Search results for: housing and construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4271

Search results for: housing and construction

4121 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 516
4120 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
4119 Assembly Solution for Modular Buildings: Development of a Plug-In Self-Locking Device Designed for Light-Framed Structures

Authors: Laurence Picard, André Bégin-Drolet, Pierre Blanchet

Abstract:

The prefabricated construction industry has been operating in North America for several years now and differs from traditional construction by its much shorter project timelines, lower costs, and increased build quality. Faced with the global housing crisis, prefabrication should be the first choice for erecting buildings quickly and at a low cost. However, the reality is quite different; manufacturers focus their operations mainly on single-home construction. This is explained by the lack of a suitable and efficient assembly solution for erecting large-scale buildings. Indeed, it is difficult to maintain the coveted advantages of prefabrication with a laborious on-site assembly and a colossal load of additional operations such as the installation of fasteners and the internal finishing. In the desire to maximize the benefits of prefabrication and make it a smart choice even for large buildings, an automated connection solution is developed. The plug-in self-locking device was developed accordingly to the product design phases: on-site observations, the definition of the problem and product requirements, solution generation, prototyping, fabricating and testing.

Keywords: assembly solution, automation, construction productivity, modular connection, modular buildings, plug-in device, self-lock mechanism

Procedia PDF Downloads 135
4118 Factors Affecting the Quality of Life of Residents in Low-Cost Housing in Thailand

Authors: Bundit Pungnirund

Abstract:

The objectives of this research were to study the factors affecting life quality of residents who lived in the low-cost housing in Thailand. This study employed by quantitative research and the questionnaire was used to collect the data from 400 sampled of the residents in low-cost housing projects in Thailand. The descriptive statistics and multiple regression analysis were used to analyze data. The research results revealed that economic status of residents, government’s policy on dwelling places, leadership of community leaders, environmental condition of the community, and the quality of life were rated at the good level, while the participation of residents, and the knowledge and understanding of community members were rated at the high level. Furthermore, the environmental condition, the government’s policy on dwelling places, knowledge and understanding of residents, leadership of community leaders, economic status of the residents, and participation of community members had significantly affected the quality of life of residents in the low-cost housing.

Keywords: quality of life, community leadership, community participation, low-cost housing

Procedia PDF Downloads 320
4117 Social and Economic Challenges of Adopting Sustainable Urban Development in Developing Economy: A Stakeholder's Perception

Authors: Raed Fawzi Mohammed Ameen, Haider I. Alyasari, Maryam Altaweel

Abstract:

Due to rapid urbanization, developing countries faced significant urban challenges that accompanied the population growth such as the inability to provide adequate housing; sustain human and community's health and wellbeing; ensure the safety in urban areas; the prevalence corruption; lack of jobs; and a shortage of investment. The destruction, degradation, and lack of planning are acute in countries such as Iraq that have suffered for more than four decades because of war and international sanctions, resulting in severe damages to the ecology sector, social utilities, housing, infrastructure, as well as the disruption of the economic sector. Many of significant urban development, housing, and regeneration projects are currently underway in different regions in Iraq, labelled as a means to reform the environmental, social, and economic sectors. However, most often with absence of public participation. Hence, there is an urgent need for understanding public perception, especially of urban socio-economic challenges, which represents a crucial concern for many planners, designers, and policy-makers in order to develop effective policies in addition to increasing their participation. The aim of this study is to investigate stakeholder perceptions of the socio-economic challenges of urban development and their priorities in the all Iraqi provinces. A nationwide questionnaire has been conducted (N = 643) across Iraq, using 19- item structured questionnaire where the stakeholder’s perspectives were collected on a 5-point Likert-type scale. The indicators were identified through deep investigation in previous studies. Principal component analysis (PCA) and statistical tests were utilized to the collected responses in order to investigate the linkage between the perceptions of socio- economic challenges and demographic factors. A high value of internal consistency and reliability of the instrument has been achieved (Cronbach’s alpha= 0.867). Five principal components have been identified, namely: economic, cultural aspects, design context, employment, security and housing demands. The item ‘safety of public places' was ranked as the most important, followed by the items 'minimize unplanned housing', and ‘provision of affordable housing’, respectively. Promote high-rise housing from the housing demands group, was ranked the lowest component between all indicators. 'Using sustainable local materials in construction' item had the second lowest mean score. The results also illustrate a link between deficiencies in the social and economic infrastructure because of the destruction and degradation caused by political instability in Iraq in the last few decades.

