Search results for: project planning
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7654

Search results for: project planning

7474 Adaptive Motion Planning for 6-DOF Robots Based on Trigonometric Functions

Authors: Jincan Li, Mingyu Gao, Zhiwei He, Yuxiang Yang, Zhongfei Yu, Yuanyuan Liu

Abstract:

Building an appropriate motion model is crucial for trajectory planning of robots and determines the operational quality directly. An adaptive acceleration and deceleration motion planning based on trigonometric functions for the end-effector of 6-DOF robots in Cartesian coordinate system is proposed in this paper. This method not only achieves the smooth translation motion and rotation motion by constructing a continuous jerk model, but also automatically adjusts the parameters of trigonometric functions according to the variable inputs and the kinematic constraints. The results of computer simulation show that this method is correct and effective to achieve the adaptive motion planning for linear trajectories.

Keywords: kinematic constraints, motion planning, trigonometric function, 6-DOF robots

Procedia PDF Downloads 241
7473 Concentrated Animal Feeding Operations and Planning in the United States: Evidences from North Carolina

Authors: Asmaa Benbaba

Abstract:

This paper aims to reconsider relationships between animal feeding operations (CAFOs) and planning. It stresses the idea of the necessity for a methodological revolution in order to increase the chances for dialogue between different actors and various planning agencies and create possibilities to manage conflicts. The explored case of North Carolina shows limitations in environmental agencies’ actions and methods. It also calls for a more integrated approach among agencies including the local agencies.

Keywords: CAFOs, North Carolina, planning, United States

Procedia PDF Downloads 376
7472 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 193
7471 Information and Communication Technologies-Based Urban Spaces: From Planning and Design to Implementation

Authors: Yountaik Leem, Kwang Woo Nam, Sang Ho Lee, Tae Heon Moon

Abstract:

As to the development of the capitalist economy, local governments put their focuses on economic growth and quality of life including the management of declined urban area. Together with the rapid advances in ICTs (information and communication technologies) Korean government tried to adapt ICTs to urban spaces to catch these two goals. Ubiquitous city, concept introduced by Mark Weiser in 1988, is a kind of ICTs based urban space which can provide IT services anytime and anywhere. This paper introduces the experience of developing ICTs-based urban planning and it’s implementation process and discusses the effect of the R&D based U-City test-bed project. For a community center of a residential zone in a newly developing city, spatial problems and citizen’s needs were identified to plan IT-based urban services. The paper also describes the structure and functions of Community O/S (COS) as an IT platform which controls data and urban devices such as media facades and U-poles. Not only one-way information but also Interactive services were included. Public creating activities using this platform also added –CO2 emission management and citizen making safety map, etc. The effects of the comprehensive U-City planning in S/W, H/W and human-ware were discussed on the case study of similar individual projects.

Keywords: ICTs-based urban planning, implementation, public IT service, U-City

Procedia PDF Downloads 295
7470 Governance and Local Planning for Sustainability: Need for Change - Implications of Legislation on Local Planning

Authors: Rahaf Suleiman Altallaa

Abstract:

City planning involves making plans, organizing and dealing with the cities urban areas. It attempts to organize socio-spatial relationships at exceptional ranges of governance Urban planning offers the social, monetary and environmental effects of defining spatial obstacles and the influence on the spatial distribution of resources. The dreams and methods of reaching such dissemination vary extensively traditionally and geographically and are often challenged through traditional strategies that expose the political nature of application interventions and the bounds of technical know-how claims. Space, network, argument, and postcolonial debates address how present-day socio-spatial organization is formed, what needs to or should not trade, and the way it underscores whether or not a good plan will contribute to a given situation. Inside the absence of an agreed-upon technical justification for the planning exercise, the planning idea has a tendency to focus on normative processes, positioning making plans as an area for participatory democracy.

