1286 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China

Authors: Junqi Zhao, Yongqiang Chen

Abstract:

The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.

Keywords: Chinese owner and contractor, conflict, construction project, conflict resolution styles

Procedia PDF Downloads 500
1285 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects

Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang

Abstract:

Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.

Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict

Procedia PDF Downloads 192
1284 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 75
1283 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 309
1282 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 244
1281 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 228
1280 Case Study: Optimization of Contractor’s Financing through Allocation of Subcontractors

Authors: Helen S. Ghali, Engy Serag, A. Samer Ezeldin

Abstract:

In many countries, the construction industry relies heavily on outsourcing models in executing their projects and expanding their businesses to fit in the diverse market. Such extensive integration of subcontractors is becoming an influential factor in contractor’s cash flow management. Accordingly, subcontractors’ financial terms are important phenomena and pivotal components for the well-being of the contractor’s cash flow. The aim of this research is to study the contractor’s cash flow with respect to the owner and subcontractor’s payment management plans, considering variable advance payment, payment frequency, and lag and retention policies. The model is developed to provide contractors with a decision support tool that can assist in selecting the optimum subcontracting plan to minimize the contractor’s financing limits and optimize the profit values. The model is built using Microsoft Excel VBA coding, and the genetic algorithm is utilized as the optimization tool. Three objective functions are investigated, which are minimizing the highest negative overdraft value, minimizing the net present worth of overdraft, and maximizing the project net profit. The model is validated on a full-scale project which includes both self-performed and subcontracted work packages. The results show potential outputs in optimizing the contractor’s negative cash flow values and, in the meantime, assisting contractors in selecting suitable subcontractors to achieve the objective function.

Keywords: cash flow optimization, payment plan, procurement management, subcontracting plan

Procedia PDF Downloads 102
1279 Innovative Pictogram Chinese Characters Representation

Authors: J. H. Low, S. H. Hew, C. O. Wong

Abstract:

This paper proposes an innovative approach to represent the pictogram Chinese characters. The advantage of this representation is using an extraordinary to represent the pictogram Chinese character. This extraordinary representation is created accordingly to the original pictogram Chinese characters revolution. The purpose of this innovative creation is to assistant the learner learning Chinese as second language (SCL) in Chinese language learning specifically on memorize Chinese characters. Commonly, the SCL will give up and frustrate easily while memorize the Chinese characters by rote. So, our innovative representation is able to help on memorize the Chinese character by the help of visually storytelling. This innovative representation enhances the Chinese language learning experience of SCL.

Keywords: Chinese e-learning, innovative Chinese character representation, knowledge management, language learning

Procedia PDF Downloads 462
1278 Influence of Organizational Culture on Frequency of Disputes in Commercial Projects in Egypt: A Contractor’s Perspective

Authors: Omneya N. Mekhaimer, Elkhayam M. Dorra, A. Samer Ezeldin

Abstract:

Over the recent decades, studies on organizational culture have gained global attention in the business management literature, where it has been established that the cultural factors embedded in the organization have an implicit yet significant influence on the organization’s success. Unlike other industries, the construction industry is widely known to be operating in a dynamic and adversarial nature; considering the unique characteristics it denotes, thereby the level of disputes has propagated in the construction industry throughout the years. In the late 1990s, the International Council for Research and Innovation in Building and Construction (CIB) created a Task Group (TG-23), which later evolved in 2006 into a Working Commission W112, with a strategic objective to promote research in investigating the role and impact of culture in the construction industry worldwide. To that end, this paper aims to study the influence of organizational culture in the contractor’s organization on the frequency of disputes caused between the owner and the contractor that occur in commercial projects based in Egypt. This objective is achieved by using a quantitative approach through a survey questionnaire to explore the dominant cultural attributes that exist in the contractor’s organization based on the Competing Value Framework (CVF) theory, which classifies organizational culture into four main cultural types: (1) clan, (2) adhocracy, (3) market, and (4) hierarchy. Accordingly, the collected data are statistically analyzed using Statistical Package for Social Sciences (SPSS 28) software, whereby a correlation analysis using Pearson Correlation is carried out to assess the relationship between these variables and their statistical significance using the p-value. The results show that there is an influence of organizational culture attributes on the frequency of disputes whereby market culture is identified to be the most dominant organizational culture that is currently practiced in contractor’s organization, which consequently contributes to increasing the frequency of disputes in commercial projects. These findings suggest that alternative management practices should be adopted rather than the existing ones with an aim to minimize dispute occurrence.

