9745 Building Information Modeling-Based Approach for Automatic Quantity Take-off and Cost Estimation
Authors: Lo Kar Yin, Law Ka Mei
Abstract:
Architectural, engineering, construction and operations (AECO) industry practitioners have been well adapting to the dynamic construction market from the fundamental training of its discipline. As further triggered by the pandemic since 2019, great steps are taken in virtual environment and the best collaboration is strived with project teams without boundaries. With adoption of Building Information Modeling-based approach and qualitative analysis, this paper is to review quantity take-off and cost estimation process through modeling techniques in liaison with suppliers, fabricators, subcontractors, contractors, designers, consultants and services providers in the construction industry value chain for automatic project cost budgeting, project cost control and cost evaluation on design options of in-situ reinforced-concrete construction and Modular Integrated Construction (MiC) at design stage, variation of works and cash flow/spending analysis at construction stage as far as practicable, with a view to sharing the findings for enhancing mutual trust and co-operation among AECO industry practitioners. It is to foster development through a common prototype of design and build project delivery method in NEC Engineering and Construction Contract (ECC) Options A and C.Keywords: building information modeling, cost estimation, quantity take-off, modeling techniques
Procedia PDF Downloads 1879744 Managing Construction Wastes in Nigeria for Sustainable Development
Authors: Ezekiel Ejiofor Nnadi
Abstract:
Nigeria construction industry is known for its active construction activities. This has earmarked the industry to be the key to economic growth of the nation. It has largest employer of labour and gives sustenance to other industries like manufacturing industry. While this is a sign of growth and prosperity; the waste generated by the industry has always been a problem and a serious concern. It results in wastage of economic gain and has resultant health effect on the populace apart from injury being sustained on sites. This work provides a platform to learn more about construction waste, its management strategy and how to reduce waste production in Nigeria construction industry. Construction sites, waste management authority and public health institutions in Lagos as the centre of most construction activities in Nigeria were selected, and a set of questionnaire was administered to using the systematic sampling technique. Descriptive statistics and relative importance index (RII) technique were employed for the analysis of the data gathered. The findings of the analysis show that excessive wastes reduce contractors’ profit margin and also that some construction wastes contain hazardous and toxic elements such as lead, asbestos or radioactive materials which required proper handling and effective disposal. The conclusion was drawn that the check on waste on construction sites starts with the designers to the contractors who execute on site.Keywords: construction cost, construction industry, economic growth, materials wastes
Procedia PDF Downloads 2729743 Research on Contract's Explicit Incentive and Reputation's Implicit Incentive Mechanism towards Construction Contractors
Authors: Li Ma, Meishuang Ma, Mengying Huang
Abstract:
The quality of construction projects reflects the credit and responsibilities of construction contractors for the owners and the whole society. Because the construction contractors master more relevant information about the entrusted engineering project under construction while the owners are in unfavorable position of gaining information, asymmetric information may lead the contractors act against the owners in order to pursue their own interests. Building a powerful motivation mechanism is the key to guarantee investor economic interests and the life and property of users in construction projects. Based on principal-agent theory and game theory, the authors develop relevant mathematical models to analyze and compare the contractor’s utility functions under different combinations of contracts’ explicit incentive mechanism and reputation’s implicit incentive mechanism aiming at finding out the conditions for incentive validity. The research concludes that the most rational motivation way is to combine the explicit and implicit incentive effects of both contracts and reputation mechanism, and puts forth some measures for problems on account of China’s current situation.Keywords: construction contractors, contract, reputation, incentive mechanism
Procedia PDF Downloads 5099742 A Relational Case-Based Reasoning Framework for Project Delivery System Selection
Authors: Yang Cui, Yong Qiang Chen
Abstract:
