial distribution of secondary schools including the modification of existing catchment area boundaries and locating new schools. This modification could also reduce the pupil pressure on certain schools and further benefits could probably be gained.

Keywords: analysis, distribution, Saudi, GIS, schools

Procedia PDF Downloads 513
10916 Modern Methods of Construction (MMC): The Potentials and Challenges of Using Prefabrication Technology for Building Modern Houses in Afghanistan

Authors: Latif Karimi, Yasuhide Mochida

Abstract:

The purpose of this paper is to study Modern Methods of Construction (MMC); specifically, the prefabrication technology and check the applicability, suitability, and benefits of this construction technique over conventional methods for building new houses in Afghanistan. Construction industry and house building sector are a key contributor to Afghanistan’s economy. However, this sector is challenged with lack of innovation and severe impacts that it has on the environment due to huge amount of construction waste from building, demolition and or renovation activities. This paper studies the prefabrication technology, a popular MMC that is becoming more common, improving in quality and being available in a variety of budgets. Several feasibility studies worldwide have revealed that this method is the way forward in improving construction industry performance as it has been proven to reduce construction time, construction wastes and improve the environmental performance of the construction processes. In addition, this study emphasizes on 'sustainability' in-house building, since it is a common challenge in housing construction projects on a global scale. This challenge becomes more severe in the case of under-developed countries, like Afghanistan. Because, most of the houses are being built in the absence of a serious quality control mechanism and dismissive to basic requirements of sustainable houses; well-being, cost-effectiveness, minimization - prevention of wastes production during construction and use, and severe environmental impacts in view of a life cycle assessment. Methodology: A literature review and study of the conventional practices of building houses in urban areas of Afghanistan. A survey is also being completed to study the potentials and challenges of using prefabrication technology for building modern houses in the cities across the country. A residential housing project is selected for case study to determine the drawbacks of current construction methods vs. prefabrication technique for building a new house. Originality: There are little previous research available about MMC considering its specific impacts on sustainability related to house building practices. This study will be specifically of interest to a broad range of people, including planners, construction managers, builders, and house owners.

Keywords: modern methods of construction (MMC), prefabrication, prefab houses, sustainable construction, modern houses

Procedia PDF Downloads 222
10915 Territorial Analysis of the Public Transport Supply: Case Study of Recife City

Authors: Cláudia Alcoforado, Anabela Ribeiro

Abstract:

This paper is part of an ongoing PhD thesis. It seeks to develop a model to identify the spatial failures of the public transportation supply. In the construction of the model, it also seeks to detect the social needs arising from the disadvantage in transport. The case study is carried out for the Brazilian city of Recife. Currently, Recife has a population density of 7,039.64 inhabitants per km². Unfortunately, only 46.9% of urban households on public roads have adequate urbanization. Allied to this reality, the trend of the occupation of the poorest population is that of the peripheries, a fact that has been consolidated in Brazil and Latin America, thus burdening the families' income, since the greater the distances covered for the basic activities and consequently also the transport costs. In this way, there have been great impacts caused by the supply of public transportation to locations with low demand or lack of urban infrastructure. The model under construction uses methods such as Currie’s Gap Assessment associated with the London’s Public Transport Access Level, and the Public Transport Accessibility Index developed by Saghapour. It is intended to present the stage of the thesis with the spatial/need gaps of the neighborhoods of Recife already detected. The benefits of the geographic information system are used in this paper. It should be noted that gaps are determined from the transport supply indices. In this case, considering the presence of walking catchment areas. Still in relation to the detection of gaps, the relevant demand index is also determined. This, in turn, is calculated through indicators that reflect social needs. With the use of the smaller Brazilian geographical unit, the census sector, the model with the inclusion of population density in the study areas should present more consolidated results. Based on the results achieved, an analysis of transportation disadvantage will be carried out as a factor of social exclusion in the study area. It is anticipated that the results obtained up to the present moment, already indicate a strong trend of public transportation in areas of higher income classes, leading to the understanding that the most disadvantaged population migrates to those neighborhoods in search of employment.

