Search results for: maintenance projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3475

Search results for: maintenance projects

3355 Template Design Packages for Repetitive Construction Projects

Authors: Ali Youniss Aidbaiss, G. Unnikrishnan, Anoob Hakim

Abstract:

Scope changes, scope creeps, cost and time overruns have become common in projects in the oil and gas sector. Even in repetitive projects, failure to implement lessons learnt and correct past mistakes have resulted in various setbacks. This paper describes the concept of reusing successfully implemented design packages as templates for repetitive projects, and thereby lowering the instances of project failures. Units or systems successfully installed in projects can be identified and taken up for preparing template design packages. Standardization of units and systems helps to develop templates from successful designs which can be repeatedly used with confidence. These packages can be used with minimum modifications for developing FEED packages faster, saving cost and other valuable resources. Lessons learnt from the completed project incorporated in the templates avoid repeating past mistakes during detailed design, procurement and execution. With template packages, consistent quality can be maintained for similar projects, avoiding scope creep and scope changes which will ultimately result in cost and time savings.

Keywords: engineering work package, repetitive construction, template design package, time saving in projects

Procedia PDF Downloads 289
3354 A Framework for ERP Project Evaluation Based on BSC Model: A Study in Iran

Authors: Mohammad Reza Ostad Ali Naghi Kashani, Esfanji Elia

Abstract:

Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing particularly in developing countries like Iran. ERP projects are expensive, time consuming, and complex, in addition the failure rate is high among these projects. It is important to know whether these projects could meet their goals or not. Furthermore, the area which should be improved should be identified. In this paper we made a framework to evaluate ERP projects success implementation. First, based on literature review we made a framework based on BSC model, financial, customer, processes, learning and knowledge, because of the importance of change management it was added to model. Then an organization was divided in three layers. We choose corporate, managerial, and operational levels. Then to find criteria to assess each aspect, we use Delphi method in two rounds. And for the second round we made a questionnaire and did some statistical tasks on them. Based on the statistical results some of them are accepted and others are rejected.

Keywords: ERP, BSC, ERP project evaluation, IT projects

Procedia PDF Downloads 300
3353 Power Transformer Risk-Based Maintenance by Optimization of Transformer Condition and Transformer Importance

Authors: Kitti Leangkrua

Abstract:

This paper presents a risk-based maintenance strategy of a power transformer in order to optimize operating and maintenance costs. The methodology involves the study and preparation of a database for the collection the technical data and test data of a power transformer. An evaluation of the overall condition of each transformer is performed by a program developed as a result of the measured results; in addition, the calculation of the main equipment separation to the overall condition of the transformer (% HI) and the criteria for evaluating the importance (% ImI) of each location where the transformer is installed. The condition assessment is performed by analysis test data such as electrical test, insulating oil test and visual inspection. The condition of the power transformer will be classified from very poor to very good condition. The importance is evaluated from load criticality, importance of load and failure consequence. The risk matrix is developed for evaluating the risk of each power transformer. The high risk power transformer will be focused firstly. The computerized program is developed for practical use, and the maintenance strategy of a power transformer can be effectively managed.

Keywords: asset management, risk-based maintenance, power transformer, health index

Procedia PDF Downloads 282
3352 The Urbanistic Initiative of Architecture Students to Intensify the Socio-Economic and Spatial Development of Small Settlements in Tatarstan

Authors: Karina Rashidovna Nabiullina

Abstract:

In 2016, the ‘Beautiful Country’ innovative project was implemented in the Republic of Tatarstan (Russia). This project started at the initiative of architecture students majoring in city planning during their summer internship. As a part of the internship, the students had to study the layout and the lifestyle of Tatarstan towns. All the projects were presented to the Ministry of Construction of Tatarstan, which allowed the settlement authorities to receive the government funding for their implementation. This initiative, from the public discussion of the projects to their implementation, was welcomed by the local communities, evoked local patriotism, created new jobs as a part of the projects' implementation, and improved the architectural environment of the settlements. The projects initiated by the students became the ‘Big Projects’ for these small settlements.

