Search results for: narrative construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4297

Search results for: narrative construction

4267 The New Far-Right: The Social Construction of Hatred against the Contemporary Islamic Community in Multicultural Australia

Authors: Angel Adams

Abstract:

In Australia, the contemporary social construction of hatred against the Islamic community was facilitated through the mainstream media. Australian public figures who have depicted Muslims and Islam not only as potential terrorists but also as incompatible with the country’s values and identities have helped to increase the level of fear against the Islamic community, leading sympathetic far-right movements to shift discussions towards anti-Islamic and anti-Muslim rhetoric. Political opportunities combined with a socially constructed narrative of fear of the ‘other’, introduced during the White Australia Policy of 1901, has allowed extreme and radical far-right movements to justify hate against the contemporary Australian Islamic community. This study aims to answer the following question: How does Australia’s founding provide a fertile environment to the spread of hatred against the contemporary Islamic community? The paper demonstrates that a forged social construct of grievances concerning the Islamic community in Australia has led to a surge in supply of far-right activism to combat what has become a perceived ‘national threat’. In essence, Australia’s history of a fear of the ‘other’ brings challenges to a multicultural society, and can potentially lead to a more unstable socio-political environment where abuse and violence are normalized and more likely to develop. Furthermore, the paper aims to bring a more nuanced understanding of what is considered ‘new far-right’ discourses with shared anti-Islam and anti-Muslim agendas in Australia. The political opportunity structures theory was the mechanism used to determine how new forms of far-right groups have become more mainstream in Australia. Previous studies on far-right groups in Australia have relied on qualitative data, but further empirical research in this area is sorely needed. Above all, this paper clarifies how hatred against minorities can have a negative impact on wider communities and allow a global narrative of ‘us’ versus ‘them’ to erupt from the fringes of society in Australia.

Keywords: Australia, Islamophobia, far-right, nationalism, political opportunity structures, political violence, social construction

Procedia PDF Downloads 100
4266 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 171
4265 Narratives and Meta-Narratives in the News of People Killed in 2022 Iranian Protests

Authors: Abbas Rezaei Samarin

Abstract:

In October 2022, protests began following the death of Mahsa Amini and were followed by the deaths of those arrested by Iran's morality police which Iran's official media and foreign Persian-language satellite channels presented to the audience different narratives of how they were killed. These two types of media produced two different and sometimes conflicting narratives when faced with the news of a certain person's death, and the conflict is found between the narratives in some cases. This study has focused on the semiotics of these narratives, the interpretation of discourses supporting the narratives, and finally, their analysis within the framework of narrative theories. In the present study, the researcher has used a qualitative approach and has concluded that the narrative of both types of media is structured around the functions of the existing and ideal political system.

Keywords: narrative, iran, fake news, protests, manipulation of reality

Procedia PDF Downloads 65
4264 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 254
4263 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 517
4262 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
4261 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 251
4260 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 197
4259 Earnings Management and Tone Management: Evidence from the UK

Authors: Salah Kayed Kayed, Jessica Hong Yang

Abstract:

This study investigates, whether earnings management in the audited financial statements is associated with tone management in the narrative sections of the annual report in the UK. Earnings management and narrative disclosure are communication strategies used from managers to communicate with investors or other users. Because earnings management and narrative disclosure stem from managers, they can exploit this by doing manipulation in their earnings, and simultaneously disclosing qualitative text (narrative information) in their reports as a tone of words, which will affect users’ perception, and hence users will be misinformed. The association between earnings and tone management can be explained by the self-serving, through cognitive reference points, theory. The sample period lasts from 2010 to 2015, and the sample comprises all non-financial firms that consider under FTSE 350 in any year during the sample period. A list of words from previous research is used to measure the tone in the narrative sections of the annual report. Because this study focuses on the managerial strategic choice and the subjective issues that come from management, it uses the abnormal tone to capture the managerial discretion on tone, and a number of different discretionary accruals proxies to measure earnings management, where accruals management is considered as a manipulation tool from managers to change the users' perception. This research is motivated to fulfil the literature gap by examining the association between earnings and tone management. Moreover, if firms that apply earnings management use tone management to mislead investors, it is beneficial for investors, policy makers, standard setters, or other users to know whether there is an association between earnings management and tone management. Clearly, we believe that this study is fundamental in the accounting context, where it evaluates the communication strategies that are used in firms' financial reports. Consistent with prior research, it is expected that tone management is positively associated with earnings management. This means that firms that use earnings management have incentives to manipulate in their narrative disclosure through tone of words, to reflect a good perception for users, which will conceal the earnings management techniques used in their reporting.