An appropriate project delivery system (PDS) is crucial to the success of a construction project. Case-based reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the relational case-based reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then, feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.Keywords: relational cased-based reasoning, case-based reasoning, project delivery system, PDS selection
Procedia PDF Downloads 4329741 Application of Transform Fourier for Dynamic Control of Structures with Global Positioning System
Authors: J. M. de Luis Ruiz, P. M. Sierra García, R. P. García, R. P. Álvarez, F. P. García, E. C. López
Abstract:
Given the evolution of viaducts, structural health monitoring requires more complex techniques to define their state. two alternatives can be distinguished: experimental and operational modal analysis. Although accelerometers or Global Positioning System (GPS) have been applied for the monitoring of structures under exploitation, the dynamic monitoring during the stage of construction is not common. This research analyzes whether GPS data can be applied to certain dynamic geometric controls of evolving structures. The fundamentals of this work were applied to the New Bridge of Cádiz (Spain), a worldwide milestone in bridge building. GPS data were recorded with an interval of 1 second during the erection of segments and turned to the frequency domain with Fourier transform. The vibration period and amplitude were contrasted with those provided by the finite element model, with differences of less than 10%, which is admissible. This process provides a vibration record of the structure with GPS, avoiding specific equipment.Keywords: Fourier transform, global position system, operational modal analysis, structural health monitoring
Procedia PDF Downloads 2469740 Evaluating Alternative Structures for Prefix Trees
Authors: Feras Hanandeh, Izzat Alsmadi, Muhammad M. Kwafha
Abstract:
Prefix trees or tries are data structures that are used to store data or index of data. The goal is to be able to store and retrieve data by executing queries in quick and reliable manners. In principle, the structure of the trie depends on having letters in nodes at the different levels to point to the actual words in the leafs. However, the exact structure of the trie may vary based on several aspects. In this paper, we evaluated different structures for building tries. Using datasets of words of different sizes, we evaluated the different forms of trie structures. Results showed that some characteristics may impact significantly, positively or negatively, the size and the performance of the trie. We investigated different forms and structures for the trie. Results showed that using an array of pointers in each level to represent the different alphabet letters is the best choice.Keywords: data structures, indexing, tree structure, trie, information retrieval
Procedia PDF Downloads 4529739 A Case Study of Control of Blast-Induced Ground Vibration on Adjacent Structures
Authors: H. Mahdavinezhad, M. Labbaf, H. R. Tavakoli
Abstract:
In recent decades, the study and control of the destructive effects of explosive vibration in construction projects has received more attention, and several experimental equations in the field of vibration prediction as well as allowable vibration limit for various structures are presented. Researchers have developed a number of experimental equations to estimate the peak particle velocity (PPV), in which the experimental constants must be obtained at the site of the explosion by fitting the data from experimental explosions. In this study, the most important of these equations was evaluated for strong massive conglomerates around Dez Dam by collecting data on explosions, including 30 particle velocities, 27 displacements, 27 vibration frequencies and 27 acceleration of earth vibration at different distances; they were recorded in the form of two types of detonation systems, NUNEL and electric. Analysis showed that the data from the explosion had the best correlation with the cube root of the explosive, R2=0.8636, but overall the correlation coefficients are not much different. To estimate the vibration in this project, data regression was performed in the other formats, which resulted in the presentation of new equation with R2=0.904 correlation coefficient. Finally according to the importance of the studied structures in order to ensure maximum non damage to adjacent structures for each diagram, a range of application was defined so that for distances 0 to 70 meters from blast site, exponent n=0.33 and for distances more than 70 m, n =0.66 was suggested.Keywords: blasting, blast-induced vibration, empirical equations, PPV, tunnel
Procedia PDF Downloads 1319738 Development of Thermal Insulation Materials Based on Silicate Using Non-Traditional Binders and Fillers
Authors: J. Hroudova, J. Zach, L. Vodova
Abstract:
When insulation and rehabilitation of structures is important to use quality building materials with high utility value. One potentially interesting and promising groups of construction materials in this area are advanced, thermally insulating plaster silicate based. With the present trend reduction of energy consumption of building structures and reducing CO2 emissions to be developed capillary-active materials that are characterized by their low density, low thermal conductivity while maintaining good mechanical properties. The paper describes the results of research activities aimed at the development of thermal insulating and rehabilitation material ongoing at the Technical University in Brno, Faculty of Civil Engineering. The achieved results of this development will be the basis for subsequent experimental analysis of the influence of thermal and moisture loads developed on these materials.Keywords: insulation materials, rehabilitation materials, lightweight aggregate, fly ash, slag, hemp fibers, glass fibers, metakaolin
Procedia PDF Downloads 2359737 Low-Cost IoT System for Monitoring Ground Propagation Waves due to Construction and Traffic Activities to Nearby Construction
Authors: Lan Nguyen, Kien Le Tan, Bao Nguyen Pham Gia
Abstract:
Due to the high cost, specialized dynamic measurement devices for industrial lands are difficult for many colleges to equip for hands-on teaching. This study connects a dynamic measurement sensor and receiver utilizing an inexpensive Raspberry Pi 4 board, some 24-bit ADC circuits, a geophone vibration sensor, and embedded Python open-source programming. Gather and analyze signals for dynamic measuring, ground vibration monitoring, and structure vibration monitoring. The system may wirelessly communicate data to the computer and is set up as a communication node network, enabling real-time monitoring of background vibrations at various locations. The device can be utilized for a variety of dynamic measurement and monitoring tasks, including monitoring earthquake vibrations, ground vibrations from construction operations, traffic, and vibrations of building structures.Keywords: sensors, FFT, signal processing, real-time data monitoring, ground propagation wave, python, raspberry Pi 4
Procedia PDF Downloads 1039736 A Brief Overview of Seven Churches in Van Province
Authors: Eylem Güzel, Soner Guler, Mustafa Gulen
Abstract:
Van province which has a very rich historical heritage is located in eastern part of Turkey, between Lake Van and the Iranian border. Many civilizations prevailing in Van until today have built up many historical structures such as castles, mosques, churches, bridges, baths, etc. In 2011, a devastating earthquake with magnitude 7.2 Mw, epicenter in Tabanlı Village, occurred in Van, where a large part of the city locates in the first-degree earthquake zone. As a result of this earthquake, 644 people were killed; a lot of reinforced, unreinforced and historical structures were badly damaged. Many historical structures damaged due to this earthquake have been restored. In this study, the damages observed in Seven churches (Yedi Kilise) after 2011 Van earthquake is evaluated with regard to architecture and civil engineering perspective.Keywords: earthquake, historical structures, Van province, church
Procedia PDF Downloads 5459735 Innovation in Lean Thinking to Achieve Rapid Construction
Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof
Abstract:
Lean thinking holds the potential for improving the construction sector, and therefore, it is a concept that should be adopted by construction sector players and academicians in the real industry. Bridging from that, a learning process for construction sector players regarding this matter should be the agenda in gaining the knowledge in preparation for their career. Lean principles offer opportunities for reducing lead times, eliminating non-value adding activities, reducing variability, and are facilitated by methods such as pull scheduling, simplified operations and buffer reduction. Thus, the drive for rapid construction, which is a systematic approach in enhancing efficiency to deliver a project using time reduction, while lean is the continuous process of eliminating waste, meeting or exceeding all customer requirements, focusing on the entire value stream and pursuing perfection in the execution of a constructed project. The methodology presented is shown to be valid through literature, interviews and questionnaire. The results show that the majority of construction sector players unfamiliar with lean thinking and they agreed that it can improve the construction process flow. With this background knowledge established and identified, best practices and recommended action are drawn.Keywords: construction improvement, rapid construction, time reduction, lean construction
Procedia PDF Downloads 3739734 Tokyo Skyscrapers: Technologically Advanced Structures in Seismic Areas
Authors: J. Szolomicki, H. Golasz-Szolomicka
Abstract:
