Search results for: Industrial project management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 15467

Search results for: Industrial project management

15287 Managing Inter-Organizational Innovation Project: Systematic Review of Literature

Authors: Lamin B Ceesay, Cecilia Rossignoli

Abstract:

Inter-organizational collaboration is a growing phenomenon in both research and practice. The partnership between organizations enables firms to leverage external resources, experiences, and technology that lie with other firms. This collaborative practice is a source of improved business model performance, technological advancement, and increased competitive advantage for firms. However, the competitive intents, and even diverse institutional logics of firms, make inter-firm innovation-based partnership even more complex, and its governance more challenging. The purpose of this paper is to present a systematic review of research linking the inter-organizational relationship of firms with their innovation practice and specify the different project management issues and gaps addressed in previous research. To do this, we employed a systematic review of the literature on inter-organizational innovation using two complementary scholarly databases - ScienceDirect and Web of Science (WoS). Article scoping relies on the combination of keywords based on similar terms used in the literature:(1) inter-organizational relationship, (2) business network, (3) inter-firm project, and (4) innovation network. These searches were conducted in the title, abstract, and keywords of conceptual and empirical research papers done in English. Our search covers between 2010 to 2019. We applied several exclusion criteria including Papers published outside the years under the review, papers in a language other than English, papers neither listed in WoS nor ScienceDirect and papers that are not sharply related to the inter-organizational innovation-based partnership were removed. After all relevant search criteria were applied, a final list of 84 papers constitutes the data for this review. Our review revealed an increasing evolution of inter-organizational relationship research during the period under the review. The descriptive analysis of papers according to Journal outlets finds that International Journal of Project Management (IJPM), Journal of Industrial Marketing, Journal of Business Research (JBR), etc. are the leading journal outlets for research in the inter-organizational innovation project. The review also finds that Qualitative methods and quantitative approaches respectively are the leading research methods adopted by scholars in the field. However, literature review and conceptual papers constitute the least in the field. During the content analysis of the selected papers, we read the content of each paper and found that the selected papers try to address one of the three phenomena in inter-organizational innovation research: (1) project antecedents; (2) project management and (3) project performance outcomes. We found that these categories are not mutually exclusive, but rather interdependent. This categorization also helped us to organize the fragmented literature in the field. While a significant percentage of the literature discussed project management issues, we found fewer extant literature on project antecedents and performance. As a result of this, we organized the future research agenda addressed in several papers by linking them with the under-researched themes in the field, thus providing great potential to advance future research agenda especially, in the under-researched themes in the field. Finally, our paper reveals that research on inter-organizational innovation project is generally fragmented which hinders a better understanding of the field. Thus, this paper contributes to the understanding of the field by organizing and discussing the extant literature to advance the theory and application of inter-organizational relationship.

Keywords: inter-organizational relationship, inter-firm collaboration, innovation projects, project management, systematic review

Procedia PDF Downloads 85
15286 Green Technology for the Treatment of Industrial Effluent Contaminated with Dyes

Authors: Afzaal Gulzar, Shafaq Mubarak, M. Zia-Ur-Rehman

Abstract:

Industrial waste waters put environmental constrains to the water quality of aqueous reserves. Number of techniques has been used to treat them before disposal to water bodies. In this work a novel green approach is study by using poultry waste eggshells as a low cost efficient adsorbent for the dyes present in industrial effluent of textile and paper industries. The developed technique not only used to treat contaminated waters but also resulted in the utilization of poultry eggshell waste which in turn assists in solid waste management. Batch sorption studies like contact time, adsorbent dose, dye concentration, temp and pH has been conducted to find the optimum adsorption parameters.

Keywords: green technology, solid waste management, industrial effluent, eggshell waste utilization, waste water treatment

Procedia PDF Downloads 437
15285 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 310
15284 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria

Authors: Ezeabasili Chibuike Patrick

Abstract:

The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.

