17259 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 70
17258 Performance Measurement by Analytic Hierarchy Process in Performance Based Logistics

Authors: M. Hilmi Ozdemir, Gokhan Ozkan

Abstract:

Performance Based Logistics (PBL) is a strategic approach that enables creating long-term and win-win relations among stakeholders in the acquisition. Contrary to the traditional single transactions, the expected value is created by the performance of the service pertaining to the strategic relationships in this approach. PBL motivates all relevant stakeholders to focus on their core competencies to produce the desired outcome in a collective way. The desired outcome can only be assured with a cost effective way as long as it is periodically measured with the right performance parameters. Thus, defining these parameters is a crucial step for the PBL contracts. In performance parameter determination, Analytic Hierarchy Process (AHP), which is a multi-criteria decision making methodology for complex cases, was used within this study for a complex system. AHP has been extensively applied in various areas including supply chain, inventory management, outsourcing, and logistics. This methodology made it possible to convert end-user’s main operation and maintenance requirements to sub criteria contained by a single performance parameter. Those requirements were categorized and assigned weights by the relevant stakeholders. Single performance parameter capable of measuring the overall performance of a complex system is the major outcome of this study. The parameter deals with the integrated assessment of different functions spanning from training, operation, maintenance, reporting, and documentation that are implemented within a complex system. The aim of this study is to show the methodology and processes implemented to identify a single performance parameter for measuring the whole performance of a complex system within a PBL contract. AHP methodology is recommended as an option for the researches and the practitioners who seek for a lean and integrated approach for performance assessment within PBL contracts. The implementation of AHP methodology in this study may help PBL practitioners from methodological perception and add value to AHP in becoming prevalent.

Keywords: analytic hierarchy process, performance based logistics, performance measurement, performance parameters

Procedia PDF Downloads 257
17257 A Systematic Snapshot of Software Outsourcing Challenges

Authors: Issam Jebreen, Eman Al-Qbelat

Abstract:

Outsourcing software development projects can be challenging, and there are several common challenges that organizations face. A study was conducted with a sample of 46 papers on outsourcing challenges, and the results show that there are several common challenges faced by organizations when outsourcing software development projects. Poor outsourcing relationship was identified as the most significant challenge, with 35% of the papers referencing it. Lack of quality was the second most significant challenge, with 33% of the papers referencing it. Language and cultural differences were the third most significant challenge, with 24% of the papers referencing it. Non-competitive price was another challenge faced by organizations, with 21% of the papers referencing it. Poor coordination and communication were also identified as a challenge, with 21% of the papers referencing it. Opportunistic behavior, lack of contract negotiation, inadequate user involvement, and constraints due to time zone were also challenges faced by organizations. Other challenges faced by organizations included poor project management, lack of technical capabilities, vendor employee high turnover, poor requirement specification, IPR issues, poor management of budget, schedule, and delay, geopolitical and country instability, the difference in development methodologies, failure to manage end-user expectations, and poor monitoring and control. In conclusion, outsourcing software development projects can be challenging, but organizations can mitigate these challenges by selecting the right outsourcing partner, having a well-defined contract and clear communication, having a clear understanding of the requirements, and implementing effective project management practices.

Keywords: software outsourcing, vendor, outsourcing challenges, quality model, continent, country, global outsourcing, IT workforce outsourcing.

Procedia PDF Downloads 58
17256 Issues of Accounting of Lease and Revenue according to International Financial Reporting Standards

Authors: Nadezhda Kvatashidze, Elena Kharabadze

Abstract:

It is broadly known that lease is a flexible means of funding enterprises. Lease reduces the risk related to access and possession of assets, as well as obtainment of funding. Therefore, it is important to refine lease accounting. The lease accounting regulations under the applicable standard (International Accounting Standards 17) make concealment of liabilities possible. As a result, the information users get inaccurate and incomprehensive information and have to resort to an additional assessment of the off-balance sheet lease liabilities. In order to address the problem, the International Financial Reporting Standards Board decided to change the approach to lease accounting. With the deficiencies of the applicable standard taken into account, the new standard (IFRS 16 ‘Leases’) aims at supplying appropriate and fair lease-related information to the users. Save certain exclusions; the lessee is obliged to recognize all the lease agreements in its financial report. The approach was determined by the fact that under the lease agreement, rights and obligations arise by way of assets and liabilities. Immediately upon conclusion of the lease agreement, the lessee takes an asset into its disposal and assumes the obligation to effect the lease-related payments in order to meet the recognition criteria defined by the Conceptual Framework for Financial Reporting. The payments are to be entered into the financial report. The new lease accounting standard secures supply of quality and comparable information to the financial information users. The International Accounting Standards Board and the US Financial Accounting Standards Board jointly developed IFRS 15: ‘Revenue from Contracts with Customers’. The standard allows the establishment of detailed revenue recognition practical criteria such as identification of the performance obligations in the contract, determination of the transaction price and its components, especially price variable considerations and other important components, as well as passage of control over the asset to the customer. IFRS 15: ‘Revenue from Contracts with Customers’ is very similar to the relevant US standards and includes requirements more specific and consistent than those of the standards in place. The new standard is going to change the recognition terms and techniques in the industries, such as construction, telecommunications (mobile and cable networks), licensing (media, science, franchising), real property, software etc.