Keywords: gap assessment, public transport supply, social exclusion, spatial gaps

Procedia PDF Downloads 146
10914 Smart Construction Sites in KSA: Challenges and Prospects

Authors: Ahmad Mohammad Sharqi, Mohamed Hechmi El Ouni, Saleh Alsulamy

Abstract:

Due to the emerging technologies revolution worldwide, the need to exploit and employ innovative technologies for other functions and purposes in different aspects has become a remarkable matter. Saudi Arabia is considered one of the most powerful economic countries in the world, where the construction sector participates effectively in its economy. Thus, the construction sector in KSA should convoy the rapid digital revolution and transformation and implement smart devices on sites. A Smart Construction Site (SCS) includes smart devices, artificial intelligence, the internet of things, augmented reality, building information modeling, geographical information systems, and cloud information. This paper aims to study the level of implementation of SCS in KSA, analyze the obstacles and challenges of adopting SCS and find out critical success factors for its implementation. A survey of close-ended questions (scale and multi-choices) has been conducted on professionals in the construction sector of Saudi Arabia. A total number of twenty-nine questions has been prepared for respondents. Twenty-four scale questions were established, and those questions were categorized into several themes: quality, scheduling, cost, occupational safety and health, technologies and applications, and general perception. Consequently, the 5-point Likert scale tool (very low to very high) was adopted for this survey. In addition, five close-ended questions with multi-choice types have also been prepared; these questions have been derived from a previous study implemented in the United Kingdom (UK) and the Dominic Republic (DR), these questions have been rearranged and organized to fit the structured survey in order to place the Kingdom of Saudi Arabia in comparison with the United Kingdom (UK) as well as the Dominican Republic (DR). A total number of one hundred respondents have participated in this survey from all regions of the Kingdom of Saudi Arabia: southern, central, western, eastern, and northern regions. The drivers, obstacles, and success factors for implementing smart devices and technologies in KSA’s construction sector have been investigated and analyzed. Besides, it has been concluded that KSA is on the right path toward adopting smart construction sites with attractive results comparable to and even better than the UK in some factors.

Keywords: artificial intelligence, construction projects management, internet of things, smart construction sites, smart devices

Procedia PDF Downloads 110
10913 Assessing the Role of Water Research and Development Investment towards Water Security in South Africa: During the Five Years Period (2009/10 - 2013/14)

Authors: Hlamulo Makelane

Abstract:

The study aims at providing new insights regarding research and development (R&D) public and private activities based on the national R&D survey of the past five years. The main question of the study is what role does water R&D plays on water security; to then analyze what lessons could be extracted to improve the security of water through R&D. In particular, this work concentrates on three main aspects of R&D investments: (i) the level of expenditures, (ii) the sources of funding related to water R&D, and (iii) the personnel working in the field, both for the public and private sectors. The nonlinear regression approached will be used for data analysis based on secondary data gathered from the South African nation R&D survey conducted annually by the Centre for science, technology and innovation indicators (CeSTII).

Keywords: water, R&D, investment, public sector, private sector

Procedia PDF Downloads 205
10912 Role of Higher Education Commission (HEC) in Strengthening the Academia and Industry Relationships: The Case of Pakistan

Authors: Shah Awan, Fahad Sultan, Shahid Jan Kakakhel

Abstract:

Higher education in the 21st century has been faced with game-changing developments impacting teaching and learning and also strengthening the academia and industry relationship. The academia and industry relationship plays a key role in economic development in developed, developing and emerging economies. The partnership not only explores innovation but also provide a real time experience of the theoretical knowledge. For this purpose, the paper assessing the role of HEC in the Pakistan and discusses the way in academia and industry contribute their role in improving Pakistani economy. Successive studies have reported the importance of innovation and technology , research development initiatives in public sector universities, and the significance of role of higher education commission in strengthening the academia and industrial relationship to improve performance and minimize failure. The paper presents the results of interviews conducted, using semi-structured interviews amongst 26 staff members of two public sector universities, higher education commission and managers from corporate sector.The study shows public sector universities face the several barriers in developing economy like Pakistan, to establish the successful collaboration between universities and industry. Of the participants interviewed, HEC provides an insufficient road map to improve organisational capabilities in facilitating and enhance the performance. The results of this study have demonstrated that HEC has to embrace and internalize support to industry and public sector universities to compete in the era of globalization. Publication of this research paper will help higher education sector to further strengthen research sector through industry and university collaboration. The research findings corroborate the findings of Dooley and Kirk who highlights the features of university-industry collaboration. Enhanced communication has implications for the quality of the product and human resource. Crucial for developing economies, feasible organisational design and framework is essential for the university-industry relationship.