The architectural and structural analysis of selected high-rise buildings in Tokyo is presented in this paper. The capital of Japan is the most densely populated city in the world and moreover is located in one of the most active seismic zones. The combination of these factors has resulted in the creation of sophisticated designs and innovative engineering solutions, especially in the field of design and construction of high-rise buildings. The foreign architectural studios (as, for Jean Nouvel, Kohn Pedesen Associates, Skidmore, Owings & Merill) which specialize in the designing of skyscrapers, played a major role in the development of technological ideas and architectural forms for such extraordinary engineering structures. Among the projects completed by them, there are examples of high-rise buildings that set precedents for future development. An essential aspect which influences the design of high-rise buildings is the necessity to take into consideration their dynamic reaction to earthquakes and counteracting wind vortices. The need to control motions of these buildings, induced by the force coming from earthquakes and wind, led to the development of various methods and devices for dissipating energy which occur during such phenomena. Currently, Japan is a global leader in seismic technologies which safeguard seismic influence on high-rise structures. Due to these achievements the most modern skyscrapers in Tokyo are able to withstand earthquakes with a magnitude of over seven degrees at the Richter scale. Damping devices applied are of a passive, which do not require additional power supply or active one which suppresses the reaction with the input of extra energy. In recent years also hybrid dampers were used, with an additional active element to improve the efficiency of passive damping.Keywords: core structures, damping system, high-rise building, seismic zone
Procedia PDF Downloads 1759733 Lean Thinking and E-Commerce as New Opportunities to Improve Partnership in Supply Chain of Construction Industries
Authors: Kaustav Kundu, Alberto Portioli Staudacher
Abstract:
Construction industry plays a vital role in the economy of the world. But due to high uncertainty and variability in the industry, its performance is not as efficient in terms of quality, lead times, productivity and costs as of other industries. Moreover, there are continuous conflicts among the different actors in the construction supply chains in terms of profit sharing. Previous studies suggested partnership as an important approach to promote cooperation among the different actors in the construction supply chains and thereby it improves the overall performance. Construction practitioners tried to focus on partnership which can enhance the performance of construction supply chains but they are not fully aware of different approaches and techniques for improving partnership. In this research, a systematic review on partnership in relation to construction supply chains is carried out to understand different elements influencing the partnership. The research development of this domain is analyzed by reviewing selected articles published from 1996 to 2015. Based on the papers, three major elements influencing partnership in construction supply chains are identified: “Lean approach”, “Relationship building” and “E-commerce applications”. This study analyses the contributions in the areas within each element and provides suggestions for future developments of partnership in construction supply chains.Keywords: partnership, construction, lean, SCM, supply chain management
Procedia PDF Downloads 4349732 Feature of Employment Injuries and Maintenance Works of Construction Machinery
Authors: Naoko Kanazawa, Tran Thi Bich Nguyet, Yoshiyuki Higuchi, Hideki Hamada
Abstract:
Construction machines’ condition is maintained with the regularly inspections, preventive maintenance and repairs by skillful and qualified engineers. If an accident occurs, there will be enormous influence such as human injuries, delays in the term of construction. In this paper, we revealed the characteristics such as inspection, maintenance and repair works for construction machines, and we also clarified the trends of employment injuries based on actual data by simple and cross tabulation methods, and investigated the relation with their works, injured body parts and accident types.Keywords: construction machines, employment injuries, maintenance and repair, safety and health
Procedia PDF Downloads 3079731 Modern Methods of Technology and Organization of Production of Construction Works during the Implementation of Construction 3D Printers
Authors: Azizakhanim Maharramli
Abstract:
The gradual transition from entrenched traditional technology and organization of construction production to innovative additive construction technology inevitably meets technological, technical, organizational, labour, and, finally, social difficulties. Therefore, the chosen nodal method will lead to the elimination of the above difficulties, combining some of the usual methods of construction and the myth in world practice that the labour force is subjected to a strong stream of reduction. The nodal method of additive technology will create favourable conditions for the optimal degree of distribution of labour across facilities due to the consistent performance of homogeneous work and the introduction of additive technology and traditional technology into construction production.Keywords: parallel method, sequential method, stream method, combined method, nodal method