Keywords: adapted graphic language, complex territorial development, identity of local resources, overcoming stagnation, participation

Procedia PDF Downloads 306
3351 Earthquake Effect in Micro Hydro Sector: Case Study of Dulakha District, Nepal

Authors: Keshav Raj Dhakal, Jit Bahadur Rokaya Chhetri

Abstract:

The Micro Hydro (MH) is one of the successful technology in Rural Nepal. Out of 75 district, 59 districts have installed 1287 MH projects with a total capacity of 24 Mega Watt (MW). Now, the challenge is how to sustain them. Dolakha is a prominent district for sustainable endues of power to sustain the MH projects. A total of 37 MH projects have been constructed with producing 886 Kilo Watt (KW) of energy in the district. This study traces out the impact of earthquake in MH sector in Dolakha district. It shows that 59 % of projects have been affected by devastating earthquake in April and May, 2015 where 29 % are completely damaged. Most of the damages are in civil structures like Penstock, forebay, power house, Canal, Intake. Transmission and distribution line have been partially damaged. This paper analysis failure of the civil structural component of MH projects and its financial consequence to the community. This study recommends that a disaster impact assessment is essential before construction of MH projects.

Keywords: micro hydro, earthquake, structural failure, financial consequence

Procedia PDF Downloads 184
3350 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 70
3349 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants

Authors: Samuel Capintero, Ole H. Petersen

Abstract:

This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.

Keywords: wastewater, treatment plants, PPP, construction

Procedia PDF Downloads 617
3348 Roadway Maintenance Management System

Authors: Chika Catherine Ayogu

Abstract:

Rehabilitation plays an important and integral part in the life of roadway rehabilitation management system. It is a systematic method for inspection and rating the roadway condition in a given area. The system performs a cost effective analysis of various maintenance and rehabilitation strategies. Finally the system prioritize and recommend roadway rehabilitation and maintenance to maximize results within a given budget amount. During execution of maintenance activity, the system also tracks labour, materials, equipment and cost for activities performed. The system implements physical assessment field inspection and rating of each street segment which is then entered into a database. The information is analyzed using a software, and provide recommendations and project future conditions. The roadway management system provides a deterioration curve for each segment based on input then assigns the most cost-effective maintenance strategy based on conditions, surface type and functional classification, and available budget. This paper investigates the roadway management system and its capabilities to assist in applying the right treatment to the right roadway at the right time so that expected service life of the roadway is extended as long as possible with acceptable cost.

Keywords: effectiveness, rehabilitation, roadway, software system

Procedia PDF Downloads 122
3347 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 334
3346 Simultaneous Optimization of Design and Maintenance through a Hybrid Process Using Genetic Algorithms

Authors: O. Adjoul, A. Feugier, K. Benfriha, A. Aoussat

Abstract:

In general, issues related to design and maintenance are considered in an independent manner. However, the decisions made in these two sets influence each other. The design for maintenance is considered an opportunity to optimize the life cycle cost of a product, particularly in the nuclear or aeronautical field, where maintenance expenses represent more than 60% of life cycle costs. The design of large-scale systems starts with product architecture, a choice of components in terms of cost, reliability, weight and other attributes, corresponding to the specifications. On the other hand, the design must take into account maintenance by improving, in particular, real-time monitoring of equipment through the integration of new technologies such as connected sensors and intelligent actuators. We noticed that different approaches used in the Design For Maintenance (DFM) methods are limited to the simultaneous characterization of the reliability and maintainability of a multi-component system. This article proposes a method of DFM that assists designers to propose dynamic maintenance for multi-component industrial systems. The term "dynamic" refers to the ability to integrate available monitoring data to adapt the maintenance decision in real time. The goal is to maximize the availability of the system at a given life cycle cost. This paper presents an approach for simultaneous optimization of the design and maintenance of multi-component systems. Here the design is characterized by four decision variables for each component (reliability level, maintainability level, redundancy level, and level of monitoring data). The maintenance is characterized by two decision variables (the dates of the maintenance stops and the maintenance operations to be performed on the system during these stops). The DFM model helps the designers choose technical solutions for the large-scale industrial products. Large-scale refers to the complex multi-component industrial systems and long life-cycle, such as trains, aircraft, etc. The method is based on a two-level hybrid algorithm for simultaneous optimization of design and maintenance, using genetic algorithms. The first level is to select a design solution for a given system that considers the life cycle cost and the reliability. The second level consists of determining a dynamic and optimal maintenance plan to be deployed for a design solution. This level is based on the Maintenance Free Operating Period (MFOP) concept, which takes into account the decision criteria such as, total reliability, maintenance cost and maintenance time. Depending on the life cycle duration, the desired availability, and the desired business model (sales or rental), this tool provides visibility of overall costs and optimal product architecture.