Keywords: construction projects, correlation analysis, disputes, Egypt, organizational culture

Procedia PDF Downloads 77
1277 Liquidity and Cash Management Practices of Owner-Managed Firms-A Case of South East, Nigeria

Authors: Ugbor Raphael Oluchukwu

Abstract:

The survey research design was adopted to examine whether liquidity and cash management practices of owner-managed firms in South East Nigeria influence their profitability, growth and survival. Four independent variables (accounting systems, working capital management, budgetary control, and managerial planning) were used in the evaluation which was restricted to eight small firms. Results indicate that one variable, working capital management alone dominate the liquidity perception of owner managers. As a result, owner managers find it difficult to meet maturing business obligations as growth sets in. The study also reveals that the four independent variables have significant impact on the profitability, growth and survival of owner managed firms. Owner managers are therefore advised to undertake regular entrepreneurship training in order to upgrade their liquidity and cash management knowledge and practices to enhance their overall performance.

Keywords: liquidity management, owner-managed firm, profitability, survival

Procedia PDF Downloads 404
1276 Cultural Understanding in Chinese Language Education for Foreigners: A Quest for Better Integration

Authors: Linhan Sun

Abstract:

With the gradual strengthening of China's economic development, more and more people around the world are learning Chinese due to economic and trade needs, which has also promoted the research related to Chinese language education for foreigners. Because the Chinese language system is different from the Western language system, learning Chinese is not easy for many learners. In addition, language learning cannot be separated from the learning and understanding of culture. How to integrate cultural learning into the curriculum of Chinese language education for foreigners is the focus of this study. Through a semi-structured in-depth interview method, 15 foreigners who have studied or are studying Chinese participated in this study. This study found that cultural learning and Chinese as a foreign language are relatively disconnected. In other words, learners were able to acquire a certain degree of knowledge of the Chinese language through textbooks or courses but did not gain a deeper understanding of Chinese culture.

Keywords: Chinese language education, Chinese culture, qualitative methods, intercultural communication

Procedia PDF Downloads 143
1275 Promoting the Contructor's Reputation in the Nigerian Construction Industry

Authors: Abdulkadir Adamu Shehu

Abstract:

Company’s reputation is an elusive asset. The reputation gained by companies must be preserved for sustainability of the company. However, the construction project is still suffering from declination of character due to the factors that affect their reputation. The problem led to the loss of projects, abandoning of the projects and many more. This contributed to negative impact on the contractors in the construction industry. As for today, previous studies have not investigated in this regards yet. For that reason, this paper examines the factors which could promote contractor’s reputation in the construction industry in Nigeria. To achieve this aim, 140 questionnaires were distributed to the Nigerian contractors. Based on the 67% response rate, descriptive analysis and analysis of variance (ANOVA) were the tools applied for the data obtained to be analysed. The result shows that, good communication system and improve quality of output of products are the most significant variables that can promote contractor’s reputation. The homogenous analyses indicate that there are significant different perceptions of respondents in term of the significant effects. The research concluded that contractor’s reputation in construction industry must be maintained and further research was suggested to focus on the qualitative method to have in-depth knowledge on contractor’s reputation in the construction industry.

Keywords: construction industry, contractor’s reputation, effects of delay, Nigeria

Procedia PDF Downloads 408
1274 Small and Medium Enterprises Owner-Managers/Entrepreneurs and Their Risk Perception in Songkhla Province, Thailand

Authors: Patraporn Kaewkhanitarak, Weerawan Marangkun

Abstract:

The objective of this study was to explore the establishment and to investigate the relationship between the gender (male or female) of SME owner-managers/ entrepreneurs and their risk perception in business activity. The study examines the data by interviewing 76 SME owner-managers/entrepreneurs’ responses (37 males, 39 females) in manufacturing, finance, human resources and marketing sector in the economic regions of Songkhla province, Thailand. This study found that four tools which were operation, cash flow, staff, and new market were perceived by the SME owner-managers/entrepreneurs at high level. However, male and female SME owner-managers/entrepreneurs perceived some factors such as the age of SME owner-managers/entrepreneurs, the duration of firm operation, type of firm, and type of business without significant differences. In contrast, the gender affected the risk perception about increasing cost, fierce competition, leapfrog development of firm, substandard staff, namely that male and female perceived these factors with significant differences. According to the research, SME owner-managers/entrepreneurs should develop their risk management competency to deal with the risk efficiently. Secondly, SME firms should gather into groups. Furthermore, it was shown that the five key tools used to manage these risky situations were the use of managerial competencies and clustering.