Keywords: strategies, risk management, contingency theory, Nigeria

Procedia PDF Downloads 94
15283 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 221
15282 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 17
15281 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework

Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise

Abstract:

The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.

Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D

Procedia PDF Downloads 140
15280 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 275
15279 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 317
15278 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 269
15277 Data Management System for Environmental Remediation

Authors: Elizaveta Petelina, Anton Sizo

Abstract:

Environmental remediation projects deal with a wide spectrum of data, including data collected during site assessment, execution of remediation activities, and environmental monitoring. Therefore, an appropriate data management is required as a key factor for well-grounded decision making. The Environmental Data Management System (EDMS) was developed to address all necessary data management aspects, including efficient data handling and data interoperability, access to historical and current data, spatial and temporal analysis, 2D and 3D data visualization, mapping, and data sharing. The system focuses on support of well-grounded decision making in relation to required mitigation measures and assessment of remediation success. The EDMS is a combination of enterprise and desktop level data management and Geographic Information System (GIS) tools assembled to assist to environmental remediation, project planning, and evaluation, and environmental monitoring of mine sites. EDMS consists of seven main components: a Geodatabase that contains spatial database to store and query spatially distributed data; a GIS and Web GIS component that combines desktop and server-based GIS solutions; a Field Data Collection component that contains tools for field work; a Quality Assurance (QA)/Quality Control (QC) component that combines operational procedures for QA and measures for QC; Data Import and Export component that includes tools and templates to support project data flow; a Lab Data component that provides connection between EDMS and laboratory information management systems; and a Reporting component that includes server-based services for real-time report generation. The EDMS has been successfully implemented for the Project CLEANS (Clean-up of Abandoned Northern Mines). Project CLEANS is a multi-year, multimillion-dollar project aimed at assessing and reclaiming 37 uranium mine sites in northern Saskatchewan, Canada. The EDMS has effectively facilitated integrated decision-making for CLEANS project managers and transparency amongst stakeholders.

Keywords: data management, environmental remediation, geographic information system, GIS, decision making

Procedia PDF Downloads 124
15276 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 369
15275 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 68
15274 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: critical success factors, procurement phase, project life cycle, project performance

Procedia PDF Downloads 161
15273 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 326
15272 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 306
15271 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: community engagement, construction, case study, project management

Procedia PDF Downloads 230
15270 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 69
15269 The Egyptian eGovernment Journey

Authors: Ali Abdelsattar Elshabrawy

Abstract:

The Egyptian government is struggling to build it's eGovernment project. They succeeded to build the Egyptian digital portal, which contain links for number of services provided by different ministries. For achieving such success, their are requirements necessary to build such a project such as: internet dissemination, IT literacy, Strategy, disqualification of paper based services. This paper is going to clarify the main obstacles to the Egyptian eGovernment project from both the supply and demand sides. Also will clarify the most critical requirements in this phase of the project lifecycle. This paper should be in great value for the project team and also for many other developing countries that share the same obstacles.

Keywords: the egyptian egovernment project lifecycle, supply side barriers, demand side barriers, egovernment project requirements

Procedia PDF Downloads 119
15268 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 126
15267 The Contribution of Community Involvement in Heritage Management

Authors: Esraa Alhadad

Abstract:

Recently, there has been considerable debate surrounding the definition, conservation, and management of heritage. Over the past few years, there has been a growing call for the inclusion of local communities in heritage management. However, the perspectives on involvement, especially concerning key stakeholders like community members, often diverge significantly. While the theoretical foundation for community involvement is reasonably established, the application of this approach in heritage management has been sluggish. Achieving a balance to fulfill the diverse goals of stakeholders in any involvement project proves challenging in practice. Consequently, there is a dearth of empirical studies exploring the practical implications of effective tools in heritage management, and limited indication exists to persuade current authorities, such as governmental organizations, to share their influence with local community members. This research project delves into community involvement within heritage management as a potent means of constructing a robust management framework. Its objective is to assess both the extent and caliber of involvement within the management of heritage sites overall, utilizing a cultural mapping-centered methodology. The findings of this study underscore the significance of engaging the local community in both heritage management and planning endeavors. Ultimately, this investigation furnishes crucial empirical evidence and extrapolates valuable theoretical and practical insights that advance understanding of cultural mapping in pivotal areas, including the catalysts for involvement and collaborative decision-making processes.