Keywords: environmental governance, environmental planning, environmental management, sustainable competitiveness, sustainability

Procedia PDF Downloads 85
7469 Application of the Building Information Modeling Planning Approach to the Factory Planning

Authors: Peggy Näser

Abstract:

Factory planning is a systematic, objective-oriented process for planning a factory, structured into a sequence of phases, each of which is dependent on the preceding phase and makes use of particular methods and tools, and extending from the setting of objectives to the start of production. The digital factory, on the other hand, is the generic term for a comprehensive network of digital models, methods, and tools – including simulation and 3D visualisation – integrated by a continuous data management system. Its aim is the holistic planning, evaluation and ongoing improvement of all the main structures, processes and resources of the real factory in conjunction with the product. Digital factory planning has already become established in factory planning. The application of Building Information Modeling has not yet been established in factory planning but has been used predominantly in the planning of public buildings. Furthermore, this concept is limited to the planning of the buildings and does not include the planning of equipment of the factory (machines, technical equipment) and their interfaces to the building. BIM is a cooperative method of working, in which the information and data relevant to its lifecycle are consistently recorded, managed and exchanged in a transparent communication between the involved parties on the basis of digital models of a building. Both approaches, the planning approach of Building Information Modeling and the methodical approach of the Digital Factory, are based on the use of a comprehensive data model. Therefore it is necessary to examine how the approach of Building Information Modeling can be extended in the context of factory planning in such a way that an integration of the equipment planning, as well as the building planning, can take place in a common digital model. For this, a number of different perspectives have to be investigated: the equipment perspective including the tools used to implement a comprehensive digital planning process, the communication perspective between the planners of different fields, the legal perspective, that the legal certainty in each country and the quality perspective, on which the quality criteria are defined and the planning will be evaluated. The individual perspectives are examined and illustrated in the article. An approach model for the integration of factory planning into the BIM approach, in particular for the integrated planning of equipment and buildings and the continuous digital planning is developed. For this purpose, the individual factory planning phases are detailed in the sense of the integration of the BIM approach. A comprehensive software concept is shown on the tool. In addition, the prerequisites required for this integrated planning are presented. With the help of the newly developed approach, a better coordination between equipment and buildings is to be achieved, the continuity of the digital factory planning is improved, the data quality is improved and expensive implementation errors are avoided in the implementation.

Keywords: building information modeling, digital factory, digital planning, factory planning

Procedia PDF Downloads 237
7468 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
7467 A Systematic Approach to Mitigate the Impact of Increased Temperature and Air Pollution in Urban Settings

Authors: Samain Sabrin, Joshua Pratt, Joshua Bryk, Maryam Karimi

Abstract:

Globally, extreme heat events have led to a surge in the number of heat-related moralities. These incidents are further exacerbated in high-density population centers due to the Urban Heat Island (UHI) effect. Varieties of anthropogenic activities such as unsupervised land surface modifications, expansion of impervious areas, and lack of use of vegetation are all contributors to an increase in the amount of heat flux trapped by an urban canopy which intensifies the UHI effect. This project aims to propose a systematic approach to measure the impact of air quality and increased temperature based on urban morphology in the selected metropolitan cities. This project will measure the impact of build environment for urban and regional planning using human biometeorological evaluations (mean radiant temperature, Tmrt). We utilized the Rayman model (capable of calculating short and long wave radiation fluxes affecting the human body) to estimate the Tmrt in an urban environment incorporating location and height of buildings and trees as a supplemental tool in urban planning, and street design. Our current results suggest a strong correlation between building height and increased surface temperature in megacities. This model will help with; 1. Quantify the impacts of the built environment and surface properties on surrounding temperature, 2. Identify priority urban neighborhoods by analyzing Tmrt and air quality data at pedestrian level, 3. Characterizing the need for urban green infrastructure or better urban planning- maximizing the cooling benefit from existing Urban Green Infrastructure (UGI), and 4. Developing a hierarchy of streets for new UGI integration and propose new UGI based on site characteristics and cooling potential.

