Search results for: reliability improvement
6028 Reliability Analysis of a Fuel Supply System in Automobile Engine
Authors: Chitaranjan Sharma
Abstract:
The present paper deals with the analysis of a fuel supply system in an automobile engine of a four wheeler which is having both the option of fuel i.e. PETROL and CNG. Since CNG is cheaper than petrol so the priority is given to consume CNG as compared to petrol. An automatic switch is used to start petrol supply at the time of failure of CNG supply. Using regenerative point technique with Markov renewal process, the reliability characteristics which are useful to system designers are obtained.Keywords: reliability, redundancy, repair time, transition, probability, regenerative points, markov renewal, process
Procedia PDF Downloads 5516027 Evaluation of Reliability Indices Using Monte Carlo Simulation Accounting Time to Switch
Authors: Sajjad Asefi, Hossein Afrakhte
Abstract:
This paper presents the evaluation of reliability indices of an electrical distribution system using Monte Carlo simulation technique accounting Time To Switch (TTS) for each section. In this paper, the distribution system has been assumed by accounting random repair time omission. For simplicity, we have assumed the reliability analysis to be based on exponential law. Each segment has a specified rate of failure (λ) and repair time (r) which will give us the mean up time and mean down time of each section in distribution system. After calculating the modified mean up time (MUT) in years, mean down time (MDT) in hours and unavailability (U) in h/year, TTS have been added to the time which the system is not available, i.e. MDT. In this paper, we have assumed the TTS to be a random variable with Log-Normal distribution.Keywords: distribution system, Monte Carlo simulation, reliability, repair time, time to switch (TTS)
Procedia PDF Downloads 4276026 Efficient Variable Modulation Scheme Based on Codebook in the MIMO-OFDM System
Authors: Yong-Jun Kim, Jae-Hyun Ro, Chang-Bin Ha, Hyoung-Kyu Song
Abstract:
Because current wireless communication requires high reliability in a limited bandwidth environment, this paper proposes the variable modulation scheme based on the codebook. The variable modulation scheme adjusts transmission power using the codebook in accordance with hannel state. Also, if the codebook is composed of many bits, the reliability is more improved by the proposed scheme. The simulation results show that the performance of proposed scheme has better reliability than the the performance of conventional scheme.Keywords: MIMO-OFDM, variable modulation, codebook, channel state
Procedia PDF Downloads 5876025 Approach for Demonstrating Reliability Targets for Rail Transport during Low Mileage Accumulation in the Field: Methodology and Case Study
Authors: Nipun Manirajan, Heeralal Gargama, Sushil Guhe, Manoj Prabhakaran
Abstract:
In railway industry, train sets are designed based on contractual requirements (mission profile), where reliability targets are measured in terms of mean distance between failures (MDBF). However, during the beginning of revenue services, trains do not achieve the designed mission profile distance (mileage) within the timeframe due to infrastructure constraints, scarcity of commuters or other operational challenges thereby not respecting the original design inputs. Since trains do not run sufficiently and do not achieve the designed mileage within the specified time, car builder has a risk of not achieving the contractual MDBF target. This paper proposes a constant failure rate based model to deal with the situations where mileage accumulation is not a part of the design mission profile. The model provides appropriate MDBF target to be demonstrated based on actual accumulated mileage. A case study of rolling stock running in the field is undertaken to analyze the failure data and MDBF target demonstration during low mileage accumulation. The results of case study prove that with the proposed method, reliability targets are achieved under low mileage accumulation.Keywords: mean distance between failures, mileage-based reliability, reliability target appropriations, rolling stock reliability
Procedia PDF Downloads 2676024 Reliability Analysis for Cyclic Fatigue Life Prediction in Railroad Bolt Hole
Authors: Hasan Keshavarzian, Tayebeh Nesari
Abstract:
Bolted rail joint is one of the most vulnerable areas in railway track. A comprehensive approach was developed for studying the reliability of fatigue crack initiation of railroad bolt hole under random axle loads and random material properties. The operation condition was also considered as stochastic variables. In order to obtain the comprehensive probability model of fatigue crack initiation life prediction in railroad bolt hole, we used FEM, response surface method (RSM), and reliability analysis. Combined energy-density based and critical plane based fatigue concept is used for the fatigue crack prediction. The dynamic loads were calculated according to the axle load, speed, and track properties. The results show that axle load is most sensitive parameter compared to Poisson’s ratio in fatigue crack initiation life. Also, the reliability index decreases slowly due to high cycle fatigue regime in this area.Keywords: rail-wheel tribology, rolling contact mechanic, finite element modeling, reliability analysis