Keywords: public participation in development, socio-economic challenges, urban development, urban sustainability

Procedia PDF Downloads 107
4116 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 251
4115 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 193
4114 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 360
4113 Large Panel Technology Apartments of Yesterday and Today: Quality Aspects

Authors: Barbara Gronostajska

Abstract:

Currently, housing conditions of buildings executed in large panel technology are deteriorating. The article presents modernization solutions implemented throughout the variety of architectural activities (adding of balconies and staircases, connecting apartments) which guarantee very intriguing results that meet the needs and expectations of the modern society.

Keywords: housing estate, apartments, flats, modernization, plate blocks

Procedia PDF Downloads 451
4112 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 313
4111 Design Criteria Recommendation to Achieve Accessibility In-House to Different Users

Authors: Claudia Valderrama-Ulloa, Cristian Schmitt, Juan Pablo Marchetti, Viviana Bucarey

Abstract:

Access to adequate housing is a fundamental human right and a crucial factor for health. Housing should be inclusive, accessible, and able to meet the needs of all its inhabitants at every stage of their lives without hindering their health, autonomy, or independence. This article addresses the importance of designing housing for people with disabilities, which varies depending on individual abilities, preferences, and cultural considerations. Based on the components of the International Classification of Functioning, Disability and Health, wheelchair users, little people (achondroplasia), children with autism spectrum disorder and Down syndrome were characterized, and six domains of activities related to daily life inside homes were defined. The article describes the main barriers homes present for this group of people. It proposes a list of architectural and design aspects to reduce barriers to housing use. The aspects are divided into three main groups: space management, building services, and supporting facilities. The article emphasizes the importance of consulting professionals and users with experience designing for diverse needs to create inclusive, safe, and supportive housing for people with disabilities.

Keywords: achondroplasia, autism spectrum disorder, disability, down syndrome, wheelchair user

Procedia PDF Downloads 80
4110 Sustainable Solutions for Enhancing Efficiency, Safety, and Quality of Construction Value Chain Services Integration

Authors: Lo Kar Yin

Abstract:

In view of the increasing speed and quantity of the housing supply, building, and civil engineering infrastructure works triggered by the pandemic across the globe, contractors, professional services providers (PSP), including consultants (e.g., architect, project manager, civil/geotechnical/structural engineer, building services engineer, quantity surveyor/cost manager, etc.) and suppliers have faced tremendous challenges of the fierce market, limited manpower, and resources under contract prices fluctuation and competitive fee and price. With qualitative analysis, this paper is to review the available information from the industry stakeholders with a view to finding solutions for enhancing efficiency, safety, and quality of construction value chain services for public and private organizations/companies’ sustainable growth, not limited to checking the deliverables and data transfer from multi-disciplinary parties. Technology, contracts, and people are the key requirements for shaping the construction industry. With the integration of a modern engineering contract (e.g., NEC) collaborative approach, practical workflows are designed to address loopholes together with different levels of people employment/retention and technology adoption to achieve the best value for money.

Keywords: efficiency, safety, quality, technology, contract, people, sustainable solutions, construction, services, integration

Procedia PDF Downloads 92
4109 The Residential Subdivision under the Influence of the Unfinished Densification, Case Study for Subdivisions in Setif, Algeria

Authors: Lacheheb Dhia Eddine Zakaria, Ballout Amor

Abstract:

Today, it is necessary to be thrifty for its planet, on one hand the space being a rare, nonrenewable resource, and on the other hand the ecological, economic and social cost of the urban sprawl. It is commonly asserted that the promotion of a more compact and dense city has a positive effect in terms of public costs of investment, functioning and costs for the citizens and the users of the city. It is clear that the modes urban development management have to evolve profoundly, in particular towards a densification favourable to the raising of the urban quality through an ideal urban density on the scale of the individual housing estate. The lot as an individual housing estate was adopted as an alternative development model to the collective housing, thought in an anthropocentric perspective to emerge as a quality model where the density plays an important role, by being included in operations of a global coherence, in an optimal organization without forgetting the main importance of the deadlines of construction and the finalization of the works. The image of eternal construction site inflicted to our cities explains the renewed interest for the application of the regulatory framework and the completion of these limited operations without global coherence, which are summed up in our case to a ground cut in plots of land, sold then built independently without being finished, and support the relevance of the essential question of the improvement of the outside aspect bound to the appearance which can be revealed as a so important factor for a better use and a better acceptance of its housing environment, that the ratio of a number of houses on a plot of land or the number of square meters by house. To demonstrate the impact of the completion degree of the subdivision dwellings, roads system and urban public utilities on the density or the densification and therefore on the urban quality, we studied two residential subdivisions, the private subdivision Sellam and the subdivision El Imane with a common situation, and a different land surface, density and cutting, being occupied by various social classes, with different needs and different household average size. The approach of this work is based on the typo morphological analysis to reveal the differences in the degrees of completions of the subdivision’s built environment and on the investigation, by a household’s survey, to demonstrate importance of the degree of completion and to reveal the conditions of qualitative densification favourable and convenient to a better subdivision’s appropriation.

