Search results for: time budget
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 18059

Search results for: time budget

17939 Authorization of Commercial Communication Satellite Grounds for Promoting Turkish Data Relay System

Authors: Celal Dudak, Aslı Utku, Burak Yağlioğlu

Abstract:

Uninterrupted and continuous satellite communication through the whole orbit time is becoming more indispensable every day. Data relay systems are developed and built for various high/low data rate information exchanges like TDRSS of USA and EDRSS of Europe. In these missions, a couple of task-dedicated communication satellites exist. In this regard, for Turkey a data relay system is attempted to be defined exchanging low data rate information (i.e. TTC) for Earth-observing LEO satellites appointing commercial GEO communication satellites all over the world. First, justification of this attempt is given, demonstrating duration enhancements in the link. Discussion of preference of RF communication is, also, given instead of laser communication. Then, preferred communication GEOs – including TURKSAT4A already belonging to Turkey- are given, together with the coverage enhancements through STK simulations and the corresponding link budget. Also, a block diagram of the communication system is given on the LEO satellite.

Keywords: communication, GEO satellite, data relay system, coverage

Procedia PDF Downloads 417
17938 Improvement of Ground Truth Data for Eye Location on Infrared Driver Recordings

Authors: Sorin Valcan, Mihail Gaianu

Abstract:

Labeling is a very costly and time consuming process which aims to generate datasets for training neural networks in several functionalities and projects. For driver monitoring system projects, the need for labeled images has a significant impact on the budget and distribution of effort. This paper presents the modifications done to an algorithm used for the generation of ground truth data for 2D eyes location on infrared images with drivers in order to improve the quality of the data and performance of the trained neural networks. The algorithm restrictions become tougher, which makes it more accurate but also less constant. The resulting dataset becomes smaller and shall not be altered by any kind of manual label adjustment before being used in the neural networks training process. These changes resulted in a much better performance of the trained neural networks.

Keywords: labeling automation, infrared camera, driver monitoring, eye detection, convolutional neural networks

Procedia PDF Downloads 90
17937 City-Wide Simulation on the Effects of Optimal Appliance Scheduling in a Time-of-Use Residential Environment

Authors: Rudolph Carl Barrientos, Juwaln Diego Descallar, Rainer James Palmiano

Abstract:

Household Appliance Scheduling Systems (HASS) coupled with a Time-of-Use (TOU) pricing scheme, a form of Demand Side Management (DSM), is not widely utilized in the Philippines’ residential electricity sector. This paper’s goal is to encourage distribution utilities (DUs) to adopt HASS and TOU by analyzing the effect of household schedulers on the electricity price and load profile in a residential environment. To establish this, a city based on an implemented survey is generated using Monte Carlo Analysis (MCA). Then, a Binary Particle Swarm Optimization (BPSO) algorithm-based HASS is developed considering user satisfaction, electricity budget, appliance prioritization, energy storage systems, solar power, and electric vehicles. The simulations were assessed under varying levels of user compliance. Results showed that the average electricity cost, peak demand, and peak-to-average ratio (PAR) of the city load profile were all reduced. Therefore, the deployment of the HASS and TOU pricing scheme is beneficial for both stakeholders.

Keywords: appliance scheduling, DSM, TOU, BPSO, city-wide simulation, electric vehicle, appliance prioritization, energy storage system, solar power

Procedia PDF Downloads 80
17936 Public Financial Management in Ghana: A Move beyond Reforms to Consolidation and Sustainability

Authors: Mohammed Sani Abdulai

Abstract:

Ghana’s Public Financial Management reforms have been going on for some two decades now (1997/98 to 2017/18). Given this long period of reforms, Ghana in 2019 is putting together both a Public Financial Management (PFM) strategy and a Ghana Integrated Financial Management Information System (GIFMIS) strategy for the next 5-years (2020-2024). The primary aim of these dual strategies is assisting the country in moving beyond reforms to consolidation and sustainability. In this paper we, first, examined the evolution of Ghana’s PFM reforms. We, secondly, reviewed the legal and institutional reforms undertaken to strengthen the country’s key PFM institutions. Thirdly, we summarized the strengths and weaknesses identified by the 2018 Public Expenditure and Financial Accountability (PEFA) assessment of Ghana’s PFM system relating to its macro-fiscal framework, budget preparation and approval, budget execution, accounting and fiscal reporting as well as external scrutiny and audit. We, finally, considered what the country should be doing to achieve its intended goal of PFM consolidation and sustainability. Using a qualitative method of review and analysis of existing documents, we, through this paper, brought to the fore the lessons that could be learnt by other developing countries from Ghana’s PFM reforms experiences. These lessons included the need to: (a) undergird any PFM reform with a comprehensive PFM reform strategy; (b) undertake a legal and institutional reforms of the key PFM institutions; (c) assess the strengths and weaknesses of those reforms using PFM performance evaluation tools such as PEFA framework; and (d) move beyond reforms to consolidation and sustainability.