Procedia PDF Downloads 3816023 Analysis of Urban Rail Transit Station's Accessibility Reliability: A Case Study of Hangzhou Metro, China
Authors: Jin-Qu Chen, Jie Liu, Yong Yin, Zi-Qi Ju, Yu-Yao Wu
Abstract:
Increase in travel fare and station’s failure will have huge impact on passengers’ travel. The Urban Rail Transit (URT) station’s accessibility reliability under increasing travel fare and station failure are analyzed in this paper. Firstly, the passenger’s travel path is resumed based on stochastic user equilibrium and Automatic Fare Collection (AFC) data. Secondly, calculating station’s importance by combining LeaderRank algorithm and Ratio of Station Affected Passenger Volume (RSAPV), and then the station’s accessibility evaluation indicators are proposed based on the analysis of passenger’s travel characteristic. Thirdly, station’s accessibility under different scenarios are measured and rate of accessibility change is proposed as station’s accessibility reliability indicator. Finally, the accessibility of Hangzhou metro stations is analyzed by the formulated models. The result shows that Jinjiang station and Liangzhu station are the most important and convenient station in the Hangzhou metro, respectively. Station failure and increase in travel fare and station failure have huge impact on station’s accessibility, except for increase in travel fare. Stations in Hangzhou metro Line 1 have relatively worse accessibility reliability and Fengqi Road station’s accessibility reliability is weakest. For Hangzhou metro operational department, constructing new metro line around Line 1 and protecting Line 1’s station preferentially can effective improve the accessibility reliability of Hangzhou metro.Keywords: automatic fare collection data, AFC, station’s accessibility reliability, stochastic user equilibrium, urban rail transit, URT
Procedia PDF Downloads 1356022 An Extended Inverse Pareto Distribution, with Applications
Authors: Abdel Hadi Ebraheim
Abstract:
This paper introduces a new extension of the Inverse Pareto distribution in the framework of Marshal-Olkin (1997) family of distributions. This model is capable of modeling various shapes of aging and failure data. The statistical properties of the new model are discussed. Several methods are used to estimate the parameters involved. Explicit expressions are derived for different types of moments of value in reliability analysis are obtained. Besides, the order statistics of samples from the new proposed model have been studied. Finally, the usefulness of the new model for modeling reliability data is illustrated using two real data sets with simulation study.Keywords: pareto distribution, marshal-Olkin, reliability, hazard functions, moments, estimation
Procedia PDF Downloads 826021 Methods of Improving Production Processes Based on Deming Cycle
Authors: Daniel Tochwin
Abstract:
Continuous improvement is an essential part of effective process performance management. In order to achieve continuous quality improvement, each organization must use the appropriate selection of tools and techniques. The basic condition for success is a proper understanding of the business need faced by the company and the selection of appropriate methods to improve a given production process. The main aim of this article is to analyze the methods of conduct which are popular in practice when implementing process improvements and then to determine whether the tested methods include repetitive systematics of the approach, i.e., a similar sequence of the same or similar actions. Based on an extensive literature review, 4 methods of continuous improvement of production processes were selected: A3 report, Gemba Kaizen, PDCA cycle, and Deming cycle. The research shows that all frequently used improvement methods are generally based on the PDCA cycle, and the differences are due to "(re)interpretation" and the need to adapt the continuous improvement approach to the specific business process. The research shows that all the frequently used improvement methods are generally based on the PDCA cycle, and the differences are due to "(re) interpretation" and the need to adapt the continuous improvement approach to the specific business process.Keywords: continuous improvement, lean methods, process improvement, PDCA
Procedia PDF Downloads 806020 Evaluation of Reliability, Availability and Maintainability for Automotive Manufacturing Process
Authors: Hamzeh Soltanali, Abbas Rohani, A. H. S. Garmabaki, Mohammad Hossein Abbaspour-Fard, Adithya Thaduri
Abstract:
Toward continuous innovation and high complexity of technological systems, the automotive manufacturing industry is also under pressure to implement adequate management strategies regarding availability and productivity. In this context, evaluation of system’s performance by considering reliability, availability and maintainability (RAM) methodologies can constitute for resilient operation, identifying the bottlenecks of manufacturing process and optimization of maintenance actions. In this paper, RAM parameters are evaluated for improving the operational performance of the fluid filling process. To evaluate the RAM factors through the behavior of states defined for such process, a systematic decision framework was developed. The results of RAM analysis revealed that that the improving reliability and maintainability of main bottlenecks for each filling workstation need to be considered as a priority. The results could be useful to improve operational performance and sustainability of production process.Keywords: automotive, performance, reliability, RAM, fluid filling process
