17147 Risk Management in Healthcare Sector in Turkey: A Dental Hospital Case Study

Authors: Pırıl Tekin, Rızvan Erol

Abstract:

Risk management has become very important and popular in developing countries in recent years. Especially making patient and employee health and safety issues compulsory in the hospitals, raised the number of studies in Turkey. Also risk management become more important for hospital senior management from clinics to the laboratories. Because quality is really important to be chosen for both patients to consult and employees to prefer to work. And also risk management studies can lead to hospital management team about future works and methods. By this point of view, this study is the risk assessment carried out in the biggest dental hospital in the south part of Turkey. This study was conducted as a research case study, covering two different health care place; A Clinic and A Laboratory. It shows that the problems in this dental hospital and how it can solve all.

Keywords: risk management, healthcare, dental hospital, quality management

Procedia PDF Downloads 343
17146 Provisions for Risk in Islamic Banking and Finance in Comparison to the Conventional Banks in Malaysia

Authors: Rashid Masoud Ali Al-Mazrui, Ramadhani Mashaka Shabani

Abstract:

Islamic banks and financial institutions are exposed to the same risks as conventional banking. These risks include the rate return risk, credit or market risk, liquidity risk, and operational risk among others. However, being a financial institution that operates Islamic banking and finance operations, there is additional risk associated with its operations different from conventional finance, such as displacing commercial risk. They face Shari'ah compliance risks because of their failure to follow Shari'ah principles. To have proper mitigation and risk management, banks should have proper risk management policies to mitigate risks. This paper aims to study the risk management taken by Islamic banks in comparison with conventional banks. Also, the study evaluates the provisions for risk management taken by selected Islamic banks and conventional banks. The study employs qualitative analysis using secondary data by applying a content analysis approach with a sample size of 4 Islamic banks and four conventional banks ranging from 2010 to 2020. We find that these banks all use the same technique, except for the associated risk. The extra ways are used, but only for additional risks that are available to Islamic banking and finance.

Keywords: emerging risk, risk management, Islamic banking, conventional bank

Procedia PDF Downloads 43
17145 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project

Authors: A. Kourou, M. Panoutsopoulou

Abstract:

Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.

Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material

Procedia PDF Downloads 101
17144 The Effect of Work Site Dangers on the Management of Construction Projects in Syria

Authors: Mohammed Aljoma, Eblal Zakzok

Abstract:

Safety is a science that seeks to protect and avoid humans from risks in any field and prevent losses in properties and lives as much as possible. On the other hand, occupational safety goals aim to protect workers from risks which can occur during work execution. The main purpose of occupational safety is to ultimately protect people, properties and the environment by reducing accidents and injuries that may cause losses and damages. To achieve this goal, we must remove the direct and indirect reasons which cause accidents and injuries; some of the reasons of accidents are the unsafe cases and inept behavior or both of them. This research focuses on the manner of providing instant protection from the very first beginning to people, properties and the environment by: -Inserting safety demands in the planning and designing works by identifying risk levels in every task of the project, -Using a new risk managing system or modifying or changing a previously-used one.

Keywords: planning, scheduling, risk management, project duration, site safety

Procedia PDF Downloads 270
17143 The Effect of Supplier Trust and Top Management Involvement on Supply Chain Risk Management through Buyer-Supplier Relationship

Authors: Hotlan Siagian, Han Tae Hee

Abstract:

This study aims to examine the effect of supplier trust and top management involvement on the supply chain risk management through buyer-supplier relationship. The population of the research is 44 Korean companies domiciled in East and Central Java of Indonesia. The respondent consists of a top management level from each company. Data collection used a questionnaire designed with five-item Likert scale. Collected data were analyzed using structural equation modeling (SEM) technique with SmartPLS software version 3.0 to examine the hypotheses. The result revealed that supplier trust has an effect on supply chain risk management, top management involvement affects supply chain risk management, supplier trust influences buyer-supplier relationship, top management involvement affects the buyer-supplier relationship, and buyer-supplier relationship affects supply chain risk management. The last finding is that buyer-supplier relationship empirically mediates the effect of supplier trust and top management involvement.