Keywords: public financial management, public expenditure and financial accountability, reforms, consolidation, sustainability

Procedia PDF Downloads 199
17935 Design of Ka-Band Satellite Links in Indonesia

Authors: Zulfajri Basri Hasanuddin

Abstract:

There is an increasing demand for broadband services in Indonesia. Therefore, the answer is the use of Ka-Band which has some advantages such as wider bandwidth, the higher transmission speeds, and smaller size of antenna in the ground. However, rain attenuation is the primary factor in the degradation of signal at the Kaband. In this paper, the author will determine whether the Ka-band frequency can be implemented in Indonesia which has high intensity of rainfall.

Keywords: Ka-band, link budget, link availability, BER, Eb/No, C/N

Procedia PDF Downloads 400
17934 Organized Crime-A Social Challenge for Kosovo towards European Union Integration

Authors: Samedin Mehmeti

Abstract:

Very tens political and economic situation, in particular armed conflicts that followed at the time of the destruction of the former Yugoslavia, influenced migrations and displacement of population. Especially setting international sanctions and embargo influenced the creation of organized criminal groups. A lot of members of the former Yugoslav security apparatus in collaboration with ordinary criminal groups engaged in: smuggling of goods, petroleum and arms, sale and transport of drugs, payable murder, damage to public property, kidnappings, extortion, racketeering, etc. This tradition of criminality, of course in other forms and with other methods, has continued after conflicts and continues with a high intensity even in nowadays. One of the most delicate problems of organized crime activity is the impact on the economic sphere, where organized crime opposes and severely damages national security and economy to criminalize it in certain sectors and directions. Organized crime groups including who find Kosovo as a place to develop their criminal activities are characterized by: loyalty of many people especially through family connections and kinship in carrying out criminal activities and the existence of powerful hierarchy of leadership which in many cases include the corrupt officials of state apparatus. Groups have clear hierarchy and flexible structure of command, each member within the criminal group knows his duties concrete. According to statistics presented in police reports its notable that Kosovo has a large number of cases of organized crime, cultivation, trafficking and possession of narcotics. As already is very well known that one of the primary conditions that must be fulfilled on track toward integration in the European Union is precisely to prevent and combat organized crime. Kosovo has serious problems with prosecutorial and judicial system. But the misuse of public funds, even those coming directly from EU budget or the budget of the European Union member states, have a negative impact on this process. The economic crisis that has gripped some of the EU countries has led to the creation of an environment in which there are far fewer resources and opportunities to invest in preventing and combating organized crime within member states. This automatically reduces the level of financial support for other countries in the fight against organized crime. Kosovo as a poor country, now has less likely benefiting from the support tools that will be eventually offered by Europe set of in this area.

Keywords: police, european integration, organized crime, narcotics

Procedia PDF Downloads 416
17933 Maintenance Wrench Time Improvement Project

Authors: Awadh O. Al-Anazi

Abstract:

As part of the organizational needs toward successful maintaining activities, a proper management system need to be put in place, ensuring the effectiveness of maintenance activities. The management system shall clearly describes the process of identifying, prioritizing, planning, scheduling, execution, and providing valuable feedback for all maintenance activities. Completion and accuracy of the system with proper implementation shall provide the organization with a strong platform for effective maintenance activities that are resulted in efficient outcomes toward business success. The purpose of this research was to introduce a practical tool for measuring the maintenance efficiency level within Saudi organizations. A comprehensive study was launched across many maintenance professionals throughout Saudi leading organizations. The study covered five main categories: work process, identification, planning and scheduling, execution, and performance monitoring. Each category was evaluated across many dimensions to determine its current effectiveness through a five-level scale from 'process is not there' to 'mature implementation'. Wide participation was received, responses were analyzed, and the study was concluded by highlighting major gaps and improvement opportunities within Saudi organizations. One effective implementation of the efficiency enhancement efforts was deployed in Saudi Kayan (one of Sabic affiliates). Below details describes the project outcomes: SK overall maintenance wrench time was measured at 20% (on average) from the total daily working time. The assessment indicates the appearance of several organizational gaps, such as a high amount of reactive work, poor coordination and teamwork, Unclear roles and responsibilities, as well as underutilization of resources. Multidiscipline team was assigned to design and implement an appropriate work process that is capable to govern the execution process, improve the maintenance workforce efficiency, and maximize wrench time (targeting > 50%). The enhanced work process was introduced through brainstorming and wide benchmarking, incorporated with a proper change management plan and leadership sponsorship. The project was completed in 2018. Achieved Results: SK WT was improved to 50%, which resulted in 1) reducing the Average Notification completion time. 2) reducing maintenance expenses on OT and manpower support (3.6 MSAR Actual Saving from Budget within 6 months).