Procedia PDF Downloads 3536019 Contention Window Adjustment in IEEE 802.11-based Industrial Wireless Networks
Authors: Mohsen Maadani, Seyed Ahmad Motamedi
Abstract:
The use of wireless technology in industrial networks has gained vast attraction in recent years. In this paper, we have thoroughly analyzed the effect of contention window (CW) size on the performance of IEEE 802.11-based industrial wireless networks (IWN), from delay and reliability perspective. Results show that the default values of CWmin, CWmax, and retry limit (RL) are far from the optimum performance due to the industrial application characteristics, including short packet and noisy environment. An adaptive CW algorithm (payload-dependent) has been proposed to minimize the average delay. Finally a simple, but effective CW and RL setting has been proposed for industrial applications which outperforms the minimum-average-delay solution from maximum delay and jitter perspective, at the cost of a little higher average delay. Simulation results show an improvement of up to 20%, 25%, and 30% in average delay, maximum delay and jitter respectively.Keywords: average delay, contention window, distributed coordination function (DCF), jitter, industrial wireless network (IWN), maximum delay, reliability, retry limit
Procedia PDF Downloads 4166018 On the Use of Reliability Factors to Reduce Conflict between Information Sources in Dempster-Shafer Theory
Authors: A. Alem, Y. Dahmani, A. Hadjali, A. Boualem
Abstract:
Managing the problem of the conflict, either by using the Dempster-Shafer theory, or by the application of the fusion process to push researchers in recent years to find ways to get to make best decisions especially; for information systems, vision, robotic and wireless sensor networks. In this paper we are interested to take account of the conflict in the combination step that took the conflict into account and tries to manage such a way that it does not influence the decision step, the conflict what from reliable sources. According to [1], the conflict lead to erroneous decisions in cases where was with strong degrees between sources of information, if the conflict is more than the maximum of the functions of belief mass K > max1...n (mi (A)), then the decision becomes impossible. We will demonstrate in this paper that the multiplication of mass functions by coefficients of reliability is a decreasing function; it leads to the reduction of conflict and a good decision. The definition of reliability coefficients accurately and multiply them by the mass functions of each information source to resolve the conflict and allow deciding whether the degree of conflict. The evaluation of this technique is done by a use case; a comparison of the combination of springs with a maximum conflict without, and with reliability coefficients.Keywords: Dempster-Shafer theory, fusion process, conflict managing, reliability factors, decision
Procedia PDF Downloads 4266017 Simple Procedure for Probability Calculation of Tensile Crack Occurring in Rigid Pavement: A Case Study
Authors: Aleš Florian, Lenka Ševelová, Jaroslav Žák
Abstract:
Formation of tensile cracks in concrete slabs of rigid pavement can be (among others) the initiation point of the other, more serious failures which can ultimately lead to complete degradation of the concrete slab and thus the whole pavement. Two measures can be used for reliability assessment of this phenomenon - the probability of failure and/or the reliability index. Different methods can be used for their calculation. The simple ones are called moment methods and simulation techniques. Two methods - FOSM Method and Simple Random Sampling Method - are verified and their comparison is performed. The influence of information about the probability distribution and the statistical parameters of input variables as well as of the limit state function on the calculated reliability index and failure probability are studied in three points on the lower surface of concrete slabs of the older type of rigid pavement formerly used in the Czech Republic.Keywords: failure, pavement, probability, reliability index, simulation, tensile crack
Procedia PDF Downloads 5466016 PVMODREL© Development Based on Reliability Evaluation of a PV Module Using Accelerated Degradation Testing
Authors: Abderafi Charki, David Bigaud
Abstract:
The aim of this oral speach is to present the PVMODREL© (PhotoVoltaic MODule RELiability) new software developed in the University of Angers. This new tool permits us to evaluate the lifetime and reliability of a PV module whatever its geographical location and environmental conditions. The electrical power output of a PV module decreases with time mainly as a result of the effects of corrosion, encapsulation discoloration, and solder bond failure. The failure of a PV module is defined as the point where the electrical power degradation reaches a given threshold value. Accelerated life tests (ALTs) are commonly used to assess the reliability of a PV module. However, ALTs provide limited data on the failure of a module and these tests are expensive to carry out. One possible solution is to conduct accelerated degradation tests. The Wiener process in conjunction with the accelerated failure time model makes it possible to carry out numerous simulations and thus to determine the failure time distribution based on the aforementioned threshold value. By this means, the failure time distribution and the lifetime (mean and uncertainty) can be evaluated. An example using the damp heat test is shown to demonstrate the usefulness PVMODREL.Keywords: lifetime, reliability, PV Module, accelerated life testing, accelerated degradation testing
Procedia PDF Downloads 5756015 Unified Assessment of Power System Reserve-based Reliability Levels
Authors: B. M. Alshammari, M. A. El-Kady
Abstract:
This paper presents a unified framework for assessment of reserve-based reliability levels in electric power systems. The unified approach is based on reserve-based analysis and assessment of the relationship between available generation capacities and required demand levels. The developed approach takes into account the load variations as well as contingencies which occur randomly causing some generation and/or transmission capacities to be lost (become unavailable). The calculated reserve based indices, which are important to assess the reserve capabilities of the power system for various operating scenarios are therefore probabilistic in nature. They reflect the fact that neither the load levels nor the generation or transmission capacities are known with absolute certainty. They are rather subjects to random variations and consequently. The calculated reserve-based reliability indices are all subjects to random variations where only expected values of these indices can be evaluated. This paper presents a unified approach to reserve-based reliability assessment of power systems using various reserve assessment criteria. Practical applications are also presented for demonstration purposes to the Saudi electricity power grid.Keywords: assessment, power system, reserve, reliability
Procedia PDF Downloads 6176014 First Order Moment Bounds on DMRL and IMRL Classes of Life Distributions
Authors: Debasis Sengupta, Sudipta Das
Abstract:
The class of life distributions with decreasing mean residual life (DMRL) is well known in the field of reliability modeling. It contains the IFR class of distributions and is contained in the NBUE class of distributions. While upper and lower bounds of the reliability distribution function of aging classes such as IFR, IFRA, NBU, NBUE, and HNBUE have discussed in the literature for a long time, there is no analogous result available for the DMRL class. We obtain the upper and lower bounds for the reliability function of the DMRL class in terms of first order finite moment. The lower bound is obtained by showing that for any fixed time, the minimization of the reliability function over the class of all DMRL distributions with a fixed mean is equivalent to its minimization over a smaller class of distribution with a special form. Optimization over this restricted set can be made algebraically. Likewise, the maximization of the reliability function over the class of all DMRL distributions with a fixed mean turns out to be a parametric optimization problem over the class of DMRL distributions of a special form. The constructive proofs also establish that both the upper and lower bounds are sharp. Further, the DMRL upper bound coincides with the HNBUE upper bound and the lower bound coincides with the IFR lower bound. We also prove that a pair of sharp upper and lower bounds for the reliability function when the distribution is increasing mean residual life (IMRL) with a fixed mean. This result is proved in a similar way. These inequalities fill a long-standing void in the literature of the life distribution modeling.Keywords: DMRL, IMRL, reliability bounds, hazard functions
Procedia PDF Downloads 3976013 Optimization of Reliability Test Plans: Increase Wafer Fabrication Equipments Uptime
Authors: Swajeeth Panchangam, Arun Rajendran, Swarnim Gupta, Ahmed Zeouita
Abstract:
Semiconductor processing chambers tend to operate in controlled but aggressive operating conditions (chemistry, plasma, high temperature etc.) Owing to this, the design of this equipment requires developing robust and reliable hardware and software. Any equipment downtime due to reliability issues can have cost implications both for customers in terms of tool downtime (reduced throughput) and for equipment manufacturers in terms of high warranty costs and customer trust deficit. A thorough reliability assessment of critical parts and a plan for preventive maintenance/replacement schedules need to be done before tool shipment. This helps to save significant warranty costs and tool downtimes in the field. However, designing a proper reliability test plan to accurately demonstrate reliability targets with proper sample size and test duration is quite challenging. This is mainly because components can fail in different failure modes that fit into different Weibull beta value distributions. Without apriori Weibull beta of a failure mode under consideration, it always leads to over/under utilization of resources, which eventually end up in false positives or false negatives estimates. This paper proposes a methodology to design a reliability test plan with optimal model size/duration/both (independent of apriori Weibull beta). This methodology can be used in demonstration tests and can be extended to accelerated life tests to further decrease sample size/test duration.Keywords: reliability, stochastics, preventive maintenance