Keywords: subdivision, degree of completion, densification, urban quality

Procedia PDF Downloads 343
4108 Evaluation of Housing Quality in the Urban Fringes of Ibadan, Nigeria

Authors: Amao Funmilayo Lanrewaju

Abstract:

The study examined the socio-economic characteristics of the residents in selected urban fringes of Ibadan; identified and examined the housing and neighbourhood characteristics and evaluated housing quality in the study area. It analysed the relationship between the socio-economic characteristics of the residents, housing and neighbourhood characteristics as well as housing quality in the study area. This was with a view to providing information that would enhance the housing quality in urban fringes of Ibadan. Primary and secondary data were used for the study. A survey of eleven purposively selected communities from Oluyole and Egbeda local government areas in the urban fringes was conducted through a questionnaire administration and expert rating by five independent assessors (Qualified Architects) using penalty scoring within similar time-frames. The study employed a random sampling method to select a sample size of 480 houses representing 5% of the sampling frame of 9600 houses. Respondent in the first house was selected randomly and subsequently every 20th house in the streets involved was systematically selected for questionnaire administration, usually a household-head per building. The structured questionnaire elicited information on socio-economic characteristics of the residents, housing and neighbourhood characteristics, factors affecting housing quality and housing quality in the study area. Secondary data obtained for the study included the land-use plan of Ibadan from previous publications, housing demographics, population figures from relevant institutions and other published materials. The data collected were analysed using descriptive and inferential statistics such as frequency distribution, Cross tabulation, Correlation Analysis, Analysis of Variance (ANOVA) and Relative Importance Index (RII). The result of the survey revealed that respondents from the Yoruba ethnic group constituted the majority, comprising 439 (91.5%) of the 480 respondents from the two local government areas selected. It also revealed that the type of tenure status of majority of the respondents in the two local government areas was self-ownership (234, 48.8%), while 44.0% of the respondents acquired their houses through personal savings. Cross tabulation indicated that majority (67.1%, 322 out of 480) of the respondents were low-income earners. The study showed that both housing and neighbourhood services were not adequately provided across neighbourhoods in the study area. Correlation analysis indicated a significant relationship between respondents’ socio–economic status and their general housing quality (r=0.46; p-value of 0.01< 0.05). The ANOVA indicated that the relationship between socio-economic characteristics of the residents, housing and neighbourhood characteristics in the study area was significant (F=18.289, p=0.00; the coefficient of determination R2= 0.192). The findings from the study however revealed that there was no significant difference in the results obtained from users based evaluation and expert rating. The study concluded that housing quality in the urban fringes of Ibadan is generally poor and the socio-economic status of the residents significantly influenced the housing quality.

Keywords: housing quality, urban fringes, economic status, poverty

Procedia PDF Downloads 411
4107 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
4106 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 271
4105 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 62
4104 Amphibious Architecture: A Benchmark for Mitigating Flood Risk

Authors: Lara Leite Barbosa, Marco Imperadori

Abstract:

This article aims to define strategies for applying innovative technology so that housing in regions subject to floods can be more resilient to disasters. Based on case studies of seven amphibious and floating projects, it proposes design guidelines to implement this practice. Its originality consists of transposing a technology developed for fluctuating buildings for housing types in regions affected by flood disasters. The proposal could be replicated in other contexts, endowing vulnerable households with the ability to resist rising water levels after a flood. The results of this study are design guidelines to adapt for houses in areas subject to flooding, contributing to the mitigation of this disaster.

