13417 A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment

Authors: A. Swetha

Abstract:

This study aims to prioritize and explore critical risks in construction project assessment, employing the Weighted Average Index method and Principal Component Analysis (PCA). Through extensive literature review and expert interviews, project assessment risk factors were identified across Budget and Cost Management Risk, Schedule and Time Management Risk, Scope and Planning Risk, Safety and Regulatory Compliance Risk, Resource Management Risk, Communication and Stakeholder Management Risk, and Environmental and Sustainability Risk domains. A questionnaire was distributed to stakeholders involved in construction activities in Hyderabad, India, with 180 completed responses analyzed using the Weighted Average Index method to prioritize risk factors. Subsequently, PCA was used to understand relationships between these factors and uncover underlying patterns. Results highlighted dependencies on critical resources, inadequate risk assessment, cash flow constraints, and safety concerns as top priorities, while factors like currency exchange rate fluctuations and delayed information dissemination ranked lower but remained significant. These insights offer valuable guidance for stakeholders to mitigate risks effectively and enhance project outcomes. By adopting systematic risk assessment and management approaches, construction projects in Hyderabad and beyond can navigate challenges more efficiently, ensuring long-term viability and resilience.

Keywords: construction project assessment risk factor, risk prioritization, weighted average index, principal component analysis, project risk factors

Procedia PDF Downloads 40
13416 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism

Procedia PDF Downloads 375
13415 Study on Novel Reburning Process for NOx Reduction by Oscillating Injection of Reburn Fuel

Authors: Changyeop Lee, Sewon Kim, Jongho Lee

Abstract:

Reburning technology has been developed to adopt various commercial combustion systems. Fuel lean reburning is an advanced reburning method to reduce NOx economically without using burnout air, however it is not easy to get high NOx reduction efficiency. In the fuel lean reburning system, the localized fuel rich eddies are used to establish partial fuel rich regions so that the NOx can react with hydrocarbon radical restrictively. In this paper, a new advanced reburning method which supplies reburn fuel with oscillatory motion is introduced to increase NOx reduction rate effectively. To clarify whether forced oscillating injection of reburn fuel can effectively reduce NOx emission, experimental tests were conducted in vertical combustion furnace. Experiments were performed in flames stabilized by a gas burner, which was mounted at the bottom of the furnace. The natural gas is used as both main and reburn fuel and total thermal input is about 40kW. The forced oscillating injection of reburn fuel is realized by electronic solenoid valve, so that fuel rich region and fuel lean region is established alternately. In the fuel rich region, NOx is converted to N2 by reburning reaction, however unburned hydrocarbon and CO is oxidized in fuel lean zone and mixing zone at downstream where slightly fuel lean region is formed by mixing of two regions. This paper reports data on flue gas emissions and temperature distribution in the furnace for a wide range of experimental conditions. All experimental data has been measured at steady state. The NOx reduction rate increases up to 41% by forced oscillating reburn motion. The CO emissions were shown to be kept at very low level. And this paper makes clear that in order to decrease NOx concentration in the exhaust when oscillating reburn fuel injection system is adopted, the control of factors such as frequency and duty ratio is very important.

Keywords: NOx, CO, reburning, pollutant

Procedia PDF Downloads 288
13414 The Impact of Project Management Approaches in Enhancing Entrepreneurial Growth: A Study Using the Theory of Planned Behaviour as a Lens to Understand

Authors: Akunna Agunwah, Kevin Gallimore, Kathryn Kinnmond

Abstract:

Entrepreneurship and project management are widely associated and seen as a vehicle for economic growth, but are studied separately. A few authors have considered the interconnectivity existing between these two fields, but relatively little empirical data currently exist in the literature. The purpose of the present empirical study is to explore whether successful entrepreneurs utilise project management approaches in enhancing enterprise growth by understanding the working practices and experiences of the entrepreneurs’ using the Theory of Planned Behaviour (TPB) as a lens. In order to understand those experiences, ten successful entrepreneurs in various business sectors in the North West of England were interviewed through a face-to-face semi-structured interview method. The collected audio tape-recorded data was transcribed and analysed using the deductive thematic technique (qualitative approach). The themes were viewed through the lens of Theory of Planned Behaviour to identify the three intentional antecedents (attitude, subjective norms, and perceived behavioural control) and to understand how they relate to the project management approaches (Planning, execution, and monitoring). The findings are twofold, the first evidence of the three intentional antecedents, which make up Theory of Planned Behaviour was present. Secondly, the analysis of project management approaches themes (planning, execution, and monitoring) using the lens of the theory of planned behaviour shows evidence of the three intentional antecedents. There were more than one intentional antecedents found in a particular project management theme, which indicates that the entrepreneur does utilise these approaches without categorising them into definite themes. However, the entrepreneur utilised these intentional antecedents as processes to enhanced business growth. In conclusion, the work presented here showed a way of understanding the interconnectivity between entrepreneurship and project management towards enhancing enterprise growth by examining the working practices and experiences of the successful entrepreneurs in the North-West England.

Keywords: business growth, entrepreneurship, project management approaches, theory of planned behaviour

Procedia PDF Downloads 205
13413 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan

Authors: Ghaleb Y. Abbasi, Satanay Alhiary

Abstract:

This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.

Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing

Procedia PDF Downloads 456
13412 Release Management with Continuous Delivery: A Case Study

Authors: A. Maruf Aytekin

Abstract:

We present our approach on using continuous delivery pattern for release management. One of the key practices of agile and lean teams is the continuous delivery of new features to stakeholders. The main benefits of this approach lie in the ability to release new applications rapidly which has real strategic impact on the competitive advantage of an organization. Organizations that successfully implement Continuous Delivery have the ability to evolve rapidly to support innovation, provide stable and reliable software in more efficient ways, decrease the amount of resources need for maintenance, and lower the software delivery time and costs. One of the objectives of this paper is to elaborate a case study where IT division of Central Securities Depository Institution (MKK) of Turkey apply Continuous Delivery pattern to improve release management process.

Keywords: automation, continuous delivery, deployment, release management

Procedia PDF Downloads 256
13411 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects

Procedia PDF Downloads 128
13410 Using Analytic Hierarchy Process as a Decision-Making Tool in Project Portfolio Management

Authors: Darius Danesh, Michael J. Ryan, Alireza Abbasi

Abstract:

Project Portfolio Management (PPM) is an essential component of an organisation’s strategic procedures, which requires attention of several factors to envisage a range of long-term outcomes to support strategic project portfolio decisions. To evaluate overall efficiency at the portfolio level, it is essential to identify the functionality of specific projects as well as to aggregate those findings in a mathematically meaningful manner that indicates the strategic significance of the associated projects at a number of levels of abstraction. PPM success is directly associated with the quality of decisions made and poor judgment increases portfolio costs. Hence, various Multi-Criteria Decision Making (MCDM) techniques have been designed and employed to support the decision-making functions. This paper reviews possible option to improve the decision-making outcomes in the organisational portfolio management processes using the Analytic Hierarchy Process (AHP) both from academic and practical perspectives and will examine the usability, certainty and quality of the technique. The results of the study will also provide insight into the technical risk associated with current decision-making model to underpin initiative tracking and strategic portfolio management.

Keywords: analytic hierarchy process, decision support systems, multi-criteria decision making, project portfolio management

Procedia PDF Downloads 321
13409 Association between Physical Composition, Swimming Performance and Somatotype of Male Competitive Swimmers of Age Group 10-13 Years

Authors: Ranjit Singh

Abstract:

Body fat % lean body mass and body type play vital role in sports performance. A sports person who is having optional body composition can show its performance flawlessly whereas other who is not physical fit may be more prone to injury. Competitive swimming is an association of plethora of aspects like morphological, physiological, biochemical, biomechanical and psychological. The primary key of the present research is to examine the correlation among selected morphological dimensions such as height, weight, body fat%, lean body mass, somatotype and swimming performance. The present study also focused to investigate by potential deficiencies if any and to find out remedial measures to curb the training stresses. Thirty (age group 10-14 years) swimmers undergoing training under skilled and professional coaches were selected in the present study. The morphological variables and performance criterion like 50 meter swimming time and speed were calculated by using standard training methodology. Correlation coefficient among body composition, somatotype and performance variables were assessed by using standard statistical package SPSS. Mean height, weight, fat% and lean body mass of the present group is 150.97±8.68 cm, 44.0±9.34 kg., 15.97±4.42 % and 37.10±8.77 kg respectively. Somatotype of the young swimmers of this research is revealed ectomorphic mesomorph. The analysis of the results Illustrated that swimming performance is significantly correlated (p<0.05) with height, body weight, mesomorphoic component and lean body mass. Body fat is significantly and negatively correlated (p<0.05) with mesomorphic component, lean body mass and swimming speed. From this present study, it can be concluded that along with techniques and tactics other the physical attributes also play significant role in swimming performance which can help the swimmers to excel in higher level of competition and swimmers having improved morphological qualities can ultimately perform well.

Keywords: body fat, mass, mesomorphic component, somatotype

Procedia PDF Downloads 234
13408 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: genetic algorithm, material ordering, project management, project scheduling

Procedia PDF Downloads 302
13407 Application of Lean Manufacturing Tools in Hot Asphalt Production

Authors: S. Bayona, J. Nunez, D. Paez, C. Diaz

Abstract:

The application of Lean manufacturing tools continues to be an effective solution for increasing productivity, reducing costs and eliminating waste in the manufacture of goods and services. This article analyzes the production process of a hot asphalt manufacturing company from an administrative and technical perspective. Three main phases were analyzed, the first phase was related to the determination of the risk priority number of the main operations in asphalt mix production process by an FMEA (Failure Mode Effects Analysis), in the second phase the Value Stream Mapping (VSM) of the production line was performed and in the third phase a SWOT (Strengths, Weaknesses Opportunities, Threats) matrix was constructed. Among the most valued failure modes were the lack training of workers in occupational safety and health issues, the lack of signaling and classification of granulated material, and the overweight of vehicles loaded. The analysis of the results in the three phases agree on the importance of training operational workers, improve communication with external actors in order to minimize delays in material orders and strengthen control suppliers.

Keywords: asphalt, lean manufacturing, productivity, process

Procedia PDF Downloads 116
13406 Comparison of Cardiometabolic Risk Factors in Lean Versus Overweight/Obese Peri-Urban Female Adolescent School Learners in Mthatha, South Africa: A Pilot Case Control Study

Authors: Benedicta N. Nkeh-Chungag, Constance R. Sewani-Rusike, Isaac M. Malema, Daniel T. Goon, Oladele V. Adeniyi, Idowu A. Ajayi

Abstract:

Background: Childhood and adolescent obesity is an important predictor of adult cardiometabolic diseases. Current data on age- and gender-specific cardiometabolic risk factors are lacking in the peri-urban Eastern Cape Province, South Africa. However, such information is important in designing innovative strategies to promote healthy living among children and adolescents. The purpose of this pilot study was to compare and determine the extent of cardiometabolic risk factors between samples of lean and overweight/obese adolescent population in a peri-urban township of South Africa. Methods: In this case-control study, age-matched, non-pregnant and non-lactating female adolescents consisting of equal number of cases (50 overweight/obese) and control (50 lean) participated in the study. Fasting venous blood samples were obtained for total cholesterol (TC), low-density lipoprotein cholesterol (LDL-C), high-density lipoprotein cholesterol (HDL-C), triglyceride (Trig), highly sensitive C-reactive protein (hsCRP) and blood sugar. Anthropometric measurements included weight, height, waist and hip circumferences. Body mass index was calculated. Blood pressure was measured; and metabolic syndrome was assessed using appropriate diagnostic criteria for children and adolescents. Results: Of the 76 participants with complete data, 12/38 of the overweight/obese and 1/38 of the lean group met the criteria for adolescent metabolic syndrome. All cardiometabolic risk factors were elevated in the overweight/obese group compared with the lean group: low HDL-C (RR = 2.21), elevated TC (RR = 1.23), elevated LDL-C (RR = 1.42), elevated Trig (RR = 1.73), and elevated hsCRP (RR = 1.9). There were significant atherosclerotic indices among the overweight/obese group compared with the lean group: TC/HDL and LDL/HDL (2.99±0.91 vs 2.63±0.48; p=0.016 and 1.73±0.61 vs 1.41±0.46; p= 0.014, respectively). Conclusion: There are multiple cardiometabolic risk factors among the overweight/obese female adolescent group compared with lean adolescent group in the study. Female adolescent who are overweight and obese have higher relative risks of developing cardiometabolic diseases compared with their lean counterparts in the peri-urban Mthatha, South Africa. School health programme focusing on promoting physical exercise, healthy eating and keeping appropriate weight are needed in the country.