Keywords: higher education commission, role, academia and industry relationship, Pakistan

Procedia PDF Downloads 431
10911 The Implementation of Human Resource Information System in the Public Sector: An Exploratory Study of Perceived Benefits and Challenges

Authors: Aneeqa Suhail, Shabana Naveed

Abstract:

The public sector (in both developed and developing countries) has gone through various waves of radical reforms in recent decades. In Pakistan, under the influence of New Public Management(NPM) Reforms; best practices of private sector are introduced in the public sector to modernize public organizations. Human Resource Information System (HRIS) has been popular in the private sector and proven to be a successful system, therefore it is being adopted in the public sector too. However, implementation of private business practices in public organizations us very challenging due to differences in context. This implementation gets further critical in Pakistan due to a centralizing tendency and lack of autonomy in public organizations. Adoption of HRIS by public organizations in Pakistan raises several questions: What challenges are faced by public organizations in implementation of HRIS? Are benefits of HRIS such as efficiency, process integration and cost reduction achieved? How is the previous system improved with this change and what are the impacts? Yet, it is an under-researched topic, especially in public enterprises. This study contributes to the existing body of knowledge by empirically exploring benefits and challenges of implementation of HRIS in public organizations. The research adopts a case study approach and uses qualitative data based on in-depth interviews conducted at various levels in the hierarchy including top management, departmental heads and employees. The unit of analysis is LESCO, the Lahore Electric Supply Company, a state-owned entity that generates, transmits and distributes electricity to 4 big cities in Punjab, Pakistan. The findings of the study show that LESCO has not achieved the benefits of HRIS as established in literature. The implementation process remained quite slow and costly. Various functions of HR are still in isolation and integration is a big challenge for the organization. Although the data is automated, the previous system of manually record maintenance and paperwork is still in work, resulting in the presence of parallel practices. The findings also identified resistance to change from top management and labor workforce, lack of commitment and technical knowledge, and costly vendors as major barriers that affect the effective implementation of HRIS. The paper suggests some potential actions to overcome these barriers and to enhance effective implementation of HR-technology. The findings are explained in light of an institutional logics perspective. HRIS’ new logic of automated and integrated HR system is in sharp contrast with the prevailing logic of process-oriented manual data maintenance, leading to resistance to change and deadlock.

Keywords: human resource information system, technological changes, state-owned enterprise, implementation challenges

Procedia PDF Downloads 120
10910 Improving Knowledge Management Practices in the South African Healthcare System

Authors: Kgabo H. Badimo, Sheryl Buckley

Abstract:

Knowledge is increasingly recognised in this, the knowledge era, as a strategic resource, by public sector organisations, in view of the public sector reform initiatives. People and knowledge play a vital role in attaining improved organisational performance and high service quality. Many government departments in the public sector have started to realise the importance of knowledge management in streamlining their operations and processes. This study focused on knowledge management in the public healthcare service organisations, where the concept of service provider competitiveness pales to insignificance, considering the huge challenges emanating from the healthcare and public sector reforms. Many government departments are faced with challenges of improving organisational performance and service delivery, improving accountability, making informed decisions, capturing the knowledge of the aging workforce, and enhancing partnerships with stakeholders. The purpose of this paper is to examine the knowledge management practices of the Gauteng Department of Health in South Africa, in order to understand how knowledge management practices influence improvement in organisational performance and healthcare service delivery. This issue is explored through a review of literature on dominant views on knowledge management and healthcare service delivery, as well as results of interviews with, and questionnaire responses from, the general staff of the Gauteng Department of Health. Web-based questionnaires, face-to-face interviews and organisational documents were used to collect data. The data were analysed using both the quantitative and qualitative methods. The central question investigated was: To what extent can the conditions required for successful knowledge management be observed, in order to improve organisational performance and healthcare service delivery in the Gauteng Department of Health. The findings showed that the elements of knowledge management capabilities investigated in this study, namely knowledge creation, knowledge sharing and knowledge application, have a positive, significant relationship with all measures of organisational performance and healthcare service delivery. These findings thus indicate that by employing knowledge management principles, the Gauteng Department of Health could improve its ability to achieve its operational goals and objectives, and solve organisational and healthcare challenges, thereby improving organisational.