Keywords: earnings management, FTSE 350, narrative disclosure, tone management

Procedia PDF Downloads 230
4258 Teaching in the Post Truth Era: A Narrative Analysis of Modern Anti-Scientific Discourses in the Classroom

Authors: Jason T. Hilton

Abstract:

The ‘post-truth era’ is marked by a shift toward a period in which objective facts are less influential in shaping public opinion than appeals to emotion and personal belief. Applying narrative analysis techniques to current public discourses in education that run counter to scientific findings, it becomes possible to identify weakness in modern pedagogy and suggest ways to counter false narratives in the classroom. Results of this study indicate that a failure to engage with popular narratives lessens teachers’ ability to be convincing in the classroom, even when presenting information supported by scientific evidence. This study seeks to empower teachers by illustrating the influence of story within the post-truth era and the ways in which narrative and rhetorical elements take hold in social media contexts. Equipped with this knowledge, teachers can create a shift in pedagogy, away from transmission of knowledge toward the crafting of powerful narratives, built upon evidence, and connected to the lives of modern learners.

Keywords: 21st century learner, critical pedagogy, culture, narrative, post-truth era, social media

Procedia PDF Downloads 235
4257 A Narrative of Monks: Culture Heroes in Songkhla Province

Authors: Kuntalee Vaitayavanich

Abstract:

This study aimed to look into roles of culture heroes of monks in Buddhism in Songkhla province during the last 50 years. Qualitative study, in-depth interviews, participatory observation and non-participatory observation were employed for this study. The results of the study indicated that culture heroes in Songkhla province would act as the followings. 1) For secular matters, monks would do something beneficial to the community. 2) For religious matters, monks would behave to follow Buddhism discipline strictly and unambitiously. At the same time, monks would not neglect to teach Buddhists to give respect to Lord Buddha by doing meditation and praying. However, when some of those culture heroes passed away, villagers in the community would show gratitude and appreciation by arranging a religious death anniversary ceremony, having icon, or having narrative to recognize those, continuously.

Keywords: narrative of monks, culture heroes, Songkhla province, social sustainability

Procedia PDF Downloads 349
4256 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 361
4255 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 314
4254 Narrative Identity Predicts Borderline Personality Disorder Features in Inpatient Adolescents up to Six Months after Admission

Authors: Majse Lind, Carla Sharp, Salome Vanwoerden

Abstract:

Narrative identity is the dynamic and evolving story individuals create about their personal pasts, presents, and presumed futures. This storied sense of self develops in adolescence and is crucial for fostering a sense of self-unity and purpose in life. A growing body of work has shown that several characteristics of narrative identity are disturbed in adults suffering from borderline personality disorder (BPD). Very little research, however, has explored the stories told by adolescents with BPD features. Investigating narrative identity early in the lifespan and in relation to personality pathology is crucial; BPD is a developmental disorder with early signs appearing already in adolescence. In the current study, we examine narrative identity (focusing on themes of agency and communion) coded from self-defining memories derived from the child attachment interview in 174 inpatient adolescents (M = 15.12, SD = 1.52) at the time of admission. The adolescents’ social cognition was further assessed on the basis of their reactions to movie scenes (i.e., the MASC movie task). They also completed a trauma checklist and self-reported BPD features at three different time points (i.e., at admission, at discharge, and 6 months after admission). Preliminary results show that adolescents who told stories containing themes of agency and communion evinced better social cognition, and lower emotional abuse on the trauma checklist. In addition, adolescents who disclosed stories containing lower levels of agency and communion demonstrated more BPD symptoms at all three time points, even when controlling for the occurrence of traumatic life events. Surprisingly, social cognitive abilities were not significantly associated with BPD features. These preliminary results underscore the importance of narrative identity as an indicator, and potential cause, of incipient personality pathology. Thus, focusing on diminished themes of narrative-based agency and communion in early adolescence could be crucial in preventing the development of personality pathology over time.