Keywords: availability, design for maintenance (DFM), dynamic maintenance, life cycle cost (LCC), maintenance free operating period (MFOP), simultaneous optimization

Procedia PDF Downloads 89
3345 Implementation of Enterprise Asset Management (E-AM) System at Oman Electricity Transmission Company

Authors: Omran Al Balushi, Haitham Al Rawahi

Abstract:

Enterprise Asset Management (eAM) has been implemented across different Generation, Transmission and Distribution subsidiaries in Nama Group companies. As part of Nama group, Oman Electricity Transmission Company (OETC) was the first company to implement this system. It was very important for OETC to implement and maintain such a system to achieve its business objectives and for effective operations, which will also support the delivery of the asset management strategy. Enterprise Asset Management (eAM) addresses the comprehensive asset maintenance requirements of Oman Electricity Transmission Company (OETC). OETC needs to optimize capacity and increase utilization, while lowering unit production. E-AM will enable OETC to adopt this strategy. Implementation of e-AM has improved operation performance with preventive and scheduled maintenance as well as it increased safety. Implementation of e-AM will also enable OETC to create optimal asset management strategy which will increase revenue and decrease cost by effectively monitoring operational data such as maintenance history and operation conditions. CMMS (Computerised Maintenance Management System) is the main software and the back-bone of e-AM system. It is used to provide an improved working practice to properly establish information and data flow related to maintenance activities. Implementation of e-AM system was one of the factors that supported OETC to achieve ISO55001 Certificate on fourth quarter of 2016. Also, full implementation of e-AM system will result in strong integration between CMMS and Geographical Information Systems (GIS) application and it will improve OETC to build a reliable maintenance strategy for all asset classes in its Transmission network. In this paper we will share our experience and knowledge of implementing such a system and how it supported OETC’s management to make decisions. Also we would highlight the challenges and difficulties that we encountered during the implementation of e-AM. Also, we will list some features and advantages of e-AM in asset management, preventive maintenance and maintenance cost management.

Keywords: CMMS, Maintenance Management, Asset Management, Maintenance Strategy

Procedia PDF Downloads 112
3344 Implementing a Strategy of Reliability Centred Maintenance (RCM) in the Libyan Cement Industry

Authors: Khalid M. Albarkoly, Kenneth S. Park

Abstract:

The substantial development of the construction industry has forced the cement industry, its major support, to focus on achieving maximum productivity to meet the growing demand for this material. Statistics indicate that the demand for cement rose from 1.6 billion metric tons (bmt) in 2000 to 4bmt in 2013. This means that the reliability of a production system needs to be at the highest level that can be achieved by good maintenance. This paper studies the extent to which the implementation of RCM is needed as a strategy for increasing the reliability of the production systems component can be increased, thus ensuring continuous productivity. In a case study of four Libyan cement factories, 80 employees were surveyed and 12 top and middle managers interviewed. It is evident that these factories usually breakdown more often than once per month which has led to a decline in productivity, they cannot produce more than 50% of their designed capacity. This has resulted from the poor reliability of their production systems as a result of poor or insufficient maintenance. It has been found that most of the factories’ employees misunderstand maintenance and its importance. The main cause of this problem is the lack of qualified and trained staff, but in addition, it has been found that most employees are not found to be motivated as a result of a lack of management support and interest. In response to these findings, it has been suggested that the RCM strategy should be implemented in the four factories. The paper shows the importance of considering the development of maintenance strategies through the implementation of RCM in these factories. The purpose of it would be to overcome the problems that could reduce the level of reliability of the production systems. This study could be a useful source of information for academic researchers and the industrial organisations which are still experiencing problems in maintenance practices.

