Search results for: construction phase health and safety plan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 19492

Search results for: construction phase health and safety plan

19282 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 655
19281 Methodological Approach to the Elaboration and Implementation of the Spatial-Urban Plan for the Special Purpose Area: Case-Study of Infrastructure Corridor of Highway E-80, Section Nis-Merdare, Serbia

Authors: Nebojsa Stefanovic, Sasa Milijic, Natasa Danilovic Hristic

Abstract:

Spatial plan of the special purpose area constitutes a basic tool in the planning of infrastructure corridor of a highway. The aim of the plan is to define the planning basis and provision of spatial conditions for the construction and operation of the highway, as well as for developing other infrastructure systems in the corridor. This paper presents a methodology and approach to the preparation of the Spatial Plan for the special purpose area for the infrastructure corridor of the highway E-80, Section Niš-Merdare in Serbia. The applied methodological approach is based on the combined application of the integrative and participatory method in the decision-making process on the sustainable development of the highway corridor. It was found that, for the planning and management of the infrastructure corridor, a key problem is coordination of spatial and urban planning, strategic environmental assessment and sectoral traffic planning and designing. Through the development of the plan, special attention is focused on increasing the accessibility of the local and regional surrounding, reducing the adverse impacts on the development of settlements and the economy, protection of natural resources, natural and cultural heritage, and the development of other infrastructure systems in the corridor of the highway. As a result of the applied methodology, this paper analyzes the basic features such as coverage, the concept, protected zones, service facilities and objects, the rules of development and construction, etc. Special emphasis is placed to methodology and results of the Strategic Environmental Assessment of the Spatial Plan, and to the importance of protection measures, with the special significance of air and noise protection measures. For evaluation in the Strategic Environmental Assessment, a multicriteria expert evaluation (semi-quantitative method) of planned solutions was used in relation to the set of goals and relevant indicators, based on the basic set of indicators of sustainable development. Evaluation of planned solutions encompassed the significance and size, spatial conditions and probability of the impact of planned solutions on the environment, and the defined goals of strategic assessment. The framework of the implementation of the Spatial Plan is presented, which is determined for the simultaneous elaboration of planning solutions at two levels: the strategic level of the spatial plan and detailed urban plan level. It is also analyzed the relationship of the Spatial Plan to other applicable planning documents for the planning area. The effects of this methodological approach relate to enabling integrated planning of the sustainable development of the infrastructure corridor of the highway and its surrounding area, through coordination of spatial, urban and sectoral traffic planning and design, as well as the participation of all key actors in the adoption and implementation of planned decisions. By the conclusions of the paper, it is pointed to the direction for further research, particularly in terms of harmonizing methodology of planning documentation and preparation of technical-design documentation.

Keywords: corridor, environment, highway, impact, methodology, spatial plan, urban

Procedia PDF Downloads 185
19280 Phase Shifter with Frequency Adaptive Control Circuit

Authors: Hussein Shaman

Abstract:

This study introduces an innovative design for an RF phase shifter that can maintain a consistent phase shift across a broad spectrum of frequencies. The proposed design integrates an adaptive control system into a reflective-type phase shifter, typically showing frequency-related variations. Adjusting the DC voltage according to the frequency ensures a more reliable phase shift across the frequency span of operation. In contrast, conventional frequency-dependent reflective-type phase shifters may exhibit significant fluctuations in phase shifts exceeding 60 degrees in the same bandwidth. The proposed phase shifter is configured to deliver a 90-degree operation with an expected deviation of around 15 degrees. The fabrication of the phase shifter and adaptive control circuit has been verified through experimentation, with the measured outcomes aligning with the simulation results.

Keywords: phase shifter, adaptive control, varactors, electronic circuits.