Keywords: knowledge management, Healthcare Service Delivery, public healthcare, public sector

Procedia PDF Downloads 237
10909 The Relationship between Citizens’ Perception of Public Officials’ Ethical Performance and Public Trust in the Government in Egypt

Authors: Nevine Henry Wasef

Abstract:

The research discusses how Egyptian citizens perceive the performance of public sector officials, particularly the ethical values manifested in their behavior. It aims at answering the question of how Egyptian citizens’ perception of public officials affects citizens' trust in the government at large and the process of public service delivery specifically. The hypothesis is that public opinion about civil servants’ ethical values would be proportional to citizens’ trust in the government, which means that the more citizens regard administrators with high ethical standards, the higher trust in the government they would have and vice versa. The research would focus on the independent variable of trust in the government and the dependent variable of public perception of administrators’ ethical performance. The data would be collected through surveys designed to measure the public evaluation of public officials they are interacting with and the quality of services delivered to them. The study concludes that implementing ethical values in public administration has a crucial role in improving citizens’ trust in the government based on various case studies of governments that successfully adopted ethical training programs for their civil servants.

Keywords: trust, distrust, ethics, performance, integrity, values, public service

Procedia PDF Downloads 56
10908 The Concept and Practice of Good Governance in the European Union

Authors: Robert Grzeszczak

Abstract:

The article deals with one of the most significant issues concerning the functioning of the public sector in the European Union. The objectives of good governance were formulated by the EU itself and also the Scholars in reaction to the discussion that started a decade ago and concerned the role of the government in 21st century, the future of integration processes and globalization challenges in Europe. Currently, the concept of good governance is mainly associated with the improvement of management of public policies in the European Union, concerning both domestic and EU policies. However, it goes beyond the issues of state capacity and effectiveness of management. Good governance relates also to societal participation in the public administration and verification of decisions made in public authorities’ (including public administration). Indirectly, the concept and practice of good governance are connected to societal legitimisation of public bodies in the European Union.

Keywords: good governance, government, European law, European Union

Procedia PDF Downloads 531
10907 Introduction of Knowledge Management in a Public Sector Organization in India

Authors: Siddharth Vashisth, Varun Mathur

Abstract:

This review provides an overview of the impact that implementation of various Knowledge Management (KM) strategies has had on the growth of a department in a Public Sector Company in India. In a regulated utility controlled by the government, the growth of an organization such as Hindustan Petroleum Corporation Limited (HPCL) had depended largely on the efficiencies of the systems and its people. However, subsequent to the de-regularization & to the entry of the private competition, the need for a ‘systematic templating’ of knowledge was recognized. This necessitated the introduction of Knowledge Management Centre (KMC). Projects & Pipelines Department (P&P) of HPCL introduced KMC that contributed significantly towards KM by adopting various strategies such as standardization, leveraging information system, competency enhancement, and improvements & innovations. These strategies gave both tangible as well as intangible benefits towards KM. Knowledge, technology & people are the three pillars that need to be catered for effective knowledge management in any organization. In HPCL, the initiative of KMC has served as an intermediary between these three major pillars as each activity of the strategy was centered on them and contributed significantly to their growth and up-gradation, ensuring overall growth of KM in the department.

Keywords: knowledge, knowledge management, public sector organization, standardization, technology, people, skill, information system, innovation, competency, impact

Procedia PDF Downloads 416
10906 The Relationship between Public Relations and Media Relations: The Case of Hotel Enterprises

Authors: Burcu Oksuz, Volkan Altıintas, Zulfiye Acar Senturk

Abstract:

Though in the academic literature, it is emphasized that Public Relations (PR) should not be seen only as media relations, in practise, the media relations has a very dominant position at the communication studies carried out by many companies. There are many PR practitioners who have journalism background. However the number of the practitioners who have started to work in the sector after having PR education at the universities has been highly increasing. Therefore, it can be said that previous journalist dominance has diminished at the public relations sector in Turkey. However, by virtue of the fact that some companies and practitioners consider the media coverage the first priority of PR, this much is certain that the dominant position of media relations is ongoing. On the other hand, still many companies measure the success of their PR by how much place their companies have taken. This situation creates major pressure on the PR practitioners to have close relations with the media members and to make them write articles about their companies. Thereupon, PR practitioners have to take the time for the media relations and the media relations comes into prominence more than the other PR functions. The aim of this study is to reveal the PR functions at the companies and to evaluate the position of the media relations in the PR studies. Therefore, it is aimed to find out at what extend the discourse of “Public relations is not media relations” is accepted in practice and actualised. Accordingly, a research about 15 hotel enterprises which are located in the city of İzmir will be carried out. İzmir as one of the most important tourism destinations has many hotels. The PR/corporate communications managers will be interviewed profoundly within the scope of this study and PR functions performed by hotels will be discussed in details in consideration of the datum obtained.

Keywords: media relations, public relations, public relations practitioners, Turkey

Procedia PDF Downloads 355
10905 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments

Authors: Ahmad Baghdadi, Mohammed Kishk

Abstract:

Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.

Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia

Procedia PDF Downloads 516
10904 Managing Construction Wastes in Nigeria for Sustainable Development

Authors: Ezekiel Ejiofor Nnadi

Abstract:

Nigeria construction industry is known for its active construction activities. This has earmarked the industry to be the key to economic growth of the nation. It has largest employer of labour and gives sustenance to other industries like manufacturing industry. While this is a sign of growth and prosperity; the waste generated by the industry has always been a problem and a serious concern. It results in wastage of economic gain and has resultant health effect on the populace apart from injury being sustained on sites. This work provides a platform to learn more about construction waste, its management strategy and how to reduce waste production in Nigeria construction industry. Construction sites, waste management authority and public health institutions in Lagos as the centre of most construction activities in Nigeria were selected, and a set of questionnaire was administered to using the systematic sampling technique. Descriptive statistics and relative importance index (RII) technique were employed for the analysis of the data gathered. The findings of the analysis show that excessive wastes reduce contractors’ profit margin and also that some construction wastes contain hazardous and toxic elements such as lead, asbestos or radioactive materials which required proper handling and effective disposal. The conclusion was drawn that the check on waste on construction sites starts with the designers to the contractors who execute on site.

Keywords: construction cost, construction industry, economic growth, materials wastes

Procedia PDF Downloads 245
10903 Public-Public Partnership and Tourism Development Strategy: The Case of Municipality of Gazi Baba in Macedonia

Authors: Dejan Metodijeski, Elizabeta Mitreva, Nako Taskov, Oliver Filiposki

Abstract:

Tourism development strategies are an important link in the tourism policy that is used to make its management better and easier. A public-public partnership (PUP) is a partnership between two or more public authorities or between a public authority and any non-profit organization with the goal of providing services and facilities or transferring technical skills. The paper presents this kind of partnership between two public authorities in Macedonia, the Municipality of Gazi Baba on one hand, and the University of Goce Delcev on the other. The main idea of this partnership is the development of a tourism strategy for the Municipality of Gazi Baba by the University on one side, and on the other, the construction of a mini park in the court of the University by the Municipality. This paper presents the causes and analyzes the procedures relating to this partnership and the methodology of the tourism development strategy. It contains a relevant literature review related to PUPs and tourism development strategy. The results and benefits of this partnership are presented with figures.

Keywords: public-public partnership, tourism development strategy, municipality of Gazi Baba, Macedonia

Procedia PDF Downloads 329
10902 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 345
10901 Neural Network Models for Actual Cost and Actual Duration Estimation in Construction Projects: Findings from Greece

Authors: Panagiotis Karadimos, Leonidas Anthopoulos

Abstract:

Predicting the actual cost and duration in construction projects concern a continuous and existing problem for the construction sector. This paper addresses this problem with modern methods and data available from past public construction projects. 39 bridge projects, constructed in Greece, with a similar type of available data were examined. Considering each project’s attributes with the actual cost and the actual duration, correlation analysis is performed and the most appropriate predictive project variables are defined. Additionally, the most efficient subgroup of variables is selected with the use of the WEKA application, through its attribute selection function. The selected variables are used as input neurons for neural network models through correlation analysis. For constructing neural network models, the application FANN Tool is used. The optimum neural network model, for predicting the actual cost, produced a mean squared error with a value of 3.84886e-05 and it was based on the budgeted cost and the quantity of deck concrete. The optimum neural network model, for predicting the actual duration, produced a mean squared error with a value of 5.89463e-05 and it also was based on the budgeted cost and the amount of deck concrete.