Keywords: efficiency, enhancement, maintenance, work force, wrench time

Procedia PDF Downloads 121
17932 Memory, Self, and Time: A Bachelardian Perspective

Authors: Michael Granado

Abstract:

The French philosopher Gaston Bachelard’s philosophy of time is articulated in his two works on the subject, the Intuition of the Instant (1932) and his The Dialectic of Duration (1936). Both works present a systematic methodology predicated upon the assumption that our understanding of time has radically changed as a result of Einstein and subsequently needs to be reimagined. Bachelard makes a major distinction in his discussion of time: 1. Time as it is (physical time), 2. Time as we experience it (phenomenological time). This paper will focus on the second distinction, phenomenological time, and explore the connections between Bachelard’s work and contemporary psychology. Several aspects of Bachelard’s philosophy of time nicely complement our current understanding of memory and self and clarify how the self relates to experienced time. Two points, in particular, stand out; the first is the relative nature of subjective time, and the second is the implications of subjective time in the formation of the narrative self. Bachelard introduces two philosophical concepts to explain these points: rhythmanalysis and reverie. By exploring these concepts, it will become apparent that there is an undeniable link between memory, self, and time. Through the use of narrative self, the individual connects and links memories and time together to form a sense of personal identity.

Keywords: Gaston Bachelard, memory, self, time

Procedia PDF Downloads 142
17931 Factors Influencing Household Expenditure Patterns on Cereal Grains in Nasarawa State, Nigeria

Authors: E. A. Ojoko, G. B. Umbugadu

Abstract:

This study aims at describing the expenditure pattern of households on millet, maize and sorghum across income groups in Nasarawa State. A multi-stage sampling technique was used to select a sample size of 316 respondents for the study. The Almost Ideal Demand System (AIDS) model was adopted in this study. Results from the study shows that the average household size was five persons with dependency ratio of 52 %, which plays an important role on the household’s expenditure pattern by increasing the household budget share. On the average 82 % were male headed households with an average age of 49 years and 13 years of formal education. Results on expenditure share show that maize has the highest expenditure share of 38 % across the three income groups and that most of the price effects are significantly different from zero at 5 % significant level. This shows that the low price of maize increased its demand as compared to other cereals. Household size and age of household members are major factors affecting the demand for cereals in the study. This agrees with the fact that increased household population (size) will bring about increase consumption. The results on factors influencing preferences for cereal grains reveals that cooking quality and appearance (65.7 %) were the most important factors affecting the demand for maize in the study area. This study recommends that cereal crop production should be prioritized in government policies and farming activities that help to boost food security and alleviate poverty should be subsidized.

Keywords: expenditure pattern, AIDS model, budget share, price cereal grains and consumption

Procedia PDF Downloads 177
17930 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 102
17929 Political Regimes, Political Stability and Debt Dependence in African Countries of Franc Zone: A Logistic Modeling

Authors: Nounamo Nguedie Yann Harold

Abstract:

The factors behind the debt have been the subject of several studies in the literature. Pioneering studies based on the 'double deficit' approach linked indebtedness to the imbalance between savings and investment, the budget deficit and the current account deficit. Most studies on identifying factors that may stimulate or reduce the level of external public debt agree that the following variables are important explanatory variables in leveraging debt: the budget deficit, trade opening, current account and exchange rate, import, export, interest rate, term variation exchange rate, economic growth rate and debt service, capital flight, and over-indebtedness. Few studies addressed the impact of political factors on the level of external debt. In general, however, the IMF's stabilization programs in developing countries following the debt crisis have resulted in economic recession and the advent of political crises that have resulted in changes in governments. In this sense, political institutions are recognised as factors of accumulation of external debt in most developing countries. This paper assesses the role of political factors on the external debt level of African countries in the Franc Zone over the period 1985-2016. Data used come from World Bank and ICRG. Using a logit in panel, the results show that the more a country is politically stable, the lower the external debt compared to the gross domestic product. Political stability multiplies 1.18% the chances of being in the sustainable debt zone. For example, countries with good political institutions experience less severe external debt burdens than countries with bad political institutions.

Keywords: African countries, external debt, Franc Zone, political factors

Procedia PDF Downloads 193
17928 Decommissioning of Nuclear Power Plants: The Current Position and Requirements

Authors: A. Stifi, S. Gentes

Abstract:

Undoubtedly from construction's perspective, the use of explosives will remove a large facility such as a 40-storey building , that took almost 3 to 4 years for construction, in few minutes. Usually, the reconstruction or decommissioning, the last phase of life cycle of any facility, is considered to be the shortest. However, this is proved to be wrong in the case of nuclear power plant. Statistics says that in the last 30 years, the construction of a nuclear power plant took an average time of 6 years whereas it is estimated that decommissioning of such plants may take even a decade or more. This paper is all about the decommissioning phase of a nuclear power plant which needs to be given more attention and encouragement from the research institutes as well as the nuclear industry. Currently, there are 437 nuclear power reactors in operation and 70 reactors in construction. With around 139 nuclear facilities already been shut down and are in different decommissioning stages and approximately 347 nuclear reactors will be in decommissioning phase in the next 20 years (assuming the operation time of a reactor as 40 years), This fact raises the following two questions (1) How far is the nuclear and construction Industry ready to face the challenges of decommissioning project? (2) What is required for a safety and reliable decommissioning project delivery? The decommissioning of nuclear facilities across the global have severe time and budget overruns. Largely the decommissioning processes are being executed by the force of manual labour where the change in regulations is respectively observed. In term of research and development, some research projects and activities are being carried out in this area, but the requirement seems to be much more. The near future of decommissioning shall be better through a sustainable development strategy where all stakeholders agree to implement innovative technologies especially for dismantling and decontamination processes and to deliever a reliable and safety decommissioning. The scope of technology transfer from other industries shall be explored. For example, remotery operated robotic technologies used in automobile and production industry to reduce time and improve effecincy and saftey shall be tried here. However, the innovative technologies are highly requested but they are alone not enough, the implementation of creative and innovative management methodologies should be also investigated and applied. Lean Management with it main concept "elimination of waste within process", is a suitable example here. Thus, the cooperation between international organisations and related industries and the knowledge-sharing may serve as a key factor for the successful decommissioning projects.