Procedia PDF Downloads 39
19279 Simulation IDM for Schedule Generation of Slip-Form Operations

Authors: Hesham A. Khalek, Shafik S. Khoury, Remon F. Aziz, Mohamed A. Hakam

Abstract:

Slipforming operation’s linearity is a source of planning complications, and operation is usually subjected to bottlenecks at any point, so careful planning is required in order to achieve success. On the other hand, Discrete-event simulation concepts can be applied to simulate and analyze construction operations and to efficiently support construction scheduling. Nevertheless, preparation of input data for construction simulation is very challenging, time-consuming and human prone-error source. Therefore, to enhance the benefits of using DES in construction scheduling, this study proposes an integrated module to establish a framework for automating the generation of time schedules and decision support for Slipform construction projects, particularly through the project feasibility study phase by using data exchange between project data stored in an Intermediate database, DES and Scheduling software. Using the stored information, proposed system creates construction tasks attribute [e.g. activities durations, material quantities and resources amount], then DES uses all the given information to create a proposal for the construction schedule automatically. This research is considered a demonstration of a flexible Slipform project modeling, rapid scenario-based planning and schedule generation approach that may be of interest to both practitioners and researchers.

Keywords: discrete-event simulation, modeling, construction planning, data exchange, scheduling generation, EZstrobe

Procedia PDF Downloads 356
19278 Households’ Willingness to Pay for Environmental and General Health Safety during the Advent of Ebola Virus Diseases in Nigeria

Authors: Shittu Bisi Agnes

Abstract:

Studies on households’ willingness to pay for environmental and general health safety in the advent of Ebola virus Diseases in Nigeria was carried out. This is aimed at revealing the means by which the virus was eventually eradicated in Nigeria as widely claimed in the media. This study therefore attempted to determine the environmental and general health condition in the State Of Osun, how socio-economic characteristics of the people affected willingness to pay. And also provide platform for the reduction of environmental and general health problems. Data were collected with the aid of well-structured questionnaire and administer 150 randomly selected people of study area, and oral interview was also utilized. Data collected were analyzed using both descriptive tools and inferential statistics vis-a-viz regression analysis. Findings showed 92.5% of respondents was aware of ebola virus diseases outbreak in Nigeria, 8.5% was unaware of any disease outbreak. And 65.7% of respondents was strongly willing to pay for environmental and general health safety 27.1% was fairly willing, 5.7% was indifferent and 1.7% was unwilling to pay. 5% rated the level of environmental and general health condition in the area has been good, 53.6% rated theirs has been fair, 33.6% as been poor. The average willingness to pay per household per month were #500.00, #250.00, #150.00 and #100.00 respectively for the four categories. It was recommended that policy instruments to increase peoples' income will accelerate eradication of environmental and general health problems, environmental health education in form of talk shop, workshop, lectures and seminars could be organized at the political ward levels, churches, mosque, and at schools. Environmental and general health safety related information could be disseminated through mass media, market women, and functional unions.

Keywords: ebola virus diseases (EVD), socio-economic, safety, pay, Osun

Procedia PDF Downloads 394
19277 Enhancing Civil Aviation Safety and Security: A Comprehensive Approach

Authors: J. Waldon

Abstract:

The civil aviation industry plays a crucial role in global transportation, connecting people and goods across the world. Ensuring the safety and security of passengers, crew, and aircraft is of paramount importance. This paper aims to address the aspect of training and human factors, amongst others, necessary for enhancing civil aviation safety and security. In this context, we are focusing on the level of attention exhibited in the checking of luggage and travel credentials, with the aim to identify areas of improvement and avoid compromising security and safety at the Nsimalen Airport Yaoundé, Cameroon. We found that there is a lack of proper awareness among both travelers and some staff on the safety and security of goods and passengers. We suggest that improved training and handling, and sensitization in the form of legible billboards are important. Thus, we recommend refresher courses like this one for staff to keep abreast with the fast-changing security landscape in air transport as well as proper sensitization, including health-related issues. In conclusion, we established that the human factors, as well as the frequency of training and refresher courses, have a positive outlook on safety and security in air transport.

