Search results for: project management tools
16263 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective
Authors: Ghanim A. Bekr
Abstract:
Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.Keywords: construction projects, critical success factors, Jordan, project success
Procedia PDF Downloads 16216262 Major Causes of Delay in Construction Projects
Authors: Y. Gholipour, E. Rezazadeh
Abstract:
Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.Keywords: delay, dam construction, project management, Iran
Procedia PDF Downloads 44416261 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City
Authors: Tukundane Hillary
Abstract:
This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.Keywords: cost value, project control, cost control, time control, project performance, control practices
Procedia PDF Downloads 7416260 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration
Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen
Abstract:
In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate
Procedia PDF Downloads 17516259 Review of Transportation Modeling Software
Authors: Hassan M. Al-Ahmadi, Hamad Bader Almobayedh
Abstract:
Planning for urban transportation is essential for developing effective and sustainable transportation networks that meet the needs of various communities. Advanced modeling software is required for effective transportation planning, management, and optimization. This paper compares PTV VISUM, Aimsun, TransCAD, and Emme, four industry-leading software tools for transportation planning and modeling. Each software has strengths and limitations, and the project's needs, financial constraints, and level of technical expertise influence the choice of software. Transportation experts can design and improve urban transportation systems that are effective, sustainable, and meet the changing needs of their communities by utilizing these software tools.Keywords: PTV VISUM, Aimsun, TransCAD, transportation modeling software
Procedia PDF Downloads 3116258 Genetic Algorithms Multi-Objective Model for Project Scheduling
Authors: Elsheikh Asser
Abstract:
Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling
Procedia PDF Downloads 41316257 Walking the Tightrope: Balancing Project Governance, Complexity, and Servant Leadership for Megaproject Success
Authors: Muhammad Shoaib Iqbal, Shih Ping Ho
Abstract:
Megaprojects are large-scale, complex ventures with significant financial investments, numerous stakeholders, and extended timelines, requiring meticulous management for successful completion. This study explores the interplay between project governance, project complexity, and servant leadership and their combined effects on project success, specifically within the context of Pakistani megaprojects. The primary objectives are to examine the direct impact of project governance on project success, understand the negative influence of project complexity, assess the positive role of servant leadership, explore the moderating effect of servant leadership on the relationship between governance and success, and investigate how servant leadership mitigates the adverse effects of complexity. Using a quantitative approach, survey data were collected from project managers and team members involved in Pakistani megaprojects. Using a Comprehensive empirical model, 257 Valid responses were analyzed. Multiple regression analysis tested the hypothesized relationships and interaction effects using PLS-SEM. Findings reveal that project governance significantly enhances project success, emphasizing the need for robust governance structures. Conversely, project complexity negatively impacts success, highlighting the challenges of managing complex projects. Servant leadership significantly boosts project success by prioritizing team support and empowerment. Although the interaction between governance and servant leadership is not significant, suggesting no significant change in project success, servant leadership significantly mitigates the negative effects of project complexity, enhancing team resilience and adaptability. These results underscore the necessity for a balanced approach integrating strong governance with flexible, supportive leadership. The study offers valuable insights for practitioners, recommending adaptive governance frameworks and promoting servant leadership to improve the management and success rates of megaprojects. This research contributes to the broader understanding of effective project management practices in complex environments.Keywords: project governance, project complexity, servant leadership, project success, megaprojects, Pakistan
Procedia PDF Downloads 3416256 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy
Abstract:
Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.Keywords: fuzzy sets, uncertainty, qualitative factors, decision making
Procedia PDF Downloads 65216255 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 7516254 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction
Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng
Abstract:
Construction knowledge can be referred to and reused among involved project managers and job-site engineers to alleviate problems on a construction job-site and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by job-site engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.Keywords: construction knowledge management, building information modeling, project management, web-based information system
Procedia PDF Downloads 35216253 Project Work with Design Thinking and Blended Learning: A Practical Report from Teaching in Higher Education
Authors: C. Vogeler
Abstract:
Change processes such as individualization and digitalization have an impact on higher education. Graduates are expected to cooperate in creative work processes in their professional life. During their studies, they need to be prepared accordingly. This includes modern learning scenarios that integrate the benefits of digital media. Therefore, design thinking and blended learning have been combined in the project-based seminar conception introduced here. The presented seminar conception has been realized and evaluated with students of information sciences since September 2017. Within the seminar, the students learn to work on a project. They apply the methods in a problem-based learning scenario. Task of the case study is to arrange a conference on the topic gaming in libraries. In order to collaborative develop creative possibilities of realization within the group of students the design thinking method has been chosen. Design thinking is a method, used to create user-centric, problem-solving and need-driven innovation through creative collaboration in multidisciplinary teams. Central characteristics are the openness of this approach to