Procedia PDF Downloads 949730 Analysis of Delay Causes in Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.Keywords: delays, construction, consultants, contributors, risk map
Procedia PDF Downloads 5419729 The Sustainability of Human Resource Planning for Construction Projects
Authors: Adegbenga Ashiru, Adebimpe L. Ashiru
Abstract:
The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction
Procedia PDF Downloads 3509728 Construction Information Visualization System Using nD CAD Model
Authors: Hyeon-seoung Kim, Sang-mi Park, Sun-ju Han, Leen-seok Kang
Abstract:
The visualization technology of construction information using 3D and nD modeling can satisfy the visualization needs of each construction project participant. The nD CAD system is a tool that the construction information, such as construction schedule, cost and resource utilization, are simulated by 4D, 5D and 6D object formats based on 3D object. This study developed a methodology and simulation engine for nD CAD system for construction project management. It has improved functions such as built-in schedule generation, cost simulation of changed budget and built-in resource allocation comparing with the current systems. To develop an integrated nD CAD system, this study attempts an integrated method to link 5D and 6D objects based on 4D object.Keywords: building information modeling, visual simulation, 3D object, nD CAD augmented reality
Procedia PDF Downloads 3129727 Investigation of Free Vibrations of Opened Shells from Alloy D19: Assistance of the Associated Mass System
Authors: Oleg Ye Sysoyev, Artem Yu Dobryshkin, Nyein Sitt Naing
Abstract:
Cylindrical shells are widely used in the construction of buildings and structures, as well as in the air structure. Thin-walled casings made of aluminum alloys are an effective substitute for reinforced concrete and steel structures in construction. The correspondence of theoretical calculations and the actual behavior of aluminum alloy structures is to ensure their trouble-free operation. In the laboratory of our university, "Building Constructions" conducted an experimental study to determine the effect of the system of attached masses on the natural oscillations of shallow cylindrical shells of aluminum alloys, the results of which were compared with theoretical calculations. The purpose of the experiment is to measure the free oscillations of an open, sloping cylindrical shell for various variations of the attached masses. Oscillations of an open, slender, thin-walled cylindrical shell, rectangular in plan, were measured using induction accelerometers. The theoretical calculation of the shell was carried out on the basis of the equations of motion of the theory of shallow shells, using the Bubnov-Galerkin method. A significant splitting of the flexural frequency spectrum is found, influenced not only by the systems of attached маsses but also by the values of the wave formation parameters, which depend on the relative geometric dimensions of the shell. The correspondence of analytical and experimental data is found, using the example of an open shell of alloy D19, which allows us to speak about the high quality of the study. A qualitative new analytical solution of the problem of determining the value of the oscillation frequency of the shell, carrying a system of attached masses is shown.Keywords: open hollow shell, nonlinear oscillations, associated mass, frequency
Procedia PDF Downloads 2959726 Measuring Sustainability Risk in the Construction Industry of Saudi Arabia
Authors: Mohammed Alquraish
Abstract:
Saudi Arabia and other emerging nations have faced significant challenges in the sustainable construction industry. This paper presents a quantitative approach to assessing sustainability risk in the Saudi Arabian construction industry and offers insights into holistic sustainability design in industry operations. The implementation of sustainable construction industry practices in the manufacturing sector has been susceptible to several risk factors that need to be identified. In order to successfully execute sustainable building projects, decision makers in the fields of construction and industry can benefit greatly from the advice this study offers by promoting the elements that motivate sustainability implementation. Sustainability risk can be measured from combining failure probability with cumulative effects from sustainability factors: social, environmental, and economic; that affect the integrity of the construction industry. The cumulative effects of sustainability risk are measured by classifying the outcomes resulting from these consequences. Operators of industrial construction can strategically manage and minimize potential disruptions affecting long-term sustainability incentives by measuring sustainability risk. Thus, the suggested strategy greatly reinforces the crucial role of the construction industry.Keywords: sustainability, risk, construction industry, Saudi Arabia