Keywords: adolescents, cardiometabolic risk factors, obesity, peri-urban South Africa

Procedia PDF Downloads 474
13405 Quantitative Risk Analysis for Major Subsystems and Project Success of a Highthrouput Satellite

Authors: Ibrahim Isa Ali (Pantami), Abdu Jaafaru Bambale, Abimbola Alale, Danjuma Ibrahim Ndihgihdah, Muhammad Alkali, Adamu Idris Umar, Babadoko Dantala Mohammed, Moshood Kareem Olawole

Abstract:

This paper dwells on the risk management required for High throughput Satellite (HTS) project, and major subsystems that pertains to the improved performance and reliability of the spacecraft. The paper gives a clear picture of high‐throughput satellites (HTS) and the associated technologies with performances as they align and differ with the traditional geostationary orbit or Geosynchronous Equatorial Orbit (GEO) Communication Satellites. The paper also highlights critical subsystems and processes in project conceptualization and execution. The paper discusses the configuration of the payload. The need for optimization of resources for the HTS project and successful integration of critical subsystems for spacecraft requires implementation of risk analysis and mitigation from the preliminary design stage; Assembly, Integration and Test (AIT); Launch and in-orbit- Management stage.

Keywords: AIT, HTS, in-orbit management, optimization

Procedia PDF Downloads 103
13404 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 256
13403 Managing Organizational Change for a Transformation Project: The Billing and Customer Relationship Management Journey

Authors: Sharifah I. N. A. Syed Azmi, Nazarina Mohd Nasir

Abstract:

The Billing & Customer Relationship Management (BCRM) project is an important enabler towards realizing customer experience transformation. It involves technological shifts for future scalability, revision of multiple business processes and adoption of change by the users and impacted employees. This massive transition, if not managed properly, may result in the decline of business performance due to productivity drop. Organizational change management is an essential element in BCRM project implementation to ensure the system is well understood and embraced by all stakeholders. In order to move impacted employees from unaware state or denial mode to full-acceptance mindset and committing themselves in using the new system, their involvement in the whole change process starting from the initial stage is imperative. Through the BCRM Change Management Plan, a holistic approach was taken whereby the strategy and program for five key components namely executive sponsorship, continuous communication, process change readiness, organizational readiness and individual readiness were all carefully established. Roles of the project sponsor, change agents, change ambassadors and community of practice (CoP) were clearly defined in gaining high commitment and support across the entire organization. Continuous communication and engagement initiatives throughout project implementation have been carried out to reach all stakeholders. The business readiness was constantly monitored and assessed including effectiveness of end-user training, thorough review of process documentation and completion of roles realignment exercise.

Keywords: BCRM, change management, organizational change, transformation project

Procedia PDF Downloads 141
13402 Portfolio Management for Construction Company during Covid-19 Using AHP Technique

Authors: Sareh Rajabi, Salwa Bheiry

Abstract:

In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.

Keywords: portfolio management, risk management, COVID-19, analytical hierarchy process technique

Procedia PDF Downloads 109
13401 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.

Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 474
13400 Study on Municipal Solid Waste Management to Protect Environment

Authors: Rajesh Kumar

Abstract:

The largest issue in the current situation is managing solid waste since it pollutes the ecosystem. When considering how to manage waste, even the disposal of mixed waste is a challenge. The Saksham Yuva Project, which is managed by the Haryana government, highlights the consequences and drivers of managing the solid waste of urban areas in the municipal committee pundri in the present study. The overall goal of the Saksham Yuva project is to mobilise the public and educate them about the dangers associated with garbage management. There has been a 20% reduction in waste, according to the study's impacts, and the cost of waste management has also gone down. Further, the study also reported the alternative use of wastes in revenue generation by generating Khaad for agricultural purposes.

Keywords: solid waste management, people awareness, dry and wet waste disposal, material recover facility

Procedia PDF Downloads 111
13399 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 295
13398 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 530
13397 Enhancing Project Performance Forecasting using Machine Learning Techniques

Authors: Soheila Sadeghi

Abstract:

Accurate forecasting of project performance metrics is crucial for successfully managing and delivering urban road reconstruction projects. Traditional methods often rely on static baseline plans and fail to consider the dynamic nature of project progress and external factors. This research proposes a machine learning-based approach to forecast project performance metrics, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category in an urban road reconstruction project. The proposed model utilizes time series forecasting techniques, including Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance based on historical data and project progress. The model also incorporates external factors, such as weather patterns and resource availability, as features to enhance the accuracy of forecasts. By applying the predictive power of machine learning, the performance forecasting model enables proactive identification of potential deviations from the baseline plan, which allows project managers to take timely corrective actions. The research aims to validate the effectiveness of the proposed approach using a case study of an urban road reconstruction project, comparing the model's forecasts with actual project performance data. The findings of this research contribute to the advancement of project management practices in the construction industry, offering a data-driven solution for improving project performance monitoring and control.

Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, earned value management

Procedia PDF Downloads 49
13396 Factors Influencing Site Overhead Cost of Construction Projects in Egypt: A Comparative Analysis

Authors: Aya Effat, Ossama A. Hosny, Elkhayam M. Dorra

Abstract:

Estimating costs is a crucial step in construction management and should be completed at the beginning of every project to establish the project's budget. The precision of the cost estimate plays a significant role in the success of construction projects as it allows project managers to effectively manage the project's costs. Site overhead costs constitute a significant portion of construction project budgets, necessitating accurate prediction and management. These costs are influenced by a multitude of factors, requiring a thorough examination and analysis to understand their relative importance and impact. Thus, the main aim of this research is to enhance the contractor’s ability to predict and manage site overheads by identifying and analyzing the main factors influencing the site overheads costs in the Egyptian construction industry. Through a comprehensive literature review, key factors were first identified and subsequently validated using a thorough comparative analysis of data from 55 real-life construction projects. Through this comparative analysis, the relationship between each factor and site overheads percentage as well as each site overheads subcategory and each project construction phase was identified and examined. Furthermore, correlation analysis was done to check for multicollinearity and identify factors with the highest impact. The findings of this research offer valuable insights into the key drivers of site overhead costs in the Egyptian construction industry. By understanding these factors, construction professionals can make informed decisions regarding the estimation and management of site overhead costs.

Keywords: comparative analysis, cost estimation, construction management, site overheads

Procedia PDF Downloads 17
13395 Types of Innovation Management Office and Their Roles and Responsibilities in Supporting the Innovation Management Process from Organisational Strategic Foresight to Managing Innovation Project Portfolios

Authors: Bakr Zade, Paolo Cervera

Abstract:

With the aim of maximising return on innovation investments, organisations create central units to support successful implementation of innovation management initiatives. The support units–referred to in this research as innovation management offices (IMOs)–range from small teams of innovation management champions to fully resourced centres of excellence for innovation management. However, roles and responsibilities of IMOs vary in different organisations. This research investigates the different types of IMO in organisations, based on their different roles and responsibilities in supporting innovation management processes. The research uses grounded theory methodology to uncover an IMO taxonomy from emergent concepts during innovation management maturity assessment exercises in twelve organisations from the United Kingdom and the United Arab Emirates. The taxonomy distinguishes five types of IMO, based on their roles and responsibilities in supporting innovation management processes, from organisational strategic foresight to managing innovation management project portfolios. The IMO taxonomy addresses a gap in research into innovation management support in organisations and offers a practical framework that diverse organisations can appreciate and use in designing IMOs that are aligned with their innovation management visions and strategies.