Keywords: risk perception, owner-managers/entrepreneurs, SME, Songkhla, Thailand

Procedia PDF Downloads 410
1273 Construction Contractor Pre-Qualification Using Multi-Attribute Utility Theory: A Multiplicative Approach

Authors: B. Vikram, Y. Anu Leena, Y. Anu Neena, M. V. Krishna Rao, V. S. S. Kumar

Abstract:

The industry is often criticized for inefficiencies in outcomes such as time and cost overruns, low productivity, poor quality and inadequate customer satisfaction. To enhance the chances for construction projects to be successful, selecting an able contractor is one of the fundamental decisions to be made by clients. The selection of the most appropriate contractor is a multi-criteria decision making (MCDM) process. In this paper, multi-attribute utility theory (MAUT) is employed utilizing the multiplicative form of utility function for ranking the prequalified contractors. Performance assessment criteria covering contracting company attributes, experience record, past performance, performance potential, financial stability and project specific criteria are considered for contractor evaluation. A case study of multistoried building for which four contractors submitted bids is considered to illustrate the applicability of multiplicative approach of MAUT to rank the prequalified contractors. The proposed MAUT decision making methodology can also be employed to other decision making situations.

Keywords: multi-attribute utility theory, construction industry, prequalification, contractor

Procedia PDF Downloads 416
1272 Beliefs in Auspicious Materials of Shop Entrepreneurs in Maung Hat Yai, Thailand

Authors: Punya Tepsing

Abstract:

This research aimed to study the beliefs in auspicious materials of entrepreneurs in Muang Hat Yai. The data were collected via documentary research and field work including interviews, observations shops in Hat Yai which used auspicious materials to bring lucks to the shops. The results were as follows. The beliefs in auspicious materials that the entrepreneurs had were of three areas: 1) The auspicious materials could correct the improperness of the shop location, for example, the shop situated opposite a branch road, a shrine, or a bank. The owner usually corrected it by putting Chinese auspicious materials in front of or in the shop, for example, a lion holding a sword in his mouth, or a mirror, etc. 2) The auspicious materials could bring in more income. The owner of the shop usually put the auspicious materials such as a cat beckoning and a bamboo fish trap believed to trap money in front of or inside the shop. 3) The auspicious materials like turtles, paired fish and a monster holding the moon in his mouth could solve life problems including health, family, and safety problems. The use of these auspicious materials showed the blending of the beliefs of the Chinese shop entrepreneurs with the Thai folk beliefs. What is interesting is that Hat Yai is located near the three southern border provinces which are the unrest area and this may cause the number of tourists to decline. This prompted them to build a mechanism in adjusting themselves both to save their lives and to increase the number of customers. Auspicious materials can make them feel more confident.

Keywords: belief, auspicious materials, shop, entrepreneur, Maung Hat Yai

Procedia PDF Downloads 222
1271 Optimization Technique for the Contractor’s Portfolio in the Bidding Process

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Selection between the available projects in bidding processes for the contractor is one of the essential areas to concentrate on. It is important for the contractor to choose the right projects within its portfolio during the tendering stage based on certain criteria. It should align the bidding process with its origination strategies and goals as a screening process to have the right portfolio pool to start with. Secondly, it should set the proper framework and use a suitable technique in order to optimize its selection process for concertation purpose and higher efforts during the tender stage with goals of success and winning. In this research paper, a two steps framework proposed to increase the efficiency of the contractor’s bidding process and the winning chance of getting the new projects awarded. In this framework, initially, all the projects pass through the first stage screening process, in which the portfolio basket will be evaluated and adjusted in accordance with the organization strategies to the reduced version of the portfolio pool, which is in line with organization activities. In the second stage, the contractor uses linear programming to optimize the portfolio pool based on available resources such as manpower, light equipment, heavy equipment, financial capability, return on investment, and success rate of winning the bid. Therefore, this optimization model will assist the contractor in utilizing its internal resource to its maximum and increase its winning chance for the new project considering past experience with clients, built-relation between two parties, and complexity in the exertion of the projects. The objective of this research will be to increase the contractor's winning chance in the bidding process based on the success rate and expected return on investment.