work results and the visualization of ideas. This approach is now also accepted in the field of higher education. Especially in problem-based learning scenarios, the method offers clearly defined process steps for creative ideas and their realization. The creative process can be supported by digital media, such as search engines and tools for the documentation of brainstorming, creation of mind maps, project management etc. Because the students have to do two-thirds of the workload in their private study, design thinking has been combined with a blended learning approach. This supports students’ preparation and follow-up of the joint work in workshops (flipped classroom scenario) as well as the communication and collaboration during the entire project work phase. For this purpose, learning materials are provided on a Moodle-based learning platform as well as various tools that supported the design thinking process as described above. In this paper, the seminar conception with a combination of design thinking and blended learning is described and the potentials and limitations of the chosen strategy for the development of a course with a multimedia approach in higher education are reflected.Keywords: blended learning, design thinking, digital media tools and methods, flipped classroom
Procedia PDF Downloads 19716252 The Potential of Digital Tools in Art Lessons at Junior School Level to Improve Artistic Ability Using Tamazight Fonts
Authors: Aber Salem Aboalgasm, Rupert Ward
Abstract:
The aim of this research is to explore how pupils in art classes can use creative digital art tools to redesign Tamazight fonts, in order to develop children’s artistic creativity, enable them to learn about a new culture, and to help the teacher assess the creativity of pupils in the art class. It can also help students to improve their talents in drawing. The study could relate to research in Libya among the Amazigh people (better known as Berber) and possibly the development of Tamazight fonts with new uses in art. The research involved students aged 9-10 years old working with digital art tools, and was designed to explore the potential of digital technology by discovering suitable tools and techniques to develop children’s artistic performance using Tamazight fonts. The project also sought to show the aesthetic aspects of these characters and to stimulate the artistic creativity of these young people.Keywords: artistic creativity, Tamazight fonts, technology acceptance model, traditional, digital art tools
Procedia PDF Downloads 26216251 Decision-Making in Higher Education: Case Studies Demonstrating the Value of Institutional Effectiveness Tools
Authors: Carolinda Douglass
Abstract:
Institutional Effectiveness (IE) is the purposeful integration of functions that foster student success and support institutional performance. IE is growing rapidly within higher education as it is increasingly viewed by higher education administrators as a beneficial approach for promoting data-informed decision-making in campus-wide strategic planning and execution of strategic initiatives. Specific IE tools, including, but not limited to, project management; impactful collaboration and communication; commitment to continuous quality improvement; and accountability through rigorous evaluation; are gaining momentum under the auspices of IE. This research utilizes a case study approach to examine the use of these IE tools, highlight successes of this use, and identify areas for improvement in the implementation of IE tools within higher education. The research includes three case studies: (1) improving upon academic program review processes including the assessment of student learning outcomes as a core component of program quality; (2) revising an institutional vision, mission, and core values; and (3) successfully navigating an institution-wide re-accreditation process. Several methods of data collection are embedded within the case studies, including surveys, focus groups, interviews, and document analyses. Subjects of these methods include higher education administrators, faculty, and staff. Key findings from the research include areas of success and areas for improvement in the use of IE tools associated with specific case studies as well as aggregated results across case studies. For example, the use of case management proved useful in all of the case studies, while rigorous evaluation did not uniformly provide the value-added that was expected by higher education decision-makers. The use of multiple IE tools was shown to be consistently useful in decision-making when applied with appropriate awareness of and sensitivity to core institutional culture (for example, institutional mission, local environments and communities, disciplinary distinctions, and labor relations). As IE gains a stronger foothold in higher education, leaders in higher education can make judicious use of IE tools to promote better decision-making and secure improved outcomes of strategic planning and the execution of strategic initiatives.Keywords: accreditation, data-informed decision-making, higher education management, institutional effectiveness tools, institutional mission, program review, strategic planning
Procedia PDF Downloads 11616250 Towards Establishing a Universal Theory of Project Management
Authors: Divine Kwaku Ahadzie
Abstract:
Project management (PM) as a concept has evolved from the early 20th Century into a recognized academic and professional discipline, and indications are that it has come to stay in the 21st Century as a world-wide paradigm shift for managing successful construction projects. However, notwithstanding the strong inroads that PM has made in legitimizing its academic and professional status in construction management practice, the underlining philosophies are still based on cases and conventional practices. An important theoretical issue yet to be addressed is the lack of a universal theory that offers philosophical legitimacy for the PM concept as a uniquely specialized management concept. Here, it is hypothesized that the law of entropy, the theory of uncertainties and the theory of risk management offer plausible explanations for addressing the lacuna of what constitute PM theory. The theoretical bases of these plausible underlying theories are argued and attempts made to establish the functional relationships that exist between these theories and the PM concept. The paper then draws on data related to the success and/or failure of a number of construction projects to validate the theory.Keywords: concepts, construction, project management, universal theory
Procedia PDF Downloads 32816249 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project
Authors: A. Kourou, M. Panoutsopoulou
Abstract:
Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material
