4059 Causes of Variation Orders in the Egyptian Construction Industry: Time and Cost Impacts

Authors: A. Samer Ezeldin, Jwanda M. El Sarag

Abstract:

Variation orders are of great importance in any construction project. Variation orders are defined as any change in the scope of works of a project that can be an addition omission, or even modification. This paper investigates the variation orders that occur during construction projects in Egypt. The literature review represents a comparison of causes of variation orders among Egypt, Tanzania, Nigeria, Malaysia and the United Kingdom. A classification of occurrence of variation orders due to owner related factors, consultant related factors and other factors are signified in the literature review. These classified events that lead to variation orders were introduced in a survey with 19 events to observe their frequency of occurrence, and their time and cost impacts. The survey data was obtained from 87 participants that included clients, consultants, and contractors and a database of 42 scenarios was created. A model is then developed to help assist project managers in predicting the frequency of variations and account for a budget for any additional costs and minimize any delays that can take place. Two experts with more than 25 years of experience were given the model to verify that the model was working effectively. The model was then validated on a residential compound that was completed in July 2016 to prove that the model actually produces acceptable results.

Keywords: construction, cost impact, Egypt, time impact, variation orders

Procedia PDF Downloads 142
4058 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 146
4057 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 483
4056 Green Construction in EGYPT

Authors: Hanan A. Anwar

Abstract:

This paper introduces green building construction in Egypt with different concepts and practices. The following study includes green building applied definition, guidelines, regulations and Standards. Evaluation of cost/benefit of green construction methods and green construction rating systems are presented. Relevant case studies will be reviewed. Four sites will be included.

Keywords: green construction, ecofreindly, self-sufficient town, carbon neutral atmosphere

Procedia PDF Downloads 619
4055 An Investigation into the Current Implementation of Design-Build Contracts in the Kingdom of Saudi Arabia

Authors: Ibrahim A. Alhammad, Suleiman A. Al-Otaibi, Khalid S. Al-Gahtani, Naïf Al-Otaibi, Abdulaziz A. Bubshait

Abstract:

In the last decade, the use of project delivery system of design build engineering contracts is increasing in North America due to the reasons of reducing the project duration and minimizing costs. The shift from traditional approach of Design-Bid-Build to Design-Build contracts have been attributed to many factors such as evolution of the regulatory and legal frameworks governing the engineering contracts and improvement in integrating design and construction. The aforementioned practice of contracting is more appropriate in North America; yet, it may not be the case in Saudi Arabia where the traditional approach of construction contracting remains dominant. The authors believe there are number of factors related to the gaps in the level of sophistication of the engineering and management of the construction projects in both countries. A step towards improving the Saudi construction practice by adopting the new trend of construction contracting, this paper identifies the reasons why Design/Build form of contracting are not frequently utilized. A field survey, which includes the questionnaire addressing the research problem, is distributed to three main parties of the construction contracts: clients, consultants, and contractors. The analyzed collected data were statistically sufficient to finding the reasons of not adopting the new trend of good practice of deign build approach in Saudi Arabia. In addition, the reasons are: (1) lack of regulation and legal framework; (2) absence of clear criteria of the owner for the trade-off between competing contractors, (3) and lack of experience, knowledge and skill.

Keywords: design built projects, Saudi Arabia, GCC, mega projects

Procedia PDF Downloads 188
4054 The Effect of Artificial Intelligence on Construction Development

Authors: Shady Gamal Aziz Shehata

Abstract:

Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception

Procedia PDF Downloads 17
4053 Differentiation of Customer Types by Stereotypical Characteristics for Modular and Conventional Construction Methods

Authors: Peter Schnell, Phillip Haag

Abstract:

In the course of the structural transformation of the construction industry, the integration of industrialization and digitization has led to the development of construction methods with an increased degree of prefabrication, such as system or modular construction. Compared to conventional construction, these innovative construction methods are characterized by modified structural and procedural properties and expand the range of construction services. Faced with the supply side, it is possible to identify construction-specific customer types with different characteristics and certain preferences as far as the choice of construction method is concerned. The basis for this finding was qualitative expert interviews. By evaluating the stereotypical customer needs, a corresponding segmentation of the demand side can be made along with the basic orientation and decision behavior. This demarcation supports the target- and needs-oriented customer approach and contributes to cooperative and successful project management.