Keywords: Libyan cement industry, reliability centred maintenance, maintenance, production, reliability

Procedia PDF Downloads 362
3343 Mitigation of High Voltage Equipment Design Deficiencies for Improved Operation and Maintenance

Authors: Riyad Awad, Abdulmohsen Alghadeer, Meshari Otaibi

Abstract:

Proper operation and maintenance (O&M) activities of high voltage equipment can lead to an increased asset lifecycle and maintain its integrity and reliability. Such a vital process is important to be proactively considered during equipment design and manufacturing phases by removing and eliminating any obstacles in the equipment which adversely affect the (O&M) activities. This paper presents a gap analysis pertaining to difficulties in performing operations and maintenance (O&M) high voltage electrical equipment, includes power transformers, switch gears, motor control center, disconnect switches and circuit breakers. The difficulties are gathered from field personnel, equipment design review comments, quality management system, and lessons learned database. The purpose of the gap analysis is to mitigate and prevent the (O&M) difficulties as early as possible in the design stage of the equipment lifecycle. The paper concludes with several recommendations and corrective actions for all identified gaps in order to reduce the cost (O&M) difficulties and improve the equipment lifecycle.

Keywords: operation and maintenance, high voltage equipment, equipment lifecycle, reduce the cost of maintenance

Procedia PDF Downloads 131
3342 Strategic Investment in Infrastructure Development to Facilitate Economic Growth in the United States

Authors: Arkaprabha Bhattacharyya, Makarand Hastak

Abstract:

The COVID-19 pandemic is unprecedented in terms of its global reach and economic impacts. Historically, investment in infrastructure development projects has been touted to boost the economic growth of a nation. The State and Local governments responsible for delivering infrastructure assets work under tight budgets. Therefore, it is important to understand which infrastructure projects have the highest potential of boosting economic growth in the post-pandemic era. This paper presents relationships between infrastructure projects and economic growth. Statistical relationships between investment in different types of infrastructure projects (transit, water and wastewater, highways, power, manufacturing etc.) and indicators of economic growth are presented using historic data between 2002 and 2020 from the U.S. Census Bureau and U.S. Bureau of Economic Analysis (BEA). The outcome of the paper is the comparison of statistical correlations between investment in different types of infrastructure projects and indicators of economic growth. The comparison of the statistical correlations is useful in ranking the types of infrastructure projects based on their ability to influence economic prosperity. Therefore, investment in the infrastructures with the higher rank will have a better chance of boosting the economic growth. Once, the ranks are derived, they can be used by the decision-makers in infrastructure investment related decision-making process.

Keywords: economic growth, infrastructure development, infrastructure projects, strategic investment

Procedia PDF Downloads 146
3341 Contents for the Maintenance and Troubleshooting of Anti-lock Braking System for Automobile Craftsmen in Nigeria

Authors: Arah Abubakar Saidu, Audu Rufai, Abdulkadir Mohammed, Ibrahim Yakubu Umar, Idris Abubakar Mohammed

Abstract:

The study determined the contents for the maintenance and troubleshooting of an anti-lock braking system for automobile craftsmen in Nigeria. Two research questions were raised and answered and two null hypotheses were formulated and tested at a .05 level of significance. The study adopted a descriptive survey research design. The study was conducted in Federal Capital Territory (FCT), Abuja, Kaduna, Kano, Lagos and Plateau States, Nigeria. The targeted population for the study was 99 consisting of all 43 non-teaching Subject Matter Experts (SMEs). The study utilized the whole population of the study. The instruments used for data collection were Anti-lock Braking System Maintenance and Troubleshooting Contents Questionnaire (ABSMTQ). Mean was used to analyze data that answered research questions and Z-test was used in testing the null hypotheses. Findings revealed, among others, that 81 items as content for the maintenance of ABS and 61 items as content for troubleshooting ABS for automobile craftsmen in Nigeria. Based on the findings of the study, the recommended, among others, that the National Board for Technical Education should include the contents for the maintenance and troubleshooting ABS in Motor Vehicle Mechanic Works curriculum used for training automobile craftsmen through the process of curriculum review in order to equip them with the competencies in troubleshooting and maintenance of ABS.

Keywords: anti-lock braking system, maintenance, troubleshooting, automobile craftsmen

Procedia PDF Downloads 64
3340 Productivity Improvement of Faffa Food Share Company Using a Computerized Maintenance Management System

Authors: Gadisa Alemayehu, Muralidhar Avvari, Atkilt Mulu G.