Keywords: decommissioning of nuclear facilities, innovative technology, innovative management, sustainable development

Procedia PDF Downloads 451
17927 Optimization of Economic Order Quantity of Multi-Item Inventory Control Problem through Nonlinear Programming Technique

Authors: Prabha Rohatgi

Abstract:

To obtain an efficient control over a huge amount of inventory of drugs in pharmacy department of any hospital, generally, the medicines are categorized on the basis of their cost ‘ABC’ (Always Better Control), first and then categorize on the basis of their criticality ‘VED’ (Vital, Essential, desirable) for prioritization. About one-third of the annual expenditure of a hospital is spent on medicines. To minimize the inventory investment, the hospital management may like to keep the medicines inventory low, as medicines are perishable items. The main aim of each and every hospital is to provide better services to the patients under certain limited resources. To achieve the satisfactory level of health care services to outdoor patients, a hospital has to keep eye on the wastage of medicines because expiry date of medicines causes a great loss of money though it was limited and allocated for a particular period of time. The objectives of this study are to identify the categories of medicines requiring incentive managerial control. In this paper, to minimize the total inventory cost and the cost associated with the wastage of money due to expiry of medicines, an inventory control model is used as an estimation tool and then nonlinear programming technique is used under limited budget and fixed number of orders to be placed in a limited time period. Numerical computations have been given and shown that by using scientific methods in hospital services, we can give more effective way of inventory management under limited resources and can provide better health care services. The secondary data has been collected from a hospital to give empirical evidence.

Keywords: ABC-VED inventory classification, multi item inventory problem, nonlinear programming technique, optimization of EOQ

Procedia PDF Downloads 234
17926 Design of a Telemetry, Tracking, and Command Radio-Frequency Receiver for Small Satellites Based on Commercial Off-The-Shelf Components

Authors: A. Lovascio, A. D’Orazio, V. Centonze

Abstract:

From several years till now the aerospace industry is developing more and more small satellites for Low-Earth Orbit (LEO) missions. Such satellites have a low cost of making and launching since they have a size and weight smaller than other types of satellites. However, because of size limitations, small satellites need integrated electronic equipment based on digital logic. Moreover, the LEOs require telecommunication modules with high throughput to transmit to earth a big amount of data in a short time. In order to meet such requirements, in this paper we propose a Telemetry, Tracking & Command module optimized through the use of the Commercial Off-The-Shelf components. The proposed approach exploits the major flexibility offered by these components in reducing costs and optimizing the performance. The method has been applied in detail for the design of the front-end receiver, which has a low noise figure (1.5 dB) and DC power consumption (smaller than 2 W). Such a performance is particularly attractive since it allows fulfilling the energy budget stringent constraints that are typical for LEO small platforms.

Keywords: COTS, LEO, small-satellite, TT&C

Procedia PDF Downloads 112
17925 Housing Practices of the Young Southern Europeans in Connection with Family Strategies during the Crisis

Authors: Myrto Dagkouli-Kyriakoglou

Abstract:

Southern European countries tend to have a lot of connections in their culture, customs, ideals and attitude towards everyday aspects. On the contrary, all of them demonstrate a lot of differences in their history, political life and economic situation. Nevertheless, the state welfare and its insufficiency to deal with citizens’ needs, is common for the whole region. As the global financial crisis initiated, all of them gradually were affected and established austerity measures. Consequently, there were crucial budget cuts in state welfare and accordingly limited support to the citizens at a time that is most needed as the economic difficulties of the households are rising rapidly. Crisis in connection with austerity measures brought up a housing problem which was hidden for decades with the assistance of the institution of the Southern European family. New or old copying practices concerning housing are already developed and more will rise in order to survive this new era. Expressly, youth is one of the most vulnerable groups in this situation and therefore there is a special focus on the policies that affect their housing as well as their copying practices in connection with the family/kinship strategies.