Keywords: air quality, heat mitigation, human-biometeorological indices, increased temperature, mean radiant temperature, radiation flux, sustainable development, thermal comfort, urban canopy, urban planning

Procedia PDF Downloads 109
7466 The Influence of Theories and Approaches to Educational Policy and Planning in Ghana’s Current Educational Developments

Authors: Ruth Donkoh, Wing On Lee, Solomon A. Boateng, Portia Oware Twerefoo, Josephine Donkor

Abstract:

In this paper we defend the value of theories and approaches to educational policy and planning in enhancing the educational developments in Ghana. This mission is achieved by enumerating the recent educational developments in Ghana and juxtaposing it with some educational theories, approaches to policy making, and policy planning to see if the educational developments conform with the theory principles as well as policy making and planning processes. Data collection for the research was made through textual analysis of policy documents as well as review of relevant literatures. The findings reveled that educational developments in Ghana are unable to attain its objectives due to the policies not conforming with the policy formation and planning principles. In addition, was that education planning in Ghana does not follow the policy-administration dichotomy theory principles and likewise the distribution of educational needs goes contrary to the equity theory. We recommend that educational policies in Ghana should be in conformity with the principles of theories as well as the approaches to educational policy making and planning to help meet the needs of learners, attain educational quality, and to help in the accomplishment of educational development objectives.

Keywords: Ghana education, equity theories, politics- administration dichotomy theory, educational policies, educational planning

Procedia PDF Downloads 116
7465 A Conceptual E-Business Model and the Effect of Strategic Planning Parameters on E-Business Strategy Management and Performance

Authors: Alexandra Lipitakis, Evangelia A. E. C. Lipitakis

Abstract:

In this article, a class of e-business strategy planning parameters are introduced and their effect on financial and non-financial performance of e-businesses and organizations is investigated. The relationships between these strategic planning parameters, i.e. Formality, Participation, Sophistication, Thoroughness, Synergy and Cooperation, Entropic Factor, Adaptivity, Uncertainty and Financial and Non-Financial Performance are examined and the directions of these relationships are given. A conceptual model has been constructed and quantitative research methods can be used to test the considered eight hypotheses. In the framework of e-business strategy planning this research study clearly demonstrates how strategic planning components have positive relationships with e-business strategy management and performance.

Keywords: e-business management, e-business model, e-business performance assessments, strategy management methodologies, strategy planning, quantitative methods

Procedia PDF Downloads 354
7464 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 130
7463 Promotion of Public Participation in Community Planning, Bang Nang Li Sub-District, Amphawa District, Samutsongkhram Province

Authors: Sakapas Saengchai, Wilasinee Jintalikitdee, Matinee Kongsatit, Natapol Puaprasert

Abstract:

The study on promotion of public participation in community planning is a qualitative research. The data collection tools included participating observation, in-depth interview and focus group of executives of sub-district administrative organizations, sub-district headmen, community leaders of 5 villages, including civil society forums for exchanging ideas of village members. The study results revealed that key promotions of public participation in community planning were as follows: 1) Perception on public authorities’ information: Public relations should be set and information on community planning, key principles of local people participation should be prepared. Collaboration with community leaders in each village via sub-district administrative organizations should be established. 2) Discussion: In civil society forums, village members should brainstorm their opinions towards community development, village development, quality of life, current situation and problems to be revolved. 3) Participation: Members of each village should jointly participate, with community leaders, in setting sub-district development policies and community development projects. 4) Collaboration: To achieve goals, communities of each member should participate in project implementation and activities of community plans. 5) People power promotion: In each stage of communication planning, community leaders, village committees, local people should jointly set directions of village development and make decisions. This will enhance their joint learning and create community driving power. Community will become strong leading to sustainable self-reliance.

Keywords: people participation, community plans, community development, community driving power

Procedia PDF Downloads 329
7462 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 306
7461 Financial Planning Framework: A Perspective of Wealth Accumulation and Retirement Planning

Authors: Stanley Yap, Mahadevan Supramaniam, Chong Wei Ying, Fatemeh Kimiyaghalam

Abstract:

Purpose: The paper shows the framework of financial planning in a different paradigm. It highlights the results from a focus group on retirement planning in the aspect of financial literacy and wealth accumulation in Malaysia. Design/methodology/approach: A focus group consisted of thirty individuals and divided into six different clusters amongst 25 to 55 years old. The selection of focus group members is pertaining to retirement planning behavior and saving profile from the different level of educations. Findings: Our results show, firstly, the focus group reflects individual capacity on saving attitude, financial literacy and awareness towards financial products. Secondly, availability, accessibility and affordability which are the significant factors that influence saving attitude, financial literacy and awareness on personal retirement planning behavior. Practical implications: The participants express the concerns of retirement planning during their golden years and the current financial products in the Malaysian financial market. Originality/value: This study is a different approach that recognizes the needs of the consumers in the context of retirement planning and wealth accumulation. Therefore, customers should obtain financial services and products from financial providers to achieve financial independence.