Keywords: community involvement, heritage management, cultural mapping, stakeholder mangement

Procedia PDF Downloads 82
15266 Development of an Intelligent Decision Support System for Smart Viticulture

Authors: C. M. Balaceanu, G. Suciu, C. S. Bosoc, O. Orza, C. Fernandez, Z. Viniczay

Abstract:

The Internet of Things (IoT) represents the best option for smart vineyard applications, even if it is necessary to integrate the technologies required for the development. This article is based on the research and the results obtained in the DISAVIT project. For Smart Agriculture, the project aims to provide a trustworthy, intelligent, integrated vineyard management solution that is based on the IoT. To have interoperability through the use of a multiprotocol technology (being the future connected wireless IoT) it is necessary to adopt an agnostic approach, providing a reliable environment to address cyber security, IoT-based threats and traceability through blockchain-based design, but also creating a concept for long-term implementations (modular, scalable). The ones described above represent the main innovative technical aspects of this project. The DISAVIT project studies and promotes the incorporation of better management tools based on objective data-based decisions, which are necessary for agriculture adapted and more resistant to climate change. It also exploits the opportunities generated by the digital services market for smart agriculture management stakeholders. The project's final result aims to improve decision-making, performance, and viticulturally infrastructure and increase real-time data accuracy and interoperability. Innovative aspects such as end-to-end solutions, adaptability, scalability, security and traceability, place our product in a favorable situation over competitors. None of the solutions in the market meet every one of these requirements by a unique product being innovative.

Keywords: blockchain, IoT, smart agriculture, vineyard

Procedia PDF Downloads 164
15265 Procedure Model for Data-Driven Decision Support Regarding the Integration of Renewable Energies into Industrial Energy Management

Authors: M. Graus, K. Westhoff, X. Xu

Abstract:

The climate change causes a change in all aspects of society. While the expansion of renewable energies proceeds, industry could not be convinced based on general studies about the potential of demand side management to reinforce smart grid considerations in their operational business. In this article, a procedure model for a case-specific data-driven decision support for industrial energy management based on a holistic data analytics approach is presented. The model is executed on the example of the strategic decision problem, to integrate the aspect of renewable energies into industrial energy management. This question is induced due to considerations of changing the electricity contract model from a standard rate to volatile energy prices corresponding to the energy spot market which is increasingly more affected by renewable energies. The procedure model corresponds to a data analytics process consisting on a data model, analysis, simulation and optimization step. This procedure will help to quantify the potentials of sustainable production concepts based on the data from a factory. The model is validated with data from a printer in analogy to a simple production machine. The overall goal is to establish smart grid principles for industry via the transformation from knowledge-driven to data-driven decisions within manufacturing companies.

Keywords: data analytics, green production, industrial energy management, optimization, renewable energies, simulation

Procedia PDF Downloads 411
15264 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 192
15263 A Scientific Umbrella for Industrial Design Disciplines

Authors: Hassan S. Naeini, Hashem Mosaddad

Abstract:

Industrial design as a multidisciplinary science has a vast field in which some different aspects are involved. In this regard, aspects of art, technology and engineering, social and economics are known as the main related fields. Also, state of the art scientific areas and also art based files have been making the new conditions for industrial design discipline. Furthermore, there are some new approaches and branches of industrial design. However, there is not any categorized style for these industrial design sub-groups. Undoubtedly, if there is an appropriate chart for the main industrial design approaches and branches, the related groups such as industrial designers, manufacturers, and industrial design students will have practical ideas to categorize their activities. In this case study, we developed a scientific umbrella for industrial design in which most of current approaches and branches and related association are introduced. For data gathering, some interviews were done among volunteer industrial design lecturers who are teaching at some well-known universities in Iran. Also, according to the inventory of industrial design, theses which are in university libraries, thesis approaches, and titles were assessed. Based on gathered data, we introduced a scientific umbrella for industrial design in which most of related branches and approaches are categorized. In this umbrella, the hierarchy of related branches is highlighted as well.