Keywords: safety, security, passengers, cargo

Procedia PDF Downloads 50
19276 Assessment of Occupational Health and Safety Conditions of Health Care Workers in Barangay Health Centers in a Selected City in Metro Manila

Authors: Deinzel R. Uezono, Vivien Fe F. Fadrilan-Camacho, Bianca Margarita L. Medina, Antonio Domingo R. Reario, Trisha M. Salcedo, Luke Wesley P. Borromeo

Abstract:

The environment of health care workers is considered one of the most hazardous settings due to the nature of their work. In developing countries especially, the Philippines, this continues to be overlooked in terms of programs and services on occupational health and safety (OHS). One possible reason for this is the existing information gap on OHS which limits data comparability and impairs effective monitoring and assessment of interventions. To address this gap, there is a need to determine the current conditions of Filipino health care workers in their workplace. This descriptive cross-sectional study assessed the occupational health and safety conditions of health care workers in barangay health centers in a selected city in Metro Manila, Philippines by: (1) determining the hazards present in the workplace; (2) determining the most common self-reported medical problems; and (3) describing the elements of an OHS system based on the six building blocks of health system. Assessment was done through walkthrough survey, self-administered questionnaire, and key informant interview. Data analysis was done using Epi Info 7 and NVivo 11. Results revealed different health hazards present in the workplace particularly biological hazards (exposure to sick patients and infectious specimens), physical hazards (inadequate space and/or lighting), chemical hazards (toxic reagents and flammable chemicals), and ergonomic hazards (activities requiring repetitive motion and awkward posture). Additionally, safety hazards (improper capping of syringe and lack of fire safety provisions) were also observed. Meanwhile, the most commonly self-reported chronic diseases among health care workers (N=336) were hypertension (20.24%, n=68) and diabetes (12.50%, n=42). Top commonly self-reported symptoms were colds (66.07%, n=222), coughs (63.10%, n=212), headache (55.65%, n=187), and muscle pain (50.60%, n=170) while other diseases were influenza (16.96%, n=57) and UTI (15.48%, n=52). In terms of the elements of the OHS system, a general policy on occupational health and safety was found to be lacking and in effect, an absence of health and safety committee overseeing the implementing and monitoring of the policy. No separate budget specific for OHS programs and services was also found to be a limitation. As a result, no OHS personnel and trainings/seminar were identified. No established information system for OHS was in place. In conclusion, health and safety hazards were observed to be present across the barangay health centers visited in a selected city in Metro Manila. Medical conditions identified as most commonly self-reported were hypertension and diabetes for chronic diseases; colds, coughs, headache, and muscle pain for medical symptoms; and influenza and UTI for other diseases. As for the elements of the occupational health and safety system, there was a lack in the general components of the six building blocks of the health system.

Keywords: health hazards, occupational health and safety, occupational health and safety system, safety hazards

Procedia PDF Downloads 161
19275 The Application of Lean-Kaizen in Course Plan and Delivery in Malaysian Higher Education Sector

Authors: Nur Aishah Binti Awi, Zulfiqar Khan

Abstract:

Lean-kaizen has always been applied in manufacturing sector since many years ago. What about education sector? This paper discuss on how lean-kaizen can also be applied in education sector, specifically in academic area of Malaysian’s higher education sector. The purpose of this paper is to describe the application of lean kaizen in course plan and delivery. Lean-kaizen techniques have been used to identify waste in the course plan and delivery. A field study has been conducted to obtain the data. This study used both quantitative and qualitative data. The researcher had interviewed the chosen lecturers regarding to the problems of course plan and delivery that they encountered. Secondary data of students’ feedback at the end of semester also has been used to improve course plan and delivery. The result empirically shows that lean-kaizen helps to improve the course plan and delivery by reducing the wastes. Thus, this study demonstrates that lean-kaizen can also help education sector to improve their services as achieved by manufacturing sector.