Keywords: housing, coping practices, Greece, familism

Procedia PDF Downloads 331
17924 Knowledge Management Efficiency of Personnel in Rajamangala University of Technology Srivijaya Songkhla, Thailand

Authors: Nongyao Intasaso, Atchara Rattanama, Navarat Pewnual

Abstract:

This research is survey research purposed to study the factor affected to knowledge management efficiency of personnel in Rajamangala University of Technology Srivijaya, and study the problem of knowledge management affected to knowledge development of personnel in the university. The tool used in this study is structures questioner standardize rating scale in 5 levels. The sample selected by purposive sampling and there are 137 participation calculated in 25% of population. The result found that factor affected to knowledge management efficiency in the university included (1) result from the organization factor found that the university provided project or activity that according to strategy and mission of knowledge management affected to knowledge management efficiency in highest level (x̅ = 4.30) (2) result from personnel factor found that the personnel are eager for knowledge and active to learning to develop themselves and work (Personal Mastery) affected to knowledge management efficiency in high level (x̅ = 3.75) (3) result from technological factor found that the organization brought multimedia learning aid to facilitate learning process affected to knowledge management efficiency in high level (x̅ = 3.70) and (4) the result from learning factor found that the personnel communicated and sharing knowledge and opinion based on acceptance to each other affected to knowledge management efficiency in high level (x̅ = 3.78). The problem of knowledge management in the university included the personnel do not change their work behavior, insufficient of collaboration, lack of acceptance in knowledge and experience to each other, and limited budget. The solutions to solve these problems are the university should be support sufficient budget, the university should follow up and evaluate organization development based on knowledge using, the university should provide the activity emphasize to personnel development and assign the committee to process and report knowledge management procedure.

Keywords: knowledge management, efficiency, personnel, learning process

Procedia PDF Downloads 282
17923 The Effectiveness of the South African Government Theory of Expanded Public Works Program: Infrastructure

Authors: Siziwe Monica Zuma

Abstract:

The Expanded Public Works Program (EPWP) is an instrument that the South African Government uses to reduce unemployment and poverty and also stimulate economic growth. However, due to the limited budget and programs in the EPWP, the program has had challenges in reducing unemployment, poverty and stimulating economic growth. The EPWP Vuk’uphile program had positive outcomes in developing Black emerging contractors, in order for them to participate in the main stream economy far better than when the EPWP program was not introduced. The Skills component of the program particularly the EPWP Infrastructure, which is the most funded program under EPWP has had limited success in transferring appropriate skills to ensure labour participants can penetrate the labour market after participating in the EPWP. Education and skills are important attributes that can contribute to labour absorption, however, the EPWP particularly the infrastructure program needs to strengthen skills development over a longer period of time suggested a year with multi skills relevant to the labour market. Longer and more sustained employment provides a safety net and reduces poverty better that short term employment. The EPWP program can be expanded in the infrastructure sector, focusing on rural infrastructure, agricultural infrastructure, infrastructure related components like property, ownership, management, and other services. These can stimulate the Economic sector Infrastructure of EPWP, offer longer term and more sustained employment and rural enterprise development and further employment. The Expanded Public Works Program (EPWP) is an instrument that the South African Government uses to reduce unemployment and poverty and also stimulate economic growth. However, due to the limited budget and programs in the EPWP, the program has had challenges in reducing unemployment, poverty and stimulating economic growth. The EPWP Vuk’uphile program has had positive outcomes in developing Black emerging contractors, in order for them to participate in the main stream economy far better than when the EPWP program was not introduced. The Skills component of the program particularly the EPWP Infrastructure, which is the most funded program under EPWP has had limited success in transferring appropriate skills to ensure labour participants are able to penetrate the labour market after participating in the EPWP. Education and skills are important attributes that can contribute to labour absorption, however, the EPWP particularly the infrastructure program needs to strengthen skills development over a longer period of time suggested a year with multi skills relevant to the labour market. Longer and more sustained employment provides a safety net and reduces poverty better that short term employment. The EPWP program can be expanded in the infrastructure sector, focusing on rural infrastructure, agricultural infrastructure, infrastructure related components like property, ownership, management, and other services. These can stimulate the Economic sector Infrastructure of EPWP, offer longer term and more sustained employment and rural enterprise development and further employment.

Keywords: Expanded Public Works Program (EPWP), VUKÚPHILE, youth, Public Works Programs (PWP), Infrastructure Sector of EPWP (EPWP Infrastructure)

Procedia PDF Downloads 198
17922 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 198
17921 Installing Cloud Computing Model for E-Businesses in Small Organizations

Authors: Khader Titi

Abstract:

Information technology developments have changed the way how businesses are working. Organizations are required to become visible online and stay connected to take advantages of costs reduction and improved operation of existing resources. The approval and the application areas of the cloud computing has significantly increased since it was presented by Google in 2007. Internet Cloud computing has attracted the IT enterprise attention especially the e-business enterprise. At this time, there is a great issue of environmental costs during the enterprises apply the e- business, but with the coming of cloud computing, most of the problem will be solved. Organizations around the world are facing with the continued budget challenges and increasing in the size of their computational data so, they need to find a way to deliver their services to clients as economically as possible without negotiating the achievement of anticipated outcomes. E- business companies need to provide better services to satisfy their clients. In this research, the researcher proposed a paradigm that use and deploy cloud computing technology environment to be used for e-business in small enterprises. Cloud computing might be a suitable model for implementing e-business and e-commerce architecture to improve efficiency and user satisfaction.

