12577 Progress of Research on Community Canteens and Reflections on Planning in China

Authors: Xi Zuo

Abstract:

Against the background of the aging population and changing family structure in China, community canteens have become an important vehicle for community-based home care services and a new space for social interaction. In this paper, we review past studies and the actual construction situation in China, firstly sort out the social interaction of the elderly and the types of places, and on this basis, we find that there is an obvious disconnection between the current construction and the academic research, and the contradiction between social benefit and cost-effectiveness, and therefore we put forward the relevant construction planning and thinking, in order to provide a disciplinary basis and academic support for the construction of community canteens and the construction of elderly-friendly cities. In order to provide disciplinary basis and academic support for the construction of community canteens and the construction of senior-friendly cities.

Keywords: urban and rural planning, community canteens, elderly people, senior-friendly

Procedia PDF Downloads 62
12576 Computational Thinking Based Coding Environment for Coding and Free Semester Mathematics Education in Korea

Authors: Han Hyuk Cho, Hanik Jo

Abstract:

In recent years, coding education has been globally emphasized, and the Free Semester System and coding education were introduced to the public schools from the beginning of 2016 and 2018 respectively in Korea. With the introduction of the Free Semester System and the rising demand of Computational Thinking (CT) capacity, this paper aims to design ‘Coding Environment’ and Minecraft-like Turtlecraft in which learners can design and construct mathematical objects through mathematical symbolic expressions. Students can transfer the constructed mathematical objects to the Turtlecraft environment (open-source codingmath website), and also can print them out through 3D printers. Furthermore, we design learnable mathematics and coding curriculum by representing the figurate numbers and patterns in terms of executable expression in the coding context and connecting them to algebraic symbols, which will allow students to experience mathematical patterns and symbolic coding expressions.

Keywords: coding education, computational thinking, mathematics education, TurtleMAL and Turtlecraft

Procedia PDF Downloads 207
12575 The Impact of Socialization Preferences on Perceptions of Generalized Social Trust in China

Authors: Menghzheng Yao

Abstract:

Generalized social trust among Chinese has been declining in the past few decades, making the search for its causes necessary. Drawing on the symbolic interaction theory and the 2012 Chinese General Social Survey data, this research investigated the impact of people’s socialization preferences and frequencies on their perceptions of generalized social trust in China. This research also took a preliminary step towards understanding the spatial differences of the generalized social trust using the ArcGIS software. The results show that respondents who interacted with their neighbors more frequently were more likely to have higher levels of perceptions of generalized social trust. Several demographics were also significantly related to perception of generalized social trust. Elderly and better educated Chinese and people with higher self-perceived social status were associated with greater levels of generalized social trust perception, while urban dwellers and religious respondents expressed lower levels of such perception. Implications for future research and policy are discussed.

Keywords: China, generalized social trust, symbolic interaction, ArcGIS

Procedia PDF Downloads 378
12574 Analysis of Exploitation Damages of the Frame Scaffolding

Authors: A. Robak, M. Pieńko, E. Błazik-Borowa, J. Bęc, I. Szer

Abstract:

The analyzes and classifications presented in the article were based on the research carried out in year 2016 and 2017 on a group of nearly one hundred scaffoldings assembled and used on construction sites in different parts of Poland. During scaffolding selection process efforts were made to maintain diversification in terms of parameters such as scaffolding size, investment size, type of investment, location and nature of conducted works. This resulted in the research being carried out on scaffoldings used for church renovation in a small town or attached to the facades of classic apartment blocks, as well as on scaffoldings used during construction of skyscrapers or facilities of the largest power plants. This variety allows to formulate general conclusions about the technical condition of used frame scaffoldings. Exploitation damages of the frame scaffolding elements were divided into three groups. The first group includes damages to the main structural components, which reduce the strength of the scaffolding elements and hence the whole structure. The qualitative analysis of these damages was made on the basis of numerical models that take into account the geometry of the damage and on the basis of computational nonlinear static analyzes. The second group focuses on exploitation damages such as the lack of a pin on the guardrail bolt which may cause an imminent threat to people using scaffolding. These are local damages that do not affect the bearing capacity and stability of the whole structure but are very important for safe use. The last group consider damages that reduce only aesthetic values and do not have direct impact on bearing capacity and safety of use. Apart from qualitative analyzes the article will present quantitative analyzes showing how frequently given type of damage occurs.