Keywords: course delivery, education, Kaizen, lean

Procedia PDF Downloads 352
19274 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 260
19273 Application of Lean Manufacturing Tools in Hot Asphalt Production

Authors: S. Bayona, J. Nunez, D. Paez, C. Diaz

Abstract:

The application of Lean manufacturing tools continues to be an effective solution for increasing productivity, reducing costs and eliminating waste in the manufacture of goods and services. This article analyzes the production process of a hot asphalt manufacturing company from an administrative and technical perspective. Three main phases were analyzed, the first phase was related to the determination of the risk priority number of the main operations in asphalt mix production process by an FMEA (Failure Mode Effects Analysis), in the second phase the Value Stream Mapping (VSM) of the production line was performed and in the third phase a SWOT (Strengths, Weaknesses Opportunities, Threats) matrix was constructed. Among the most valued failure modes were the lack training of workers in occupational safety and health issues, the lack of signaling and classification of granulated material, and the overweight of vehicles loaded. The analysis of the results in the three phases agree on the importance of training operational workers, improve communication with external actors in order to minimize delays in material orders and strengthen control suppliers.

Keywords: asphalt, lean manufacturing, productivity, process

Procedia PDF Downloads 99
19272 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 527
19271 Applications of Social Marketing in Road Safety of Georgia

Authors: Charita Jashi

Abstract:

The aim of the paper is to explore the role of social marketing in changing the behavior of consumers on road safety, identify critical aspects and priority needs which impede the implementation of road safety program in Georgia. Given the goals of the study, a quantitative method was used to carry out interviews for primary data collection. This research identified the awareness level of road safety, legislation base, and marketing interventions to change behavior of drivers and pedestrians. During several years the non-governmental sector together with the local authorities and media have been very intensively working on the road safety issue in Georgia, but only seat-belts campaign should be considered rather successful. Despite achievements in this field, efficiency of road safety programs far from fulfillment and needs strong empowering.

Keywords: road safety, social marketing interventions, behavior change, well-being

Procedia PDF Downloads 174
19270 Two-Phase Flow Study of Airborne Transmission Control in Dental Practices

Authors: Mojtaba Zabihi, Stephen Munro, Jonathan Little, Ri Li, Joshua Brinkerhoff, Sina Kheirkhah

Abstract:

Occupational Safety and Health Administration (OSHA) identified dental workers at the highest risk of contracting COVID-19. This is because aerosol-generating procedures (AGP) during dental practices generate aerosols ( < 5µm) and droplets. These particles travel at varying speeds, in varying directions, and for varying durations. If these particles bear infectious viruses, their spreading causes airborne transmission of the virus in the dental room, exposing dentists, hygienists, dental assistants, and even other dental clinic clients to the infection risk. Computational fluid dynamics (CFD) simulation of two-phase flows based on a discrete phase model (DPM) is carried out to study the spreading of aerosol and droplets in a dental room. The simulation includes momentum, heat, and mass transfers between the particles and the airflow. Two simulations are conducted and compared. One simulation focuses on the effects of room ventilation in winter and summer on the particles' travel. The other simulation focuses on the control of aerosol and droplets' spreading. A suction collector is added near the source of aerosol and droplets, creating a flow sink in order to remove the particles. The effects of the suction flow on the aerosol and droplet travel are studied. The suction flow can remove aerosols and also reduce the spreading of droplets.

Keywords: aerosols, computational fluid dynamics, COVID-19, dental, discrete phase model, droplets, two-phase flow

Procedia PDF Downloads 240
19269 Cement-Based Composites with Carbon Nanofillers for Smart Structural Health Monitoring Sensors

Authors: Antonella D'Alessandro, Filippo Ubertini, Annibale Luigi Materazzi

Abstract:

The progress of nanotechnology resulted in the development of new instruments in the field of civil engineering. In particular, the introduction of carbon nanofillers into construction materials can enhance their mechanical and electrical properties. In construction, concrete is among the most used materials. Due to the characteristics of its components and its structure, concrete is suitable for modification, at the nanometer level too. Moreover, to guarantee structural safety, it is desirable to achieve a widespread monitoring of structures. The ideal thing would be to realize structures able to identify their behavior modifications, states of incipient damage or conditions of possible risk for people. This paper presents a research work about novel cementitious composites with conductive carbon nanoinclusions able of monitoring their state of deformation, with particular attention to concrete. The self-sensing ability is achieved through the correlation between the variation of stress or strain and that of electrical resistance. Carbon nanofillers appear particularly suitable for such applications. Nanomodified concretes with different carbon nanofillers has been tested. The samples have been subjected to cyclic and dynamic loads. The experimental campaign shows the potentialities of this new type of sensors made of nanomodified concrete for diffuse Structural Health Monitoring.

Keywords: carbon nanofillers, cementitious nanocomposites, smart sensors, structural health monitoring.

Procedia PDF Downloads 309
19268 Adaptable Regulatory Oversight and Safety Awareness Regime: An Experience-Based Contribution Towards Sustainability in a Changing Railway Environment

Authors: Peaceman Sopazi, Mabila Mathebula, John Smallwood

Abstract:

Recent health and safety (H&S) concerns and their resultant impact on railway operations, namely, the severe acute respiratory syndrome (SARS) or collectively known as SARS-CoV-2 (Covid-19) pandemic and the Fourth Industrial Revolution (4IR), which have dominated public discourse, brought into question as to whether, or not, some aspects of how we have so far managed safety oversight as railway regulatory bodies and operators will remain relevant in a changing railway environment. Railway practitioners have generally found themselves between a proverbial rock and a hard place by being confronted by emerging challenges which have brought along great opportunities for sustainability. As witnesses and participants to the progressively introduced railway safety management, and transformation regimes, this paper attempts to share gathered field experience on adaptable regulatory oversight and safety awareness. The discourse is approached from a South African context but also with an informed perspective of what seems to work and what usually does not. The authors share their own multi and transdisciplinary experience coupled with insights they have gained as researchers of global trends in general safety management and specific aspects of railway safety management, for sustainability. In addition to sharing a largely experience-based methodology for survival, suggestions are offered for consideration as a way of keeping the railway safety management discourse alive as practitioners navigate a new path which is shrouded in a cloud of untold uncertainty. The authors further believe that the right timing for the implementation of the proposed suggestions in this paper will produce beneficial outcomes. Finally, the paper will identify areas that are still open for further investigation for and by researchers and practitioners alike.

Keywords: health & safety management, safety awareness, railway safety management, railway systems sustainability

Procedia PDF Downloads 154
19267 Vibration-Based Monitoring of Tensioning Stay Cables of an Extradosed Bridge

Authors: Chun-Chung Chen, Bo-Han Lee, Yu-Chi Sung

Abstract:

Monitoring the status of tensioning force of stay cables is a significant issue for the assessment of structural safety of extradosed bridges. Moreover, it is known that there is a high correlation between the existing tension force and the vibration frequencies of cables. This paper presents the characteristic of frequencies of stay cables of a field extradosed bridge by using vibration-based monitoring methods. The vibration frequencies of each stay cables were measured in stages from the beginning to the completion of bridge construction. The result shows that the vibration frequency variation trend of different lengths of cables at each measured stage is different. The observed feature can help the application of the bridge long-term monitoring system and contribute to the assessment of bridge safety.