Keywords: future foresight, future shaping, innovation management, innovation management office, portfolio management

Procedia PDF Downloads 396
13394 Financial Management Skills of Supreme Student Government Officers in the Schools Division of Quezon: Basis for Project Financial Literacy Information Program

Authors: Edmond Jaro Malihan

Abstract:

This study aimed to develop and propose Project Financial Literacy Information Program (FLIP) for the Schools Division of Quezon to improve the financial management skills of Supreme Student Government (SSG) officers across different school sizes. This employed a descriptive research design covering the participation of 424 selected SSG officers using purposive sampling procedures from the SDO-Quezon. The consultation was held with DepEd officials, budget officers, and financial advisors to validate the design of the self-made questionnaires in which the computed mean was verbally interpreted using the four-point Likert scale. The data gathered were presented and analyzed using weighted arithmetic mean and ANOVA test. Based on the findings, generally, SSG officers in the SDO-Quezon possess high financial management skills in terms of budget preparation, resource mobilization, and auditing and evaluation. The size of schools has no significant difference and does not contribute to the financial management skills of SSG officers, which they apply in implementing their mandated programs, projects, and activities (PPAs). The Project Financial Literacy Information Program (FLIP) was developed considering their general level of financial management skills and the launched PPAs by the organization. The project covered the suggested training program vital in conducting the Virtual Division Training on Financial Management Skills of the SSG officers.

Keywords: financial management skills, SSG officers, school size, financial literacy information program

Procedia PDF Downloads 73
13393 Integrated Risk Management as a Framework for Organisational Success

Authors: Olakunle Felix Adekunle

Abstract:

Risk management is recognised as an essential tool to tackle the inevitable uncertainty associated with business and projects at all levels. But it frequently fails to meet expectations, with projects continuing to run late, over budget or under performing, and business is not gaining the expected benefits. The evident disconnect which often occurs between strategic vision and tactical project delivery typically arises from poorly defined project objectives and inadequate attention to the proactive management of risks that could affect those objectives. One of the main failings in the traditional approach to risk management arises from a narrow focus on the downside, restricted to the technical or operational field, addressing tactical threats to processes, performance or people. This shortcoming can be overcome by widening the scope of risk management to encompass both strategic risks and upside opportunities, creating an integrated approach which can bridge the gap between strategy and tactics. Integrated risk management addresses risk across a variety of levels in the organisation, including strategy and tactics, and covering both opportunity and threat. Effective implementation of integrated risk management can produce a number of benefits to the organisation which are not available from the typical limited-scope risk process. This paper explores how to expand risk management to deliver strategic advantage while retaining its use as a tactical tool.

Keywords: risk management, success, organization, strategy, project, tactis, vision

Procedia PDF Downloads 397
13392 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 148
13391 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 129
13390 Body Composition Evaluation among High Intensity and Long Term Walking Distance Participants

Authors: Priscila Vitorino, Jeeziane Rezende, Edison Pereira, Adrielly Silva, Weimar Barroso

Abstract:

Body composition insight during physical activity is relevant to follow up sports income since it can be important and actuate in velocity, resistance, potency, and has an effect on force and agility. The purpose of this study was to identify anthropometric profile, evaluate and correlate body mass index and bioimpedance behavior during the days of Caminhada Ecológica de Goiás - Brasil. A longitudinal study was performed with 25 male participants, with an average age of 45.6±9.1 years. All patients were actives. Body composition was evaluated by body mass index (BMI) measurement and bioimpedance procedures. Both were collected 20 days before walking beginning (A0) and in the four days along the same (A1, A2, A3 e A4). Data were collected in the end of each walking day at athletes accommodations. Final distance during walking route was 308 km in five days, with an average of 62km/day and 7,6 km/hour, and an average temperature of 30°C. Data are represented with mean and standard deviation. ANOVA (Bonferroni pos test) was used to compare frequent measurements between the days. Pearson's correlation test was used to correlate BMI with lean mass, fat mass, and water. BMI decreased from A0 to A1, A2 and A3 (p < 0,01) and increased on A4 (p < 0,01). No changes were observed concerning fat percentage (p=0,60), lean mass (p=0,10) and body water composition (p=0,09). A positive and moderate correlation between BMI and fat percentage was observed; an inverse and moderate correlation between BMI, lean mass and body water composition occurred. Total body mass increased during high intensity and long term walking distance. However, the values of body fat, lean mass and water were maintained.

Keywords: aerobic exercise, body composition, metabolism, sports

Procedia PDF Downloads 310
13389 Digital Transformation of Lean Production: Systematic Approach for the Determination of Digitally Pervasive Value Chains

Authors: Peter Burggräf, Matthias Dannapfel, Hanno Voet, Patrick-Benjamin Bök, Jérôme Uelpenich, Julian Hoppe

Abstract:

The increasing digitalization of value chains can help companies to handle rising complexity in their processes and thereby reduce the steadily increasing planning and control effort in order to raise performance limits. Due to technological advances, companies face the challenge of smart value chains for the purpose of improvements in productivity, handling the increasing time and cost pressure and the need of individualized production. Therefore, companies need to ensure quick and flexible decisions to create self-optimizing processes and, consequently, to make their production more efficient. Lean production, as the most commonly used paradigm for complexity reduction, reaches its limits when it comes to variant flexible production and constantly changing market and environmental conditions. To lift performance limits, which are inbuilt in current value chains, new methods and tools must be applied. Digitalization provides the potential to derive these new methods and tools. However, companies lack the experience to harmonize different digital technologies. There is no practicable framework, which instructs the transformation of current value chains into digital pervasive value chains. Current research shows that a connection between lean production and digitalization exists. This link is based on factors such as people, technology and organization. In this paper, the introduced method for the determination of digitally pervasive value chains takes the factors people, technology and organization into account and extends existing approaches by a new dimension. It is the first systematic approach for the digital transformation of lean production and consists of four steps: The first step of ‘target definition’ describes the target situation and defines the depth of the analysis with regards to the inspection area and the level of detail. The second step of ‘analysis of the value chain’ verifies the lean-ability of processes and lies in a special focus on the integration capacity of digital technologies in order to raise the limits of lean production. Furthermore, the ‘digital evaluation process’ ensures the usefulness of digital adaptions regarding their practicability and their integrability into the existing production system. Finally, the method defines actions to be performed based on the evaluation process and in accordance with the target situation. As a result, the validation and optimization of the proposed method in a German company from the electronics industry shows that the digital transformation of current value chains based on lean production achieves a raise of their inbuilt performance limits.

Keywords: digitalization, digital transformation, Industrie 4.0, lean production, value chain

Procedia PDF Downloads 313
13388 Genetic Algorithm Optimization of Multiple Resources for Multi-Projects

Authors: A. Samer Ezeldin, Sarah A. Fotouh

Abstract:

Optimization of resources is very important in all fields, as in construction management. Project managers have to face problems regarding management of cost, time and available resources of single projects and more problems arise when managing multiple projects. Most of the studies focused on optimization of resources for a single project, but, this paper will discuss the design and modeling of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in construction industry optimize the resources for single projects only, but with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources and decreases the fluctuation as much as possible. The proposed model calculates the cost of each resource, tries to minimize the cost of extra resources as much as possible and generates the schedule of each project within a selected program.

Keywords: construction management, genetic algorithm, multiple projects, multiple resources, optimization

Procedia PDF Downloads 459