Abstract:

Since 1962 EC, the Faffa Food Share Company has been producing and supplying flour (famix) and value-added flour (baby food) in Ethiopia. It meets nearly all of the country's total flour demand, both for relief and commercial markets. However, it is incompetent in the international market due to a poor maintenance management system. The results of recorded documents and stopwatches revealed that frequent failure machines, as well as a poor maintenance management system, cause increased production downtimes, resulting in a 29.19 percent decrease in production from the planned production. As a result, the current study's goal is to recommend newly developed software for use in and as a Computerized Maintenance Management System (CMMS). As a result, the system increases machine reliability and decreases the frequency of equipment failure, reducing breakdown time and maintenance costs. The company's overall manufacturing performance improved by 4.45 percent, particularly after the implementation of the CMMS.

Keywords: CMMS, manufacturing performance, delivery, availability, flexibility, Faffa Food Share Company

Procedia PDF Downloads 106
3339 Reliability-Based Life-Cycle Cost Model for Engineering Systems

Authors: Reza Lotfalian, Sudarshan Martins, Peter Radziszewski

Abstract:

The effect of reliability on life-cycle cost, including initial and maintenance cost of a system is studied. The failure probability of a component is used to calculate the average maintenance cost during the operation cycle of the component. The standard deviation of the life-cycle cost is also calculated as an error measure for the average life-cycle cost. As a numerical example, the model is used to study the average life cycle cost of an electric motor.

Keywords: initial cost, life-cycle cost, maintenance cost, reliability

Procedia PDF Downloads 568
3338 Towards a Simulation Model to Ensure the Availability of Machines in Maintenance Activities

Authors: Maryam Gallab, Hafida Bouloiz, Youness Chater, Mohamed Tkiouat

Abstract:

The aim of this paper is to present a model based on multi-agent systems in order to manage the maintenance activities and to ensure the reliability and availability of machines just with the required resources (operators, tools). The interest of the simulation is to solve the complexity of the system and to find results without cost or wasting time. An implementation of the model is carried out on the AnyLogic platform to display the defined performance indicators.

Keywords: maintenance, complexity, simulation, multi-agent systems, AnyLogic platform

Procedia PDF Downloads 282
3337 Role of Community Participation in Sustainability of Projects: A Multiple Case Study of Developmental Projects in Khyber Pakhtunkhwa, Pakistan

Authors: Sajid Ali Khan, Karim Ullah, Usman Ghani

Abstract:

Community participation is the collaboration of project beneficiaries; voluntarily or because of some incentives or persuasion agree to put effort and work with development projects. Sustainability of projects is the ability to maintain its services, operations, and other benefits during its anticipated time. This study investigated the dynamics of community participation and its contribution to the sustainability of projects. In multiple case-study designs with semi-structured questionnaires and interviews, this study analyzes community participation with the help of individual case analysis followed by cross-case analysis in the RAHA & CDLD developmental project. Finally, the study outcomes are linked with the specified literature in order to comprehend the phenomena. The findings of the study suggest an Analytical framework developed by the current study covering different barriers and enablers to community participation and its implications.

Keywords: community participation, enablers, barriers, project sustainability

Procedia PDF Downloads 221
3336 Administrative and Legal Instruments of Disciplining Maintenance Debtors in Poland - A Critical Analysis of Their Effectiveness

Authors: Tomasz Kosicki

Abstract:

The subject of the presentation will be the administrative and legal instruments of disciplining maintenance debtors adopted by the Polish legislator, the substantive legal bases of which were adopted in the Act of 7 September 2007 on assistance to persons entitled to maintenance (Journal of Laws of 2022, item 1205). These provisions are complemented by procedural regulations resulting from the Act of 14 June 1960 - Code of Administrative Procedure (Journal of Laws of 2021, item 735, as amended). The first part of the paper will focus on the administrative proceedings regarding the recognition of the debtor as evading maintenance obligations. The initiation of this procedure ex officio is preceded by a number of actions by public administration bodies, including Conducting a maintenance interview with the debtor, during which his health and professional situation and the reasons for non-payment of maintenance are determined, Professional activation in a situation where the lack of payment of maintenance results from the lack of employment. The reasons for initiating the above-mentioned administrative proceedings ex officio will be indicated, taking into account the current views of the judicial decisions. The second part of the paper will focus on the instrument of retaining the driving license of the debtor, who was previously found to be evading maintenance. The author points out that the detention of the driving license is one of the types of administrative sanctions of a very severe nature. Doubts of a constitutional nature will also be highlighted, as well as those concerning the effectiveness of this legal instrument and the protection of the debtor's rights. The thesis will be presented that the administrative procedure for the retention of a driving license does not fulfill its role and especially does not affect the collection of maintenance obligations from debtors. All the considerations will be based on the current and most representative views of the literature on the subject and the jurisprudence of Polish administrative courts.

Keywords: maintenance debtor, administrative proceedings, detention of driving license, administrative sanction, polish administrative law, public administration

Procedia PDF Downloads 58
3335 Analyzing Competition in Public Construction Projects

Authors: Khaled Hesham Hyari, Amjad Almani

Abstract:

Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.

Keywords: construction projects, competitive bidding, public construction, competition

Procedia PDF Downloads 310
3334 Optimal Tamping for Railway Tracks, Reducing Railway Maintenance Expenditures by the Use of Integer Programming

Authors: Rui Li, Min Wen, Kim Bang Salling

Abstract:

For the modern railways, maintenance is critical for ensuring safety, train punctuality and overall capacity utilization. The cost of railway maintenance in Europe is high, on average between 30,000 – 100,000 Euros per kilometer per year. In order to reduce such maintenance expenditures, this paper presents a mixed 0-1 linear mathematical model designed to optimize the predictive railway tamping activities for ballast track in the planning horizon of three to four years. The objective function is to minimize the tamping machine actual costs. The approach of the research is using the simple dynamic model for modelling condition-based tamping process and the solution method for finding optimal condition-based tamping schedule. Seven technical and practical aspects are taken into account to schedule tamping: (1) track degradation of the standard deviation of the longitudinal level over time; (2) track geometrical alignment; (3) track quality thresholds based on the train speed limits; (4) the dependency of the track quality recovery on the track quality after tamping operation; (5) Tamping machine operation practices (6) tamping budgets and (7) differentiating the open track from the station sections. A Danish railway track between Odense and Fredericia with 42.6 km of length is applied for a time period of three and four years in the proposed maintenance model. The generated tamping schedule is reasonable and robust. Based on the result from the Danish railway corridor, the total costs can be reduced significantly (50%) than the previous model which is based on optimizing the number of tamping. The different maintenance strategies have been discussed in the paper. The analysis from the results obtained from the model also shows a longer period of predictive tamping planning has more optimal scheduling of maintenance actions than continuous short term preventive maintenance, namely yearly condition-based planning.

Keywords: integer programming, railway tamping, predictive maintenance model, preventive condition-based maintenance

Procedia PDF Downloads 417
3333 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects

Authors: Akerele Akintunde Hareef

Abstract:

GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.

Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment

Procedia PDF Downloads 519
3332 Surveying Apps in Dam Excavation

Authors: Ali Mohammadi

Abstract:

Whenever there is a need to dig the ground, the presence of a surveyor is required to control the map. In projects such as dams and tunnels, these controls are more important because any mistakes can increase the cost. Also, time is great importance in These projects have and one of the ways to reduce the drilling time is to use techniques that can reduce the mapping time in these projects. Nowadays, with the existence of mobile phones, we can design apps that perform calculations and drawing for us on the mobile phone. Also, if we have a device that requires a computer to access its information, by designing an app, we can transfer its information to the mobile phone and use it, so we will not need to go to the office.