Keywords: vibration-based method, extradosed bridges, bridge health monitoring, bridge stay cables

Procedia PDF Downloads 131
19266 “Human Trafficking In Your Backyard: Know The Signs And How To Help”

Authors: Jessie Fazel, Kristen Smith

Abstract:

Human trafficking is a multi-billion-dollar criminal industry that affects 24.9 million people around the world. There are several different types of trafficking, the most common being sex trafficking, labor trafficking, and domestic servitude. Survival sex is common in the pediatric population, as they engage in sex for food, a place to sleep, or other basic needs. Statistics show that health care workers are at a unique advantage to help identify victims and get them the help they need, as 88% of trafficked victims encounter a health care worker while being trafficked. Unfortunately, victims don’t usually self-identify that they are being trafficked and the situations they face can vary dramatically. It is imperative to remember that traditional red flags are not always present in the pediatric population. Risk factors and red flags with their history and physical exam are one of the best indicators that health care providers need to be vigilant in looking at. There are numerous barriers for disclosure in the healthcare setting. Periods of time before and after disclosure are often emotionally difficult and could be dangerous for the victim. It is extremely important to have a plan in place for intervention if the victim does disclose trafficking. A trauma informed approach to medical and mental health interventions, that focus on safety, are vital in this population. This is happening where you live and you can make a difference in their lives.

Keywords: human trafficking, public health, emergency medicine, sexual health

Procedia PDF Downloads 15
19265 Ethical Leadership and Individual Creativity: The Mediating Role of Psychological Safety

Authors: Hyeondal Jeong, Yoonjung Baek

Abstract:

This study examines the relationship between ethical leadership and individual creativity and focused on mediating effects of psychological safety. In order to clarify the mechanism of ethical leadership, psychological safety of the members was set as a mediator. Using data gathered from a sample of 150 employees. For data analysis, exploratory factor analysis, correlation analysis, hierarchical regression analysis and Sobel-Test were performed. The results showed that ethical leadership had a positive effect on psychological safety and individual creativity, and psychological safety had a positive mediating effect. Since the mediating effect of psychological safety has been confirmed, we need to find ways to improve the psychological safety of the members in terms of organizational management. Psychological safety has a positive effect on individual creativity, which can have a positive impact on innovation throughout the organization.

Keywords: ethical leadership, creativity, psychological safety, ethics management, innovative behaviors

Procedia PDF Downloads 224
19264 Fire Safety Assessment of At-Risk Groups

Authors: Naser Kazemi Eilaki, Carolyn Ahmer, Ilona Heldal, Bjarne Christian Hagen

Abstract:

Older people and people with disabilities are recognized as at-risk groups when it comes to egress and travel from hazard zone to safe places. One's disability can negatively influence her or his escape time, and this becomes even more important when people from this target group live alone. This research deals with the fire safety of mentioned people's buildings by means of probabilistic methods. For this purpose, fire safety is addressed by modeling the egress of our target group from a hazardous zone to a safe zone. A common type of detached house with a prevalent plan has been chosen for safety analysis, and a limit state function has been developed according to the time-line evacuation model, which is based on a two-zone and smoke development model. An analytical computer model (B-Risk) is used to consider smoke development. Since most of the involved parameters in the fire development model pose uncertainty, an appropriate probability distribution function has been considered for each one of the variables with indeterministic nature. To achieve safety and reliability for the at-risk groups, the fire safety index method has been chosen to define the probability of failure (causalities) and safety index (beta index). An improved harmony search meta-heuristic optimization algorithm has been used to define the beta index. Sensitivity analysis has been done to define the most important and effective parameters for the fire safety of the at-risk group. Results showed an area of openings and intervals to egress exits are more important in buildings, and the safety of people would improve with increasing dimensions of occupant space (building). Fire growth is more critical compared to other parameters in the home without a detector and fire distinguishing system, but in a home equipped with these facilities, it is less important. Type of disabilities has a great effect on the safety level of people who live in the same home layout, and people with visual impairment encounter more risk of capturing compared to visual and movement disabilities.