Keywords: assessment of the lease assets and liabilities, contractual liability, division of contract, identification of contracts, contract price, lease identification, lease liabilities, off-balance sheet, transaction value

Procedia PDF Downloads 289
17255 Re-Examining Contracts in Managing and Exploiting Strategic National Resources: A Case in Divestation Process in the Share Distribution of Mining Corporation in West Nusa Tenggara, Indonesia

Authors: Hayyan ul Haq, Zainal Asikin

Abstract:

This work aims to explore the appropriate solution in solving legal problems stemmed from managing and exploiting strategic natural resources in Indonesia. This discussion will be focused on the exploitation of gold mining, i.e. divestation process in the New Mont Corporation, West Nusa Tenggara. These legal problems relate to the deviation of the national budget regulation, UU. No. 19/2012, and the implementation of the divestastion process, which infringes PP. No. 50/2007 concerning the Impelementation Procedure of Regional Cooperation, which is an implementation regulation of UU No. 1/2004 on State’s Treasury. The cooperation model, have been developed by the Provincial Government, failed to create a permanent legal solution through normative approach. It has merely used practical approach that tends (instant solution), by using some loopholes in the divestation process. The above blunders have accumulated by other secondary legal blunders, i.e. good governance principles, particularly justice, transparency, efficiency, effective principles and competitiveness principle. To solve the above problems, this work offers constitutionalisation of contract that aimed at reviewing and coherencing all deviated contracts, rules and policies that have deprived the national and societies’ interest to optimize the strategic natural resources towards the greatest benefit for the greatest number of people..

Keywords: constitutionalisation of contract, strategic national resources, divestation, the greatest benefit for the greatest number of people, Indonesian Pancasila values

Procedia PDF Downloads 431
17254 Beneficial Ownership in Islamic Finance: The Need for Shari'ah Parameters

Authors: Nik Abdul Rahim Nik Abdul Ghani, Mat Noor Mat Zain, Ahmad Dahlan Salleh

Abstract:

Ownership of asset is an important aspect in ensuring the validity of sale contract. Nevertheless, in Islamic finance, the issue of beneficial ownership as practiced in the current system is seriously debated among Shariah scholars. It has been argued as violating the real concept of ownership (milkiyyah) in Shariah law. This article aims at studying the status of beneficial ownership from the Shariah perspective. This study begins with examining the meaning of ownership and its attributes from the Islamic point of view and followed by the discussion on the origin of beneficial ownership from the legal perspective. The approach that is applied to clarify the concept of beneficial ownership is content analysis. Subsequently, this study explains some current applications of beneficial ownership in Islamic finance to be analyzed further from the Shariah aspect. The research finding suggests that beneficial ownership should be recognized as a real ownership due to the fact that Shariah allows the transfer of ownership after the execution of offer (ijab) and acceptance (qabul).

Keywords: beneficial ownership, ownership, Islamic finance, parameter

Procedia PDF Downloads 238
17253 Applicable Law to Intellectual and Industrial Property Agreements According to Turkish Private International Law and Rome I Regulation

Authors: Sema Cortoglu Koca

Abstract:

Intellectual and industrial property rules, have a substantial effect on the sustainable development. Intellectual and industrial property rights, as temporary privileges over the products of intellectual activity, determine the supervision of information and technology. The level and scope of intellectual property protection thus influence the flow of technology between developed and developing countries. In addition, intellectual and industrial property rights are based on the notion of balance. Since they are time-limited rights, they reconcile private and public benefits. That is, intellectual and industrial property rights respond to both private interests and public interests by rewarding innovators and by promoting the dissemination of ideas, respectively. Intellectual and industrial property rights can, therefore, be a tool for sustainable development. If countries can balance their private and public interests according to their particular context and circumstances, they can ensure the intellectual and industrial property which promotes innovation and technology transfer relevant for them. People, enterprises and countries who need technology, can transfer developed technology which is acquired by people, enterprises and countries so as to decrease their technological necessity and improve their technology. Because of the significance of intellectual and industrial property rights on the technology transfer law as mentioned above, this paper is confined to intellectual and industrial property agreements especially technology transfer contracts. These are license contract, know-how contract, franchise agreement, joint venture agreement, management agreement, research and development agreement. In Turkey, technology transfer law is still a developing subject. For developing countries, technology transfer regulations are very important for their private international law because these countries do not know which technology transfer law is applicable when conflicts arise. In most technology transfer contracts having international elements, the parties choose a law to govern their contracts. Where the parties do not choose a law, either expressly or impliedly, and matters which is not excluded in party autonomy, the court has to determine the applicable law to contracts in a matter of capacity, material, the formal and essential validity of contracts. For determining the proper law of technology transfer contracts, it is tried to build a rule for applying all technology transfer contracts. This paper is confined to the applicable law to intellectual and industrial property agreements according to ‘5718 Turkish Act on Private International Law and Civil Procedure’ and ‘Regulation (EC) No 593/2008 of the European Parliament and of the Council of 17 June 2008 on the law applicable to contractual obligations (Rome I)’. Like these complex contracts, to find a rule can be really difficult. We can arrange technology transfer contracts in groups, and we can determine the rule and connecting factors to these groups. For the contracts which are not included in these groups, we can determine a special rule considering the characteristics of the contract.

Keywords: intellectual and industrial property agreements, Rome I regulation, technology transfer, Turkish act on private international law and civil procedure

Procedia PDF Downloads 121
17252 The Thermal Simulation of Hydraulic Cable Drum Trailers 15-Ton

Authors: Ahmad Abdul-Razzak Aboudi Al-Issa

Abstract:

Thermal is the main important aspect in any hydraulic system since it is affected on the hydraulic system performance. Therefore must be simulated the hydraulic system -that was designed- in this aspect before constructing it. In this study, an existed expert system was using to simulate the thermal aspect of a designed hydraulic system that will be used in an industrial field. The expert system which is used in this study is (Hydraulic System Calculations), and its symbol (HSC). HSC had been designed and coded in an interactive program userfriendly named (Microsoft Visual Basic 2010).

Keywords: fluid power, hydraulic system, thermal and hydrodynamic, expert system

Procedia PDF Downloads 467
17251 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 262
17250 Accounting for Rice Productivity Heterogeneity in Ghana: The Two-Step Stochastic Metafrontier Approach

Authors: Franklin Nantui Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

Rice yields among agro-ecological zones are heterogeneous. Farmers, researchers and policy makers are making frantic efforts to bridge rice yield gaps between agro-ecological zones through the promotion of improved agricultural technologies (IATs). Farmers are also modifying these IATs and blending them with indigenous farming practices (IFPs) to form farmer innovation systems (FISs). Also, different metafrontier models have been used in estimating productivity performances and their drivers. This study used the two-step stochastic metafrontier model to estimate the productivity performances of rice farmers and their determining factors in GSZ, FSTZ and CSZ. The study used both primary and secondary data. Farmers in CSZ are the most technically efficient. Technical inefficiencies of farmers are negatively influenced by age, sex, household size, education years, extension visits, contract farming, access to improved seeds, access to irrigation, high rainfall amount, less lodging of rice, and well-coordinated and synergized adoption of technologies. Albeit farmers in CSZ are doing well in terms of rice yield, they still have the highest potential of increasing rice yield since they had the lowest TGR. It is recommended that government through the ministry of food and agriculture, development partners and individual private companies promote the adoption of IATs as well as educate farmers on how to coordinate and synergize the adoption of the whole package. Contract farming concept and agricultural extension intensification should be vigorously pursued to the latter.

Keywords: efficiency, farmer innovation systems, improved agricultural technologies, two-step stochastic metafrontier approach

Procedia PDF Downloads 239
17249 Treating On-Demand Bonds as Cash-In-Hand: Analyzing the Use of “Unconscionability” as a Ground for Challenging Claims for Payment under On-Demand Bonds

Authors: Asanga Gunawansa, Shenella Fonseka

Abstract:

On-demand bonds, also known as unconditional bonds, are commonplace in the construction industry as a means of safeguarding the employer from any potential non-performance by a contractor. On-demand bonds may be obtained from commercial banks, and they serve as an undertaking by the issuing bank to honour payment on demand without questioning and/or considering any dispute between the employer and the contractor in relation to the underlying contract. Thus, whether or not a breach had occurred under the underlying contract, which triggers the demand for encashment by the employer, is not a question the bank needs to be concerned with. As a result, an unconditional bond allows the beneficiary to claim the money almost without any condition. Thus, an unconditional bond is as good as cash-in-hand. In the past, establishing fraud on the part of the employer, of which the bank had knowledge, was the only ground on which a bank could dishonour a claim made under an on-demand bond. However, recent jurisprudence in common law countries shows that courts are beginning to consider unconscionable conduct on the part of the employer in claiming under an on-demand bond as a ground that contractors could rely on the prevent the banks from honouring such claims. This has created uncertainty in connection with on-demand bonds and their liquidity. This paper analyzes recent judicial decisions in four common law jurisdictions, namely, England, Singapore, Hong Kong, and Sri Lanka, to identify the scope of using the concept of “unconscionability” as a ground for preventing unreasonable claims for encashment of on-demand bonds. The objective of this paper is to argue that on-demand bonds have lost their effectiveness as “cash-in-hand” and that this is, in fact, an advantage and not an impediment to international commerce, as the purpose of such bonds should not be to provide for illegal and unconscionable conduct by the beneficiaries.

Keywords: fraud, performance guarantees, on-demand bonds, unconscionability

Procedia PDF Downloads 68
17248 Solar-Assisted City Bus Electrical Installation: Opportunities and Impact on the Environment in Sydney

Authors: M. J. Geca, T. Tulwin, A. Majczak

Abstract:

On-board electricity consumption in the diesel city bus during operation is an important energy source. Electricity is generated by a combustion engine-driven alternator. Increased fuel consumption to generate on-board electricity in the bus has a negative impact on the emission of toxic components and carbon dioxide. At the same time, the bus roof surface allows placing a set of lightweight photovoltaic panels with power from 1 to 1.5 kW. The article presents an experimental study of electricity consumption of a city bus with diesel engine equipped with photovoltaic installation. The stream of electricity consumed by the bus and generated by a standard alternator and PV system was recorded. Base on the experimental research carried out in central Europe; the article analyses the impact of an additional source of electricity in the form of a photovoltaic installation on fuel consumption and emissions of toxic components of vehicles located in the latitude of Sydney. In Poland, the maximum global value of horizontal irradiation GHI is 1150 kWh/m², while for Sydney 1652 kWh/m². In addition, the profile of temperature and sunshine per year is different for these two different latitudes as presented in the article. Electricity generated directly from the sun powers the bus's electrical receivers. The photovoltaic system is able to replace 23% of annual electricity consumption, which at the same time will reduce 4% of fuel consumption and CO₂ reduction. Approximately 25% of the light is lost during vehicle traffic in Sydney latitude. The temperature losses of photovoltaic panels are comparable due to the cooling during vehicle motion. Acknowledgement: The project/research was financed in the framework of the project Lublin University of Technology - Regional Excellence Initiative, funded by the Polish Ministry of Science and Higher Education (contract no. 030/RID/2018/19).

Keywords: electric energy, photovoltaic system, fuel consumption, CO₂

Procedia PDF Downloads 86
17247 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 305
17246 Beyond Adoption: Econometric Analysis of Impacts of Farmer Innovation Systems and Improved Agricultural Technologies on Rice Yield in Ghana

Authors: Franklin N. Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

In order to increase and bridge the differences in rice yield, many farmers have resorted to adopting Farmer Innovation Systems (FISs) and Improved Agricultural Technologies (IATs). This study econometrically analysed the impacts of adoption of FISs and IATs on rice yield using multinomial endogenous switching regression (MESR). Nine-hundred and seven (907) rice farmers from Guinea Savannah Zone (GSZ), Forest Savannah Transition Zone (FSTZ) and Coastal Savannah Zone (CSZ) were used for the study. The study used both primary and secondary data. FBO advice, rice farming experience and distance from farming communities to input markets increase farmers’ adoption of only FISs. Factors that increase farmers’ probability of adopting only IATs are access to extension advice, credit, improved seeds and contract farming. Farmers located in CSZ have higher probability of adopting only IATs than their counterparts living in other agro-ecological zones. Age and access to input subsidy increase the probability of jointly adopting FISs and IATs. FISs and IATs have heterogeneous impact on rice yield with adoption of only IATs having the highest impact followed by joint adoption of FISs and IATs. It is important for stakeholders in rice subsector to champion the provision of improved rice seeds, the intensification of agricultural extension services and contract farming concept. Researchers should endeavour to researched into FISs.

Keywords: farmer innovation systems, improved agricultural technologies, multinomial endogenous switching regression, treatment effect

Procedia PDF Downloads 391
17245 Teaching the Binary System via Beautiful Facts from the Real Life

Authors: Salem Ben Said

Abstract:

In recent times the decimal number system to which we are accustomed has received serious competition from the binary number system. In this note, an approach is suggested to teaching and learning the binary number system using examples from the real world. More precisely, we will demonstrate the utility of the binary system in describing the optimal strategy to win the Chinese Nim game, and in telegraphy by decoding the hidden message on Perseverance’s Mars parachute written in the language of binary system. Finally, we will answer the question, “why do modern computers prefer the ternary number system instead of the binary system?”. All materials are provided in a format that is conductive to classroom presentation and discussion.