Keywords: app, tunnel, excavation, dam

Procedia PDF Downloads 32
3331 Administrative and Legal Instruments of Disciplining Maintenance (alimony) Debtors in Poland - A Critical Analysis of their Effectiveness

Authors: Tomasz Kosicki

Abstract:

The subject of the presentation will be the administrative and legal instruments of disciplining maintenance debtors adopted by the Polish legislator, the substantive legal bases of which were adopted in the Act of 7 September 2007 on assistance to persons entitled to maintenance (Journal of Laws of 2022, item 1205). These provisions are complemented by procedural regulations resulting from the Act of 14 June 1960 - Code of Administrative Procedure (Journal of Laws of 2021, item 735, as amended). The first part of the paper will focus on the administrative proceedings regarding the recognition of the debtor as evading maintenance obligations. The initiation of this procedure ex officio is preceded by a number of actions by public administration bodies, including Conducting a maintenance interview with the debtor, during which his health and professional situation and the reasons for non-payment of maintenance are determined, Professional activation in a situation where the lack of payment of maintenance results from the lack of employment. The reasons for initiating the above-mentioned administrative proceedings ex officio will be indicated, taking into account the current views of the judicial decisions. The second part of the paper will focus on the instrument of retaining the driving license of the debtor, who was previously found to be evading maintenance. The author points out that the detention of the driving license is one of the types of administrative sanctions of a very severe nature. Doubts of a constitutional nature will also be highlighted, as well as those concerning the effectiveness of this legal instrument and the protection of the debtor's rights. The thesis will be presented that the administrative procedure for the retention of a driving license does not fulfill its role and especially does not affect the collection of maintenance obligations from debtors. All the considerations will be based on the current and most representative views of the literature on the subject and the jurisprudence of Polish administrative courts.

Keywords: maintenance debtor, administrative proceedings, detention of driving license, administrative sanction, polish administrative law, public administration

Procedia PDF Downloads 58
3330 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 286
3329 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 359
3328 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 489
3327 Hearing Aids Maintenance Training for Hearing-Impaired Preschool Children with the Help of Motion Graphic Tools

Authors: M. Mokhtarzadeh, M. Taheri Qomi, M. Nikafrooz, A. Atashafrooz

Abstract:

The purpose of the present study was to investigate the effectiveness of using motion graphics as a learning medium on training hearing aids maintenance skills to hearing-impaired children. The statistical population of this study consisted of all children with hearing loss in Ahvaz city, at age 4 to 7 years old. As the sample, 60, whom were selected by multistage random sampling, were randomly assigned to two groups; experimental (30 children) and control (30 children) groups. The research method was experimental and the design was pretest-posttest with the control group. The intervention consisted of a 2-minute motion graphics clip to train hearing aids maintenance skills. Data were collected using a 9-question researcher-made questionnaire. The data were analyzed by using one-way analysis of covariance. Results showed that the training of hearing aids maintenance skills with motion graphics was significantly effective for those children. The results of this study can be used by educators, teachers, professionals, and parents to train children with disabilities or normal students.

Keywords: hearing aids, hearing aids maintenance skill, hearing impaired children, motion graphics

Procedia PDF Downloads 125
3326 Building Information Management in Context of Urban Spaces, Analysis of Current Use and Possibilities

Authors: Lucie Jirotková, Daniel Macek, Andrea Palazzo, Veronika Malinová

Abstract:

Currently, the implementation of 3D models in the construction industry is gaining popularity. Countries around the world are developing their own modelling standards and implement the use of 3D models into their individual permitting processes. Another theme that needs to be addressed are public building spaces and their subsequent maintenance, where the usage of BIM methodology is directly offered. The significant benefit of the implementation of Building Information Management is the information transfer. The 3D model contains not only the spatial representation of the item shapes but also various parameters that are assigned to the individual elements, which are easily traceable, mainly because they are all stored in one place in the BIM model. However, it is important to keep the data in the models up to date to achieve useability of the model throughout the life cycle of the building. It is now becoming standard practice to use BIM models in the construction of buildings, however, the building environment is very often neglected. Especially in large-scale development projects, the public space of buildings is often forwarded to municipalities, which obtains the ownership and are in charge of its maintenance. A 3D model of the building surroundings would include both the above-ground visible elements of the development as well as the underground parts, such as the technological facilities of water features, electricity lines for public lighting, etc. The paper shows the possibilities of a model in the field of information for the handover of premises, the following maintenance and decision making. The attributes and spatial representation of the individual elements make the model a reliable foundation for the creation of "Smart Cities". The paper analyses the current use of the BIM methodology and presents the state-of-the-art possibilities of development.

Keywords: BIM model, urban space, BIM methodology, facility management

Procedia PDF Downloads 102