Search results for: construction design teams
15582 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns
Authors: Saidu Ibrahim, Winston M. W. Shakantu
Abstract:
The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.Keywords: conceptual framework, cost overrun, material waste, project stags
Procedia PDF Downloads 29715581 Approaches to Eco-Friendly Architecture: Modules Assembled Specially to Conserve
Authors: Arshleen Kaur, Sarang Barbarwar, Madhusudan Hamirwasia
Abstract:
Sustainable architecture is going to be the soul of construction in the near future, with building material as a vital link connecting sustainability to construction. The priority in Architecture has shifted from having a lesser negative footprint to having a positive footprint on Earth. The design has to be eco-centric as well as anthro-centric so as to attain its true purpose. Brick holds the same importance like a cell holds in one’s body. The study focuses on this basic building block with an experimental material and technique known as Module Assembled Specially to Conserve (MASC). The study explores the usage and construction of these modules in the construction of buildings. It also shows the impact assessment of the modules on the environment and its significance in reducing the carbon footprint of the construction industry. The aspects like cost-effectiveness, ease of working and reusability of MASC have been studied as well.Keywords: anthro-centric, carbon footprint, eco-centric, sustainable
Procedia PDF Downloads 17515580 Factors Affecting the Formation of Architectural Space and Construction Systems in the Jordanian Vernacular Architecture
Authors: Mohannad Tarrad
Abstract:
The research deals with the beginnings of the vernacular Jordanian architecture since the establishment of the Jordanian state in the early nineteenth century until now, where the Jordanian architecture was based on the interactions of the Jordanian society with the surrounding environment, where the local materials available in the construction area were used, and the construction systems inherited from previous civilizations were used. The builders in Jordan relied on exchanging knowledge and transferring it from one generation to another, where they were able to formulate a construction style capable of responding to the requirement of architectural spaces, and each region of Jordan has its own way of building, as there are various geographical areas in Jordan, including agricultural, mountainous and desert areas. Then the research touched on a historical study of the architectural space and identifying the value of the architectural space in the Jordanian social life, which is related to the customs and traditions of a society influenced by the Arab Islamic civilization, and then the construction, the structural structure, its characteristics and the constituent elements of the building were defined in the vernacular l Jordanian architecture. From the structural point of view, and then to identify the structural materials used in the structural structure and the impact of the structural structure on the design from several aspects, leading to the interior space and the factors affecting it. The research aims to explain and clarify the interconnected design and construction solutions in the vernacular Jordanian architecture in a manner that respects the environmental context, taking into account the material cost of the building, where the financial situation of the home owner plays an important role in choosing the building material and construction method. Case studies from heritage buildings from several Jordanian regions will be analyzed to illustrate the idea of the research.Keywords: construction systems, architectural space, environmental context, Jordanian architecture
Procedia PDF Downloads 20315579 Text2Time: Transformer-Based Article Time Period Prediction
Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang
Abstract:
Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.Keywords: NLP, BERT, LLM, deep learning, classification
Procedia PDF Downloads 10415578 Importance of Knowledge in the Interdisciplinary Production Processes of Innovative Medical Tools
Authors: Katarzyna Mleczko
Abstract:
Processes of production of innovative medical tools have interdisciplinary character. They consist of direct and indirect close cooperation of specialists of different scientific branches. The Knowledge they have seems to be important for undertaken design, construction and manufacturing processes. The Knowledge exchange between participants of these processes is therefore crucial for the final result, which are innovative medical products. The paper draws attention to the necessity of feedback from the end user to the designer / manufacturer of medical tools which will allow for more accurate understanding of user needs. The study describes prerequisites of production processes of innovative medical (surgical) tools including participants and category of knowledge resources occurring in these processes. They are the result of research in selected Polish organizations involved in the production of medical instruments and are the basis for further work on the development of knowledge sharing model in interdisciplinary teams geographically dispersed.Keywords: interdisciplinary production processes, knowledge exchange, knowledge sharing, medical tools
Procedia PDF Downloads 44215577 Review of Affected Parameters on Flexural Behavior of Hollow Concrete Beams Reinforced by Steel/GFRP Rebars
Authors: Shahrad Ebrahimzadeh
Abstract:
Nowadays, the main efforts of the researchers aim to constantly evolve new, optimized and efficient construction materials and methods related to reinforced concrete beams. Due to the fewer applied materials and offering a higher structural efficiency compared to solid concrete beams with the same concrete area, hollow reinforced concrete beams (HRCB) internally reinforced with steel rebars have been employed extensively for bridge structural members and high-rise buildings. Many experimental studies have been conducted to investigate the behavior of hollow beams subjected to bending loading and found that the structural performance of HRCBs is critically affected by many design parameters. While the proper design of the HRCBs demonstrated comparable behavior to solid sections, inappropriate design leads beams to be extremely prone to brittle failure. Another potential issue that needs to be further investigated is the replacement of steel bars with suitable materials due to their susceptibility to corrosion. Hence, to develop a reliable construction system, the application of GFRP bars as a non-corroding material has been utilized. Furthermore, this study aims to critically review the different design parameters that affect the flexural performance of the HRCBs and recognize the gaps of knowledge in the better design and more effective use of this construction system.Keywords: design parameters, experimental investigations, hollow reinforced concrete beams, steel, GFRP, flexural strength
Procedia PDF Downloads 20215576 Reliability of the Estimate of Earthwork Quantity Based on 3D-BIM
Authors: Jaechoul Shin, Juhwan Hwang
Abstract:
In case of applying the BIM method to the civil engineering in the area of free formed structure, we can expect comparatively high rate of construction productivity as it is in the building engineering area. In this research, we developed quantity calculation error applying it to earthwork and bridge construction (e.g. PSC-I type segmental girder bridge amd integrated bridge of steel I-girders and inverted-Tee bent cap), NATM (New Austrian Tunneling Method) tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D modeling quantity survey. we confirmed high reliability of the BIM-based method in structure work in which errors occurred in range between -6% ~ +5%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14% ~ +13% of earthwork quantity calculation. It is benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed.Keywords: BIM, 3D modeling, 3D-BIM, quantity of earthwork
Procedia PDF Downloads 44215575 Improving the Constructability of Highway Design Plans
Authors: R. Edward Minchin Jr.
Abstract:
The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans
Procedia PDF Downloads 21615574 Developing API Economy: Associating Value to APIs and Microservices in an Enterprise
Authors: Mujahid Sultan
Abstract:
The IT industry has seen many transformations in the Software Development Life Cycle (SDLC) methodologies and development approaches. SDLCs range from waterfall to agile, and the development approaches from monolith to microservices. Management, orchestration, and monetization of microservices have created an API economy in the modern enterprise. There are two approaches to API design, code first and design first. Design first is gaining popularity in the industry as this allows capturing the API needs from the stakeholders rather than the development teams guesstimating the needs and associating a monetary value with the APIs and microservices. In this publication, we describe an approach to organizing and creating stakeholder needs and requirements for designing microservices and APIs.Keywords: requirements engineering, enterprise architecture, APIs, microservices, DevOps, continuous delivery, continuous integration, stakeholder viewpoints
Procedia PDF Downloads 19115573 Virtual Marketing Team Leadership and Burnout: Literature Review, Implications for Managers, and Recommendations for Future Research
Authors: Chad A. Roberts
Abstract:
In the digitally connected world, global virtual teams are increasingly becoming the norm at large, multinational companies. Marketing managers see the positives of virtual teams. They also see the negatives. Employees who work from home may feel isolated, unorganized, and distracted by homelife. These complexities create a phenomenon that leaves virtual team members feeling burnout, a significant issue for marketing leaders and their team members. This paper examines remote worker burnout in global virtual marketing team settings. It provides an overview of the benefits and downsides to remote working marketing teams. The paper presents the literature on remote work stress and burnout, discusses ways marketing leaders can help prevent virtual employee burnout and suggests future research studies.Keywords: burnout, COVID-19 pandemic, leadership, marketing, remote work, virtual team
Procedia PDF Downloads 21815572 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 30315571 Policies Promoting the Development of Green Buildings in Sub-Saharan Africa: A South African Case-Study
Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo
Abstract:
Contemporary building methods typically pay little attention to the built environment's greater economic, environmental, or social impacts or energy efficiency. Green construction aims to sever ties with these conventions. In order to provide better living and working conditions and lessen environmental consequences, green building today combines numerous building design, construction, and operation and maintenance approaches. As one of Sub-Saharan Africa's most industrialized nations, South Africa has a good number of green building projects. Therefore, this study examines the elements impacting the adoption of green buildings and regulations created to encourage the growth of green buildings using South Africa as a case study. The study has a survey-style design. A total of one hundred fifty (150) questionnaires were distributed to professionals in the construction industry in South Africa, of which one hundred and twenty-four (128) were returned and judged appropriate for investigation. The gathered data was examined using percentage, mean item scores, standard deviation, and Kruskal-Wallis. The findings show that cost and market circumstances are the two main elements impacting the adoption of green construction, while leadership advice is the most important policy. The study concluded that in order to encourage the construction of green buildings, additional Sub-Saharan nations should adopt these suggested policies.Keywords: green building, Sub-Saharan Africa, building design, environmental conditions
Procedia PDF Downloads 11115570 Barclays Bank Zambia: Considerations for Raft Foundation Design on Dolomite Land
Authors: Yashved Serhun, Kim A. Timm
Abstract:
Barclays Bank has identified the need for a head office building in Lusaka, Zambia, and construction of a 7200 m2 three-storey reinforced concrete office building with a structural steel roof is currently underway. A unique characteristic of the development is that the building footprint is positioned on dolomitic land. Dolomite rock has the tendency to react with and breakdown in the presence of slightly acidic water, including rainwater. This leads to a potential for subsidence and sinkhole formation. Subsidence and the formation of sinkholes beneath a building can be detrimental during both the construction and operational phases. This paper outlines engineering principles which were considered during the structural design of the raft foundation for the Barclays head office building. In addition, this paper includes multidisciplinary considerations and the impact of these on the structural engineering design of the raft foundation. By ensuring that the design of raft foundations on dolomitic land incorporates the requirements of all disciplines and relevant design codes during the design process, the risk associated with subsidence and sinkhole formation can be effectively mitigated during the operational phase of the building.Keywords: dolomite, dolomitic land, raft foundation, structural engineering design
Procedia PDF Downloads 12415569 Applying Resilience Engineering to improve Safety Management in a Construction Site: Design and Validation of a Questionnaire
Authors: M. C. Pardo-Ferreira, J. C. Rubio-Romero, M. Martínez-Rojas
Abstract:
Resilience Engineering is a new paradigm of safety management that proposes to change the way of managing the safety to focus on the things that go well instead of the things that go wrong. Many complex and high-risk sectors such as air traffic control, health care, nuclear power plants, railways or emergencies, have applied this new vision of safety and have obtained very positive results. In the construction sector, safety management continues to be a problem as indicated by the statistics of occupational injuries worldwide. Therefore, it is important to improve safety management in this sector. For this reason, it is proposed to apply Resilience Engineering to the construction sector. The Construction Phase Health and Safety Plan emerges as a key element for the planning of safety management. One of the key tools of Resilience Engineering is the Resilience Assessment Grid that allows measuring the four essential abilities (respond, monitor, learn and anticipate) for resilient performance. The purpose of this paper is to develop a questionnaire based on the Resilience Assessment Grid, specifically on the ability to learn, to assess whether a Construction Phase Health and Safety Plans helps companies in a construction site to implement this ability. The research process was divided into four stages: (i) initial design of a questionnaire, (ii) validation of the content of the questionnaire, (iii) redesign of the questionnaire and (iii) application of the Delphi method. The questionnaire obtained could be used as a tool to help construction companies to evolve from Safety-I to Safety-II. In this way, companies could begin to develop the ability to learn, which will serve as a basis for the development of the other abilities necessary for resilient performance. The following steps in this research are intended to develop other questions that allow evaluating the rest of abilities for resilient performance such as monitoring, learning and anticipating.Keywords: resilience engineering, construction sector, resilience assessment grid, construction phase health and safety plan
Procedia PDF Downloads 13715568 The Porsche Pavilion in Wolfsburg, Germany
Authors: H. Pasternak, T. Krausche
Abstract:
The Porsche Pavilion is an innovative stainless steel construction using the principle, often used in ship and car design, as an advantage for building a light but stiff structure. The Pavilion is a one of a kind and outstanding construction that you can find. It fits right in the existing parts of the Autostadt within the lagoon landscape and was built in only eight months. With its curving lines and exiting bends the structure is an extraordinary work which was designed by Henn architects, Munich. The monocoque has a good balance between material and support structure. The stiffness is achieved by the upper and lower side sheathing plates and the intermediate formers. Also the roof shell has no joints and a smooth surface. The assembling of the structure requires a large time and effort cost due to many welds which are necessary to connect all section to one large shell.Keywords: construction welding, exhibition building, light steel construction, monocoque