Procedia PDF Downloads 156012 Reliability of Movement Assessment Battery for Children-2 Age Band 3 Using Multiple Testers
Authors: Jernice S. Y. Tan
Abstract:
Introduction: Reliability within and between testers is vital to ensure the accuracy of any motor assessment instrument. However, reliability checks of the Movement Assessment Battery for Children-2 (MABC-2) age band 3 using multiple testers assigned to different MABC-2 tasks for the same group of participants are uncommon. Multiple testers were not stated as a choice in the MABC-2 manual. Therefore, the purpose of this study was to determine the inter- and intra-tester reliability for using multiple testers to administer the test protocols of MABC-2 age band 3. Methods: Thirty volunteered adolescents (n = 30; 15 males, 15 females; age range: 13 – 16 years) performed the eight tasks in a randomised sequence at three different test stations for the MABC-2 task components (Manual Dexterity, Aiming and Catching, Balance). Ethics approval and parental consent were obtained. The participants were videotaped while performing the test protocols of MABC-2 age band 3. Five testers were involved in the data collection process. They were Sports Science graduating students doing their final year project and were supervised by experienced motor assessor. Inter- and intra-tester reliability checks using intra-class coefficient (ICC) were carried out using the videotaped data. Results: The inter-tester reliability between the five testers for the eight tasks ranged from rᵢcc = 0.705 to rᵢcc = 0.995. This suggests that the average agreement between them was considered good to excellent. With the exception of one tester who had rᵢcc = 0.687 for one of the eight tasks (i.e. zip-zap hopping), the intra-tester reliability within each tester ranged from rᵢcc = 0.728 to rᵢcc = 1.000, and this also suggested good to excellent consistency within testers. Discussion: The use of multiple testers with good intra-tester reliability for different test stations is feasible. This method allows several participants to be assessed concurrently at different test stations and saves overall data collection time. Therefore, it is recommended that the administering of MABC-2 with multiple testers should be extended to other age bands ensuring the feasibility of such method for other age bands.Keywords: adolescents, MABC, motor assessment, motor skills, reliability
Procedia PDF Downloads 3236011 Reliability Analysis of Computer Centre at Yobe State University Using LRU Algorithm
Authors: V. V. Singh, Yusuf Ibrahim Gwanda, Rajesh Prasad
Abstract:
In this paper, we focus on the reliability and performance analysis of Computer Centre (CC) at Yobe State University, Damaturu, Nigeria. The CC consists of three servers: one database mail server, one redundant and one for sharing with the client computers in the CC (called as a local server). Observing the different possibilities of the functioning of the CC, the analysis has been done to evaluate the various popular measures of reliability such as availability, reliability, mean time to failure (MTTF), profit analysis due to the operation of the system. The system can ultimately fail due to the failure of router, redundant server before repairing the mail server and switch failure. The system can also partially fail when a local server fails. The failed devices have restored according to Least Recently Used (LRU) techniques. The system can also fail entirely due to a cooling failure of the server, electricity failure or some natural calamity like earthquake, fire tsunami, etc. All the failure rates are assumed to be constant and follow exponential time distribution, while the repair follows two types of distributions: i.e. general and Gumbel-Hougaard family copula distribution.Keywords: reliability, availability Gumbel-Hougaard family copula, MTTF, internet data centre
Procedia PDF Downloads 5306010 The Factors Predicting Credibility of News in Social Media in Thailand
Authors: Ekapon Thienthaworn
Abstract:
This research aims to study the reliability of the forecasting factor in social media by using survey research methods with questionnaires. The sampling is the group of undergraduate students in Bangkok. A multiple-step random number of 400 persons, data analysis are descriptive statistics with multivariate regression analysis. The research found the average of the overall trust at the intermediate level for reading the news in social media and the results of the multivariate regression analysis to find out the factors that forecast credibility of the media found the only content that has the power to forecast reliability of undergraduate students in Bangkok to reading the news on social media at the significance level.at 0.05.These can be factors with forecasts reliability of news in social media by a variable that has the highest influence factor of the media content and the speed is also important for reliability of the news.Keywords: credibility of news, behaviors and attitudes, social media, web board