Keywords: bidding process, internal resources, optimization, contracting portfolio management

Procedia PDF Downloads 126
1270 An Exploratory Study of Chinese Paper-Cut Art in Household Product Design

Authors: Ruining Wu, Na Song

Abstract:

Paper-cut, as one of the Chinese traditional folk decoration art, has become a unique visual aesthetic characteristics of the Chinese nation in the long-term evolution of cultural symbols. Chinese paper-cut art is the treasure-house for product design in natural resources. This paper first analyzed Chinese folk art of historical origin, cultural background, cultural values, aesthetic value, style features of Chinese paper cut art, then analyzed the design thought and design cases of paper-cut art application in different areas, such as clothing design, logo design and product design areas. Through the research of Chinese paper-cut art culture and design elements, this paper aims to build a household product design concept of Chinese traditional culture.

Keywords: paper-cut art, culture, household products, design

Procedia PDF Downloads 589
1269 Digital Development of Cultural Heritage: Construction of Traditional Chinese Pattern Database

Authors: Shaojian Li

Abstract:

The traditional Chinese patterns, as an integral part of Chinese culture, possess unique values in history, culture, and art. However, with the passage of time and societal changes, many of these traditional patterns are at risk of being lost, damaged, or forgotten. To undertake the digital preservation and protection of these traditional patterns, this paper will collect and organize images of traditional Chinese patterns. It will provide exhaustive and comprehensive semantic annotations, creating a resource library of traditional Chinese pattern images. This will support the digital preservation and application of traditional Chinese patterns.

Keywords: digitization of cultural heritage, traditional Chinese patterns, digital humanities, database construction

Procedia PDF Downloads 37
1268 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 311
1267 Commodification of the Chinese Language: Investigating Language Ideology in the Chinese Complementary Schools’ Online Discourse

Authors: Yuying Liu

Abstract:

Despite the increasing popularity of Chinese and the recognition of the growing commodifying ideology of Chinese language in many contexts (Liu and Gao, 2020; Guo, Shin and Shen 2020), the ideological orientations of the Chinese diaspora community towards the Chinese language remain under-researched. This research contributes seeks to bridge this gap by investigating the micro-level language ideologies embedded in the Chinese complementary schools in the Republic of Ireland. Informed by Ruíz’s (1984) metaphorical representations of language, 11 Chinese complementary schools’ websites were analysed as discursive texts that signal the language policy and ideology to prospective learners and parents were analysed. The results of the analysis suggest that a move from a portrayal of Chinese as linked to student heritage identity, to the commodification of linguistic and cultural diversity, is evident. It denotes the growing commodifying ideology among the Chinese complementary schools in the Republic of Ireland. The changing profile of the complementary school, from serving an ethnical community to teaching Chinese as a foreign language for the wider community, indicates the possibility of creating the a positive synergy between the Complementary school and the mainstream education. This study contributes to the wider discussions of language ideology and language planning, with regards to modern language learning and heritage language maintenance.

Keywords: the Chinese language;, Chinese as heritage language, Chinese as foreign language, Chinese community schools

Procedia PDF Downloads 101
1266 Understanding the ‘Third Gender’: A Qualitative Study of the Perception of Being a Leftover Woman among Chinese Female Ph.D. Students

Authors: Qian Wang

Abstract:

In recent years, a growing number of Chinese women choose to pursue Ph.D. education. Except for the male and female, women with PhD degrees are stigmatized as the ‘third gender’ in Chinese society. People, especially most men, believe that female PhD students challenge the traditional image and gender role of Chinese women. This gender stereotype causes a range of difficulties in finding partners in marriage market for Chinese female PhD students. In this study, the author conducted in-depth interviews with 15 participants who are currently doing their PhD studies in Chinese universities to explore their perceptions of being leftover women on the basis of their experience. All the participants are single. Based on the analysis of qualitative data, this study found that the ‘leftover women’ phenomenon among Chinese female PhD students is the result of the contradictions generated between Chinese patriarchal society and them. Although Chinese female PhD students is an attention-attracting group, the studies about them are very limited in China. This study could not only contribute to the understanding of the ‘third gender’ phenomenon and the ‘leftover women’ studies in China, but also, in practical level, could give some guidance for governments to resolve the social problems of female PhD students.