Keywords: differentiation of customer types, modular construction methods, conventional construction methods, stereotypical customer types

Procedia PDF Downloads 81
4052 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 171
4051 Family Planning and HIV Integration: A One-stop Shop Model at Spilhaus Clinic, Harare Zimbabwe

Authors: Mercy Marimirofa, Farai Machinga, Alfred Zvoushe, Tsitsidzaishe Musvosvi

Abstract:

The Government of Zimbabwe embarked on integrating family planning with Sexually Transmitted Infection (STI) and Human Immunodeficiency Virus (HIV) services in May 2020 with support from the World Health Organization (WHO). There was high HIV prevalence, incidence rates and STI infections among women attending FP clinics. Spilhaus is a specialized center of excellence clinic which offers a range of sexual reproductive health services. HIV services were limited to testing only, and clients were referred to other facilities for further management. Integration of services requires that all the services be available at one point so that clients will access them during their visit to the facility. Objectives: The study was conducted to assess the impact the one-stop-shop model has made in accessing integrated Family Planning services and sexual reproductive health services compared to the supermarket approach. It also assessed the relationship family planning services have with other sexual reproductive health services. Methods: A secondary data analysis was conducted at Spilhaus clinic in Harare using family planning registers and HIV services registers comparing years 2019 and 2021. A 2 sample t-test was used to determine the difference in clients accessing the services under the two models. A Spearman’s rank correlation was used to determine if accessing family planning services has a relationship with other sexual reproductive health services. Results: In 2019, 7,548 clients visited the Spilhaus clinic compared to 8,265 during the period January to December 2021. The median age for all clients accessing services was 32 years. An increase of 69% in the number of services accessed was recorded from 2019 to 2021. More services were accessed in 2021. There was no difference in the number of clients accessing family planning services cervical cancer, and HIV services. A difference was found in the number of clients who were offered STI screening services. There was also a relationship between accessing family planning services and STI screening services (ρ = 0.729, p-value=0.006). Conclusion: Programming towards SRH services was a great achievement, the use of an integrated approach proved to be cost-effective as it minimised the required resources for separate programs. Clients accessed important health needs at once. The integration of these services provided an opportunity to offer comprehensive information which addressed an individual’s sexual reproductive health needs.

Keywords: intergration, one stop shop, family planning, reproductive health

Procedia PDF Downloads 32
4050 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 253
4049 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 516
4048 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
4047 Construction Contractor Pre-Qualification Using Multi-Attribute Utility Theory: A Multiplicative Approach

Authors: B. Vikram, Y. Anu Leena, Y. Anu Neena, M. V. Krishna Rao, V. S. S. Kumar

Abstract:

The industry is often criticized for inefficiencies in outcomes such as time and cost overruns, low productivity, poor quality and inadequate customer satisfaction. To enhance the chances for construction projects to be successful, selecting an able contractor is one of the fundamental decisions to be made by clients. The selection of the most appropriate contractor is a multi-criteria decision making (MCDM) process. In this paper, multi-attribute utility theory (MAUT) is employed utilizing the multiplicative form of utility function for ranking the prequalified contractors. Performance assessment criteria covering contracting company attributes, experience record, past performance, performance potential, financial stability and project specific criteria are considered for contractor evaluation. A case study of multistoried building for which four contractors submitted bids is considered to illustrate the applicability of multiplicative approach of MAUT to rank the prequalified contractors. The proposed MAUT decision making methodology can also be employed to other decision making situations.

Keywords: multi-attribute utility theory, construction industry, prequalification, contractor

Procedia PDF Downloads 410
4046 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 251
4045 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 196
4044 Rising STI Prevalence among MSM Clients in Calabar, Nigeria: A Call to Action

Authors: Ugoh Kelechi Melford, Anene O.

Abstract:

Introduction: Evidence has shown that there are increasing rates of new HIV and other STI infections occurring among Men who have Sex with Men (MSM) in Nigeria, with the prevalence 3 times higher than the general population as reported by the 2011 National Integrated Bio Behavioral Surveillance Survey. The poor state of health care and support services hinders our effort to control the high rates of these new infections among MSM. Methods: The Initiative for Improved Male Health (IMH-Initiative) works to provide a safe space for young MSM living with HIV to access comprehensive palliative care and support, as well as referrals for other services through drama and dance competitions. An STI assessment was conducted in IMH-Initiative’s Community Center in Calabar, for gay men and other MSM. An STI history was conducted for all clients who visited the community clinic specifically for HCT and STI counseling and referrals within a 5 month period, and their data were collated. Results: 61 MSM were diagnosed, and reported the following in the last 6 months. 49 where living with HIV. 46 had previous histories of untreated anal warts. 20 had previous histories of treated Gonorrhea by self-medication and herbs. 21 had untreated boils and rashes around the genitals. 10 clients where living with HIV, and reported untreated penile and rectal gonorrhea. All clients indicated that there were not comfortable discussing STI infections with staff of public hospitals. Conclusion: It is evident that a reasonable number of STI infections among MSM are not completely treated or ignored. This thereby increases the individual’s risk of HIV infection, and cripples HIV prevention programming in Nigeria. HIV programs targeting MSM must incorporate STI syndromic management, so as to increase access to non-stigmatized diagnosis and treatment of STIs. Also, access to STI drugs for clients cannot be overemphasized.