Keywords: scaffolding, damage, safety, numerical analysis

Procedia PDF Downloads 260
12573 Improvement in Plasticity Index and Group Index of Black Cotton Soil Using Palm Kernel Shell Ash

Authors: Patel Darshan Shaileshkumar, M. G. Vanza

Abstract:

Black cotton soil is problematic soil for any construction work. Black cotton soil contains montmorillonite in its structure. Due to this mineral, black cotton soil will attain maximum swelling and shrinkage. Due to these volume changes, it is necessary to stabilize black cotton soil before the construction of the road. For soil stabilization use of pozzolanic waste is found to be a good solution by some researchers. The palm kernel shell ash (PKSA) is a pozzolanic material that can be used for soil stabilization. Basically, PKSA is a waste material, and it is available at a cheap cost. Palm kernel shell is a waste material generated in palm oil mills. Then palm kernel shell is used in industries instead of coal for power generation. After the burning of a palm kernel shell, ash is formed; the ash is called palm kernel shell ash (PKSA). The PKSA contains a free lime content that will react chemically with the silicate and aluminate of black cotton soil and forms a C-S-H and C-A-H gel which will bines soil particles together and reduce the plasticity of the soil. In this study, the PKSA is added to the soil. It was found that with the addition of PKSA content in the soil, the liquid limit of the soil is decreased, the plastic limit of the soil is increased, and the plasticity of the soil is decreased. The group index value of the soil is evaluated, and it was found that with the addition of PKSA GI value of the soil is decreased, which indicates the strength of the soil is improved.

Keywords: palm kernel shell ash, black cotton soil, liquid limit, group index, plastic limit, plasticity index

Procedia PDF Downloads 111
12572 Productivity of Construction Companies Using the Management of Threats and Opportunities ‎in Construction Projects of Iran

Authors: Nima Amani, Ali Salehi Dastjerdi, Fatemeh Ahmadi, Ardalan Sabamehr

Abstract:

The cost overrun of the construction projects has always been one of the main problems of the construction companies caused by the risky nature of the construction projects. Therefore, today, the application of risk management is inevitable. Although in theory, the issue of risk management is divided into the opportunities and threats management, in practice, most of the projects have been focused on the threats management. However, considering the opportunities management and applying the opportunities-response strategies can lead to the improved profitability of the construction projects of the companies. In this paper, a new technique is developed to identify the opportunities in the construction projects using an improved protocol and propose the appropriate opportunities-response strategies to the construction companies to provide them with higher profitability. To evaluate the effectiveness of the protocol for selecting the most appropriate strategies in ‎response to the opportunities and threats, two projects from a construction company in Iran were ‎studied. Both projects selected were in mid-range in terms of size and similar in terms of time, ‎run time and costs. Finally, the output indicates that using the proposed opportunities-response strategies show that the company's profitability in the future can be increased approximately for similar projects.

Keywords: opportunities management, risk-response strategy, opportunity-response strategy, productivity, risk management

Procedia PDF Downloads 230
12571 Research on the Calculation Method of Smartization Rate of Concrete Structure Building Construction

Authors: Hongyu Ye, Hong Zhang, Minjie Sun, Hongfang Xu

Abstract:

In the context of China's promotion of smart construction and building industrialization, there is a need for evaluation standards for the development of building industrialization based on assembly-type construction. However, the evaluation of smart construction remains a challenge in the industry's development process. This paper addresses this issue by proposing a calculation and evaluation method for the smartization rate of concrete structure building construction. The study focuses on examining the factors of smart equipment application and their impact on costs throughout the process of smart construction design, production, transfer, and construction. Based on this analysis, the paper presents an evaluation method for the smartization rate based on components. Furthermore, it introduces calculation methods for assessing the smartization rate of buildings. The paper also suggests a rapid calculation method for determining the smartization rate using Building Information Modeling (BIM) and information expression technology. The proposed research provides a foundation for the swift calculation of the smartization rate based on BIM and information technology. Ultimately, it aims to promote the development of smart construction and the construction of high-quality buildings in China.