Keywords: Chinese female Ph.D. students, the ‘leftover women’, the Chinese patriarchal society, gender role, Chinese culture

Procedia PDF Downloads 192
1265 The Role of Authority's Testimony in Preschoolers' Ownership Judgment: A Study with Conflicting Cues Method

Authors: Zhanxing Li, Liqi Zhu

Abstract:

Authorities often intervene in children’s property conflicts, which may affect young children’s ownership understanding. First possession is a typical rule of ownership judgment. We recruited Chinese preschoolers as subjects and investigated their ownership reasoning regarding first possession, by setting three conditions via a conflicting cues method, in which a third party (mother or peer friend)’s testimony was always opposite to the cue of first possession (authority/non-authority testimony condition), or only the cue of first possession was present (no testimony condition). In Study A, we examined forty-two 3- and 5-year olds’ attribution and justification of ownership. The results showed while 5-year olds gave more support for the first possessor as the owner across three conditions, 3-year olds’ choice for the first possessor had no difference from the non-first possessor in the authority testimony condition. Moreover, 3-year olds tended to justify by reference to what mother said in the authority testimony condition, 5-year olds consistently referred to the first possession in three conditions. In Study B, we added two ownership questions to quantify children’s ability of ownership reasoning with four age groups (n = 32 for the 3-year-olds, n = 33 for the 4-year-olds, n = 27 for the 5-year olds and n = 30 for the adults) to explore the developmental trajectory further. It revealed that while 5-year olds’ performances were similar to the adults’ and always judged the first possessor as owner in three conditions, 3- and 4-year olds’ performed at chance level in the authority testimony condition. The results imply that Chinese young preschooler’s ownership reasoning was susceptible to authority’s testimony. Family authority may play an important role in diluting children’s adherence to ownership principles, which will be helpful for children to learn to share with others.

Keywords: authority, ownership judgment, preschoolers, testimony

Procedia PDF Downloads 172
1264 Case Study; Drilled Shafts Installation in Difficult Site Conditions; Loose Sand and High Water Table

Authors: Anthony El Hachem, Hosam Salman

Abstract:

Selecting the most effective construction method for drilled shafts under the high phreatic surface can be a challenging task that requires effective communication between the design and construction teams. Slurry placement, temporary casing, and permanent casing are the three most commonly used installation techniques to ensure the stability of the drilled hole before casting the concrete. Each one of these methods has its implications on the installation and performance of the drilled piers. Drilled shafts were designed to support a fire wall for an Energy project in Central Texas. The subsurface consisted of interlayers of sands and clays of varying shear strengths. The design recommended that the shafts be installed with temporary casing or slurry displacement due to the anticipated groundwater seepage through granular soils. During the foundation construction, it was very difficult to maintain the stability of the hole, and the contractor requested to install the shafts using permanent casings. Therefore, the foundation design was modified to ensure that the cased shafts achieve the required load capacity. Effective and continuous communications between the owner, contractor and design team during field shaft installations to mitigate the unforeseen challenges helped the team to successfully complete the project.

Keywords: construction challenges, deep foundations, drilled shafts, loose sands underwater table, permanent casing

Procedia PDF Downloads 168
1263 Language Learning Strategies of Chinese Students at Suan Sunandha Rajabhat University in Thailand

Authors: Gunniga Anugkakul, Suwaree Yordchim

Abstract:

The objectives were to study language learning strategies (LLSs) employed by Chinese students, and the frequency of LLSs they used, and examine the relationship between the use of LLSs and gender. The Strategy Inventory for Language Learning (SILL) by Oxford was administered to thirty-six Chinese students at Suan Sunandha Rajabhat University in Thailand. The data obtained was analyzed using descriptive statistics and chi-square tests. Three useful findings were found on the use of LLSs reported by Chinese students. First, Chinese students used overall LLSs at a high level. Second, among the six strategy groups, Chinese students employed compensation strategy most frequently and memory strategy least frequently. Third, the research results also revealed that gender had significant effect on Chinese Student’s use of overall LLSs.

Keywords: English language, language learning strategy, Chinese students, compensation strategy

Procedia PDF Downloads 658
1262 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 47
1261 Wh-Movement in Second Language Acquisition: Evidence from Magnitude Estimation

Authors: Dong-Bo Hsu

Abstract:

Universal Grammar (UG) claims that the constraints that are derived from this should operate in language users’ L2 grammars. This study investigated this hypothesis on knowledge of Subjacency and resumptive pronoun usage among Chinese learners of English. Chinese fulfills two requirements to examine the existence of UG, i.e., Subjacency does not operate in Chinese and resumptive pronouns in English are very different from those in Chinese and second L2 input undermines the knowledge of Subjacency. The results indicated that Chinese learners of English demonstrated a nearly identical pattern as English native speakers do but the resumptive pronoun in the embedding clauses. This may be explained in terms of the case that Chinese speakers’ usage of pronouns is not influenced by the number of embedding clauses. Chinese learners of English have full access to knowledge endowed by UG but their processing of English sentences may be different from native speakers as a general slow rate for processing in their L2 English.