Procedia PDF Downloads 409725 BIM-based Construction Noise Management Approach With a Focus on Inner-City Construction
Authors: Nasim Babazadeh
Abstract:
Growing demand for a quieter dwelling environment has turned the attention of construction companies to reducing the propagated noise of their project. In inner-city constructions, close distance between the construction site and surrounding buildings lessens the efficiency of passive noise control methods. Dwellers of the nearby areas may file complaints and lawsuits against the construction companies due to the emitted construction noise, thereby leading to the interruption of processes, compensation costs, or even suspension of the project. Therefore, construction noise should be predicted along with the project schedule. The advantage of managing the noise in the pre-construction phase is two-fold. Firstly, changes in the time plan and construction methods can be applied more flexibly. Thus, the costs related to rescheduling can be avoided. Secondly, noise-related legal problems are expected to be reduced. To implement noise mapping methods for the mentioned prediction, the required detailed information (such as the location of the noisy process, duration of the noisy work) can be exported from the 4D BIM model. The results obtained from the noise maps would be used to help the planners to define different work scenarios. The proposed approach has been applied for the foundation and earthwork of a site located in a residential area, and the obtained results are discussed.Keywords: building information modeling, construction noise management, noise mapping, 4D BIM
Procedia PDF Downloads 1859724 A Review: Recycled Materials Used in Construction
Authors: Oghenerukome Akponovo, Lynda I. Onyebuchukwu
Abstract:
Construction waste, along with that of many other industries, contributes significantly to the world's annual solid waste totals. Most of these materials, such as ash from rice hulls, slags, cement kiln dust, tire ash, plastic waste (PW), and silica fumes, end up in landfills or waterways. Some of them might even end up polluting the air from high in the atmosphere. It's sustainable, cheap, and environmentally friendly to recycle these items into new building supplies. When constructing a "Green" structure, the materials employed have the potential to either exacerbate environmental imbalance or maintain a stable ecosystem. The purpose of this research is to take stock of what is already known about recycling's potential in the construction industry and to identify its deficiencies. Therefore, this study systematically reviews the wide range of recycled materials that go into building construction. Recognizing that the construction industry's use of recycled materials has an influence on the environment and that investigating these materials may have a substantial economic impact if they were discoveredKeywords: building, construction, recycled materials, waste management
Procedia PDF Downloads 1049723 Growth of Public Listed Construction Companies in Malaysia
Authors: M. C. Theong, F. L. Ang, G. J. Muga
Abstract:
Growth of firms is influenced by environmental changes such as the global and national economy. On the other hand, it indicates the economic situation of a country. Therefore, it is imperative for firms to be sensitive to changes and to stay competitive and remain compatible with the environment. The Malaysian construction industry is prone to environmental changes due to its complexity. In order to survive in the construction industry, focus on the development of the firms themselves to achieve long term their long term goals is vital besides maximizing profits. The objective of this paper is to measure growth of the public listed construction companies in Malaysia and to investigate the development of the companies with highest, moderate and lowest growth. Growth is measured based on the companies' sales between year 2008 and 2012 collected via secondary data collection method. Findings show that the highest average growth created is 235.20 % while the lowest average growth is -22.75%. The construction companies remained active in the construction industry by implementing different sets of strategies and involving in several types of construction projects.Keywords: growth, Malaysian construction industry, public listed companies, sales
Procedia PDF Downloads 3829722 Finite Element Analysis of a Glass Facades Supported by Pre-Tensioned Cable Trusses
Authors: Khair Al-Deen Bsisu, Osama Mahmoud Abuzeid
Abstract:
Significant technological advances have been achieved in the design and building construction of steel and glass in the last two decades. The metal glass support frame has been replaced by further sophisticated technological solutions, for example, the point fixed glazing systems. The minimization of the visual mass has reached extensive possibilities through the evolution of technology in glass production and the better understanding of the structural potential of glass itself, the technological development of bolted fixings, the introduction of the glazing support attachments of the glass suspension systems and the use for structural stabilization of cables that reduce to a minimum the amount of metal used. The variability of solutions of tension structures, allied to the difficulties related to geometric and material non-linear behavior, usually overrules the use of analytical solutions, letting numerical analysis as the only general approach to the design and analysis of tension structures. With the characteristics of low stiffness, lightweight, and small damping, tension structures are obviously geometrically nonlinear. In fact, analysis of cable truss is not only one of the most difficult nonlinear analyses because the analysis path may have rigid-body modes, but also a time consuming procedure. Non-linear theory allowing for large deflections is used. The flexibility of supporting members was observed to influence the stresses in the pane considerably in some cases. No other class of architectural structural systems is as dependent upon the use of digital computers as are tensile structures. Besides complexity, the process of design and analysis of tension structures presents a series of specificities, which usually lead to the use of special purpose programs, instead of general purpose programs (GPPs), such as ANSYS. In a special purpose program, part of the design know how is embedded in program routines. It is very probable that this type of program will be the option of the final user, in design offices. GPPs offer a range of types of analyses and modeling options. Besides, traditional GPPs are constantly being tested by a large number of users, and are updated according to their actual demands. This work discusses the use of ANSYS for the analysis and design of tension structures, such as cable truss structures under wind and gravity loadings. A model to describe the glass panels working in coordination with the cable truss was proposed. Under the proposed model, a FEM model of the glass panels working in coordination with the cable truss was established.Keywords: Glass Construction material, Facades, Finite Element, Pre-Tensioned Cable Truss
Procedia PDF Downloads 2809721 Preparation Non-Woven Nanofiber Structures for Uniform and Rapid Drug Releasing Applications Using an Electrospinning Process
Authors: Cho-Liang Chung
Abstract:
Uniform and rapid drug release are important for trauma dressing application. Low glass transition polymer system and non-woven nanofiber structures as the designs conduct rapid-release characteristics. In this study, polyvinylpyrrolidone, polysulfone, and polystyrene were dissolved in dimethylformamide to form precursor solution. These solutions were blended with vitamin C to form the electrospinning solutions. The non-woven nanofibers structures were successfully prepared using an electrospinning process. The following instruments were used to analyze the characteristics of non-woven nanofibers structures: Atomic force microscopy (AFM), Field Emission Scanning Electron Microscope (FE-SEM), and X-ray Diffraction (XRD). The AFM was used to scan the nanofibers. 3D Graphics were applied to explore the surface morphology of nanofibers. FE-SEM was used to explore the morphology of non-woven structures. XRD was used to identify crystal structures in the non-woven structures. The evolution of morphology of non-woven structures was changed dramatically in different durations, because of the moisture absorption and decreasing glass transition temperature; the non-woven nanofiber structures can be applied to uniform and rapid drug release for trauma dressing application.Keywords: nanofibers, non-woven, electrospinning process, rapid drug releasing
Procedia PDF Downloads 1389720 Architectural Advancements: Lightweight Structures and Future Applications in Ultra-High-Performance Concrete, Fabrics, and Flexible Photovoltaics
Authors: Pratik Pankaj Pawar
Abstract:
Lightweight structures - structures with reduced weight, which otherwise retain the qualities necessary for the building performance, ensuring proper durability and strength, safety, indoor environmental quality, and energy efficiency; structures that strive for the optimization of structural systems - are in tune with current trends and socio-economic, environmental, and technological factors. The growing interest in lightweight structures design makes them an ever more significant field of research. This article focuses on the architectural aspects of lightweight structures and on their contemporary and future applications. The selected advanced building technologies - i.e., Ultra-High-Performance Concrete, fabrics, and flexible photovoltaics.Keywords: light weight building, carbyne, aerographite, geopolymer reinforced wood particles aggregate