Procedia PDF Downloads 52315567 Modern Work Modules in Construction Practice
Authors: Robin Becker, Nane Roetmann, Manfred Helmus
Abstract:
Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model
Procedia PDF Downloads 8615566 Comprehensive Risk Assessment Model in Agile Construction Environment
Authors: Jolanta Tamošaitienė
Abstract:
The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.Keywords: assessment, environment, agile, model, risk
Procedia PDF Downloads 25515565 Roller Compacting Concrete “RCC” in Dams
Authors: Orod Zarrin, Mohsen Ramezan Shirazi
Abstract:
Rehabilitation of dam components such as foundations, buttresses, spillways and overtopping protection require a wide range of construction and design methodologies. Geotechnical Engineering considerations play an important role in the design and construction of foundations of new dams. Much investigation is required to assess and evaluate the existing dams. The application of roller compacting concrete (RCC) has been accepted as a new method for constructing new dams or rehabilitating old ones. In the past 40 years there have been so many changes in the usage of RCC and now it is one of most satisfactory solutions of water and hydropower resource throughout the world. The considerations of rehabilitation and construction of dams might differ due to upstream reservoir and its influence on penetrating and dewatering of downstream, operations requirements and plant layout. One of the advantages of RCC is its rapid placement which allows the dam to be operated quickly. Unlike ordinary concrete it is a drier mix, and stiffs enough for compacting by vibratory rollers. This paper evaluates some different aspects of RCC and focuses on its preparation progress.Keywords: spillway, vibrating consistency, fly ash, water tightness, foundation
Procedia PDF Downloads 60515564 The Role of Urban Design in Creating Cohesive and People’s Public Spaces
Authors: Hazem Abuorf
Abstract:
From the perspective of viewing urban design as the architecture of public spaces, the latter has many advantages; for example, in achieving attractive and vibrant public spaces, ensuring safety and amenity, supporting a strong sense of place and local character. Besides all advantages, such spaces nevertheless trigger numerous dilemmas, how to design urban spaces preserving the quality of life in the long term while equally achieving cohesion between new urban developments and the already existing urban structure without causing a split in history through the cause of functional and aesthetic degradation. Analysis of this article seeks to propose a methodology deemed essential for assessing and stimulating design criteria of the public spaces when rehabilitating urban sites. The method’s utility is shown by analyzing rehabilitation projects in Gaza Strip, whose design of the public spaces has mainly focused on the physical aspect ignoring the place’s local identity, users’ needs, and history. The proposed methodology serves as a guide for municipal authorities and technical teams to deal with interventions that would rework the role of urban design towards making sense of place.Keywords: urban design, public realm, rehabilitation projects, quality of life
Procedia PDF Downloads 15915563 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry
Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba
Abstract:
The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.Keywords: black business forums, construction mafia, emergence, implication
Procedia PDF Downloads 13415562 Safety Climate Assessment and Its Impact on the Productivity of Construction Enterprises
Authors: Krzysztof J. Czarnocki, F. Silveira, E. Czarnocka, K. Szaniawska
Abstract:
Research background: Problems related to the occupational health and decreasing level of safety occur commonly in the construction industry. Important factor in the occupational safety in construction industry is scaffold use. All scaffolds used in construction, renovation, and demolition shall be erected, dismantled and maintained in accordance with safety procedure. Increasing demand for new construction projects unfortunately still is linked to high level of occupational accidents. Therefore, it is crucial to implement concrete actions while dealing with scaffolds and risk assessment in construction industry, the way on doing assessment and liability of assessment is critical for both construction workers and regulatory framework. Unfortunately, professionals, who tend to rely heavily on their own experience and knowledge when taking decisions regarding risk assessment, may show lack of reliability in checking the results of decisions taken. Purpose of the article: The aim was to indicate crucial parameters that could be modeling with Risk Assessment Model (RAM) use for improving both building enterprise productivity and/or developing potential and safety climate. The developed RAM could be a benefit for predicting high-risk construction activities and thus preventing accidents occurred based on a set of historical accident data. Methodology/Methods: A RAM has been developed for assessing risk levels as various construction process stages with various work trades impacting different spheres of enterprise activity. This project includes research carried