Keywords: buyer supplier relationship, supplier trust, supply chain risk management, top management involvement

Procedia PDF Downloads 179
17142 A Guidance to Enhance the Risk Culture among the Organizations

Authors: Najeebah Almahmeed

Abstract:

Risk Management is an evolving subject among organizations that include corporations, governments, non-governmental organizations, and not-for-profit corporations. In order to enhance awareness around the importance of Risk Management and make sure everyone is using it in their day-to-day job, the Risk Culture topic has emerged and gained importance not only in the Finance Sector but also in the National Oil Companies in Kuwait. Risk Culture can be defined as the shared beliefs, attitudes, and behaviors within a company that guide its approach to managing risks. It acts as a connecting force that links policies, procedures, and individuals, influencing how risks are understood and tackled through activities. In this research, benefits of Risk Culture are shared, guidelines are presented to promote a risk aware culture, and fully embed and enforce Risk-based processes and procedures. Moreover, this research demonstrates methodologies of measuring the Risk Culture using specific dimensions and clusters.

Keywords: clusters, dimensions, national oil companies, risk culture, risk management

Procedia PDF Downloads 41
17141 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 230
17140 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 535
17139 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 428
17138 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 194
17137 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 270
17136 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 61
17135 The Underestimation of Cultural Risk in the Execution of Megaprojects

Authors: Alan Walsh, Peter Walker, Michael Ellis

Abstract:

There is a real danger that both practitioners and researchers considering risks associated with megaprojects ignore or underestimate the impacts of cultural risk. The paper investigates the potential impacts of a failure to achieve cultural unity between the principal actors executing a megaproject. The principle relationships include the relationships between the principle Contractors and the project stakeholders or the project stakeholders and their principle advisors, Western Consultants. This study confirms that cultural dissonance between these parties can delay or disrupt the megaproject execution and examines why cultural issues should be prioritized as a significant risk factor in megaproject delivery. This paper addresses the practical impacts and potential mitigation measures, which may reduce cultural dissonance for a megaproject's delivery. This information is retrieved from on-going case studies in live infrastructure megaprojects in Europe and the Middle East's GCC states, from Western Consultants' perspective. The collaborating researchers each have at least 30 years of construction experience and are engaged in architecture, project management and contracts management, dealing with megaprojects in Europe or the GCC. After examining the cultural interfaces they have observed during the execution of megaprojects, they conclude that globally, culture significantly influences their efficient delivery. The study finds that cultural risk is ever-present, where different nationalities co-manage megaprojects and that cultural conflict poses a real threat to the timely delivery of megaprojects. The study indicates that the higher the cultural distance between the principal actors, the more pronounced the risk, with the risk of cultural dissonance more prominent in GCC megaprojects. The findings support a more culturally aware and cohesive team approach and recommend cross-cultural training to mitigate the effects of cultural disparity.

Keywords: cultural risk underestimation, cultural distance, megaproject characteristics, megaproject execution

Procedia PDF Downloads 81
17134 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 306
17133 Towards Establishing a Universal Theory of Project Management

Authors: Divine Kwaku Ahadzie

Abstract:

Project management (PM) as a concept has evolved from the early 20th Century into a recognized academic and professional discipline, and indications are that it has come to stay in the 21st Century as a world-wide paradigm shift for managing successful construction projects. However, notwithstanding the strong inroads that PM has made in legitimizing its academic and professional status in construction management practice, the underlining philosophies are still based on cases and conventional practices. An important theoretical issue yet to be addressed is the lack of a universal theory that offers philosophical legitimacy for the PM concept as a uniquely specialized management concept. Here, it is hypothesized that the law of entropy, the theory of uncertainties and the theory of risk management offer plausible explanations for addressing the lacuna of what constitute PM theory. The theoretical bases of these plausible underlying theories are argued and attempts made to establish the functional relationships that exist between these theories and the PM concept. The paper then draws on data related to the success and/or failure of a number of construction projects to validate the theory.

Keywords: concepts, construction, project management, universal theory

Procedia PDF Downloads 302
17132 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective

Authors: Ghanim A. Bekr

Abstract:

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.

Keywords: construction projects, critical success factors, Jordan, project success

Procedia PDF Downloads 129
17131 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 216
17130 Dilemmas of HRM in a Project-Oriented Organisation

Authors: Katarzyna Piwowar-Sulej

Abstract:

The functioning of a project-oriented organisation creates new and different, from the traditional ones, conditions for human resources management. In the analysed case HRM is primarily characterized by a double-track nature – on the one hand within the framework of permanent structures (departments) and, on the other, within the area of particular projects. The purpose of the article is to present the dilemmas associated with the development of selected HRM areas in project-oriented organisations. Theoretical discussion was supplemented by the results of empirical research.