Keywords: MSM, IBBSS, STI, IMH

Procedia PDF Downloads 304
4043 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 360
4042 Bank Customers' Satisfaction, Customers' Loyalty and Additional Purchases of Banking Products and Services: A Case Study from the Czech Republic

Authors: Jaroslav Belás, Anna Chochoľáková, Lenka Gabčová

Abstract:

The aim of this article was to examine and quantify the dependence of additional purchases of banking products from customer loyalty and dependence of bank clients’ loyalty on the customers’ satisfaction. In this context, in our research from 2014, the respondents were divided into satisfied (loyal) and dissatisfied (disloyal) banking clients and their attitudes in the area of loyalty and additional purchases of banking products were compared. The differences in attitudes were examined by means of Pearson statistics. It was found out that satisfied customers compared with those dissatisfied clients significantly more advise their bank to their friends, also they often consider that they would use their bank in the future, they are more resistant to the offers from the other banks as well. Loyal customers are more interested in the services of their own banks when considering investments in the financial market, keep their savings in their own bank, take out a mortgage loan from their own bank and use other banking products and services offered by their own bank as well. According to the results of our research, with the different intensities the loyalty of customers is transforming into a potential purchase of additional banking products. The greatest potential interest of the bank customers was in keeping their own savings in the bank and mortgage loans. The intensity of interest in the purchase of financial investments and other products was relatively low.

Keywords: commercial bank, bank customers’ satisfaction, loyalty of bank clients, additional purchases of banking products and services

Procedia PDF Downloads 444
4041 Predictors of Lost to Follow-Up among HIV Patients Attending Anti-Retroviral Therapy Treatment Centers in Nigeria

Authors: Oluwasina Folajinmi, Kate Ssamulla, Penninah Lutung, Daniel Reijer

Abstract:

Background: Despite of well-verified benefits of anti-retroviral therapy (ART) in prolonging life expectancy being lost to follow-up (LTFU) presents a challenge to the success of ART programs in resource limited countries like Nigeria. In several studies of ART programs in developing countries, researchers have reported that there has been a high rate of LTFU among patients receiving care and treatment at ART treatment centers. This study seeks to determine the cause of LTFU among HIV clients. Method: A descriptive cross sectional study focused on a population of 9,280 persons living with HIV/AIDS who were enrolled in nine treatment centers in Nigeria (both pre-ART and ART patients were included). Out of the total population, 1752 (18.9%) were found to be LTFU. Of this group we randomly selected 1200 clients (68.5%) their d patients’ information was generated through a database. Data on demographics and CD4 counts, causes of LTFU were analyzed and summarized. Results: Out of 1200 LTFU clients selected, 462 (38.5%) were on ART; 341 clients (73.8%) had CD4 level < 500cell/µL and 738 (61.5%) on pre-ART had CD4 level >500/µL. In our records we found telephone number for 675 (56.1%) of these clients. 675 (56.1%) were owners of a phone. The majority of the client’s 731 (60.9%) were living at not more than 25km away from the ART center. A majority were females (926 or 77.2%) while 274 (22.8%) were male. 675 (56.1%) clients were reported traced via telephone and home address. 326 (27.2%) of clients phone numbers were not reachable; 173 (14.4%) of telephone numbers were incomplete. 71 (5.9%) had relocated due to communal crises and expert client trackers reported that some patient could not afford transportation to ART centers. Conclusion: This study shows that, low health education levels, poverty, relocations and lack of reliable phone contact were major predictors of LTFU. Periodic updates of home addresses, telephone contacts including at least two next of kin, phone text messages and home visits may improve follow up. Early and consistent tracking of missed appointments is crucial. Creation of more ART decentralized centres are needed to avoid long distances.