Keywords: building industrialization, high quality building, smart construction, smartization rate, component

Procedia PDF Downloads 72
12570 Management Workspaces to Create Value

Authors: Nevruz Zogu, Shpetim Rezniqi

Abstract:

It is very important that a new environment where work shall be constructed in such a strong record to be creative and eligible for workers, can not have success in the workplace. But, is it possible to design the inner-inspire to create and collaborate? By watching and analyzing examples of creativity in business, construction managers can learn ways on how to encourage their imagination inside buildings. We struggle to find and retain talented employees and skilled labor environment is becoming more and always an important tool for recruiting and retaining employees. Managers who recognize the importance are gaining an edge over their competitors. The physical work environment is as important as its quality is often used as a recruiting tool and even to companies with The relationship between the company and the employees between strategy and behavior, between the product and the customer can reincorporated under the light of symbolic mediation of space, as instrument and interpreter of the core values and identity of the organization.

Keywords: strategy, business, quality, productivity, space, offices, assets

Procedia PDF Downloads 389
12569 Mobile Application for Construction Sites Management

Authors: A. Khelifi, M. Al Kaabi, B. Al Rawashdeh

Abstract:

The infrastructure is one of the most important pillars of the UAE, where it spends millions of dollars for investments in the construction sectors. The research done by Kuwait Finance House (KFH) Research showed clearly that the UAE investments in the construction sectors have exceeded 30 billion dollars in 2013. There are many construction companies in the UAE and each one of them is taking the responsibilities to build different infrastructures. The large scale construction projects consist of multi human activities which can affect the efficiency and productivity of the running projects. The Construction Administration System is developed to increase the efficiency and productivity at the construction sites. It runs on two platforms: web server and mobile phone and supports two main users: mobile user and institution employee. With Construction Administration Mobile Application the user can manage and control several projects, create several reports and send these reports in Portable Document Format (PDF) formats through emails, view the physical location of each project, capturing and save photos. An institution employee can use the system to view all existing workers and projects, send emails and view the progress of each project.

Keywords: construction sites, management, mobile application, Portable Document Format (PDF)

Procedia PDF Downloads 375
12568 The Sustainability of Health and Safety on Construction Sites in Zamfara State

Authors: Ismaila Oladunni Muhammed, Adegbenga Raphael Ashiru

Abstract:

Construction industry has been attributed to be the engine growth of Nigerian economic and infrastructural development. It promotes infrastructural development and grows an average output of Nigerian Gross Domestic Profit. However, from this great prospect, yearly reports show that consistent accidents on construction sites in Zamfara State has affected a substantial number of workers as they become temporarily or permanently disabled, thereby making many construction sites a death trap. This posed a great threat to the industry’s sustainability, de- motivate workers from working in the industry, and further have negative impact on the economy as well. It is as a result of high construction site accident currently experiencing in Zamfara state that this research was carried out to appraise the sustainability of health and safety of construction workers on sites. The proper practice and compliance to Construction Health and safety laws are very vital to the output and growth of Zamfara State construction sector. However, a quantitative approach was adopted to justify the aforesaid statement which will provide a broader understanding of the study. Descriptive statistical analysis was obtained through Statistical Package for the Social Sciences (SPSS Version 20). Furthermore, the findings from the research highlighted that the performance and output of construction workers on construction sites depends on the proper practice of health and safety. The research findings also recommended ways to enhance employers and employee’s compliance with existing laws guiding health and safety on Zamfara State construction sites. Nevertheless, the purpose of the paper is to appraise the sustainability of Health and Safety on Zamfara State construction sites. This study further provided thorough information for resolving challenges of construction sites accidents to improve construction firm productivity and also ensured construction worker’s safety on site.