Procedia PDF Downloads 4686009 Solid State Drive End to End Reliability Prediction, Characterization and Control
Authors: Mohd Azman Abdul Latif, Erwan Basiron
Abstract:
A flaw or drift from expected operational performance in one component (NAND, PMIC, controller, DRAM, etc.) may affect the reliability of the entire Solid State Drive (SSD) system. Therefore, it is important to ensure the required quality of each individual component through qualification testing specified using standards or user requirements. Qualification testing is time-consuming and comes at a substantial cost for product manufacturers. A highly technical team, from all the eminent stakeholders is embarking on reliability prediction from beginning of new product development, identify critical to reliability parameters, perform full-blown characterization to embed margin into product reliability and establish control to ensure the product reliability is sustainable in the mass production. The paper will discuss a comprehensive development framework, comprehending SSD end to end from design to assembly, in-line inspection, in-line testing and will be able to predict and to validate the product reliability at the early stage of new product development. During the design stage, the SSD will go through intense reliability margin investigation with focus on assembly process attributes, process equipment control, in-process metrology and also comprehending forward looking product roadmap. Once these pillars are completed, the next step is to perform process characterization and build up reliability prediction modeling. Next, for the design validation process, the reliability prediction specifically solder joint simulator will be established. The SSD will be stratified into Non-Operating and Operating tests with focus on solder joint reliability and connectivity/component latent failures by prevention through design intervention and containment through Temperature Cycle Test (TCT). Some of the SSDs will be subjected to the physical solder joint analysis called Dye and Pry (DP) and Cross Section analysis. The result will be feedbacked to the simulation team for any corrective actions required to further improve the design. Once the SSD is validated and is proven working, it will be subjected to implementation of the monitor phase whereby Design for Assembly (DFA) rules will be updated. At this stage, the design change, process and equipment parameters are in control. Predictable product reliability at early product development will enable on-time sample qualification delivery to customer and will optimize product development validation, effective development resource and will avoid forced late investment to bandage the end-of-life product failures. Understanding the critical to reliability parameters earlier will allow focus on increasing the product margin that will increase customer confidence to product reliability.Keywords: e2e reliability prediction, SSD, TCT, solder joint reliability, NUDD, connectivity issues, qualifications, characterization and control
Procedia PDF Downloads 1746008 SPICE Modeling for Evaluation of Distribution System Reliability Indices
Authors: G. N. Srinivas, K. Raju
Abstract:
This paper presents Markov processes for determining the reliability indices of distribution system. The continuous Markov modeling is applied to a complex radial distribution system and electrical equivalent circuits are developed for the modeling. In general PSPICE is being used for electrical and electronic circuits and various applications of power system like fault analysis, transient analysis etc. In this paper, the SPICE modeling equivalent circuits which are developed are applied in a novel way to Distribution System reliability analysis. These circuits are simulated using PSPICE software to obtain the state probabilities, the basic and performance indices. Thus the basic indices and the performance indices obtained by this method are compared with those obtained by FMEA technique. The application of the concepts presented in this paper are illustrated and analyzed for IEEE-Roy Billinton Test System (RBTS).Keywords: distribution system, Markov Model, reliability indices, spice simulation
Procedia PDF Downloads 5396007 A Study on the Reliability Evaluation of a Timer Card for Air Dryer of the Railway Vehicle
Authors: Chul Su Kim, Jun Ku Lee, Won Jun Lee
Abstract:
The EMU (electric multiple unit) vehicle timer card is a PCB (printed circuit board) for controlling the air-dryer to remove the moisture of the generated air from the air compressor of the braking device. This card is exposed to the lower part of the railway vehicle, so it is greatly affected by the external environment such as temperature and humidity. The main cause of the failure of this timer card is deterioration of soldering area of the PCB surface due to temperature and humidity. Therefore, in the viewpoint of preventive maintenance, it is important to evaluate the reliability of the timer card and predict the replacement cycle to secure the safety of the air braking device is one of the main devices for driving. In this study, the existing and the improved products were evaluated on the reliability through ALT (accelerated life test). In addition, the acceleration factor by the 'Coffin-Manson' equation was obtained, and the remaining lifetime was compared and examined.Keywords: reliability evaluation, timer card, Printed Circuit Board, Accelerated Life Test