out by teams of researchers on over 60 construction sites in Poland and Portugal, under which over 450 individual research cycles were carried out. The conducted research trials included variable conditions of employee exposure to harmful physical and chemical factors, variable levels of stress of employees and differences in behaviors and habits of staff. Genetic modeling tool has been used for developing the RAM. Findings and value added: Common types of trades, accidents, and accident causes have been explored, in addition to suitable risk assessment methods and criteria. We have found that the initial worker stress level is more direct predictor for developing the unsafe chain leading to the accident rather than the workload, or concentration of harmful factors at the workplace or even training frequency and management involvement.Keywords: safety climate, occupational health, civil engineering, productivity
Procedia PDF Downloads 31815561 Experimental Study of Application of Steel Slag as Aggregate in Road Construction
Authors: Meftah M. Elsaraiti, Samir Milad Elsariti
Abstract:
Steel slag is a by-product of the steel production and utilizing it potentially as new or substitute materials in road construction is advantageous regarding cost reduction and flattening improvement or properties pavement. Ease of use, low cost, and resource availability are some of few advantages of reuse and recycling of steel slag. This study assesses the use of Steel Slag Aggregates (SSA) as an alternative to natural road building aggregates. This paper discusses the basic characteristics of steel slag based on extensive laboratory tests, and to determine the possibilities of using steel slag in road construction. Samples were taken from the furnaces directly at different times and dates. Moreover, random samples were also taken from the slag field from various areas at different far distances from each other. A necessary analysis was performed through the use of (XRF). Three different percentages of SSA (0, 50 and 100%) were added as an alternative to natural aggregate in hot mix asphalt (HMA) production. The proposed design of the mix was made according to the Marshall mix design. The results of the experiments revealed that the percentages of iron oxide ranged from (9 to 26%) and that the addition of SSA has a significant improvement on HMA properties. It was observed that the Marshall stability obtained in the mix of 100% slag ranged from 600 to 800 N as a minimum, and the flow of Marshall obtained from 2.4 to 3.23 mm and the specification requires from 2 to 4 mm. The results may be showed possibilities to use steel slag as new or substitute materials in road construction in Libya.Keywords: by-product material, properties, road construction, steel slag
Procedia PDF Downloads 18515560 Swift Rising Pattern of Emerging Construction Technology Trends in the Construction Management
Authors: Gayatri Mahajan
Abstract:
Modern Construction Technology (CT) includes a broad range of advanced techniques and practices that bound the recent developments in material technology, design methods, quantity surveying, facility management, services, structural analysis and design, and other management education. Adoption of recent digital transformation technology is the need of today to speed up the business and is also the basis of construction improvement. Incorporating and practicing the technologies such as cloud-based communication and collaboration solution, Mobile Apps and 5G,3D printing, BIM and Digital Twins, CAD / CAM, AR/ VR, Big Data, IoT, Wearables, Blockchain, Modular Construction, Offsite Manifesting, Prefabrication, Robotic, Drones and GPS controlled equipment expedite the progress in the Construction industry (CI). Resources used are journaled research articles, web/net surfing, books, thesis, reports/surveys, magazines, etc. The outline of the research organization for this study is framed at four distinct levels in context to conceptualization, resources, innovative and emerging trends in CI, and better methods for completion of the construction projects. The present study conducted during 2020-2022 reveals that implementing these technologies improves the level of standards, planning, security, well-being, sustainability, and economics too. Application uses, benefits, impact, advantages/disadvantages, limitations and challenges, and policies are dealt with to provide information to architects and builders for smooth completion of the project. Results explain that construction technology trends vary from 4 to 15 for CI, and eventually, it reaches 27 for Civil Engineering (CE). The perspective of the most recent innovations, trends, tools, challenges, and solutions is highly embraced in the field of construction. The incorporation of the above said technologies in the pandemic Covid -19 and post-pandemic might lead to a focus on finding out effective ways to adopt new-age technologies for CI.Keywords: BIM, drones, GPS, mobile apps, 5G, modular construction, robotics, 3D printing
Procedia PDF Downloads 10515559 Challenges of Outreach Team Leaders in Managing Ward Based Primary Health Care Outreach Teams in National Health Insurance Pilot Districts in Kwazulu-Natal
Authors: E. M. Mhlongo, E. Lutge
Abstract:
In 2010, South Africa’s National Department of Health (NDoH) launched national primary health care (PHC) initiative to strengthen health promotion, disease prevention, and early disease detection. The strategy, called Re-engineering Primary Health Care (rPHC), aims to support a preventive and health-promoting community-based PHC model by using community-based outreach teams (known in South Africa as Ward-based Primary Health Care Outreach teams or WBPHCOTs). These teams provide health education, promote healthy behaviors, assess community health needs, manage minor health problems, and support linkages to health services and health facilities. Ward based primary health care outreach teams are supervised by a professional nurse who is the outreach team leader. In South Africa, the WBPHCOTs have been established, registered, and are reporting their activities in the District Health Information System (DHIS). This study explored and described the challenges faced by outreach team leaders in supporting and supervising the WBPHCOTs. Qualitative data were obtained through interviews conducted with the outreach team leaders at a sub-district level. Thematic analysis of data was done. Findings revealed some challenges faced by team leaders in day to day execution of their duties. Issues such as staff shortages, inadequate resources to carry out health promotion activities, and lack of co-operation from team members may undermine the capacity of team leaders to support and supervise the WBPHCOTs. Many community members are under the impression that the outreach team is responsible for bringing the clinic to the community while the outreach teams do not carry any medication/treatment with them when doing home visits. The study further highlights issues around the challenges of WBPHCOTs at a household level. In conclusion, the WBPHCOTs are an important component of National Health Insurance (NHI), and in order for NHI to be optimally implemented, the issues raised in this research should be addressed with some urgency.Keywords: community health worker, national health insurance, primary health care, ward-based primary health care outreach teams
Procedia PDF Downloads 14015558 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership
Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien
Abstract:
The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectivesKeywords: organisational leadership, project delivery, roles, sustainable construction
Procedia PDF Downloads 12315557 An E-Assessment Website to Implement Hierarchical Aggregate Assessment
Authors: M. Lesage, G. Raîche, M. Riopel, F. Fortin, D. Sebkhi
Abstract:
This paper describes a Web server implementation of the hierarchical aggregate assessment process in the field of education. This process describes itself as a field of teamwork assessment where teams can have multiple levels of hierarchy and supervision. This process is applied everywhere and is part of the management, education, assessment and computer science fields. The E-Assessment website named “Cluster” records in its database the students, the course material, the teams and the hierarchical relationships between the students. For the present research, the hierarchical relationships are team member, team leader and group administrator appointments. The group administrators have the responsibility to supervise team leaders. The experimentation of the application has been performed by high school students in geology courses and Canadian army cadets for navigation patrols in teams. This research extends the work of Nance that uses a hierarchical aggregation process similar as the one implemented in the “Cluster” application.Keywords: e-learning, e-assessment, teamwork assessment, hierarchical aggregate assessment
Procedia PDF Downloads 36915556 Ranking Theory-The Paradigm Shift in Statistical Approach to the Issue of Ranking in a Sports League
Authors: E. Gouya Bozorg
Abstract:
The issue of ranking of sports teams, in particular soccer teams is of primary importance in the professional sports. However, it is still based on classical statistics and models outside of area of mathematics. Rigorous mathematics and then statistics despite the expectation held of them have not been able to effectively engage in the issue of ranking. It is something that requires serious pathology. The purpose of this study is to change the approach to get closer to mathematics proper for using in the ranking. We recommend using theoretical mathematics as a good option because it can hermeneutically obtain the theoretical concepts and criteria needful for the ranking from everyday language of a League. We have proposed a framework that puts the issue of ranking into a new space that we have applied in soccer as a case study. This is an experimental and theoretical study on the issue of ranking in a professional soccer league based on theoretical mathematics, followed by theoretical statistics. First, we showed the theoretical definition of constant number Є = 1.33 or ‘golden number’ of a soccer league. Then, we have defined the ‘efficiency of a team’ by this number and formula of μ = (Pts / (k.Є)) – 1, in which Pts is a point obtained by a team in k number of games played. Moreover, K.Є index has been used to show the theoretical median line in the league table and to compare top teams and bottom teams. Theoretical coefficient of σ= 1 / (1+ (Ptx / Ptxn)) has also been defined that in every match between the teams x, xn, with respect to the ability of a team and the points of both of them Ptx, Ptxn, and it gives a performance point resulting in a special ranking for the League. And it has been useful particularly in evaluating the performance of weaker teams. The current theory has been examined for the statistical data of 4 major European Leagues during the period of 1998-2014. Results of this study showed that the issue of ranking is dependent on appropriate theoretical indicators of a League. These indicators allowed us to find different forms of ranking of teams in a league including the ‘special table’ of a league. Furthermore, on this basis the issue of a record of team has been revised and amended. In addition, the theory of ranking can be used to compare and classify the different leagues and tournaments. Experimental results obtained from archival statistics of major professional leagues in the world in the past two decades have confirmed the theory. This topic introduces a new theory for ranking of a soccer league. Moreover, this theory can be used to compare different leagues and tournaments.Keywords: efficiency of a team, ranking, special table, theoretical mathematic