Keywords: borderline personality disorder, inpatient adolescents, narrative identity, follow-ups

Procedia PDF Downloads 125
4253 ‘An Invisible Labyrinth of Time’: Temporal Disjunction in J.M. Coetzee’s Dusklands

Authors: Barbara Janari

Abstract:

This paper focuses on temporality in J.M. Coetzee’s first novel, Dusklands, to argue that the novel’s fractured, disjointed temporality is intricately linked to the representations of the war in Vietnam and the colonial project in South Africa. The disrupted temporalities in the novel eschew chronological plots and linear time in favour of narratives that subvert the notion of historical progress to suggest instead the coextensive, multivalent ways in which the past and present interpenetrate one another. The disruption of temporal flow in the novel is evident in its form – the novel comprises two novellas that are juxtaposed, with the first part (‘The Vietnam War’) set centuries before the second part (‘The Narrative of Jacobus Coetzee’). The juxtaposition of the two novellas suggests history’s sometimes overlapping and lateral, rather than linear, movement. The novel’s form is extended in its montage narrative structure, which works to extend its temporal range. The temporal disjunction is reinforced, firstly, by Coetzee’s textual strategies, which include the subversion and critique of realism, parody, repetition, and the narrative technique of montage, and secondly, by the novel’s thematic concerns, which focus on the ways in which American domination can be linked to the colonial quest from earlier times. The complex structure of various strands and levels of authorship slows down the narrative’s temporal flow, requiring the reader to spend a fair amount of time unraveling the various parts of the narrative and relating them to each other. The structure epitomizes reflexive referencing, in which the reader can only make sense of the narrative by going back and forth and connecting various parts of it. The narrative structure also emphasizes the underlying similarities in the brutality that marked these two distinct historical events, epitomized by the drive towards subjection and domination by the novel’s two protagonists, Eugene Dawn and Jacobus Coetzee. The links and overlapping strands between the two novellas emphasize the ways in which the historical truth of colonial discourse becomes as much a myth as the propaganda program in Vietnam.

Keywords: disjunction, juxtaposition, montage, temporality

Procedia PDF Downloads 33
4252 Revealing Corruption through Strategic Narration in Mandla Langa’s Memory of Stones (2000)

Authors: Dzunisani Sibuyi

Abstract:

This article demonstrates how corruption is revealed in Mandla Langa’s Memory of Stones (2000) through the deployment of narrational strategies by applying narrative theories by Gerard Genette’s Narrative Discourse and Narrative Discourse Revisited, as well as Mikhail Bakhtin’s Dialogic Imagination to the text. This is accomplished by analysing Langa’s use of extradiegetic-heterodiegetic and intradiegetic-homodiegetic narrational strategies respectively employed by the anonymous narrator and character narrator Mpanza. The narration provided by these narrators is multi-voiced in its approach to the events depicting corruption from various completing and explanatory perspectives. In addition, Langa also employs narrative techniques of narrating times such as simultaneous, subsequent, and interpolated narration to highlight corruption taking place, which is highlighted by situating the story in its presentness moments coinciding with the corruption action. As a result, by emphasising the events portraying the plight of the main characters and their struggle to resist and defeat corrupt leaders, the narration strategically reveals corruption.

Keywords: narrational strategies, narrating voice, dialogism, corruption, Gérard Genette, Mandla Langa, Mikhail Bakhtin, time(s) of the narration

Procedia PDF Downloads 75
4251 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
4250 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 272
4249 Understanding Narrative Transformations of Ebola in Negotiations of Epidemic Risk

Authors: N. W. Paul, M. Banerjee

Abstract:

Discussing the nexus between global health policy and local practices, this article addresses the recent Ebola outbreak as a role model for narrative co-constructions of epidemic risk. We will demonstrate in how far a theory-driven and methodologically rooted analysis of narrativity can help to improve mechanisms of prevention and intervention whenever epidemic risk needs to be addressed locally in order to contribute to global health. Analyzing the narrative transformation of Ebola, we will also address issues of transcultural problem-solving and of normative questions at stake. In this regard, we seek to contribute to a better understanding of a key question of global health and justice as well as to the underlying ethical questions. By highlighting and analyzing the functions of narratives, this paper provides a translational approach to refine our practices by which we address epidemic risk, be it on the national, the transnational or the global scale.

Keywords: ebola, epidemic risk, medical ethics, medical humanities

Procedia PDF Downloads 421
4248 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 63
4247 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 46
4246 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 53
4245 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 225
4244 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 85
4243 The Development of Iranian Theatrical Performance through the Integration of Narrative Elements from Western Drama

Authors: Azadeh Abbasikangevari

Abstract:

Background and Objectives: Theatre and performance are two separate themes. What is presented in Iran as a performance is the species and ritual and traditional forms of the play. The Iranian performance has its roots in myth and ritual. Drama is essentially a Western phenomenon that has gradually entered Iran and influenced Iranian performance. A theatre is based on antagonism (axis) and protagonism (anti-axis), while performance has a monotonous and steady motion. The elements of Iranian performance include field, performance on the stage, and magnification in performance, all of which are based on narration. This type of narration has been present in Iranian modern drama. The objective of this study was to analyze the drama structure according to narration elements by a comparison between the Western theater and the Iranian performance and determining the structural differences in the type of narrative. Materials and Methods: In this study, the elements of the drama were analyzed using the library method among the available library resources. The review of the literature included research articles and textbooks which focused on Iranian plays, as well as books and articles which encompassed narrative and drama element. Data were analyzed in the comparative-descriptive method. Results: Examining and studying different kinds of Iranian performances, showed that the narrative has always been a characteristic feature of Iranian plays. Iranians have narrated the stories and myths and have had a particular skill of oral literature. Over time, they slowly introduced narrative culture into their art, where this element is the most important structural element in Iran's dramatic art. Considering the fact that narration in Iranian traditional play, such as Ta'ziyeh and Naghali, was oral and consequently, it was slowly forgotten and excluded from written theatrical texts. Since the drama has entered in its western form in Iran, the plays written by the authors were influenced by narrative elements existing in western plays. Conclusions: The narrative’s element has undoubtedly had an impact on modern Iranian drama and Iranian contemporary drama. Therefore, the element of narration is an integral part of the Iranian traditional play structure.

Keywords: drama methodology, Iranian performance, Iranian modern drama, narration

Procedia PDF Downloads 104
4242 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 86
4241 A Brief Narrative Intervention to Improve Well-being and Relational Ethics in Couples: A Mixed-Method Case Study

Authors: Kevser Cakmak, Adrián Montesano, Lourdes Artigas, Marta Salla, Clara Mateu

Abstract:

The main objective of this research is to explore the relational letter writing technique as an intervention in couple therapy for reconnecting couples with their values and ethical preferences. This is a recently developed therapeutic tool within the framework of Narrative Therapy that consists of two interviews and a letter writing task, in which a meta-conversation between the relationship itself, the couple members, and the therapists is fostered. Although this specific therapeutic technique can be used within the therapy process, in this case study, it is used as a brief stand-alone narrative intervention for a middle age heterosexual couple breast cancer survivor. Couple’s relational and personal wellbeing was monitored before, during, and after the intervention by means of the dyadic adjustment and the clinical outcomes in routine evaluation-outcome measure, respectively. The couple showed a significant improvement after the intervention in both levels. The content of the letter writing exercises was qualitatively analysed to explore the reconstruction of their ethical values. Results from both methods are integrated in order to get an in-depth perspective of the newly developed tool. The potential of the letter writing technique as stand-alone and as adjunct brief intervention is discussed.

Keywords: couple therapy, narrative therapy, psychotherapy tool, relational letter writing

Procedia PDF Downloads 98
4240 Narrative Constructs and Environmental Engagement: A Textual Analysis of Climate Fiction’s Role in Shaping Sustainability Consciousness

Authors: Dean J. Hill

Abstract:

This paper undertakes the task of conducting an in-depth textual analysis of the cli-fi genre. It examines how writing in the genre contributes to expressing and facilitating the articulation of environmental consciousness through the form of narrative. The paper begins by situating cli-fi within the literary continuum of ecological narratives and identifying the unique textual characteristics and thematic preoccupations of this area. The paper unfolds how cli-fi transforms the esoteric nature of climate science into credible narrative forms by drawing on language use, metaphorical constructs, and narrative framing. It also involves how descriptive and figurative language in the description of nature and disaster makes climate change so vivid and emotionally resonant. The work also points out the dialogic nature of cli-fi, whereby the characters and the narrators experience inner disputes in the novel regarding the ethical dilemma of environmental destruction, thus demanding the readers challenge and re-evaluate their standpoints on sustainability and ecological responsibilities. The paper proceeds with analysing the feature of narrative voice and its role in eliciting empathy, as well as reader involvement with the ecological material. In looking at how different narratorial perspectives contribute to the emotional and cognitive reaction of the reader to text, this study demonstrates the profound power of perspective in developing intimacy with the dominating concerns. Finally, the emotional arc of cli-fi narratives, running its course over themes of loss, hope, and resilience, is analysed in relation to how these elements function to marshal public feeling and discourse into action around climate change. Therefore, we can say that the complexity of the text in the cli-fi not only shows the hard edge of the reality of climate change but also influences public perception and behaviour toward a more sustainable future.

Keywords: cli-fi genre, ecological narratives, emotional arc, narrative voice, public perception

Procedia PDF Downloads 8
4239 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 222
4238 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 358