Keywords: fire safety, at-risk groups, zone model, egress time, uncertainty

Procedia PDF Downloads 80
19263 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 259
19262 Needs Assessment of Barangay Health Workers in Delivering Health Care Services: Basis for Communication Planning

Authors: Ivan N. Gallegos, Merle Dawn Comidoy, Mira Sol Cabal, Paul Martin Acol, Arnie Polistico

Abstract:

Barangay Health Workers (BHWs) are the lead health advocates who provide basic health care services at the grass-roots level. Hence, adequate skills and training are needed to deliver these services effectively. The study aimed at identifying the communication needs of Barangay health workers situated at the dumpsite of Davao City, Philippines, gravitating towards designing a communication plan tailor-fitted to their needs. It employed a qualitative research design, particularly an in-depth interview of the health workers. Several communication problems were identified, including the lack of participation of BHWs in the Barangay development plan, the lack of a continuous skills enhancement program, ineffective communication strategies resulting in insufficient knowledge of proper personal hygiene, and the inactive participation of community members in health services. Based on these communication problems, the following activities and training were suggested: capacitating BHWs on writing proposals and plans; basic communication skills training; educational seminars for parents; and a sanitation campaign.

Keywords: communication planning, health care services, Barangay health workers, communication strategies

Procedia PDF Downloads 61
19261 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 206
19260 Real-Time Mine Safety System with the Internet of Things

Authors: Şakir Bingöl, Bayram İslamoğlu, Ebubekir Furkan Tepeli, Fatih Mehmet Karakule, Fatih Küçük, Merve Sena Arpacık, Mustafa Taha Kabar, Muhammet Metin Molak, Osman Emre Turan, Ömer Faruk Yesir, Sıla İnanır

Abstract:

This study introduces an IoT-based real-time safety system for mining, addressing global safety challenges. The wearable device, seamlessly integrated into miners' jackets, employs LoRa technology for communication and offers real-time monitoring of vital health and environmental data. Unique features include an LCD panel for immediate information display and sound-based location tracking for emergency response. The methodology involves sensor integration, data transmission, and ethical testing. Validation confirms the system's effectiveness in diverse mining scenarios. The study calls for ongoing research to adapt the system to different mining contexts, emphasizing its potential to significantly enhance safety standards in the industry.

Keywords: mining safety, internet of things, wearable technology, LoRa, RFID tracking, real-time safety system, safety alerts, safety measures

Procedia PDF Downloads 33
19259 The Link between Migration Status and Occupational Health and Safety of Filipino Migrant Workers in South Korea

Authors: Lito M. Amit, Venecio U. Ultra, Young Woong Song

Abstract:

The purpose of this study was to document the prevalence and types of work-related health and safety problems among Filipino migrant workers and the link between their migration status and occupational health and safety (OHS) problems. We conducted a survey among 116 Filipino migrant workers who were both legal and undocumented. To assess the various forms of occupational health problems, we utilized the Korean occupational stress scale (KOSS), Nordic musculoskeletal questionnaire (NMQ) and a validated health and safety questionnaire. A focus group discussion (FGD) was also conducted to record relevant information that was limited by the questionnaires. Descriptive data were presented in frequency with percentages, mean, and standard deviation. Chi-square tests and logistic regression analyses were performed to estimate the degree of association between variables (p < 0.05). Among the eight subscales of KOSS, inadequate social support (2.48), organizational injustice (2.57), and lack of reward (2.52) were experienced by workers. There was a 44.83% prevalence of musculoskeletal disorders with arm/elbow having the highest rate, followed by shoulder and low back regions. Inadequate social support and discomfort in organizational climate and overall MSDs prevalence showed significant relationships with migration status (p < 0.05). There was a positive association between migration status and seven items under language and communication. A positive association was seen between migration status and some of the OHS problems of Filipino migrant workers in Korea. Undocumented workers in this study were seen to be more vulnerable to those stressors compared to those employed legally.