Procedia PDF Downloads 589719 A Study of Carbon Emissions during Building Construction
Authors: Jonggeon Lee, Sungho Tae, Sungjoon Suk, Keunhyeok Yang, George Ford, Michael E. Smith, Omidreza Shoghli
Abstract:
In recent years, research to reduce carbon emissions through quantitative assessment of building life cycle carbon emissions has been performed as it relates to the construction industry. However, most research efforts related to building carbon emissions assessment have been focused on evaluation during the operational phase of a building’s life span. Few comprehensive studies of the carbon emissions during a building’s construction phase have been performed. The purpose of this study is to propose an assessment method that quantitatively evaluates the carbon emissions of buildings during the construction phase. The study analysed the amount of carbon emissions produced by 17 construction trades, and selected four construction trades that result in high levels of carbon emissions: reinforced concrete work; sheathing work; foundation work; and form work. Building materials, and construction and transport equipment used for the selected construction trades were identified, and carbon emissions produced by the identified materials and equipment were calculated for these four construction trades. The energy consumption of construction and transport equipment was calculated by analysing fuel efficiency and equipment productivity rates. The combination of the expected levels of carbon emissions associated with the utilization of building materials and construction equipment provides means for estimating the quantity of carbon emissions related to the construction phase of a building’s life cycle. The proposed carbon emissions assessment method was validated by case studies.Keywords: building construction phase, carbon emissions assessment, building life cycle
Procedia PDF Downloads 7519718 Comparative Life Cycle Analysis of Selected Modular Timber Construction and Assembly Typologies
Authors: Benjamin Goldsmith, Felix Heisel
Abstract:
The building industry must reduce its emissions in order to meet 2030 neutrality targets, and modular and/or offsite construction is seen as an alternative to conventional construction methods which could help achieve this goal. Modular construction has previously been shown to be less wasteful and has a lower global warming potential (GWP). While many studies have been conducted investigating the life cycle impacts of modular and conventional construction, few studies have compared different types of modular assembly and construction in order to determine which offer the greatest environmental benefits over their whole life cycle. This study seeks to investigate three different modular construction types -infill frame, core, and podium- in order to determine environmental impacts such as GWP as well as circularity indicators. The study will focus on the emissions of the production, construction, and end-of-life phases. The circularity of the various approaches will be taken into consideration in order to acknowledge the potential benefits of the ability to reuse and/or reclaim materials, products, and assemblies. The study will conduct hypothetical case studies for the three different modular construction types, and in doing so, control the parameters of location, climate, program, and client. By looking in-depth at the GWP of the beginning and end phases of various simulated modular buildings, it will be possible to make suggestions on which type of construction has the lowest global warming potential.Keywords: modular construction, offsite construction, life cycle analysis, global warming potential, environmental impact, circular economy
Procedia PDF Downloads 1669717 Cost Overrun Causes in Public Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors
Procedia PDF Downloads 4759716 Evaluation of Traditional Methods in Construction and Their Effects on Reinforced-Concrete Buildings Behavior
Authors: E. H. N. Gashti, M. Zarrini, M. Irannezhad, J. R. Langroudi
Abstract:
Using ETABS software, this study analyzed 23 buildings to evaluate effects of mistakes during construction phase on buildings structural behavior. For modelling, two different loadings were assumed: 1) design loading and 2) loading due to the effects of mistakes in construction phase. Research results determined that considering traditional construction methods for buildings resulted in a significant increase in dead loads and consequently intensified the displacements and base-shears of buildings under seismic loads.Keywords: reinforced-concrete buildings, construction mistakes, base-shear, displacements, failure
Procedia PDF Downloads 269