Keywords: human resources management, tracks of HRM, project, project-oriented organisation

Procedia PDF Downloads 241
17129 A Relationship between Transformational Leadership, Internal Audit and Risk Management Implementation in the Indonesian Public Sector

Authors: Tio Novita Efriani

Abstract:

Public sector organizations work in a complex and risky environment. Since the beginning of 2000s, the public sector has paid attention to the need for an effective risk management. The Indonesian public sector has also concerned about this issue and in 2008 it enacted the Government Regulation that gives mandate for the implementation of risk management in government organizations. This paper investigates risk management implementation in the Indonesian public sector organizations and the role of transformational leadership and internal audit activities. Data was collected via survey. A total of 202 effective responses (30% response rate) from employees in 34 government ministries were statistically analyzed by using Partial least square structural equation modelling (PLS-SEM) and the software was SmartPLS 3.0. All the constructs were lower order, except for the risk management implementation construct, which was treated as a second-order construct. A two-stage approach was employed in the analysis of the higher order component. The findings revealed that transformational leadership positively influence risk management implementation. The findings also found that the core and legitimate roles of internal audit in risk management positively affect the implementation of risk management. The final finding showed that internal auditing mediates a relationship between transformational leadership and risk management implementation. These results suggest that the implementation of risk management in the Indonesian public sector was significantly supported by internal auditors and leadership. The findings confirm the importance of transformational leadership and internal audit in the public sector risk management strategies.

Keywords: Indonesian public sector, internal audit, risk management, transformational leadership

Procedia PDF Downloads 171
17128 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 400
17127 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
17126 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 273
17125 Overview of Risk Management in Electricity Markets Using Financial Derivatives

Authors: Aparna Viswanath

Abstract:

Electricity spot prices are highly volatile under optimal generation capacity scenarios due to factors such as non-storability of electricity, peak demand at certain periods, generator outages, fuel uncertainty for renewable energy generators, huge investments and time needed for generation capacity expansion etc. As a result market participants are exposed to price and volume risk, which has led to the development of risk management practices. This paper provides an overview of risk management practices by market participants in electricity markets using financial derivatives.

Keywords: financial derivatives, forward, futures, options, risk management

Procedia PDF Downloads 449
17124 Safeguarding the Cloud: The Crucial Role of Technical Project Managers in Security Management for Cloud Environments

Authors: Samuel Owoade, Zainab Idowu, Idris Ajibade, Abel Uzoka

Abstract:

Cloud computing adoption continues to soar, with 83% of enterprise workloads estimated to be in the cloud by 2022. However, this rapid migration raises security concerns, needing strong security management solutions to safeguard sensitive data and essential applications. This paper investigates the critical role of technical project managers in orchestrating security management initiatives for cloud environments, evaluating their responsibilities, challenges, and best practices for assuring the resilience and integrity of cloud infrastructures. Drawing from a comprehensive review of industry reports and interviews with cloud security experts, this research highlights the multifaceted landscape of security management in cloud environments. Despite the rapid adoption of cloud services, only 25% of organizations have matured their cloud security practices, indicating a pressing need for effective management strategies. This paper proposes a strategy framework adapted to the demands of technical project managers, outlining the important components of effective cloud security management. Notably, 76% of firms identify misconfiguration as a major source of cloud security incidents, underlining the significance of proactive risk assessment and constant monitoring. Furthermore, the study emphasizes the importance of technical project managers in facilitating cross-functional collaboration, bridging the gap between cybersecurity professionals, cloud architects, compliance officers, and IT operations teams. With 68% of firms seeing difficulties integrating security policies into their cloud systems, effective communication and collaboration are critical to success. Case studies from industry leaders illustrate the practical use of security management projects in cloud settings. These examples demonstrate the importance of technical project managers in using their expertise to address obstacles and generate meaningful outcomes, with 92% of firms reporting improved security practices after implementing proactive security management tactics. In conclusion, this research underscores the critical role of technical project managers in safeguarding cloud environments against evolving threats. By embracing their role as guardians of the cloud realm, project managers can mitigate risks, optimize resource utilization, and uphold the trust and integrity of cloud infrastructures in an era of digital transformation.

Keywords: cloud security, security management, technical project management, cybersecurity, cloud infrastructure, risk management, compliance

Procedia PDF Downloads 20
17123 Implementation of an Economic – Probabilistic Model to Risk Analysis of ERP Project in Technological Innovation Firms – A Case Study of ICT Industry in Iran

Authors: Reza Heidari, Maryam Amiri

Abstract:

In a technological world, many countries have a tendency to fortifying their companies and technological infrastructures. Also, one of the most important requirements for developing technology is innovation, and then, all companies are struggling to consider innovation as a basic principle. Since, the expansion of a product need to combine different technologies, therefore, different innovative projects would be run in the firms as a base of technology development. In such an environment, enterprise resource planning (ERP) has special significance in order to develop and strengthen of innovations. In this article, an economic-probabilistic analysis was provided to perform an implementation project of ERP in the technological innovation (TI) based firms. The used model in this article assesses simultaneously both risk and economic analysis in view of the probability of each event that is jointly between economical approach and risk investigation approach. To provide an economic-probabilistic analysis of risk of the project, activities and milestones in the cash flow were extracted. Also, probability of occurrence of each of them was assessed. Since, Resources planning in an innovative firm is the object of this project. Therefore, we extracted various risks that are in relation with innovative project and then they were evaluated in the form of cash flow. This model, by considering risks affecting the project and the probability of each of them and assign them to the project's cash flow categories, presents an adjusted cash flow based on Net Present Value (NPV) and with probabilistic simulation approach. Indeed, this model presented economic analysis of the project based on risks-adjusted. Then, it measures NPV of the project, by concerning that these risks which have the most effect on technological innovation projects, and in the following measures probability associated with the NPV for each category. As a result of application of presented model in the information and communication technology (ICT) industry, provided an appropriate analysis of feasibility of the project from the point of view of cash flow based on risk impact on the project. Obtained results can be given to decision makers until they can practically have a systematically analysis of the possibility of the project with an economic approach and as moderated.

Keywords: cash flow categorization, economic evaluation, probabilistic, risk assessment, technological innovation

Procedia PDF Downloads 382
17122 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 77
17121 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 306
17120 The Promotion of a Risk Culture: a Descriptive Study of Ghanaian Banks

Authors: Gerhard Grebe, Johan Marx

Abstract:

The aim of the study is to assess the state of operational risk management and the adoption of an appropriate risk culture in Ghanaian banks. The Bank of Ghana (BoG) joined the Basel Consultative Group (BCG) of the Basel Committee on Bank Supervision (BCBS) in 2021 and is proceeding with the implementation of the Basel III international regulatory framework for banks. The BoG’s Directive about risk management encourages, inter alia, the creation of an appropriate risk culture by Ghanaian banks. However, it is not evident how the risk management staff of Ghanaian banks experience the risk culture and the implementation of operational risk management in the banks where they are employed. Ghana is a developing economy, and it is addressing challenges with its organisational culture. According to Transparency International, successive Ghanaian governments claim to be fighting corruption, but little success has been achieved so far. This points to a possible lack of accountability, transparency, and integrity in the environment in which Ghanaian banks operate and which could influence their risk culture negatively. Purposive sampling was used for the survey, and the questionnaire was completed byGhanaian bank personnel who specializesin operational risk management, risk governance, and compliance, bank supervision, risk analyses, as well as the implementation of the operational risk management requirements of the Basel regulatory frameworks. The respondents indicated that they are fostering a risk culture and implementing monitoring and reporting procedures; the three lines of defence (3LOD); compliance; internal auditing; disclosure of operational risk information; and receiving guidance from the bank supervisor in an attempt to improve their operational risk management practices. However, the respondents reported the following challenges with staff members who are not inside the risk management departments(in order of priority), namelydemonstrating a risk culture, training and development; communication; reporting and disclosure; roles and responsibilities; performance appraisal; and technological and environmental barriers. Recommendations to address these challenges are provided

Keywords: ghana, operational risk, risk culture, risk management

Procedia PDF Downloads 85
17119 Practical Experiences as Part of Project Management Course

Authors: H. Hussain, N. H. Mohamad

Abstract:

Practical experiences have been one of the successful criteria for the Project Management course for the art and design students. There are series of events that the students have to undergo as part of their practical exercises in the learning context for Project Management courses. These series have been divided into few mini programs that involved the whole individual in each group. Therefore, the events have been one of the bench marks for these students. Through the practical experience, the task that has been given to individual has been performed according to the needs of professional practice and ethics.

Keywords: practical experience, project management, art and design students, events, programs

Procedia PDF Downloads 535
17118 Project Management Tools within SAP S/4 Hana Program Environment

Authors: Jagoda Bruni, Jan Müller-Lucanus, Gernot Stöger-Knes

Abstract:

The purpose of this article is to demonstrate modern project management approaches in the SAP S/R Hana surrounding a programming environment composed of multiple focus-diversified projects. We would like to propose innovative and goal-oriented management standards based on the specificity of the SAP transformations and customer-driven expectations. Due to the regular sprint-based controlling and management tools' application, it has been data-proven that extensive analysis of productive hours of the employees as much as a thorough review of the project progress (per GAP, per business process, and per Lot) within the whole program, can have a positive impact on customer satisfaction and improvement for projects' budget. This has been a collaborative study based on real-life experience and measurements in collaboration with our customers.

Keywords: project management, program management, SAP, controlling