Keywords: actual cost and duration, attribute selection, bridge construction, neural networks, predicting models, FANN TOOL, WEKA

Procedia PDF Downloads 109
10900 Investment Trend Analysis of Dhaka Stock Exchange: A Comparative Study

Authors: Azaz Zaman, Mirazur Rahman

Abstract:

Capital market is a crucial financial market place where companies and the government can raise long-term funds and, at the same time, investors get the opportunity to invest in the listed companies. Capital markets play a vital role not only in shifting the funds from surplus entity to deficit for investment, but also in the overall economic development of any developing country like Bangladesh. Being the first and biggest capital market of Bangladesh, Dhaka Stock Exchange (DSE) is the prime bourse of the country. The differences in the investment preference— among three broad categories of investors in DSE including individual investors, institutional investors, and government— are easily observed. Authors of this article have used five categories of investors such as sponsors or directors of the company, institutional investors, foreign investors, government, and the general public in order to present a comparative analysis of their investment patterns. Obtaining data on the percentage of investment by these five types of investors in different sectors from the DSE website, this study aims to analyze the sector-wise investment preference of these investors using August 2018 data. The study has found that the sponsors or directors of the company have the highest percentage of investment in the textile industry which is close to 16%. The Bangladesh government, as an investor, has the highest percentage of investment in the fuel & power sector, approximately 32%. It has also found that the mutual funds' sector is mostly financed by institutional investors, nearly 28%. Foreign investors have their most investments in the banking sector, which is close to 22%. It has also revealed that the textile sector is mostly financed by the general public, close to 17%. Nevertheless, general public, surprisingly, has the lowest percentage of investment in the telecommunication sector, which is 0.10%.

Keywords: stock market investment, Dhaka stock exchange, capital market, Bangladesh

Procedia PDF Downloads 93
10899 The Link between Strategic Sense-Making and Performance in Dubai Public Sector

Authors: Mohammad Rahman, Guy Burton, Megan Mathias

Abstract:

Strategic management as an organizational practice was adopted by the public sector in the New Public Management (NPM) era that began in most parts of the world in the 1980s. Strategy as a new public management concept was subscribed by governments in both developed and developing world, as they were persuaded that clearly defined vision, mission and goals, as well as programs and projects - aligned with the goals - could potentially help achieve government vision at the national level and organizational goals at the service-delivery level. The advocates for strategic management in the public sector saw an inherent link between strategy and performance, claiming that the implementation of organizational strategy has an effect on the overall performance of an organization. Arguably, many government entities that have failed in enhancing team and individual performance had poorly-designed strategy or weak strategy implementation. Another key argument about low-level performance is linked with lack of strategic sense-making and orientation by middle managers in particular. Scholars maintain that employees at all levels need to understand strategic management plan in order to facilitate its implementation. Therefore, involving employees (particularly the middle managers) from the beginning potentially helps an organization avoid the drop in performance, and on the contrary would increase their commitment. The United Arab Emirates (UAE) is well known for adopting public sector reform strategies and tools since the 1990s. This observation is contextually pertinent in the case of the Government of Dubai, which has provided a Strategy Execution Guide to all of its entities to achieve high level strategic success in service delivery. The Dubai public sector also adopts road maps for e-Government, Smart Dubai, Expo 2020, investment, environment, education, health and other sectors. Evidently, some of these strategies are bringing tangible (e.g. Smart Dubai transformation) results in a transformational manner. However, the amount of academic research and literature on the strategy process vis-à-vis staff performance in the Government of Dubai is limited. In this backdrop, this study examines how individual performance of public sector employees in Dubai is linked with their sense-making, engagement and orientation with strategy development and implementation processes. Based on a theoretical framework, this study will undertake a sample-based questionnaire survey amongst middle managers in Dubai public sector to (a) measure the level of engagement of middle managers in strategy development and implementation processes as perceived by them; (b) observe the organizational landscape in which role expectations are placed on middle managers; and (c) examine the impact of employee engagement in strategy development process and the conditions for role expectations on individual performance. The paper is expected to provide new insights on the interface between strategic sense-making and performance in order to contribute a better understanding of the current culture/practices of staff engagement in strategic management in the public sector of Dubai.