Keywords: industrial design, art, industrial design approaches, scientific umbrella

Procedia PDF Downloads 374
15262 A Transition Towards Sustainable Feed Production Using Algae: The Development of Algae Biotechnology in the Kingdom of Saudi Arabia (DAB-KSA Project)

Authors: Emna Mhedhbi, Claudio Fuentes Grunewald

Abstract:

According to preliminary results of DAB-KSA project and considering the current 0.09-ha microalgae pilot plant facilities, we can produce 2.6 tons/year of microalgae biomass for proteins applications in animal feeds in KSA. By 2030, our projections are to reach 65,940,593.4 tons deploying 100.000 ha's production plants. We also have assessed the energy cost (industrial) in KSA (€0.061/kWh) and compared to (€0.32/kWh)in Germany, we can argue a clear lower OPEX for microalgae biomass production cost in KSA.

Keywords: microalgae, feed production, bioprocess, fishmeal

Procedia PDF Downloads 141
15261 An Approach to Specify Software Requirements in Semantic Form

Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy

Abstract:

Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.

Keywords: functional requirement, ontology, requirements management, semantics

Procedia PDF Downloads 337
15260 Escalation of Commitment and Turnover in Top Management Teams

Authors: Dmitriy V. Chulkov

Abstract:

Escalation of commitment is defined as continuation of a project after receiving negative information about it. While literature in management and psychology identified various factors contributing to escalation behavior, this phenomenon has received little analysis in economics, potentially due to the apparent irrationality of escalation. In this study, we present an economic model of escalation with asymmetric information in a principal-agent setup where the agents are responsible for a project selection decision and discover the outcome of the project before the principal. Our theoretical model complements the existing literature on several accounts. First, we link the incentive to escalate commitment to a project with the turnover decision by the manager. When a manager learns the outcome of the project and stops it that reveals that a mistake was made. There is an incentive to continue failing projects and avoid admitting the mistake. This incentive is enhanced when the agent may voluntarily resign from the firm before the outcome of the failing project is revealed, and thus not bear the full extent of reputation damage due to project failure. As long as some successful managers leave the firm for extraneous reasons, outside firms find it difficult to link failing projects with certainty to managers that left a firm. Second, we demonstrate that non-CEO managers have reputation concerns separate from those of the CEO, and thus may escalate commitment to projects they oversee, when such escalation can attenuate damage to reputation from impending project failure. Such incentive for escalation will be present for non-CEO managers if the CEO delegates responsibility for a project to a non-CEO executive. If reputation matters for promotion to the CEO, the incentive for a rising executive to escalate in order to protect reputation is distinct from that of a CEO. Third, our theoretical model is supported by empirical analysis of changes in the firm’s operations measured by the presence of discontinued operations at the time of turnover among the top four members of the top management team. Discontinued operations are indicative of termination of failing projects at a firm. The empirical results demonstrate that in a large dataset of over three thousand publicly traded U.S. firms for a period from 1993 to 2014 turnover by top executives significantly increases the likelihood that the firm discontinues operations. Furthermore, the type of turnover matters as this effect is strongest when at least one non-CEO member of the top management team leaves the firm and when the CEO departure is due to a voluntary resignation and not to a retirement or illness. Empirical results are consistent with the predictions of the theoretical model and suggest that escalation of commitment is primarily observed in decisions by non-CEO members of the top management team.

Keywords: discontinued operations, escalation of commitment, executive turnover, top management teams

Procedia PDF Downloads 342
15259 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 73
15258 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 648