Keywords: anti-retroviral therapy, HIV/AIDS, predictors, lost to follow up

Procedia PDF Downloads 281
4040 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 313
4039 Quality of Life Measurements: Evaluation of Intervention Program of Persons with Addiction

Authors: Julie Wittmannová, Petr Šeda

Abstract:

Quality of life measurements (QLF) help to evaluate interventions programs in different groups of persons with special needs. Our presentation deals with QLF of persons with addiction in relation to the physical activity (PA), type of addiction, age, gender and other variables. The aim of presentation is to summarize the basic findings and offer thoughts for questions arose. Methods: SQUALA (Subjective Quality of Life Analysis); SEIQoL (Schedule for the Evaluation of Individual Quality of Life); questionnaire of own construction. The results are evaluated by Mann­Whitney U test and Kruskall­Wallis ANOVA test (p ≤ 0,05). Sample of 64 participants – clients of aftercare center, aged 18 plus. Findings: Application of the methods SQUALA and SEIQoL in the chosen population seems appropriate, the obtaining information regarding the QLF correlate to intervention program topics, the need of an activelifestyle and health related topics in persons with addiction is visible. Conclusions or Implications: The subjective evaluation of quality of life of Aftercare clients is an important part of evaluation process, especially used to evaluate satisfaction with offered services and programs. Techniques SQUALA and SEIQoL gave us the desired outcomes.

Keywords: adapted physical activity, addiction, quality of life, physical activity, aftercare

Procedia PDF Downloads 300
4038 Cold Tomato Paste as an Alternative Therapy for Elderly Clients with Exacerbation of Arthritis

Authors: Mary Therese G. Caluna, Mark Justin B. Campanero, Erlin Maris T. Cantiller, Claudine Mae A. Cantillo, Nerissa L. Caño

Abstract:

Objective: The study determined the effectiveness of cold tomato paste in relieving pain caused by exacerbation of arthritis in the elderly, specifically on clients 60 years old and above. The study focused on alternative, cost-effective and non-pharmacological techniques in relieving pain experienced by the older people with osteoarthritis and rheumatoid arthritis. Methods: Using purposive non-probability sampling, the researchers gathered a total number of 40 subjects that passed the inclusion criteria provided by the researchers. The subjects were divided into two groups, experimental group (20 subjects) and control groups (20 subjects). The Numeric Rating 11-point Scale (NRS-11) was utilized to assess the pain level of the subject prior the application of the treatment and after the application of the treatment. Key findings: There is a significant difference in the pain levels of the experimental group before and after the application of cold tomato paste. This indicates that that the application of cold tomato paste alleviates the pain experienced by elderly clients with exacerbation of arthritis. Conclusion: The effectiveness of cold tomato paste in relieving pain experienced by elderly clients who are in exacerbation of arthritis was proven to be evidence-based. The cold tomato paste application has significant impact in the field of nursing and therefore, can be used in both clinical trials and practices. The effectiveness of cold tomato application promotes innovation in the field of nursing, thus encouraging further researches regarding other uses of tomato and other herbal interventions to relieve the pain caused by osteoarthritis and rheumatoid arthritis.

Keywords: alternative therapy, arthritis, cold tomato paste, elderly clients, exacerbation

Procedia PDF Downloads 394
4037 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: building information modeling, BIM, construction industry, Kuwait

Procedia PDF Downloads 348
4036 Descriptive Assessment of Health and Safety Regulations and Its Current Situation in the Construction Industry of Pakistan

Authors: Khawaja A. Wahaj Wani, Aykut Erkal

Abstract:

Pakistan's construction industry, a key player in economic development, has experienced remarkable growth. However, the surge in activities has been accompanied by dangerous working conditions, attributed to legislative gaps and flaws. Unhealthy construction practices, uncertain site conditions, and hazardous environments contribute to a concerning rate of injuries and fatalities. The principal aim of this research study is to undertake a thorough evaluation based on the assessment of the current situation of Health & Safety policies and the surveys performed by stakeholders of Pakistan with the aim of providing solution-centric methodologies for the enforcement of health and safety regulations within construction companies operating on project sites. Recognizing the pivotal role that the construction industry plays in bolstering a nation's economy, it is imperative to address the pressing need for heightened awareness among site engineers and laborers. The study adopts a robust approach, utilizing questionnaire surveys and interviews. As an exclusive investigative study, it encompasses all stakeholders: clients, consultants, contractors, and subcontractors. Targeting PEC-registered companies. Safety performance was assessed through the examination of sixty safety procedures using SPSS-18. A high Cronbach's alpha value of 0.958 ensures data reliability, and non-parametric tests were employed due to the non-normal distribution of data. The safety performance evaluation revealed significant insights. "Using Hoists and Cranes" and "Precautionary Measures (Shoring and Excavation)" exhibited commendable safety levels. Conversely, "Trainings on Safety" displayed a lower safety performance, alongside areas such as "Safety in Contract Documentation," "Meetings for Safety," and "Worker Participation," indicating room for improvement. These findings provide stakeholders with a detailed understanding of current safety measures within Pakistan's construction industry.