Keywords: Filipino workers, migration status, occupational health and safety, undocumented workers

Procedia PDF Downloads 109
19258 Risk Analysis in Off-Site Construction Manufacturing in Small to Medium-Sized Projects

Authors: Atousa Khodadadyan, Ali Rostami

Abstract:

The objective of off-site construction manufacturing is to utilise the workforce and machinery in a controlled environment without external interference for higher productivity and quality. The usage of prefabricated components can save up to 14% of the total energy consumption in comparison with the equivalent number of cast-in-place ones. Despite the benefits of prefabrication construction, its current project practices encompass technical and managerial issues. Building design, precast components’ production, logistics, and prefabrication installation processes are still mostly discontinued and fragmented. Furthermore, collaboration among prefabrication manufacturers, transportation parties, and on-site assemblers rely on real-time information such as the status of precast components, delivery progress, and the location of components. From the technical point of view, in this industry, geometric variability is still prevalent, which can be caused during the transportation or production of components. These issues indicate that there are still many aspects of prefabricated construction that can be developed using disruptive technologies. Practical real-time risk analysis can be used to address these issues as well as the management of safety, quality, and construction environment issues. On the other hand, the lack of research about risk assessment and the absence of standards and tools hinder risk management modeling in prefabricated construction. It is essential to note that no risk management standard has been established explicitly for prefabricated construction projects, and most software packages do not provide tailor-made functions for this type of projects.

Keywords: project risk management, risk analysis, risk modelling, prefabricated construction projects

Procedia PDF Downloads 153
19257 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 95
19256 Enhancing the Safety Climate and Reducing Violence against Staff in Closed Hospital Wards

Authors: Valerie Isaak

Abstract:

This study examines the effectiveness of an intervention program aimed at enhancing a unit-level safety climate as a way to minimize the risk of employees being injured by patient violence. The intervention program conducted in maximum security units in one of the psychiatric hospitals in Israel included a three day workshop. Safety climate was examined before and after the implementation of the intervention. We also collected data regarding incidents involving patient violence. Six months after the intervention a significant improvement in employees’ perceptions regarding management’s commitment to safety were found as well as a marginally significant improvement in communication concerning safety issues. Our research shows that an intervention program aimed at enhancing a safety climate is associated with a decrease in the number of aggressive incidents. We conclude that such an intervention program is likely to return the sense of safety and reduce the scope of violence.

Keywords: violence, intervention, safety climate, performance, public sector

Procedia PDF Downloads 323
19255 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 132
19254 Self‑reported Auditory Problems Are Associated with Adverse Mental Health Outcomes and Alcohol Misuse in the UK Armed Forces

Authors: Fred N. H. Parker, Nicola T. Fear, S. A. M. Stevelink, L. Rafferty

Abstract:

Purpose Auditory problems, such as hearing loss and tinnitus, have been associated with mental health problems and alcohol misuse in the UK general population and in the US Armed Forces; however, few studies have examined these associations within the UK Armed Forces. The present study examined the association between auditory problems and probable common mental disorders, post-traumatic stress disorder and alcohol misuse. Methods 5474 serving and ex-service personnel from the UK Armed Forces were examined, selected from those who responded to phase two (data collection 2007–09) and phase three (2014–16) of a military cohort study. Multivariable logistic regression was used to examine the association between auditory problems at phase two and mental health problems at phase three. Results 9.7% of participants reported ever experiencing hearing problems alone, 7.9% reported tinnitus within the last month alone, and 7.8% reported hearing problems with tinnitus. After adjustment, hearing problems with tinnitus at phase two was associated with increased odds of probable common mental disorders (AOR = 1.50, 95% CI 1.09–2.08), post-traumatic stress disorder (AOR = 2.30, 95% CI 1.41–3.76), and alcohol misuse (AOR = 1.94, 95% CI 1.28–2.96) at phase three. Tinnitus alone was associated with probable post-traumatic stress disorder (AOR = 1.80, 95% CI 1.03–3.15); however, hearing problems alone were not associated with any outcomes of interest. Conclusions The association between auditory problems and mental health problems emphasizes the importance of the prevention of auditory problems in the Armed Forces: through enhanced audiometric screening, improved hearing protection equipment, and greater levels of utilization of such equipment.

Keywords: armed forces, hearing problems, tinnitus, mental health, alcohol misuse

Procedia PDF Downloads 140
19253 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 375