Keywords: binary number system, Nim game, telegraphy, computers prefer the ternary system

Procedia PDF Downloads 151
17244 Digitalisation of Onboarding: A Case Study to Investigate the Impact of Virtual Reality Technology on Employees Social Interactions and Information Seeking During Job-Onboarding

Authors: Ewenam Gbormittah

Abstract:

Because of the effects of the pandemic, companies are focusing on the future of work arrangements for their employees. This includes adapting to a remote or hybrid working model. It is important that employers provide those working remotely or in a hybrid mode a rewarding onboarding experience and opportunities for interaction. Although, Information & Communication Technologies (ICT) have transformed the ways organisations manage employees over the years, there is still a need for a platform where organisations can adjust their onboarding to suit the social and interactive aspects of their employees, to facilitate successful integration. This study aimed to explore this matter by investigating whether Virtual Reality (VR) technology contributes to new employees integration into the organisation during their job-onboarding (JOB) process. The research questions are as follows: (1) To what extent does VR have an impact on employees successful integration into the organisation, and (2) How does VR help elements of new employees Psychological Contract (PC) during the course of interactions. An exploratory case study approach, which consisted of a semi-structured interview was conducted on 20 employees, split from two different case organisations. The results of the data were analysed according to each case, and then a cross-case comparison was provided. The results have generated 8 themes, presenting in excess of 7 sub-themes for CS1 and presented 7 themes, in excess of 7 sub-themes for CS2. The cross-case analysis has revealed that VR does have the potential to support employees integration into the organisation. However, the effects were shown to be stronger for employees in CS2, compared to employees in CS1. The results highlight practical implications for onboarding psychology and strategic talent solutions within recruitment. Such strategy this research particularly outlines, involves providing insights on how to manage the PC of employees from the recruitment stage to creating successful employment relationships.

Keywords: job-onboarding, psychological contract, virtual reality, case study one, case study two

Procedia PDF Downloads 25
17243 Monocular 3D Person Tracking AIA Demographic Classification and Projective Image Processing

Authors: McClain Thiel

Abstract:

Object detection and localization has historically required two or more sensors due to the loss of information from 3D to 2D space, however, most surveillance systems currently in use in the real world only have one sensor per location. Generally, this consists of a single low-resolution camera positioned above the area under observation (mall, jewelry store, traffic camera). This is not sufficient for robust 3D tracking for applications such as security or more recent relevance, contract tracing. This paper proposes a lightweight system for 3D person tracking that requires no additional hardware, based on compressed object detection convolutional-nets, facial landmark detection, and projective geometry. This approach involves classifying the target into a demographic category and then making assumptions about the relative locations of facial landmarks from the demographic information, and from there using simple projective geometry and known constants to find the target's location in 3D space. Preliminary testing, although severely lacking, suggests reasonable success in 3D tracking under ideal conditions.

Keywords: monocular distancing, computer vision, facial analysis, 3D localization

Procedia PDF Downloads 107
17242 Recent Developments and Expectations in the Legal Expenses Insurance in Turkey

Authors: İbrahim Arslan, Mücahit Ünal

Abstract:

An important issue to ensure justice is to simplify the right to seek justice. But there is a cost of seeking justice in civil law. It costs at least, attorneys' fees and judicial expenses during the beginning and in case of losing a trial. Indeed, most of the people refrain from seeking justice because of these expenses. Therefore, it is not inappropriate to say that the removal of obstacles staying on the way of seeking justice will increase the belief in justice. Legal expenses insurance is a private law contract of insurance in which the insurer is obliged to pay premiums of the insured, to provide the necessary services for the protection of legal interests of the insured person within the agreed scope. This type of insurance is being practiced in the Western world for a long time. The special rights, duties and obligations of the parties to a legal expenses insurance contract shall be governed by the Turkish Commercial Code (TCC) and the contractual agreements which are regularly closed in the form of general terms and conditions. If the number of the legal expenses insurance contracts concluded increase this will definitely improve the percentage of seeking justice before the courts. The general terms and conditions applicable in Turkey generally include litigation costs, referee fees, guarantee fund , enforcement costs , appeal costs borne decision corrections costs. In addition, besides the insured, other family members or the people specified in the policy are protected in the scope of personal/family legal expenses insurance. The commercial law disputes fall outside the scope of coverage in this insurance branch. The insured person chooses his own lawyer and the insurer is not allowed to give advice during the selection of a lawyer. In April 2015, the Prime Minister announced of a new era in the field of legal expenses insurance in Turkey and this announcement excited the insurance industry and legal community.