Keywords: amphibious housing, disaster resilience, floating architecture, flood mitigation, post-disaster reconstruction

Procedia PDF Downloads 129
4103 Predictability of Thermal Response in Housing: A Case Study in Australia, Adelaide

Authors: Mina Rouhollahi, J. Boland

Abstract:

Changes in cities’ heat balance due to rapid urbanization and the urban heat island (UHI) have increased energy demands for space cooling and have resulted in uncomfortable living conditions for urban residents. Climate resilience and comfortable living spaces can be addressed through well-designed urban development. The sustainable housing can be more effective in controlling high levels of urban heat. In Australia, to mitigate the effects of UHIs and summer heat waves, one solution to sustainable housing has been the trend to compact housing design and the construction of energy efficient dwellings. This paper analyses whether current housing configurations and orientations are effective in avoiding increased demands for air conditioning and having an energy efficient residential neighborhood. A significant amount of energy is consumed to ensure thermal comfort in houses. This paper reports on the modelling of heat transfer within the homes using the measurements of radiation, convection and conduction between exterior/interior wall surfaces and outdoor/indoor environment respectively. The simulation was tested on selected 7.5-star energy efficient houses constructed of typical material elements and insulation in Adelaide, Australia. The chosen design dwellings were analyzed in extremely hot weather through one year. The data were obtained via a thermal circuit to accurately model the fundamental heat transfer mechanisms on both boundaries of the house and through the multi-layered wall configurations. The formulation of the Lumped capacitance model was considered in discrete time steps by adopting a non-linear model method. The simulation results focused on the effects of orientation of the solar radiation on the dynamic thermal characteristics of the houses orientations. A high star rating did not necessarily coincide with a decrease in peak demands for cooling. A more effective approach to avoid increasing the demands for air conditioning and energy may be to integrate solar–climatic data to evaluate the performance of energy efficient houses.

Keywords: energy-efficient residential building, heat transfer, neighborhood orientation, solar–climatic data

Procedia PDF Downloads 100
4102 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 45
4101 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 52
4100 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 224
4099 Alternative Housing Systems: Influence on Blood Profile of Egg-Type Chickens in Humid Tropics

Authors: Olufemi M. Alabi, Foluke A. Aderemi, Adebayo A. Adewumi, Banwo O. Alabi

Abstract:

General well-being of animals is of paramount interest in some developed countries and of global importance hence the shift onto alternative housing systems for egg-type chickens as replacement for conventional battery cage system. However, there is paucity of information on the effect of this shift on physiological status of the hens to judge their health via the blood profile. Therefore, investigation was carried out on two strains of hen kept in three different housing systems in humid tropics to evaluate changes in their blood parameters. 108, 17-weeks old super black (SBL) hens and 108, 17-weeks old super brown (SBR) hens were randomly allotted to three different intensive systems Partitioned Conventional Cage (PCC), Extended Conventional Cage (ECC) and Deep Litter System (DLS) in a randomized complete block design with 36 hens per housing system, each with three replicates. The experiment lasted 37 weeks during which blood samples were collected at 18th week of age and bi-weekly thereafter for analyses. Parameters measured are packed cell volume (PCV), hemoglobin concentration (Hb), red blood counts (RBC), white blood counts (WBC) and serum metabolites such as total protein (TP), albumin (Alb), globulin (Glb), glucose, cholesterol, urea, bilirubin, serum cortisol while blood indices such as mean corpuscular hemoglobin (MCH), mean cell volume (MCV) and mean corpuscular hemoglobin concentration (MCHC) were calculated. The hematological values of the hens were not significantly (p>0.05) affected by the housing system and strain, so also the serum metabolites except for the serum cortisol which was significantly (p<0.05) affected by the housing system only. Hens housed on PCC had higher values (20.05 ng/ml for SBL and 20.55 ng/ml for SBR) followed by hens on ECC (18.15ng/ml for SBL and 18.38ng/ml for SBL) while hens on DLS had the lowest value (16.50ng/ml for SBL and 16.00ng/ml for SBR) thereby confirming indication of stress with conventionally caged birds. Alternative housing systems can also be adopted for egg-type chickens in the humid tropics from welfare point of view with the results of this work confirming stress among caged hens.