Procedia PDF Downloads 12216248 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.Keywords: strategy, project management, strategy implementation, agile
Procedia PDF Downloads 11616247 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries
Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi
Abstract:
Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.Keywords: physical progress, time progress, financial progress, delays, critical path
Procedia PDF Downloads 37316246 Radio Frequency Identification (Rfid) Cost-Effective, Location-Based System for Managing Construction Materials
Authors: Mourad Bakouka, Abdelaziz Rabehi
Abstract:
Companies need to have logistics and transportation in place that can adapt to the changing nature of construction sites. This ensures they can react quickly when needed. A study was conducted to develop a way to locate and track materials on construction sites. The system is an RFID/GPS integration that's required to pull off this feat. The study also reports how the platform has been used in construction. They found many advantages to using it, including reductions in both time and costs as well as improved management of materials orders. . For example, the time in which a project could start up was shortened from two weeks to three days with just a single digital order. As of now, the technology is still limited in its widespread adoption due largely to overall lack of awareness and difficulty connecting to it. However, as more and more companies embrace it in construction, the technology is expected to become ubiquitous. The developed platform provides contractors and construction managers with real-time information about the status of materials and work, allowing them to better manage the workflow in a project. The study sheds new light on this subject, which is essential to know. This work is becoming increasingly aware of the use of smart tools in constructing buildings.Keywords: materials management, internet of things (IoT), radio frequency identification (RFID), construction site, supply chain management
Procedia PDF Downloads 8116245 Improving Cost and Time Control of Construction Projects Management Practices in Nigeria
Authors: Mustapha Yakubu, Ahmed Usman, Hashim Ambursa
Abstract:
This paper presents the findings of a research which sought to investigate techniques used to improve cost and time control of construction projects management practice in Nigeria. However, there is limited research on issues surrounding the practical usage of these techniques. Data were collected through a questionnaire distributed to construction experts through a survey conducted on the 100 construction organisations and 50 construction consultancy firms in the Nigeria aimed at identifying common project cost and time control practices and factors inhibiting effective project control in practice. The study reveals that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.Keywords: construction project, cost control, Nigeria, time control
Procedia PDF Downloads 31216244 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle
Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter
Abstract:
The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework
Procedia PDF Downloads 10016243 Navigating Uncertainties in Project Control: A Predictive Tracking Framework
Authors: Byung Cheol Kim
Abstract:
This study explores a method for the signal-noise separation challenge in project control, focusing on the limitations of traditional deterministic approaches that use single-point performance metrics to predict project outcomes. We detail how traditional methods often overlook future uncertainties, resulting in tracking biases when reliance is placed solely on immediate data without adjustments for predictive accuracy. Our investigation led to the development of the Predictive Tracking Project Control (PTPC) framework, which incorporates network simulation and Bayesian control models to adapt more effectively to project dynamics. The PTPC introduces controlled disturbances to better identify and separate tracking biases from useful predictive signals. We will demonstrate the efficacy of the PTPC with examples, highlighting its potential to enhance real-time project monitoring and decision-making, marking a significant shift towards more accurate project management practices.Keywords: predictive tracking, project control, signal-noise separation, Bayesian inference
Procedia PDF Downloads 1816242 Automation of AAA Game Development Using AI
Authors: Branden Heng, Harsheni Siddharthan, Allison Tseng, Paul Toprac, Sarah Abraham, Etienne Vouga
Abstract:
The goal of this project was to evaluate and document the capabilities and limitations of AI tools for empowering small teams to create high-budget, high-profile (AAA) 3D games typically developed by large studios. Two teams of novice game developers attempted to create two different games using AI and Unreal Engine 5.3. First, the teams evaluated 60 AI art, design, sound, and programming tools by considering their capability, ease of use, cost, and license restrictions. Then, the teams used a shortlist of 12 AI tools for game development. During this process, the following tools were found to be the most productive: (i) ChatGPT 4.0 for both game and narrative concepts and documentation; (ii) Dall-E 3 and OpenArt for concept art; (iii) Beatoven for music drafting; (iv) ChatGPT 4.0 and Github Copilot for generating simple code and to complement human-made tutorials as an additional learning resource. While current generative AI may appear impressive at first glance, the assets they produce fall short of AAA industry standards. Generative AI tools are helpful when brainstorming ideas such as concept art and basic storylines, but they still cannot replace human input or creativity at this time. Regarding programming, AI can only effectively generate simple code and act as an additional learning resource. Thus, generative AI tools are, at best, tools to enhance developer productivity rather than as a system to replace developers.Keywords: AAA games, AI, automation tools, game development
Procedia PDF Downloads 2616241 Improving Automotive Efficiency through Lean Management Tools: A Case Study
Authors: Raed El-Khalil, Hussein Zeaiter
Abstract:
Managing and improving efficiency in the current highly competitive global automotive industry demands that companies adopt leaner and more flexible systems. During the past 20 years the domestic automotive industry in North America has been focusing on establishing new management strategies in order to meet market demands. 98The lean management process also known as Toyota Manufacturing Process (TPS) or lean manufacturing encompasses tools and techniques that were established in order to provide the best quality product with the fastest lead time at the lowest cost. The following paper presents a study that focused on improving labor efficiency at one of the Big Three (Ford, GM, Chrysler LLC) domestic automotive facility in North America. The objective of the study was to utilize several lean management tools in order to optimize the efficiency and utilization levels at the “Pre-Marriage” chassis area in a truck manufacturing and assembly facility. Utilizing three different lean tools (i.e. Standardization of work, 7 Wastes, and 5S) this research was able to improve efficiency by 51%, utilization by 246%, and reduce operations by 14%. The return on investment calculated based on the improvements made was 284%.Keywords: lean manufacturing, standardized work, operation efficiency, utilization
Procedia PDF Downloads 51916240 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image
Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang
Abstract:
Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image
Procedia PDF Downloads 50716239 The Choosing the Right Projects With Multi-Criteria Decision Making to Ensure the Sustainability of the Projects
Authors: Saniye Çeşmecioğlu
Abstract:
The importance of project sustainability and success has become increasingly significant due to the proliferation of external environmental factors that have decreased project resistance in contemporary times. The primary approach to forestall the failure of projects is to ensure their long-term viability through the strategic selection of projects as creating judicious project selection framework within the organization. Decision-makers require precise decision contexts (models) that conform to the company's business objectives and sustainability expectations during the project selection process. The establishment of a rational model for project selection enables organizations to create a distinctive and objective framework for the selection process. Additionally, for the optimal implementation of this decision-making model, it is crucial to establish a Project Management Office (PMO) team and Project Steering Committee within the organizational structure to oversee the framework. These teams enable updating project selection criteria and weights in response to changing conditions, ensuring alignment with the company's business goals, and facilitating the selection of potentially viable projects. This paper presents a multi-criteria decision model for selecting project sustainability and project success criteria that ensures timely project completion and retention. The model was developed using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) and was based on broadcaster companies’ expectations. The ultimate results of this study provide a model that endorses the process of selecting the appropriate project objectively by utilizing project selection and sustainability criteria along with their respective weights for organizations. Additionally, the study offers suggestions that may ascertain helpful in future endeavors.Keywords: project portfolio management, project selection, multi-criteria decision making, project sustainability and success criteria, MACBETH
Procedia PDF Downloads 6216238 Advances in Medication Reconciliation Tools
Authors: Zixuan Liu, Xin Zhang, Kexin He
Abstract:
In the context of widespread prevalence of multiple diseases, medication safety has become a highly concerned issue affecting patient safety. Medication reconciliation plays a vital role in preventing potential medication risks. However, in medical practice, medication reconciliation faces various challenges, and there is a wide variety of medication reconciliation tools, making the selection of appropriate tools somewhat difficult. The article introduces and analyzes the currently available medication reconciliation tools, providing a reference for healthcare professionals to choose and apply the appropriate medication reconciliation tools.Keywords: patient safety, medication reconciliation, tools, review
Procedia PDF Downloads 8016237 Integration of Design Management in the Product Development Process in SME's
Authors: Vitor Carneiro, Augusto Barata Da Rocha, Barbara Rangel, Jorge Lino Alves
Abstract:
In the European Union countries, Small and Medium-Sized Enterprises (SME’s) have an important contribution to economic activity and to the Gross Domestic Product (GDP). The implementation of design practices in SME’s is often a difficult task due to resources limitations. Unlike large companies, their product development and innovation processes frequentlylack adequate planning and systematic procedures. Design management interest has grown exponentially in recent years, but as it is a recent topic there is an absence of systematic methodologies to implement design management in SME’s with little or no design experience. This work presents a contribution to improve and optimize the process of design integration and management in SME’s. A review analysis is presented to select relevant articles on the subject, review and classify the main published contributions. Based on the selected articles content it was possible to identify five main themes related to the subject under analysis: Design Function Organization, Design Management Integration, Design Management Capabilities, Managing Design Projects, and Tools and Methods. Design management is discussed from different perspectives depending on the focus on which it is placed, whether in a design or management perspective, leading to different visions and definitions: from a more upstream strand at the intersection of design and the organization's strategic management (strategic design management) to a more downstream strand related to project management and design process (design management operational). The review analysis of the selected articles allowed the identification of a high level of complexity of connections and parameters in the design management during the product development process in the context of SME’s. Within each group of the five main themes, several sub-themes, directly or indirectly related, should be considered.Sub-connections also occur between sub-themes of different themes creating a complex and intricate web of connections. This complexity of connections is often the main obstacle to conduct design management and product development efficiently. This work proposes a formulation of a systematic methodological approach to optimize the integrated project and the management and control of the product development process among SME's. The implementation of this formulation will improve the integration of design management in the product development and innovation process in SME’s.Keywords: design management, product development, product innovation, SME’s.