Keywords: universal grammar, Chinese, English, wh-questions, resumption

Procedia PDF Downloads 449
1260 From Tionghoa to Tjina: Historical Tracing on the Identity Politics in Demonization of Ethnic Chinese in Indonesia

Authors: Michael J. Kristiono

Abstract:

This paper attempts to investigate the reasons behind the negative sentiments directed towards Chinese Indonesians from International Relations (IR) perspective. By tracing back the treatment of the New Order government towards ethnic Chinese, it was found that such demonization initially happened due to two politically motivated reasons. Firstly, as part of de-Soekarnoization done by the New Order, the Chinese were outcast because Chinese identity does not conform to the 'Indonesian identity', which was in essence, the Javanese identity. Secondly, the condition reflected the change in Indonesian foreign policy which drifted apart from People’s Republic of China (PRC) as the latter was suspected to be involved in September 30 Movement. Then, this paper argues that due to those reasons, coupled by blatant maltreatment from the New Order Government, Chinese Indonesians were constructed as the Others, that is, as non-Indonesians. Such construct has been deeply embedded such that reconciliation attempts done by the Reformation Era government were not sufficient enough to stop ethnic discrimination towards Chinese Indonesians from happening even until the present.

Keywords: Chinese Indonesians, ethnic discrimination, identity, New Order

Procedia PDF Downloads 312
1259 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 434
1258 Case Study Approach Using Scenario Analysis to Analyze Unabsorbed Head Office Overheads

Authors: K. C. Iyer, T. Gupta, Y. M. Bindal

Abstract:

Head office overhead (HOOH) is an indirect cost and is recovered through individual project billings by the contractor. Delay in a project impacts the absorption of HOOH cost allocated to that particular project and thus diminishes the expected profit of the contractor. This unabsorbed HOOH cost is later claimed by contractors as damages. The subjective nature of the available formulae to compute unabsorbed HOOH is the difficulty that contractors and owners face and thus dispute it. The paper attempts to bring together the rationale of various HOOH formulae by gathering contractor’s HOOH cost data on all of its project, using case study approach and comparing variations in values of HOOH using scenario analysis. The case study approach uses project data collected from four construction projects of a contractor in India to calculate unabsorbed HOOH costs from various available formulae. Scenario analysis provides further variations in HOOH values after considering two independent situations mainly scope changes and new projects during the delay period. Interestingly, one of the findings in this study reveals that, in spite of HOOH getting absorbed by additional works available during the period of delay, a few formulae depict an increase in the value of unabsorbed HOOH, neglecting any absorption by the increase in scope. This indicates that these formulae are inappropriate for use in case of a change to the scope of work. Results of this study can help both parties in deciding on an appropriate formula more objectively, considering the events on a project causing the delay and contractor's position in respect of obtaining new projects.

Keywords: absorbed and unabsorbed overheads, head office overheads, scenario analysis, scope variation

Procedia PDF Downloads 147
1257 Sustainable Building Law - The Legal Issues Abound

Authors: Richard J. Sobelsohn

Abstract:

Green Building and Sustainable Development help fight climate change, and protects the ozone, animal habitats, air quality, and ground water. The myriad of reasons to go Green has multiplied to the point that a developer that is building a ground-up or renovating/retrofitting a property has a plethora of choices to get to the green goal post. Sustainability not affects the bottom line but satisfies corporate mandates (ESG), consumer demand, market requirements, and the many laws dictating green building practices. The good news is that there are many paths a property owner can take to become green. The bad news is that there are many paths a property owner can take to become green, and they need to choose which direction to take. Certification of a building used to be the highest achievement in the Green building world. Now there are so many variables and laws with which a property owner must comply, and the legal analysis has mushroomed. Operation and Maintenance have also become one of the most important functions for a prudent Green Building owner. So adding to the “development/retrofit” parties involved in the sustainable building legal world, we now need to include all those people who keep the building green, and there are a lot of them!

Keywords: green building, sustainable development, legal issues, greenwashing, green cleaning, compliance, ESQ

Procedia PDF Downloads 99