Keywords: construction industry, health and safety regulations, Pakistan, risk management

Procedia PDF Downloads 24
4035 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
4034 A Co-Relational Descriptive Study to Assess the Impact of Cancer Event on Self, Family, Coping Level of Cancer Clients and Quality of Life among Them

Authors: Padma Sree Potru

Abstract:

Abstract: A co-relational descriptive study was conducted to assess the impact of cancer event on self, on family, coping strategies of cancer clients and quality of life among them in G.G.H., Guntur, Andhra Pradesh, India. Aim: The aim of the study was to investigate the impact of cancer events on self, on family, coping of clients and quality of life among cancer patients. Methods: 50 cancer patients were selected through random sampling technique. The data were obtained by using impact of events scale, impact on family scale, coping health inventory and WHOQOL-BREF scale. Results: The results revealed that majority (32%) of them were in the age group of 36-45 years, 72% were females, 44% were having the income of Rs. 5001-10000/- per month, 40% were working for daily wage, and 15% were newly diagnosed of cancer. Among 50 cancer patients, 65% had extreme impact of events, 61% shows extreme impact on family, 46% possess minimal coping strategies and 68% had poor quality of life. This study focuses on that there is a strong positive correlation between quality of life and coping behavior r=0.603 and also between impact of event and impact on family r=0.610, but a negative correlation existed between quality of life and impact of events r= -0.201. ANOVA test reveals that there is a significant difference between subscales of impact on family and coping behavior with f values = 3.893, 3.957 respectively. Chi-square highlights that there is a significant association between impact of events with age, occupation and impact on family with duration of illness. Conclusion: Even though cancer is a dreadful disease still there are many emerging treatment modalities and innovative procedures which are focusing on improving the standards of life among cancer clients. But all this can happen only when the clients accepts the reality, increase their willpower and confidence, desire to live, focusing on coping mechanisms and good ongoing support from the family members.

Keywords: impact of event, impact on family, coping, quality of event

Procedia PDF Downloads 417
4033 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 272
4032 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments

Authors: Ahmad Baghdadi, Mohammed Kishk

Abstract:

Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.

Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia

Procedia PDF Downloads 516
4031 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 340
4030 Construction Innovation: Support for 3D Printing House

Authors: Andrea Palazzo, Daniel Macek, Veronika Malinova

Abstract:

Contour processing is the new technology challenge for architects and construction companies. The many advantages it promises make it one of the most interesting solutions for construction in terms of automation of building processes. The technology for 3D printing houses offers many application possibilities, from low-cost construction, to being considered by NASA for visionary projects as a good solution for building settlements on other planets. Another very important point is that clients, as architects, will no longer have many limits in design concerning ideas and creativity. The prices for real estate are constantly increasing and the lack of availability of construction materials as well as the speculation that has been created around it in 2021 is bringing prices to such a level that in the future real estate developers risk not being able to find customers for these ultra-expensive homes. Hence, this paper starts with the introduction of 3D printing, which now has the potential to gain an important position in the market, becoming a valid alternative to the classic construction process. This technology is not only beneficial from an economic point of view but it is also a great opportunity to have an impact on the environment by reducing CO2 emissions. Further on in the article we will also understand if, after the COP 26 (2021 United Nations Climate Change Conference), world governments could also push towards building technologies that reduce the waste materials that are needed to be disposed of and at the same time reduce emissions with the contribution of governmental funds. This paper will give us insight on the multiple benefits of 3D printing and emphasise the importance of finding new solutions for materials that can be used by the printer. Therefore, based on the type of material, it will be possible to understand the compatibility with current regulations and how the authorities will be inclined to support this technology. This will help to enable the rise and development of this technology in Europe and in the rest of the world on actual housing projects and not only on prototypes.

Keywords: additive manufacturing, contour crafting, development, new regulation, printing material

Procedia PDF Downloads 163