Procedia PDF Downloads 22216236 The Effect of Principled Human Resource Management and Training Based on Existing Standards in Order to Improve the Quality of Construction Projects
Authors: Arsalan Salahi
Abstract:
Today, the number of changes in the construction industry and urban mass house building is increasing, which makes you need to pay more attention to targeted planning for human resource management and training. The human resources working in the construction industry have various problems and deficiencies, and in order to solve these problems, there is a need for basic management and training of these people in order to lower the construction costs and increase the quality of the projects, especially in mass house building projects. The success of any project in reaching short and long-term professional goals depends on the efficient combination of work tools, financial resources, raw materials, and most importantly, human resources. Today, due to the complexity and diversity of each project, specialized management fields have emerged to maximize the potential benefits of each component of that project. Human power is known as the most important resource in construction projects for its successful implementation, but unfortunately, due to the low cost of human power compared to other resources, such as materials and machinery, little attention is paid to it. With the correct management and training of human resources, which depends on its correct planning and development, it is possible to improve the performance of construction projects. In this article, the training and motivation of construction industry workers and their effects on the effectiveness of projects in this industry have been researched. In this regard, some barriers to the training and motivation of construction workers and personnel have been identified and solutions have been provided for construction companies. Also, the impact of workers and unskilled people on the efficiency of construction projects is investigated. The results of the above research show that by increasing the use of correct and basic training for human resources, we will see positive results and effects on the performance of construction projects.Keywords: human resources, construction industry, principled training, skilled and unskilled workers
Procedia PDF Downloads 9316235 A Case Study on Machine Learning-Based Project Performance Forecasting for an Urban Road Reconstruction Project
Authors: Soheila Sadeghi
Abstract:
In construction projects, predicting project performance metrics accurately is essential for effective management and successful delivery. However, conventional methods often depend on fixed baseline plans, disregarding the evolving nature of project progress and external influences. To address this issue, we introduce a distinct approach based on machine learning to forecast key performance indicators, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category within an urban road reconstruction project. Our proposed model leverages time series forecasting techniques, namely Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance by analyzing historical data and project progress. Additionally, the model incorporates external factors, including weather patterns and resource availability, as features to improve forecast accuracy. By harnessing the predictive capabilities of machine learning, our performance forecasting model enables project managers to proactively identify potential deviations from the baseline plan and take timely corrective measures. To validate the effectiveness of the proposed approach, we conduct a case study on an urban road reconstruction project, comparing the model's predictions with actual project performance data. The outcomes of this research contribute to the advancement of project management practices in the construction industry by providing a data-driven solution for enhancing project performance monitoring and control.Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, schedule variance, earned value management
Procedia PDF Downloads 3916234 The Use of Computer Simulation as Technological Education for Crisis Management Staff
Authors: Jiří Barta, Josef Krahulec, Jiří F. Urbánek
Abstract:
Education and practical training crisis management members are a topical issue nowadays. The paper deals with the perspectives and possibilities of ‘smart solutions’ to education for crisis management staff. Currently, there are a large number of simulation tools, which notes that they are suitable for practical training of crisis management staff. The first part of the paper is focused on the introduction of the technology simulation tools. The simulators aim is to create a realistic environment for the practical training of extending units of crisis staff. The second part of the paper concerns the possibilities of using the simulation technology to the education process. The aim of this section is to introduce the practical capabilities and potential of the simulation programs for practical training of crisis management staff.Keywords: crisis management staff, computer simulation, software, technological education
Procedia PDF Downloads 354