Keywords: retirement planning, wealth accumulation, financial literacy, focus group, saving attitude, availability, accessibility, affordability

Procedia PDF Downloads 327
7460 Project Knowledge Harvesting: The Case of Improving Project Performance through Project Knowledge Sharing Framework

Authors: Eng Rima Al-Awadhi, Abdul Jaleel Tharayil

Abstract:

In a project-centric organization like KOC, managing the knowledge of the project is of critical importance to the success of the project and the organization. However, due to the very nature and complexity involved, each project engagement generates a lot of 'learnings' that need to be factored into while new projects are initiated and thus avoid repeating the same mistake. But, many a time these learnings are localized and remains as ‘tacit knowledge’ leading to scope re-work, schedule overrun, adjustment orders, concession requests and claims. While KOC follows an asset based organization structure, with a multi-cultural and multi-ethnic workforce and larger chunk of the work is carried out through complex, long term project engagement, diffusion of ‘learnings’ across assets while dealing with the natural entropy of the organization is of great significance. Considering the relatively higher number of mega projects, it's important that the issues raised during the project life cycle are centrally harvested, analyzed and the ‘learnings’ from these issues are shared, absorbed and are in-turn utilized to enhance and refine the existing process and practices, leading to improve the project performance. One of the many factors contributing to the successful completion of a project on time is the reduction in the number of variations or concessions triggered during the project life cycle. The project process integrated knowledge sharing framework discusses the knowledge harvesting methodology adopted, the challenges faced, learnings acquired and its impact on project performance. The framework facilitates the proactive identification of issues that may have an impact on the overall quality of the project and improve performance.

Keywords: knowledge harvesting, project integrated knowledge sharing, performance improvement, knowledge management, lessons learn

Procedia PDF Downloads 359
7459 Deficits and Solutions in the Development of Modular Factory Systems

Authors: Achim Kampker, Peter Burggräf, Moritz Krunke, Hanno Voet

Abstract:

As a reaction to current challenges in factory planning, many companies think about introducing factory standards to lower planning times and decrease planning costs. If these factory standards are set-up with a high level of modularity, they are defined as modular factory systems. This paper deals with the main current problems in the application of modular factory systems in practice and presents a solution approach with its basic models. The methodology is based on methods from factory planning but also uses the tools of other disciplines like product development or technology management to deal with the high complexity, which the development of modular factory systems implies. The four basic models that such a methodology has to contain are introduced and pointed out.

Keywords: factory planning, modular factory systems, factory standards, cost-benefit analysis

Procedia PDF Downloads 571
7458 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System

Authors: Vuk M. Popovic, Dunja D. Popovic

Abstract:

Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.

Keywords: laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs

Procedia PDF Downloads 324
7457 Analysis of Universal Mobile Telecommunications Service (UMTS) Planning Using High Altitude Platform Station (HAPS)

Authors: Yosika Dian Komala, Uke Kurniawan Usman, Yuyun Siti Rohmah

Abstract:

The enable technology fills up needs of high-speed data service is Universal Mobile Telecommunications Service (UMTS). UMTS has a data rate up to 2Mbps.UMTS terrestrial system has a coverage area about 1-2km. High Altitude Platform Station (HAPS) can be built by a macro cell that is able to serve the wider area. Design method of UMTS using HAPS is planning base on coverage and capacity. The planning method is simulated with 2.8.1 Atoll’s software. Determination of radius of the cell based on the coverage uses free space loss propagation model. While the capacity planning to determine the average cell through put is available with the Offered Bit Quantity (OBQ).