Keywords: E-commerce, cloud computing, B2C, SaaS

Procedia PDF Downloads 294
17920 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 29
17919 Quantitative Analysis of Nutrient Inflow from River and Groundwater to Imazu Bay in Fukuoka, Japan

Authors: Keisuke Konishi, Yoshinari Hiroshiro, Kento Terashima, Atsushi Tsutsumi

Abstract:

Imazu Bay plays an important role for endangered species such as horseshoe crabs and black-faced spoonbills that stay in the bay for spawning or the passing of winter. However, this bay is semi-enclosed with slow water exchange, which could lead to eutrophication under the condition of excess nutrient inflow to the bay. Therefore, quantification of nutrient inflow is of great importance. Generally, analysis of nutrient inflow to the bays takes into consideration nutrient inflow from only the river, but that from groundwater should not be ignored for more accurate results. The main objective of this study is to estimate the amounts of nutrient inflow from river and groundwater to Imazu Bay by analyzing water budget in Zuibaiji River Basin and loads of T-N, T-P, NO3-N and NH4-N. The water budget computation in the basin is performed using groundwater recharge model and quasi three-dimensional two-phase groundwater flow model, and the multiplication of the measured amount of nutrient inflow with the computed discharge gives the total amount of nutrient inflow to the bay. In addition, in order to evaluate nutrient inflow to the bay, the result is compared with nutrient inflow from geologically similar river basins. The result shows that the discharge is 3.50×107 m3/year from the river and 1.04×107 m3/year from groundwater. The submarine groundwater discharge accounts for approximately 23 % of the total discharge, which is large compared to the other river basins. It is also revealed that the total nutrient inflow is not particularly large. The sum of NO3-N and NH4-N loadings from groundwater is less than 10 % of that from the river because of denitrification in groundwater. The Shin Seibu Sewage Treatment Plant located below the observation points discharges treated water of 15,400 m3/day and plans to increase it. However, the loads of T-N and T-P from the treatment plant are 3.9 mg/L and 0.19 mg/L, so that it does not contribute a lot to eutrophication.

Keywords: Eutrophication, groundwater recharge model, nutrient inflow, quasi three-dimensional two-phase groundwater flow model, submarine groundwater discharge

Procedia PDF Downloads 436
17918 Effects of Climate Change and Land Use, Land Cover Change on Atmospheric Mercury

Authors: Shiliang Wu, Huanxin Zhang

Abstract:

Mercury has been well-known for its negative effects on wildlife, public health as well as the ecosystem. Once emitted into atmosphere, mercury can be transformed into different forms or enter the ecosystem through dry deposition or wet deposition. Some fraction of the mercury will be reemitted back into the atmosphere and be subject to the same cycle. In addition, the relatively long lifetime of elemental mercury in the atmosphere enables it to be transported long distances from source regions to receptor regions. Global change such as climate change and land use/land cover change impose significant challenges for mercury pollution control besides the efforts to regulate mercury anthropogenic emissions. In this study, we use a global chemical transport model (GEOS-Chem) to examine the potential impacts from changes in climate and land use/land cover on the global budget of mercury as well as its atmospheric transport, chemical transformation, and deposition. We carry out a suite of sensitivity model simulations to separate the impacts on atmospheric mercury associated with changes in climate and land use/land cover. Both climate change and land use/land cover change are found to have significant impacts on global mercury budget but through different pathways. Land use/land cover change primarily increase mercury dry deposition in northern mid-latitudes over continental regions and central Africa. Climate change enhances the mobilization of mercury from soil and ocean reservoir to the atmosphere. Also, dry deposition is enhanced over most continental areas while a change in future precipitation dominates the change in mercury wet deposition. We find that 2000-2050 climate change could increase the global atmospheric burden of mercury by 5% and mercury deposition by up to 40% in some regions. Changes in land use and land cover also increase mercury deposition over some continental regions, by up to 40%. The change in the lifetime of atmospheric mercury has important implications for long-range transport of mercury. Our case study shows that changes in climate and land use and cover could significantly affect the source-receptor relationships for mercury.

Keywords: mercury, toxic pollutant, atmospheric transport, deposition, climate change

Procedia PDF Downloads 457
17917 Directors’ Liability for Losses Incurred in the Management of PT Merpati Nusantara Airlines, Persero

Authors: Eny Suastuti

Abstract:

This paper is about state’s capital equity in establishing State-owned Company (PT Merpati Persero). Under private law regime, PT Merpati Persero equity is a state asset allocated separately from the State Budget. Consequently, it is no longer a state asset; rather, it becomes a part of company assets. The adoption of Act No. 17 of 2003 on State Finance, Act No. 31 of 1999, which is amended by Act No. 20 of 2001 on Eradication of Corrupt Practices, Act No. 15 of 2004 on Auditing, Management, and Accountability of State Finance, and Act No. 15 of 2006 Audit Board raises legal issues of whether State-owned Company’s (PT Merpati Persero) loss may be deemed as loss on state finance made by the Directors of PT Merpati Persero, which implication leads to corrupt practices conducted by the Directors. The principle of civil law states that state assets are separated from the state budget is not a government asset. Therefore the case of a lease agreement 2 (two) units of Boeing 737-400 and Boeing 737-500 between PT Merpati Nusantara Airlines with companies Third Stone Aircraft Leasing Group (TALG) the United States cannot be prosecuted under Articles 2 and 3 of Act No. 31 of 1999 Jo Act No. 20 of 2001 on Eradication of Corrupt Practices (Law PTPK). From this paper, three things are found. First, state’s capital equity, which has been allocated separately from state assets in establishing the PT Merpati Perserois not state asset; rather, it is company’s asset. Second, in the case of mismanagement leading to company loss, the Directors of PT Merpati Persero may not be charged with committing corrupt practice as prescribed in Articles 2 and 3 of Corrupt Practices Eradication Law. Third, misperception has been made by judicial practices since the courts consider loss in certain transaction made by Directors of PT Merpati Persero to be loss of state finance whose implication is applicability of Articles 2 and 3 of Corrupt Practices Eradication Law.