Keywords: insurance, in the Turkish law on legal protection insurance, legal protection insurance, legal protection

Procedia PDF Downloads 331
17241 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 253
17240 An Assessment of Drainage Network System in Nigeria Urban Areas using Geographical Information Systems: A Case Study of Bida, Niger State

Authors: Yusuf Hussaini Atulukwu, Daramola Japheth, Tabitit S. Tabiti, Daramola Elizabeth Lara

Abstract:

In view of the recent limitations faced by the township concerning poorly constructed and in some cases non - existence of drainage facilities that resulted into incessant flooding in some parts of the community poses threat to life,property and the environment. The research seeks to address this issue by showing the spatial distribution of drainage network in Bida Urban using Geographic information System techniques. Relevant features were extracted from existing Bida based Map using un-screen digitization and x, y, z, data of existing drainages were acquired using handheld Global Positioning System (GPS). These data were uploaded into ArcGIS 9.2, software, and stored in the relational database structure that was used to produce the spatial data drainage network of the township. The result revealed that about 40 % of the drainages are blocked with sand and refuse, 35 % water-logged as a result of building across erosion channels and dilapidated bridges as a result of lack of drainage along major roads. The study thus concluded that drainage network systems in Bida community are not in good working condition and urgent measures must be initiated in order to avoid future disasters especially with the raining season setting in. Based on the above findings, the study therefore recommends that people within the locality should avoid dumping municipal waste within the drainage path while sand blocked or weed blocked drains should be clear by the authority concerned. In the same vein the authority should ensured that contract of drainage construction be awarded to professionals and all the natural drainages caused by erosion should be addressed to avoid future disasters.

Keywords: drainage network, spatial, digitization, relational database, waste

Procedia PDF Downloads 310
17239 Legal Allocation of Risks: A Computational Analysis of Force Majeure Clauses

Authors: Farshad Ghodoosi

Abstract:

This article analyzes the effect of supervening events in contracts. Contracts serve an important function: allocation of risks. In spite of its importance, the case law and the doctrine are messy and inconsistent. This article provides a fresh look at excuse doctrines (i.e., force majeure, impracticability, impossibility, and frustration) with a focus on force majeure clauses. The article makes the following contributions: First, it furnishes a new conceptual and theoretical framework of excuse doctrines. By distilling the decisions, it shows that excuse doctrines rests on the triangle of control, foreseeability, and contract language. Second, it analyzes force majeure clauses used by S&P 500 companies to understand the stickiness and similarity of such clauses and the events they cover. Third, using computational and statistical tools, it analyzes US cases since 1810 in order to assess the weight given to the triangle of control, foreseeability, and contract language. It shows that the control factor plays an important role in force majeure analysis, while the contractual interpretation is the least important factor. The Article concludes that it is the standard for control -whether the supervening event is beyond the control of the party- that determines the outcome of cases in the force majeure context and not necessarily the contractual language. This article has important implications on COVID-19-related contractual cases. Unlike the prevailing narrative that it is the language of the force majeure clause that’s determinative, this article shows that the primarily focus of the inquiry will be on whether the effects of COVID-19 have been beyond the control of the promisee. Normatively, the Article suggests that the trifactor of control, foreseeability, and contractual language are not effective for allocation of legal risks in times of crises. It puts forward a novel approach to force majeure clauses whereby that the courts should instead focus on the degree to which parties have relied on (expected) performance, in particular during the time of crisis.

Keywords: contractual risks, force majeure clauses, foreseeability, control, contractual language, computational analysis

Procedia PDF Downloads 113
17238 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka

Authors: R. M. Rajapaksa

Abstract:

Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.

Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects

Procedia PDF Downloads 184
17237 TRAC: A Software Based New Track Circuit for Traffic Regulation

Authors: Jérôme de Reffye, Marc Antoni

Abstract:

Following the development of the ERTMS system, we think it is interesting to develop another software-based track circuit system which would fit secondary railway lines with an easy-to-work implementation and a low sensitivity to rail-wheel impedance variations. We called this track circuit 'Track Railway by Automatic Circuits.' To be internationally implemented, this system must not have any mechanical component and must be compatible with existing track circuit systems. For example, the system is independent from the French 'Joints Isolants Collés' that isolate track sections from one another, and it is equally independent from component used in Germany called 'Counting Axles,' in French 'compteur d’essieux.' This track circuit is fully interoperable. Such universality is obtained by replacing the train detection mechanical system with a space-time filtering of train position. The various track sections are defined by the frequency of a continuous signal. The set of frequencies related to the track sections is a set of orthogonal functions in a Hilbert Space. Thus the failure probability of track sections separation is precisely calculated on the basis of signal-to-noise ratio. SNR is a function of the level of traction current conducted by rails. This is the reason why we developed a very powerful algorithm to reject noise and jamming to obtain an SNR compatible with the precision required for the track circuit and SIL 4 level. The SIL 4 level is thus reachable by an adjustment of the set of orthogonal functions. Our major contributions to railway engineering signalling science are i) Train space localization is precisely defined by a calibration system. The operation bypasses the GSM-R radio system of the ERTMS system. Moreover, the track circuit is naturally protected against radio-type jammers. After the calibration operation, the track circuit is autonomous. ii) A mathematical topology adapted to train space localization by following the train through a linear time filtering of the received signal. Track sections are numerically defined and can be modified with a software update. The system was numerically simulated, and results were beyond our expectations. We achieved a precision of one meter. Rail-ground and rail-wheel impedance sensitivity analysis gave excellent results. Results are now complete and ready to be published. This work was initialised as a research project of the French Railways developed by the Pi-Ramses Company under SNCF contract and required five years to obtain the results. This track circuit is already at Level 3 of the ERTMS system, and it will be much cheaper to implement and to work. The traffic regulation is based on variable length track sections. As the traffic growths, the maximum speed is reduced, and the track section lengths are decreasing. It is possible if the elementary track section is correctly defined for the minimum speed and if every track section is able to emit with variable frequencies.

Keywords: track section, track circuits, space-time crossing, adaptive track section, automatic railway signalling

Procedia PDF Downloads 307
17236 Simulation Study on Comparison of Thermal Comfort during Heating with All-Air System and Radiant Floor System

Authors: Shiyun Liu

Abstract:

Radiant heating systems work fundamentally differently from air systems by taking advantage of both radiant and convective heat transfer to remove space heating load. There are rare studies on differences of heating systems between all-air system and radiant floor system. This paper uses the method of simulation based on state-space to calculate the indoor temperature and wall temperature of each system and shows how the dynamic heat transfer in rooms conditioned by a radiant system is different from an air system. Then this paper analyses the changes of indoor temperature of these two systems, finding out the differences between all-air heating system and radiant floor heating system to help the designer choose a more suitable heating system.

Keywords: radiant floor, all-air system, thermal comfort, simulation, heating system

Procedia PDF Downloads 133
17235 Supply Chain Management Strategies of the Private Residential Construction Sector in South Africa

Authors: R. Khoza, K. K. Govender

Abstract:

The aim of the study was to review and critically evaluate the supply chain management (SCM) strategies and challenges in the private residential construction sector in South Africa. The study was grounded in three theories, namely, theory of constraints, principal-agency theory, and stakeholder theory. A quantitative approach was used to survey 320 private residential construction companies which registered with the National Homebuilders Registration Council (NHBRC) within the Gauteng province. The data from 250 questionnaires returned were analysed using SPSS (Versions 23) and Smart PLS. It became evident that the SCM challenges included lack of trust between the supplier and the organization; lack of adoption of SCM system; lack of a sufficiently skilled SCM workforce; and poor implementation of contract management. The findings also indicate that there is a significant positive relationship between the performance of the private residential construction sector in South Africa and SCM challenges, SCM strategies and SCM processes. A framework is proposed comprising SCM practices and strategies of private residential construction sector in South Africa, which will enable them to enhance performance.

Keywords: management challenges, residential housing, South Africa, supply chain management

Procedia PDF Downloads 50
17234 Design an Expert System to Assess the Hydraulic System in Thermal and Hydrodynamic Aspect

Authors: Ahmad Abdul-Razzak Aboudi Al-Issa

Abstract:

Thermal and Hydrodynamic are basic aspects in any hydraulic system and therefore, they must be assessed with regard to this aspect before constructing the system. This assessment needs a good expertise in this aspect to obtain an efficient hydraulic system. Therefore, this study aims to build an expert system called Hydraulic System Calculations (HSC) to ensure a smooth operation for the hydraulic system. The expert system (HSC) had been designed and coded in an user-friendly interactive program called Microsoft Visual Basic 2010. The suggested code provides the designer with a number of choices to resolve the problem of hydraulic oil overheating which may arise during the continuous operation of the hydraulic unit. As a result, the HSC can minimize the human errors, effort, time and cost of hydraulic machine design.