Keywords: employee performance, government of Dubai, middle managers, strategic sense-making

Procedia PDF Downloads 171
10898 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 327
10897 Labor Productivity and Organization Performance in Specialty Trade Construction: The Moderating Effect of Safety

Authors: Shalini Priyadarshini

Abstract:

The notion of performance measurement has held great appeal for the industry and research communities alike. This idea is also true for the construction sector, and some propose that performance measurement and productivity analysis are two separate management functions, where productivity is a subset of performance, the latter requiring comprehensive analysis of comparable factors. Labor productivity is considered one of the best indicators of production efficiency. The construction industry continues to account for a disproportionate share of injuries and illnesses despite adopting several technological and organizational interventions that promote worker safety. Specialty trades contractors typically complete a large fraction of work on any construction project, but insufficient body of work exists that address subcontractor safety and productivity issues. Literature review has revealed the possibility of a relation between productivity, safety and other factors and their links to project, organizational, task and industry performance. This research posits that there is an association between productivity and performance at project as well as organizational levels in the construction industry. Moreover, prior exploration of the importance of safety within the performance-productivity framework has been anecdotal at best. Using structured questionnaire survey and organization- and project level data, this study, which is a combination of cross-sectional and longitudinal research designs, addresses the identified research gap and models the relationship between productivity, safety, and performance with a focus on specialty trades in the construction sector. Statistical analysis is used to establish a correlation between the variables of interest. This research identifies the need for developing and maintaining productivity and safety logs for smaller businesses. Future studies can design and develop research to establish causal relationships between these variables.

Keywords: construction, safety, productivity, performance, specialty trades

Procedia PDF Downloads 248
10896 The Flypaper Effect and the Municipal Participation Fund in the Brazilian Public Sector

Authors: Lucas Oliveira Gomes Ferreira, André Luiz Marques Serrano

Abstract:

The fiscal decentralization driven by the 1988 Constitution was responsible for granting greater autonomy to Brazilian subnational entities, as states and municipalities were entrusted with greater responsibilities to provide local public goods and services. However, the revenues necessary to implement the new attributions are largely received through intergovernmental transfers and not by local tax collection. The literature points out that public spending increases more by receiving unconditional and nonmatching (lump sum) intergovernmental grants than by an increase in taxpayers' income. This effect, called the flypaper effect, happens because the funds received could be used to reduce local taxes, meaning an increase in the citizen's private income. However, they are applied in the public sector in the form of expenses. The present work investigates the existence of the flypaper effect in Brazilian municipalities during the first two decades of the 21st century. The research uses the Municipal Participation Fund (FPM) as a grant proxy from 2000 to 2019 through econometrics of cross-section and panel data for all 5,568 municipalities. The results indicate the flypaper effect in Brazilian municipalities, as well as the proportional relationship between the receipt of constitutional transfers and the increase in public expenditure.

Keywords: flypaper effect, intergovernmental transfers, municipal participation fund, fiscal federalism

Procedia PDF Downloads 105
10895 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 371
10894 Profitability and Productivity Performance of the Selected Public Sector Banks in India

Authors: Sudipto Jana

Abstract:

Background and significance of the study: Banking industry performs as a catalyst for industrial growth and agricultural growth, however, as well involves the existence and welfare of the citizens. The banking system in India was described by unmatched growth and the recreation of bunch making in the pre-liberalization era. At the time of financial sector reforms Reserve Bank of India issued a regulatory norm concerning capital adequacy, income recognition, asset classification and provisioning that have increasingly precede meeting by means of the international paramount performs. Bank management ceaselessly manages the triumph, effectiveness, productivity and performance of the bank as good performance, high productivity and efficiency authorizes the triumph of the bank management targets as well as aims of bank. In a comparable move toward performance of any economy depends upon the expediency and effectiveness of its financial system of nation establishes its economic growth indicators. Profitability and productivity are the most important relevant parameters of any banking group. Keeping in view of this, this study examines the profitability and productivity performance of the selected public sector banks in India. Methodology: This study is based on secondary data obtained from Reserve Bank of India database for the periods between 2006 and 2015. This study purposively selects four types of commercial banks, namely, State Bank of India, United Bank of India, Punjab National Bank and Allahabad Bank. In order to analyze the performance with relation to profitability and productivity, productivity performance indicators in terms of capital adequacy ratio, burden ratio, business per employee, spread per employee and advances per employee and profitability performance indicators in terms of return on assets, return on equity, return on advances and return on branch have been considered. In the course of analysis, descriptive statistics, correlation statistics and multiple regression have been used. Major findings: Descriptive statistics indicate that productivity performance of State Bank of India is very satisfactory than other public sector banks in India. But management of productivity is unsatisfactory in case of all the public sector banks under study. Correlation statistics point out that profitability of the public sector banks are strongly positively related with productivity performance in case of all the public sector banks under study. Multiple regression test results show that when profitability increases profit per employee increases and net non-performing assets decreases. Concluding statements: Productivity and profitability performance of United Bank of India, Allahabad Bank and Punjab National Bank are unsatisfactory due to poor management of asset quality as well as management efficiency. It needs government’s interference so that profitability and productivity performance are increased in the near future.

Keywords: India, productivity, profitability, public sector banks

Procedia PDF Downloads 397
10893 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 294
10892 The Sustainability of Health and Safety on Construction Sites in Zamfara State

Authors: Ismaila Oladunni Muhammed, Adegbenga Raphael Ashiru

Abstract:

Construction industry has been attributed to be the engine growth of Nigerian economic and infrastructural development. It promotes infrastructural development and grows an average output of Nigerian Gross Domestic Profit. However, from this great prospect, yearly reports show that consistent accidents on construction sites in Zamfara State has affected a substantial number of workers as they become temporarily or permanently disabled, thereby making many construction sites a death trap. This posed a great threat to the industry’s sustainability, de- motivate workers from working in the industry, and further have negative impact on the economy as well. It is as a result of high construction site accident currently experiencing in Zamfara state that this research was carried out to appraise the sustainability of health and safety of construction workers on sites. The proper practice and compliance to Construction Health and safety laws are very vital to the output and growth of Zamfara State construction sector. However, a quantitative approach was adopted to justify the aforesaid statement which will provide a broader understanding of the study. Descriptive statistical analysis was obtained through Statistical Package for the Social Sciences (SPSS Version 20). Furthermore, the findings from the research highlighted that the performance and output of construction workers on construction sites depends on the proper practice of health and safety. The research findings also recommended ways to enhance employers and employee’s compliance with existing laws guiding health and safety on Zamfara State construction sites. Nevertheless, the purpose of the paper is to appraise the sustainability of Health and Safety on Zamfara State construction sites. This study further provided thorough information for resolving challenges of construction sites accidents to improve construction firm productivity and also ensured construction worker’s safety on site.

Keywords: construction industry, health and safety regulations, causes of accident, construction safety practices

Procedia PDF Downloads 186
10891 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 216
10890 Pipeline Construction in Oil and Gas Fields as per Kuwait Oil Company Procedures

Authors: Jasem Al-Safran

Abstract:

Nowadays Oil and Gas industry considered as one of the biggest industries around the world although it caused a lot of pollution to the world and it caused many damages to the mankind and the other creatures around the globe it still one of the biggest industries, it create millions of careers around the globe which reduced the poorness level and make the mankind life’s much more comfortable you may compare the humans life before the exploration of the oil and after the oil industries development. Construction project’s consist of 3 major sections also we call them EPC projects the first section is the detailed engineering, the second section is the procurements section and finally is the Construction section, each section required a specialized work force with a different skills in order to handle the work load for example in the oil sector and depending on the nature of the project and the project size the Construction team required mechanical engineer, civil engineer, electrical engineer and instrumentation engineer, also a work site supervisor for each disciplines also a huge number of labors, technicians and many equipment’s.

Keywords: Construction, EPC, Project, Work force

Procedia PDF Downloads 88
10889 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 90