Keywords: corrupt practice, loss, state's capital equity, state finance (PT Merpati Persero)

Procedia PDF Downloads 243
17916 Management of Local Towns (Tambon) According to Philosophy of Sufficiency Economy

Authors: Wichian Sriprachan, Chutikarn Sriviboon

Abstract:

The objectives of this research were to study the management of local towns and to develop a better model of town management according to the Philosophy of Sufficiency Economy. This study utilized qualitative research, field research, as well as documentary research at the same time. A total of 10 local towns or Tambons of Supanburi province, Thailand were selected for an in-depth interview. The findings revealed that the model of local town management according to Philosophy of Sufficient Economy was in a level of “good” and the model of management has the five basic guidelines: 1) ability to manage budget information and keep it up-to-date, 2) ability to decision making according to democracy rules, 3) ability to use check and balance system, 4) ability to control, follow, and evaluation, and 5) ability to allow the general public to participate. In addition, the findings also revealed that the human resource management according to Philosophy of Sufficient Economy includes obeying laws, using proper knowledge, and having integrity in five areas: plan, recruit, select, train, and maintain human resources.

Keywords: management, local town (Tambon), principles of sufficiency economy, marketing management

Procedia PDF Downloads 324
17915 A Hazard Rate Function for the Time of Ruin

Authors: Sule Sahin, Basak Bulut Karageyik

Abstract:

This paper introduces a hazard rate function for the time of ruin to calculate the conditional probability of ruin for very small intervals. We call this function the force of ruin (FoR). We obtain the expected time of ruin and conditional expected time of ruin from the exact finite time ruin probability with exponential claim amounts. Then we introduce the FoR which gives the conditional probability of ruin and the condition is that ruin has not occurred at time t. We analyse the behavior of the FoR function for different initial surpluses over a specific time interval. We also obtain FoR under the excess of loss reinsurance arrangement and examine the effect of reinsurance on the FoR.

Keywords: conditional time of ruin, finite time ruin probability, force of ruin, reinsurance

Procedia PDF Downloads 372
17914 A Suggestive Framework for Measuring the Effectiveness of Social Media: An Irish Tourism Study

Authors: Colm Barcoe, Garvan Whelan

Abstract:

Over the past five years, visitations of American holidaymakers to Ireland have grown exponentially owing to the online strategies of Tourism Ireland, a Destination Marketer (DMO) with a meagre budget which is extended by their understanding of best practices to maximise their monetary allowance. This suggested framework incorporates a range of Key Performance Indicators (KPI’s) such as financial, marketing, and operational that offer a scale of measurement from which the Irish DMO can monitor the success of each promotional campaign when targeting the US and Canada. These are presented not as final solutions but rather as suggestions based on empirical evidence obtained from both primary and secondary sources. This research combines the wisdom extracted through qualitative methodologies with the objective of understanding the processes that drive both emergent and agile strategies. The Study extends the work relative to performance and examines the role of social media in the context of promoting Ireland to North America. There are two main themes that are identified and analysed in this investigation, these are the approach of the DMO when advocating Ireland as a brand and the benefits of digital platforms set against a proposed scale of KPIs, such as destination marketing, brand positioning, and identity development. The key narrative of this analysis is to focus on the power of social media when capitalising upon marketing opportunities, operating on a relatively small budget. This will always be a relevant theme of discussion due to the responsibility of an organisation like Tourism Ireland operating under the restraints imposed by government funding. The overall conclusions of this research may help inform those concerned with the implementing of social media strategies develop clearer models of measurement when promoting a destination to North America. The suggestions of this study will benefit small and medium enterprises particularly.