Keywords: construction industry, health and safety regulations, causes of accident, construction safety practices

Procedia PDF Downloads 212
12567 A Weighted Group EI Incorporating Role Information for More Representative Group EI Measurement

Authors: Siyu Wang, Anthony Ward

Abstract:

Emotional intelligence (EI) is a well-established personal characteristic. It has been viewed as a critical factor which can influence an individual's academic achievement, ability to work and potential to succeed. When working in a group, EI is fundamentally connected to the group members' interaction and ability to work as a team. The ability of a group member to intelligently perceive and understand own emotions (Intrapersonal EI), to intelligently perceive and understand other members' emotions (Interpersonal EI), and to intelligently perceive and understand emotions between different groups (Cross-boundary EI) can be considered as Group emotional intelligence (Group EI). In this research, a more representative Group EI measurement approach, which incorporates the information of the composition of a group and an individual’s role in that group, is proposed. To demonstrate the claim of being more representative Group EI measurement approach, this study adopts a multi-method research design, involving a combination of both qualitative and quantitative techniques to establish a metric of Group EI. From the results, it can be concluded that by introducing the weight coefficient of each group member on group work into the measurement of Group EI, Group EI will be more representative and more capable of understanding what happens during teamwork than previous approaches.

Keywords: case study, emotional intelligence, group EI, multi-method research

Procedia PDF Downloads 127
12566 I, Me and the Bot: Forming a Theory of Symbolic Interactivity with a Chatbot

Authors: Felix Liedel

Abstract:

The rise of artificial intelligence has numerous and far-reaching consequences. In addition to the obvious consequences for entire professions, the increasing interaction with chatbots also has a wide range of social consequences and implications. We are already increasingly used to interacting with digital chatbots, be it in virtual consulting situations, creative development processes or even in building personal or intimate virtual relationships. A media-theoretical classification of these phenomena has so far been difficult, partly because the interactive element in the exchange with artificial intelligence has undeniable similarities to human-to-human communication but is not identical to it. The proposed study, therefore, aims to reformulate the concept of symbolic interaction in the tradition of George Herbert Mead as symbolic interactivity in communication with chatbots. In particular, Mead's socio-psychological considerations will be brought into dialog with the specific conditions of digital media, the special dispositive situation of chatbots and the characteristics of artificial intelligence. One example that illustrates this particular communication situation with chatbots is so-called consensus fiction: In face-to-face communication, we use symbols on the assumption that they will be interpreted in the same or a similar way by the other person. When briefing a chatbot, it quickly becomes clear that this is by no means the case: only the bot's response shows whether the initial request corresponds to the sender's actual intention. This makes it clear that chatbots do not just respond to requests. Rather, they function equally as projection surfaces for their communication partners but also as distillations of generalized social attitudes. The personalities of the chatbot avatars result, on the one hand, from the way we behave towards them and, on the other, from the content we have learned in advance. Similarly, we interpret the response behavior of the chatbots and make it the subject of our own actions with them. In conversation with the virtual chatbot, we enter into a dialog with ourselves but also with the content that the chatbot has previously learned. In our exchanges with chatbots, we, therefore, interpret socially influenced signs and behave towards them in an individual way according to the conditions that the medium deems acceptable. This leads to the emergence of situationally determined digital identities that are in exchange with the real self but are not identical to it: In conversation with digital chatbots, we bring our own impulses, which are brought into permanent negotiation with a generalized social attitude by the chatbot. This also leads to numerous media-ethical follow-up questions. The proposed approach is a continuation of my dissertation on moral decision-making in so-called interactive films. In this dissertation, I attempted to develop a concept of symbolic interactivity based on Mead. Current developments in artificial intelligence are now opening up new areas of application.