Procedia PDF Downloads 41815555 Modeling Comfort by Thermal Inertia in Eco-Construction for Low-Income People in an Aqueous Environment in the Face of Sustainable Development in Sub-Saharan Africa; Case of the City of Kinshasa, DR Congo
Authors: Mbambu K. Shaloom, Biba Kalengo, Pierre Echard, Olivier Gilson, Tshiswaka Ngalula, Léonard Kabeya Mukeba Yakasham
Abstract:
In this 21st century, while design and eco-construction continue to be governed by considerations of functionality, safety, comfort and initial investment cost. Today, the principles of sustainable development lead us to think over longer time frames, to take into account new issues and the operating costs of green energy. DR Congo (sub-Saharan Africa) still suffers from the unusability of certain bio-sourced materials (such as bamboo, branches, etc.) and the lack of energy, i.e. 9% of the population has access to electricity and 21% of access to water. Ecoconstruction involves the energy performance of buildings which carry out a dynamic thermal simulation, which targets the different assumptions and conventional parameters (weather, occupancy, materials, thermal comfort, green energies, etc.). The objective of this article is to remedy the thermal, economic and technical artisanal problems in an aqueous environment in the city of Kinshasa. In order to establish a behavioral model to mitigate environmental impacts on architectural modifications and low-cost eco-construction through the approach of innovation and design thinking.Keywords: thermal comfort, bio-sourced material, eco-architecture, eco-construction, squatting, design thinking
Procedia PDF Downloads 8715554 Time Overrun in Pre-Construction Planning Phase of Construction Projects
Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui
Abstract:
Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun
Procedia PDF Downloads 25515553 Exploration of Building Information Modelling Software to Develop Modular Coordination Design Tool for Architects
Authors: Muhammad Khairi bin Sulaiman
Abstract:
The utilization of Building Information Modelling (BIM) in the construction industry has provided an opportunity for designers in the Architecture, Engineering and Construction (AEC) industry to proceed from the conventional method of using manual drafting to a way that creates alternative designs quickly, produces more accurate, reliable and consistent outputs. By using BIM Software, designers can create digital content that manipulates the use of data using the parametric model of BIM. With BIM software, more alternative designs can be created quickly and design problems can be explored further to produce a better design faster than conventional design methods. Generally, BIM is used as a documentation mechanism and has not been fully explored and utilised its capabilities as a design tool. Relative to the current issue, Modular Coordination (MC) design as a sustainable design practice is encouraged since MC design will reduce material wastage through standard dimensioning, pre-fabrication, repetitive, modular construction and components. However, MC design involves a complex process of rules and dimensions. Therefore, a tool is needed to make this process easier. Since the parameters in BIM can easily be manipulated to follow MC rules and dimensioning, thus, the integration of BIM software with MC design is proposed for architects during the design stage. With this tool, there will be an improvement in acceptance and practice in the application of MC design effectively. Consequently, this study will analyse and explore the function and customization of BIM objects and the capability of BIM software to expedite the application of MC design during the design stage for architects. With this application, architects will be able to create building models and locate objects within reference modular grids that adhere to MC rules and dimensions. The parametric modeling capabilities of BIM will also act as a visual tool that will further enhance the automation of the 3-Dimensional space planning modeling process. (Method) The study will first analyze and explore the parametric modeling capabilities of rule-based BIM objects, which eventually customize a reference grid within the rules and dimensioning of MC. Eventually, the approach will further enhance the architect's overall design process and enable architects to automate complex modeling, which was nearly impossible before. A prototype using a residential quarter will be modeled. A set of reference grids guided by specific MC rules and dimensions will be used to develop a variety of space planning and configuration. With the use of the design, the tool will expedite the design process and encourage the use of MC Design in the construction industry.Keywords: building information modeling, modular coordination, space planning, customization, BIM application, MC space planning
Procedia PDF Downloads 84