Keywords: fluid power, hydraulic system, thermal and hydrodynamic, expert system

Procedia PDF Downloads 414
17233 Implementation of Proof of Work Using Ganache

Authors: Sakshi Singh, Shampa Chakraverty

Abstract:

One of the essential characteristics of Blockchain is the ability to validate the integrity of new transactions added to the Blockchain. Moreover, one of the essential consensus algorithms, Proof of Work, performs this job. In this work, we implemented the Proof of Work consensus method on the block formed by performing the transaction using Ganache. The primary goal of this implementation is to understand the process and record how Proof of Work works in reality on newly created blocks.

Keywords: proof of work, blockchain, ganache, smart contract

Procedia PDF Downloads 117
17232 A Design Framework for an Open Market Platform of Enriched Card-Based Transactional Data for Big Data Analytics and Open Banking

Authors: Trevor Toy, Josef Langerman

Abstract:

Around a quarter of the world’s data is generated by financial with an estimated 708.5 billion global non-cash transactions reached between 2018 and. And with Open Banking still a rapidly developing concept within the financial industry, there is an opportunity to create a secure mechanism for connecting its stakeholders to openly, legitimately and consensually share the data required to enable it. Integration and data sharing of anonymised transactional data are still operated in silos and centralised between the large corporate entities in the ecosystem that have the resources to do so. Smaller fintechs generating data and businesses looking to consume data are largely excluded from the process. Therefore there is a growing demand for accessible transactional data for analytical purposes and also to support the rapid global adoption of Open Banking. The following research has provided a solution framework that aims to provide a secure decentralised marketplace for 1.) data providers to list their transactional data, 2.) data consumers to find and access that data, and 3.) data subjects (the individuals making the transactions that generate the data) to manage and sell the data that relates to themselves. The platform also provides an integrated system for downstream transactional-related data from merchants, enriching the data product available to build a comprehensive view of a data subject’s spending habits. A robust and sustainable data market can be developed by providing a more accessible mechanism for data producers to monetise their data investments and encouraging data subjects to share their data through the same financial incentives. At the centre of the platform is the market mechanism that connects the data providers and their data subjects to the data consumers. This core component of the platform is developed on a decentralised blockchain contract with a market layer that manages transaction, user, pricing, payment, tagging, contract, control, and lineage features that pertain to the user interactions on the platform. One of the platform’s key features is enabling the participation and management of personal data by the individuals from whom the data is being generated. This framework developed a proof-of-concept on the Etheruem blockchain base where an individual can securely manage access to their own personal data and that individual’s identifiable relationship to the card-based transaction data provided by financial institutions. This gives data consumers access to a complete view of transactional spending behaviour in correlation to key demographic information. This platform solution can ultimately support the growth, prosperity, and development of economies, businesses, communities, and individuals by providing accessible and relevant transactional data for big data analytics and open banking.

Keywords: big data markets, open banking, blockchain, personal data management

Procedia PDF Downloads 43
17231 Digital Twin Technology: A Solution for Remote Operation and Productivity Improvement During Covid-19 Era and Future

Authors: Muhamad Sahir Bin Ahmad Shatiry, Wan Normeza Wan Zakaria, Mohamad Zaki Hassan

Abstract:

The pandemic Covid19 has significantly impacted the world; the spreading of the Covid19 virus initially from China has dramatically impacted the world's economy. Therefore, the world reacts with establishing the new way or norm in daily life. The rapid rise of the latest technology has been seen by introducing many technologies to ease human life to have a minor contract between humans and avoid spreading the virus Covid19. Digital twin technologies are one of the technologies created before the pandemic Covid19 but slow adoption in the industry. Throughout the Covid19, most of the companies in the world started to explore to use it. The digital twin technology provides the virtual platform to replicate the existing condition or setup for anything such as office, manufacturing line, factories' machine, building, and many more. This study investigates the effect on the economic perspective after the companies use the Digital Twin technology in the industry. To minimize the contact between humans and to have the ability to operate the system digitally remotely. In this study, the explanation of the digital twin technology impacts the world's microeconomic and macroeconomic.

Keywords: productivity, artificially intelligence, IoT, digital twin

Procedia PDF Downloads 165
17230 A System Functions Set-Up through Near Field Communication of a Smartphone

Authors: Jaemyoung Lee

Abstract:

We present a method to set up system functions through a near filed communication (NFC) of a smartphone. The short communication distance of the NFC which is usually less than 4 cm could prevent any interferences from other devices and establish a secure communication channel between a system and the smartphone. The proposed set-up method for system function values is demonstrated for a blacbox system in a car. In demonstration, system functions of a blackbox which is manipulated through NFC of a smartphone are controls of image quality, sound level, shock sensing level to store images, etc. The proposed set-up method for system function values can be used for any devices with NFC.

Keywords: system set-up, near field communication, smartphone, android

Procedia PDF Downloads 311