Keywords: artificial intelligence, chatbot, media theory, symbolic interactivity

Procedia PDF Downloads 56
12565 A Mixed Methodology of the Social and Spatial Fragmentation of the City of Beirut Leading to the Creation of Internal Boundaries

Authors: Hala Obeid

Abstract:

Among the cities that have been touched by hard events and have been experiencing this polemic of existence, one can quote Beirut. A city that defies and confronts itself for its own existence. Beirut materialized all the social complexity; it has also preserved the memory of a society that has been able to build and reflect a certain unique identity. In spite of its glory, Lebanon’s civil war has marked a turning point in Beirut’s history. It has caused many deaths and opposed religious communities. Once this civil war has ended, the reconstruction of the city center, however, saw the spatial exclusion of manual labor, small local commerce, and middle-class residences. The urban functions that characterized the pre-war center were removed, and the city’s spontaneous evolutions were replaced by a historical urban planning, which neglected the city’s memory and identity. The social and spatial fragmentation that has erupted since the war has led to a breakdown of spatial and social boundaries within the city. The aim of this study is to evaluate the impact of fragmentation and boundaries on the city of Beirut in spatial, social, religious and ethnic terms. The method used in this research is what we call the mixed method which is a combination between the quantitative method and the qualitative one. These two approaches, in this case, do not oppose but complement each other in order to study the city of Beirut physically and socially. The main purpose of the qualitative approach is to describe and analyze the social phenomenon of the fragmentation of the city; this method can be summarized by the field observation and study. While the quantitative approach is based on filling out questionnaires that leads to statistics analyzes. Together, these two approaches will mark the course of the research. As a result, Beirut is not only a divided city but is fragmented spatially into many fragments and socially into many groups. This fragmentation is creating immaterial boundaries between fragments and therefore between groups. These urban and social boundaries are specifically religious and ethnic limits. As a conclusion, one of the most important and discussed boundary in Beirut is a spatial and religious boundary called ‘the green line’ or the demarcation line, a true caesura within the city. It marks the opposition of two urban groups and the aggravated fragmentation between them. This line divided Beirut into two compartments: East Beirut (for Christians) and West Beirut (for Muslims). This green line has become an urban void that holds the past in suspension. Finally, to think of Beirut as an urban unit becomes an insoluble problem.

Keywords: Beirut, boundaries, fragmentation, identity

Procedia PDF Downloads 178
12564 Dynamic Construction Site Layout Using Ant Colony Optimization

Authors: Yassir AbdelRazig

Abstract:

Evolutionary optimization methods such as genetic algorithms have been used extensively for the construction site layout problem. More recently, ant colony optimization algorithms, which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to benchmark combinatorial optimization problems. This paper proposes a formulation of the site layout problem in terms of a sequencing problem that is suitable for solution using an ant colony optimization algorithm. In the construction industry, site layout is a very important planning problem. The objective of site layout is to position temporary facilities both geographically and at the correct time such that the construction work can be performed satisfactorily with minimal costs and improved safety and working environment. During the last decade, evolutionary methods such as genetic algorithms have been used extensively for the construction site layout problem. This paper proposes an ant colony optimization model for construction site layout. A simple case study for a highway project is utilized to illustrate the application of the model.

Keywords: ant colony, construction site layout, optimization, genetic algorithms

Procedia PDF Downloads 383
12563 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 194
12562 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 326
12561 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 71
12560 Microstructure of Hydrogen Permeation Barrier Coatings

Authors: Motonori Tamura

Abstract:

Ceramics coatings consisting of fine crystal grains, with diameters of about 100 nm or less, provided superior hydrogen-permeation barriers. Applying TiN, TiC or Al₂O₃ coatings on a stainless steel substrate reduced the hydrogen permeation by a factor of about 100 to 5,000 compared with uncoated substrates. Effect of the microstructure of coatings on hydrogen-permeation behavior is studied. The test specimens coated with coatings, with columnar crystals grown vertically on the substrate, tended to exhibit higher hydrogen permeability. The grain boundaries of the coatings became trap sites for hydrogen, and microcrystalline structures with many grain boundaries are expected to provide effective hydrogen-barrier performance.