Keywords: destination marketing, framework, measure, performance

Procedia PDF Downloads 130
17913 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 726
17912 Using Open Source Data and GIS Techniques to Overcome Data Deficiency and Accuracy Issues in the Construction and Validation of Transportation Network: Case of Kinshasa City

Authors: Christian Kapuku, Seung-Young Kho

Abstract:

An accurate representation of the transportation system serving the region is one of the important aspects of transportation modeling. Such representation often requires developing an abstract model of the system elements, which also requires important amount of data, surveys and time. However, in some cases such as in developing countries, data deficiencies, time and budget constraints do not always allow such accurate representation, leaving opportunities to assumptions that may negatively affect the quality of the analysis. With the emergence of Internet open source data especially in the mapping technologies as well as the advances in Geography Information System, opportunities to tackle these issues have raised. Therefore, the objective of this paper is to demonstrate such application through a practical case of the development of the transportation network for the city of Kinshasa. The GIS geo-referencing was used to construct the digitized map of Transportation Analysis Zones using available scanned images. Centroids were then dynamically placed at the center of activities using an activities density map. Next, the road network with its characteristics was built using OpenStreet data and other official road inventory data by intersecting their layers and cleaning up unnecessary links such as residential streets. The accuracy of the final network was then checked, comparing it with satellite images from Google and Bing. For the validation, the final network was exported into Emme3 to check for potential network coding issues. Results show a high accuracy between the built network and satellite images, which can mostly be attributed to the use of open source data.

Keywords: geographic information system (GIS), network construction, transportation database, open source data

Procedia PDF Downloads 150
17911 Budgetary Performance Model for Managing Pavement Maintenance

Authors: Vivek Hokam, Vishrut Landge

Abstract:

An ideal maintenance program for an industrial road network is one that would maintain all sections at a sufficiently high level of functional and structural conditions. However, due to various constraints such as budget, manpower and equipment, it is not possible to carry out maintenance on all the needy industrial road sections within a given planning period. A rational and systematic priority scheme needs to be employed to select and schedule industrial road sections for maintenance. Priority analysis is a multi-criteria process that determines the best ranking list of sections for maintenance based on several factors. In priority setting, difficult decisions are required to be made for selection of sections for maintenance. It is more important to repair a section with poor functional conditions which includes uncomfortable ride etc. or poor structural conditions i.e. sections those are in danger of becoming structurally unsound. It would seem therefore that any rational priority setting approach must consider the relative importance of functional and structural condition of the section. The maintenance priority index and pavement performance models tend to focus mainly on the pavement condition, traffic criteria etc. There is a need to develop the model which is suitably used with respect to limited budget provisions for maintenance of pavement. Linear programming is one of the most popular and widely used quantitative techniques. A linear programming model provides an efficient method for determining an optimal decision chosen from a large number of possible decisions. The optimum decision is one that meets a specified objective of management, subject to various constraints and restrictions. The objective is mainly minimization of maintenance cost of roads in industrial area. In order to determine the objective function for analysis of distress model it is necessary to fix the realistic data into a formulation. Each type of repair is to be quantified in a number of stretches by considering 1000 m as one stretch. A stretch considered under study is having 3750 m length. The quantity has to be put into an objective function for maximizing the number of repairs in a stretch related to quantity. The distress observed in this stretch are potholes, surface cracks, rutting and ravelling. The distress data is measured manually by observing each distress level on a stretch of 1000 m. The maintenance and rehabilitation measured that are followed currently are based on subjective judgments. Hence, there is a need to adopt a scientific approach in order to effectively use the limited resources. It is also necessary to determine the pavement performance and deterioration prediction relationship with more accurate and economic benefits of road networks with respect to vehicle operating cost. The infrastructure of road network should have best results expected from available funds. In this paper objective function for distress model is determined by linear programming and deterioration model considering overloading is discussed.

Keywords: budget, maintenance, deterioration, priority

Procedia PDF Downloads 181
17910 Full Disclosure Policy: Transparency in Fiscal Administration

Authors: Joyly Jill Apud

Abstract:

Corruption is an all-encompassing issue worldwide. Many attempts have been done to address such cases especially by the government through increasing transparency. The Philippine government increased the mechanism of transparency by opening to public its financial transactions through Full Disclosure Policy – mandating all local governments to post in their websites all financial transactions (Philippine Public Transparency Reporting Project, 2011). For transparency to be fully realized, the challenge lies in creating a mechanism where the constituents are encouraged to engage as social auditors. In line of the said challenge, the study focused in Davao City, Philippines measuring the respondent’s awareness, access and utilization of Full Disclosure Policy (FDP). Particularly, this study determined the significant difference on the awareness, access and utilization of respondents when grouped according to sector and the significant relationship between respondents’ awareness and in the access and utilization of FDP reports. The study used descriptive-correlation, Mean, Anova and Pearson R as statistical treatment. The 120 respondents are from the different sectors of Davao City. These are the Academe, Youth, LGUs, NGOs, Business, and Church groups. The awareness of the respondents was measured in three main categories: Existence of the Policy, Content of the Policy and the Manner of Publication. Access and Utilization of the FDP reports is divided into three: Budget Reports, Procurement Reports and Special Purpose Fund Reports. Results showed that the respondents are moderately aware of the Policy. Though it manifested that the respondents are aware of the disclosure, they are unaware of the Full Disclosure Policy and Full Disclosure Policy Portal. Moreover, the respondents seldom access and utilize all the FDP reports. Further results revealed that there is a significant difference in the awareness and the access and utilization of FDP when grouped according to sector. Moreover, significant relationship in the awareness and the access and utilization of the FDP is evident. It showed that the higher the awareness on FDP, the higher the level of access and utilization on the FDP reports.

Keywords: corruption, e-governance, budget transparency, participation

Procedia PDF Downloads 361