Keywords: UMTS, HAPS, coverage planning, capacity planning, signal level, Ec/Io, overlapping zone, throughput

Procedia PDF Downloads 605
7456 Oracle JDE Enterprise One ERP Implementation: A Case Study

Authors: Abhimanyu Pati, Krishna Kumar Veluri

Abstract:

The paper intends to bring out a real life experience encountered during actual implementation of a large scale Tier-1 Enterprise Resource Planning (ERP) system in a multi-location, discrete manufacturing organization in India, involved in manufacturing of auto components and aggregates. The business complexities, prior to the implementation of ERP, include multi-product with hierarchical product structures, geographically distributed multiple plant locations with disparate business practices, lack of inter-plant broadband connectivity, existence of disparate legacy applications for different business functions, and non-standardized codifications of products, machines, employees, and accounts apart from others. On the other hand, the manufacturing environment consisted of processes like Assemble-to-Order (ATO), Make-to-Stock (MTS), and Engineer-to-Order (ETO) with a mix of discrete and process operations. The paper has highlighted various business plan areas and concerns, prior to the implementation, with specific focus on strategic issues and objectives. Subsequently, it has dealt with the complete process of ERP implementation, starting from strategic planning, project planning, resource mobilization, and finally, the program execution. The step-by-step process provides a very good learning opportunity about the implementation methodology. At the end, various organizational challenges and lessons emerged, which will act as guidelines and checklist for organizations to successfully align and implement ERP and achieve their business objectives.

Keywords: ERP, ATO, MTS, ETO, discrete manufacturing, strategic planning

Procedia PDF Downloads 217
7455 An Approach to Spatial Planning for Water Conservation: The Case of Kovada Sub-Watershed (Turkey)

Authors: Aybike Ayfer Karadağ

Abstract:

Today, the amount of water available is decreasing day by day due to global warming, environmental problems and population increase. To protect water resources, it is necessary to take a lot of measures from the global scale to the local scale. Some of these measures are related to spatial planning studies. In this study, the impact of water process analysis was assessed in the development of spatial planning for water conservation. The study was conducted in the Kovada sub-watershed (Isparta, Turkey). By means of water process analysis, the way to reach underground water of surface water in the study area is mapped. In this context, plant cover, soil and rock permeability were evaluated holistically with geographic information systems technologies. Then, on the map, water permeability is classified and this is spatially expressed. The findings show that the permeability of the water is different in the study case. As a result, the water permeability map needs to be included in the planning for water conservation planning.

Keywords: water, conservation, spatial planning, water process analysis

Procedia PDF Downloads 184
7454 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 222
7453 The Effect of Principled Human Resource Management and Training Based on Existing Standards in Order to Improve the Quality of Construction Projects

Authors: Arsalan Salahi

Abstract:

Today, the number of changes in the construction industry and urban mass house building is increasing, which makes you need to pay more attention to targeted planning for human resource management and training. The human resources working in the construction industry have various problems and deficiencies, and in order to solve these problems, there is a need for basic management and training of these people in order to lower the construction costs and increase the quality of the projects, especially in mass house building projects. The success of any project in reaching short and long-term professional goals depends on the efficient combination of work tools, financial resources, raw materials, and most importantly, human resources. Today, due to the complexity and diversity of each project, specialized management fields have emerged to maximize the potential benefits of each component of that project. Human power is known as the most important resource in construction projects for its successful implementation, but unfortunately, due to the low cost of human power compared to other resources, such as materials and machinery, little attention is paid to it. With the correct management and training of human resources, which depends on its correct planning and development, it is possible to improve the performance of construction projects. In this article, the training and motivation of construction industry workers and their effects on the effectiveness of projects in this industry have been researched. In this regard, some barriers to the training and motivation of construction workers and personnel have been identified and solutions have been provided for construction companies. Also, the impact of workers and unskilled people on the efficiency of construction projects is investigated. The results of the above research show that by increasing the use of correct and basic training for human resources, we will see positive results and effects on the performance of construction projects.

Keywords: human resources, construction industry, principled training, skilled and unskilled workers

Procedia PDF Downloads 55
7452 Conversion of HVAC Lines into HVDC in Transmission Expansion Planning

Authors: Juan P. Novoa, Mario A. Rios

Abstract:

This paper presents a transmission planning methodology that considers the conversion of HVAC transmission lines to HVDC as an alternative of expansion of power systems, as a consequence of restrictions for the construction of new lines. The transmission expansion planning problem formulates an optimization problem that minimizes the total cost that includes the investment cost to convert lines from HVAC to HVDC and possible required reinforcements of the power system prior to the conversion. The costs analysis assesses the impact of the conversion on the reliability because transmission lines are out of service during the conversion work. The presented methodology is applied to a test system considering a planning a horizon of 10 years.