Keywords: hydrogen permeation, tin coating, microstructure, crystal grain, stainless steel

Procedia PDF Downloads 390
12559 The Impact of Music on Social Identity Formation and Intergroup Relations in American-Born Korean Skaters in 2018 Winter Olympics

Authors: Sehwan Kim, Jepkorir Rose Chepyator Thomson

Abstract:

Music provides opportunities to affirm social identities and facilitate the internalization of one’s identity. The purpose of this study was to examine the role of music in breaking down boundaries between the in-group and out-of-group sport participants. Social identity theory was used to guide an understanding of two American-born South Korean skaters—Yura Min and Alexander Gamelin—who used a Korean representative traditional folk song, Arirang, at the 2018 Winter Olympics. This was an interpretive case study that focused on 2018 Winter Olympic participants whose performance and use of music was understood through the lenses of Koreans. Semi-structured interviews were conducted with 15 Korean audiences who watched two American-born South Korean skaters’ performances. Data analysis involved the determination of themes in the data collected. The findings of this study are as follows: First Koreans viewed the skaters as the out-group based on ethnic appearances and stereotypes. Second, Koreans’ inter-group bias against the skaters was meditated after Koreans watched the skaters as they used Arirang song in performance. Implications for this study include the importance of music as an instrument of unity across diverse populations, including intergroup relations. Music can also offer ways to understand people’s cultures and bridge gaps between age and gender across categories of naturalization.

Keywords: impact of music, intergroup relations, naturalized athletes, social identity theory

Procedia PDF Downloads 207
12558 Top-Down Construction Method in Concrete Structures: Advantages and Disadvantages of This Construction Method

Authors: Hadi Rouhi Belvirdi

Abstract:

The construction of underground structures using the traditional method, which begins with excavation and the implementation of the foundation of the underground structure, continues with the construction of the main structure from the ground up, and concludes with the completion of the final ceiling, is known as the Bottom-Up Method. In contrast to this method, there is an advanced technique called the Top-Down Method, which has practically replaced the traditional construction method in large projects in industrialized countries in recent years. Unlike the traditional approach, this method starts with the construction of surrounding walls, columns, and the final ceiling and is completed with the excavation and construction of the foundation of the underground structure. Some of the most significant advantages of this method include the elimination or minimization of formwork surfaces, the removal of temporary bracing during excavation, the creation of some traffic facilities during the construction of the structure, and the possibility of using it in limited and high-traffic urban spaces. Despite these numerous advantages, unfortunately, there is still insufficient awareness of this method in our country, to the extent that it can be confidently stated that most stakeholders in the construction industry are unaware of the existence of such a construction method. However, it can be utilized as a very important execution option alongside other conventional methods in the construction of underground structures. Therefore, due to the extensive practical capabilities of this method, this article aims to present a methodology for constructing underground structures based on the aforementioned advanced method to the scientific community of the country, examine the advantages and limitations of this method and their impacts on time and costs, and discuss its application in urban spaces. Finally, some underground structures executed in the Ahvaz urban rail, which are being implemented using this advanced method to the best of our best knowledge, will be introduced.

Keywords: top-down method, bottom-up method, underground structure, construction method

Procedia PDF Downloads 15
12557 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 397
12556 A Neurosymbolic Learning Method for Uplink LTE-A Channel Estimation

Authors: Lassaad Smirani

Abstract:

In this paper we propose a Neurosymbolic Learning System (NLS) as a channel estimator for Long Term Evolution Advanced (LTE-A) uplink. The proposed system main idea based on Neural Network has modules capable of performing bidirectional information transfer between symbolic module and connectionist module. We demonstrate various strengths of the NLS especially the ability to integrate theoretical knowledge (rules) and experiential knowledge (examples), and to make an initial knowledge base (rules) converted into a connectionist network. Also to use empirical knowledge witch by learning will have the ability to revise the theoretical knowledge and acquire new one and explain it, and finally the ability to improve the performance of symbolic or connectionist systems. Compared with conventional SC-FDMA channel estimation systems, The performance of NLS in terms of complexity and quality is confirmed by theoretical analysis and simulation and shows that this system can make the channel estimation accuracy improved and bit error rate decreased.

Keywords: channel estimation, SC-FDMA, neural network, hybrid system, BER, LTE-A

Procedia PDF Downloads 394
12555 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 147
12554 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration

Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen

Abstract:

In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.

Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate

Procedia PDF Downloads 176
12553 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 236
12552 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 67
12551 The Social Construction of Diagnosis: An Exploratory Study on Gender Dysphoria and Its Implications on Personal Narratives

Authors: Jessica Neri, Elena Faccio

Abstract:

In Europe, except for Denmark and Malta, the legal gender change and the stages of the possible process of gender transition are bound to the diagnosis of a gender identity disorder. The requirement of the evaluation of a mental disorder might have many implications on trans people’s self-representations, interpersonal relations in different social contexts and the therapeutic relations with clinicians during the transition. Psychopathological language may contribute to define the individual’s reality from normative presuppositions with value implications related to the dominant cultural principles. In an effort to mark the boundaries between sanity and pathology, it concurs to the definition of the management procedures of the constructed diversities and deviances, legitimizing the operational practices of particular professional figures. The aim of this research concerns the analysis of the diagnostic category of gender dysphoria contained in the last edition of the Diagnostic and Statistical Manual of Mental Disorders. In particular, this study focuses on the relationship between the implicit and explicit assumptions related to the expressions of gender non-conformity, that sustain the language and the criteria characterizing the Manual, and the possible implications on people’s narratives of transition. In order to achieve this objective two main research methods were used: historical reconstruction of the diagnostic category in the different versions of the Manual and content analysis of that category in the present version. From the historical analysis, in the medical and psychiatric field gender non-conformity has been predominantly explicated by naturalistic perspectives, naming it ‘transsexualism’ and collocating it in the category of gender identity disorder. Currently, pathological judged experiences are represented by gender dysphoria, described in the DSM-5 as the distress that may accompany the incongruence between one's experienced or expressed gender and one's assigned gender, specifying that there must be ‘evidence’ of this. Implicit theories about gender binary, parallelism between gender identity, sex and sexuality and the understanding of the mental health and the subject’s agency as subordinated to the expert knowledge, can be found in the process of designation of the category. A lack of awareness of the historical, social and political aspects connected to the cultural and normative dimensions at the basis of these implicit theories, can be noticed and data given by culture and data given by supposed -biological or psychological- nature, are often confused. This reductionist interpretation of gender and its presumed diversities legitimize the clinician to assume the role of searching and orienting, in a correctional perspective, the biographical elements that correspond to him specific expectations, with no space for other possibilities and identity configurations for people in transition. This research may contribute to the current critical debate about the epistemological foundation of the psychodiagnosis, emphasizing the pragmatic effects on the individuals and on the psychological practice in its wider social context. This work also permits to underline the risks due to the lack of awareness of the processes of social construction of the diagnostic system and its essential role of defence of the values that hold up the symbolic universe of reference.

Keywords: diagnosis, gender dysphoria, narratives, social constructionism

Procedia PDF Downloads 233
12550 Analysis of Construction Waste Generation and Its Effect in a Construction Site

Authors: R. K. D. G. Kaluarachchi

Abstract:

The generation of solid waste and its effective management are debated topics in Sri Lanka as well as in the global environment. It was estimated that the most of the waste generated in global was originated from construction and demolition of buildings. Thus, the proportion of construction waste in solid waste generation cannot be underestimated. The construction waste, which is the by-product generated and removed from work sites is collected in direct and indirect processes. Hence, the objectives of this research are to identify the proportion of construction waste which can be reused and identify the methods to reduce the waste generation without reducing the quality of the process. A 6-storey building construction site was selected for this research. The site was divided into six zones depending on the process. Ten waste materials were identified by considering the adverse effects on safety and health of people and the economic value of them. The generated construction waste in each zone was recorded per week for a period of five months. The data revealed that sand, cement, wood used for form work and rusted steel rods were the generated waste which has higher economic value in all zones. Structured interviews were conducted to gather information on how the materials are categorized as waste and the capability of reducing, reusing and recycling the waste. It was identified that waste is generated in following processes; ineffective storage of material for a longer time and improper handling of material during the work process. Further, the alteration of scheduled activities of construction work also yielded more waste. Finally, a proper management of construction waste is suggested to reduce and reuse waste.

Keywords: construction-waste, effective management, reduce, reuse

Procedia PDF Downloads 202
12549 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 83
12548 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 248