Keywords: blood, housing, humid-tropics, layers

Procedia PDF Downloads 440
4098 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 84
4097 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 23
4096 A View of Flexible Housing in China

Authors: L. I. Shanshan

Abstract:

Beginning with the debate of concept, this essay explains the historical source and development of flexible housing in China. In the former part, the flexibility contained in traditional house is explored. While in the latter, the relevant practices in modern times are systematically analyzed as three phases–the Embryonic Period (1949 - 1980), the Systematic Practice (1981 - 2000), as well as the Integrated Trend and Prosperity (2001 - present). As a conclusion, the generalized flexibility is tentatively discussed.

Keywords: flexibility, long-term effectiveness, variety, social background

Procedia PDF Downloads 256
4095 Effects of Education Equity Policy on Housing Prices: Evidence from Simultaneous Admission to Public and Private Schools Policy in Shanghai

Authors: Tianyu Chen

Abstract:

China's school district education policy has encouraged parents to purchase properties in school districts with high-quality education resources. Shanghai has implemented "Simultaneous Admission to Public and Private Schools" (SAPPS) since 2018, which has covered all nine-year compulsory education by 2020. This study examines the impact of SAPPS on the housing market, specifically the premium effect of houses located in dual-school districts. Based on the Hedonic Pricing Model and the Signaling Theory, data is collected from 585 second-hand house transactions in Pudong New Area, Shanghai, and it is analyzed with the Difference-in-Differences (DID) model. The results indicate that the implementation of SAPPS has exacerbated the premium of dual school district housing and weakened the effect of the policy to a certain degree. To ensure equal access to education for all students, the government should work both on the supply and demand sides of the education resource equation.

Keywords: simultaneous admission to public and private schools, housing prices, education policy, education equity

Procedia PDF Downloads 52
4094 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 86
4093 Design and Construction of a Maize Dehusking Machine for Small and Medium-Scale Farmers

Authors: Francis Ojo Ologunagba, Monday Olatunbosun Ale, Lewis A. Olutayo

Abstract:

The economic successes of commercial development of agricultural product processing depend upon the adaptability of each processing stage to mechanization. In maize processing, one of its post-harvest operations that is still facing a major challenge is dehusking. Therefore, a maize dehusking machine that could replace the prevalent traditional method of dehusking maize in developing countries, especially Nigeria was designed, constructed and tested at the Department of Agricultural and Bio-Environmental Engineering Technology, Rufus Giwa Polytechnic, Owo. The basic features of the machine are feeding unit (hopper), housing frame, dehusking unit, drive mechanism and discharge outlets. The machine was tested with maize of 50mm average diameter at 13% moisture content and 2.5mm machine roller clearance. Test results showed appreciable performance with the dehusking efficiency of 92% and throughput capacity of 200 Kg/hr at a machine speed of 400rpm. The estimated production cost of the machine at the time of construction is forty-five thousand, one hundred and eighty nairas (₦45,180) excluding the cost of the electric motor. It is therefore recommended for small and medium-scale maize farmers and processors in Nigeria.

Keywords: construction, dehusking, design, efficiency, maize

Procedia PDF Downloads 280
4092 Valuation of Cultural Heritage: A Hedonic Pricing Analysis of Housing via GIS-based Data

Authors: Dai-Ling Li, Jung-Fa Cheng, Min-Lang Huang, Yun-Yao Chi

Abstract:

The hedonic pricing model has been popularly applied to describe the economic value of environmental amenities in urban housing, but the results for cultural heritage variables remain relatively ambiguous. In this paper, integrated variables extending by GIS-based data and an existing typology of communities used to examine how cultural heritage and environmental amenities and disamenities affect housing prices across urban communities in Tainan, Taiwan. The developed models suggest that, although a sophisticated variable for central services is selected, the centrality of location is not fully controlled in the price models and thus picked up by correlated peripheral and central amenities such as cultural heritage, open space or parks. Analysis of these correlations permits us to qualify results and present a revised set of relatively reliable estimates. Positive effects on housing prices are identified for views, various types of recreational infrastructure and vicinity of nationally cultural sites and significant landscapes. Negative effects are found for several disamenities including wasteyards, refuse incinerators, petrol stations and industries. The results suggest that systematic hypothesis testing and reporting of correlations may contribute to consistent explanatory patterns in hedonic pricing estimates for cultural heritage and landscape amenities in urban.

Keywords: hedonic pricing model, cultural heritage, landscape amenities, housing

Procedia PDF Downloads 308