Keywords: transmission expansion planning, HVDC, cost optimization, energy non-supplied

Procedia PDF Downloads 361
7451 Visualizing the Future of New York’s Southern Tier: Engaging Students to Help Create Sustainable Communities

Authors: William C. Dean

Abstract:

In the pedagogical sequence of the four- and five-year architectural programs at Alfred State, the fourth-year Urban Design Studio constitutes the first course where students directly explore design issues in the urban context. It is the first large-scale, community-based service learning project for most of the participating students. The students learn key lessons that include the benefits of working both individually and in groups of different sizes toward a common goal, accepting - and responding creatively too - criticism from stakeholders at different points in the project, and recognizing the role that local politics and activism can play in planning for community development. Above all, students are exposed to the importance of good planning in relation to preservation and community revitalization. The purpose of this paper is to discuss the use of community-based service-learning projects in undergraduate architectural education to promote student civic engagement as a means of helping communities visualize potential solutions for revitalizing their neighborhoods and business districts. A series of case studies will be presented in terms of challenges that were encountered, opportunities for student engagement and leadership, and the feasibility of sustainable community development resulting from those projects. The reader will be encouraged to consider how they can recognize needs within their own communities that could benefit from the assistance of architecture students and faculty.

Keywords: urban design, service-learning, civic engagement, community revitalization

Procedia PDF Downloads 60
7450 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective

Authors: Ghanim A. Bekr

Abstract:

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.

Keywords: construction projects, critical success factors, Jordan, project success

Procedia PDF Downloads 129
7449 The Fadama Initiative: Implications for Human Security and Sustainable Development in Nigeria

Authors: Albert T. Akume, Yahya M. Abdullahi

Abstract:

The impact of poverty on individual and society is grave, hence the efforts by the government to eradicate or alleviate. In Nigeria the various efforts to reduce rural poverty by empowering them and making the process of their development self-sustaining have ended dismally. That notwithstanding, government determination to conquer poverty has not diminish as in the early 1990s the government with financial collaboration from the World Bank and African Development Bank introduced the fadama project. It is against this backdrop that this paper uses the documentary and analytical research methods to examine the implication the fadama development project has for community capacity development and human security in Nigeria. From the analysis it was discovered the fadama project improved household income of fadama farmers, community empowerment, participatory development planning and support for demand driven productive investment in farm and non-farm activities including community infrastructures. Despite this impressive result the fadama project is challenged by conflict especially in northern Nigeria and late delivery of necessary farm consumables that aid improved productivity. It was therefore recommended that the government should strengthen her various state security institutions to proactively mitigate conflicts and to ensure that farm consumables and other support services reach farmers timely.

Keywords: capacity development, empowerment, fadama, human security, poverty reduction, theory of change, sustainable development

Procedia PDF Downloads 445
7448 Participatory Planning of the III Young Sea Meeting: An Experience of the Young Albatroz Collective

Authors: Victor V. Ribeiro, Thais C. Lopes, Rafael A. A. Monteiro

Abstract:

The Albatroz, Baleia Jubarte, Coral Vivo, Golfinho Rotador and Tamar projects make up the Young Sea Network (YSN), part of the BIOMAR Network, which aims to integrate the environmental youths of the Brazilian coast. For this, three editions of the Young Sea Meeting (YSM) were performed. Seeking to stimulate belonging, self-knowledge, participation, autonomy and youth protagonism, the Albatroz Project hosted the III YSM, in Bertioga (SP), in April 2019 and aimed to collectively plan the meeting. Five pillars of Environmental Education were used: identity, community, dialogue, power to act and happiness, the OCA Method and the Young Educates Young; Young Chooses Young; and One Generation Learns from the Other principals. In December 2018, still in the II YSM, the participatory planning of the III YSM began. Two "representatives" of each group were voluntarily elected to facilitate joint decisions, propose, receive and communicate demands from their groups and coordinators. The Young Albatroz Collective (YAC) facilitated the organization process as a whole. The purpose of the meeting was collectively constructed, answering the following question: "What is the YSM for?". Only two of the five pairs of representatives responded. There was difficulty gathering the young people in each group, because it was the end of the year, with people traveling. Thus, due to the short planning time, the YAC built a pre-programming to be validated by the other groups, defining as the objective of the meeting the strengthening of youth protagonism within the YSN. In the planning process, the YAC held 20 meetings, with 60 hours of face-to-face work, in three months, and two technical visits to the headquarters of the III YSM. The participatory dynamics of consultation, when it occurred, required up to two weeks, evidencing the limits of participation. The project coordinations stated that they were not being included in the process by their young people. There is a need to work more to be able to aloud the participation, developing skills and understanding about its principles. This training must take place in an articulated way between the network, implying the important role of the five projects in jointly developing and implementing educator processes with this objective in a national dimension, but without forgetting the specificities of each young group. Finally, it is worth highlighting the great potential of the III YSM by stimulating the exercise of leading environmental youth in more than 50 young people from Brazilian coast, linked to the YSN, stimulating the learning and mobilization of young people in favor of coastal and marine conservation.

Keywords: Marine Conservation, Environmental Education, Youth, Participation, Planning

Procedia PDF Downloads 134
7447 Optimising the Reservoir Operation Using Water Resources Yield and Planning Model at Inanda Dam, uMngeni Basin

Authors: O. Nkwonta, B. Dzwairo, F. Otieno, J. Adeyemo

Abstract:

The effective management of water resources is of great importance to ensure the supply of water resources to support changing water requirements over a selected planning horizon and in a sustainable and cost-effective way. Essentially, the purpose of the water resources planning process is to balance the available water resources in a system with the water requirements and losses to which the system is subjected. In such situations, water resources yield and planning model can be used to solve those difficulties. It has an advantage over other models by managing model runs, developing a representative system network, modelling incremental sub-catchments, creating a variety of standard system features, special modelling features, and run result output options.

Keywords: complex, water resources, planning, cost effective, management

Procedia PDF Downloads 418
7446 Evaluating the Logistic Performance Capability of Regeneration Processes

Authors: Thorben Kuprat, Julian Becker, Jonas Mayer, Peter Nyhuis

Abstract:

For years now, it has been recognized that logistic performance capability contributes enormously to a production enterprise’s competitiveness and as such is a critical control lever. In doing so, the orientation on customer wishes (e.g. delivery dates) represents a key parameter not only in the value-adding production but also in product regeneration. Since production and regeneration processes have different characteristics, production planning and control measures cannot be directly transferred to regeneration processes. As part of a special research project, the Institute of Production Systems and Logistics Hannover is focused on increasing the logistic performance capability of regeneration processes for complex capital goods. The aim is to ensure logistic targets are met by implementing a model specifically designed to align the capacities and load in regeneration processes.

Keywords: capacity planning, complex capital goods, logistic performance, regeneration process

Procedia PDF Downloads 460
7445 A Principal-Agent Model for Sharing Mechanism in Integrated Project Delivery Context

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasingly attention from construction industry because of its efficiency of solving adversarial problems and reliability to deliver high-performing buildings. However, some evidence showed that some project participants obtained less profit from IPD projects than the typical projects. They attributed it to the unfair IPD sharing mechanism, which resulted in additional time and cost of negotiation on the sharing fractions among project participants. The study is aimed to investigate the reward distribution by constructing a principal-agent model. Based on cooperative game theory, it is examined how to distribute the shared project rewards between client and non-client parties, and identify the sharing fractions among non-client parties. It is found that at least half of the project savings should be allocated to the non-client parties to motivate them to create more project value. Second, the client should raise his sharing fractions when the integration among project participants is efficient. In addition, the client should allocate higher sharing fractions to the non-client party who is more able. This study can help the IPD project participants make fair and motivated sharing mechanisms.

Keywords: cooperative game theory, IPD, principal agent model, sharing mechanism