Procedia PDF Downloads 2796006 Implementing a Strategy of Reliability Centred Maintenance (RCM) in the Libyan Cement Industry
Authors: Khalid M. Albarkoly, Kenneth S. Park
Abstract:
The substantial development of the construction industry has forced the cement industry, its major support, to focus on achieving maximum productivity to meet the growing demand for this material. Statistics indicate that the demand for cement rose from 1.6 billion metric tons (bmt) in 2000 to 4bmt in 2013. This means that the reliability of a production system needs to be at the highest level that can be achieved by good maintenance. This paper studies the extent to which the implementation of RCM is needed as a strategy for increasing the reliability of the production systems component can be increased, thus ensuring continuous productivity. In a case study of four Libyan cement factories, 80 employees were surveyed and 12 top and middle managers interviewed. It is evident that these factories usually breakdown more often than once per month which has led to a decline in productivity, they cannot produce more than 50% of their designed capacity. This has resulted from the poor reliability of their production systems as a result of poor or insufficient maintenance. It has been found that most of the factories’ employees misunderstand maintenance and its importance. The main cause of this problem is the lack of qualified and trained staff, but in addition, it has been found that most employees are not found to be motivated as a result of a lack of management support and interest. In response to these findings, it has been suggested that the RCM strategy should be implemented in the four factories. The paper shows the importance of considering the development of maintenance strategies through the implementation of RCM in these factories. The purpose of it would be to overcome the problems that could reduce the level of reliability of the production systems. This study could be a useful source of information for academic researchers and the industrial organisations which are still experiencing problems in maintenance practices.Keywords: Libyan cement industry, reliability centred maintenance, maintenance, production, reliability
Procedia PDF Downloads 3906005 Optimal Sequential Scheduling of Imperfect Maintenance Last Policy for a System Subject to Shocks
Authors: Yen-Luan Chen
Abstract:
Maintenance has a great impact on the capacity of production and on the quality of the products, and therefore, it deserves continuous improvement. Maintenance procedure done before a failure is called preventive maintenance (PM). Sequential PM, which specifies that a system should be maintained at a sequence of intervals with unequal lengths, is one of the commonly used PM policies. This article proposes a generalized sequential PM policy for a system subject to shocks with imperfect maintenance and random working time. The shocks arrive according to a non-homogeneous Poisson process (NHPP) with varied intensity function in each maintenance interval. As a shock occurs, the system suffers two types of failures with number-dependent probabilities: type-I (minor) failure, which is rectified by a minimal repair, and type-II (catastrophic) failure, which is removed by a corrective maintenance (CM). The imperfect maintenance is carried out to improve the system failure characteristic due to the altered shock process. The sequential preventive maintenance-last (PML) policy is defined as that the system is maintained before any CM occurs at a planned time Ti or at the completion of a working time in the i-th maintenance interval, whichever occurs last. At the N-th maintenance, the system is replaced rather than maintained. This article first takes up the sequential PML policy with random working time and imperfect maintenance in reliability engineering. The optimal preventive maintenance schedule that minimizes the mean cost rate of a replacement cycle is derived analytically and determined in terms of its existence and uniqueness. The proposed models provide a general framework for analyzing the maintenance policies in reliability theory.Keywords: optimization, preventive maintenance, random working time, minimal repair, replacement, reliability
Procedia PDF Downloads 2756004 Seizure Effects of FP Bearings on the Seismic Reliability of Base-Isolated Systems
Authors: Paolo Castaldo, Bruno Palazzo, Laura Lodato
Abstract:
This study deals with the seizure effects of friction pendulum (FP) bearings on the seismic reliability of a 3D base-isolated nonlinear structural system, designed according to Italian seismic code (NTC08). The isolated system consists in a 3D reinforced concrete superstructure, a r.c. substructure and the FP devices, described by employing a velocity dependent model. The seismic input uncertainty is considered as a random variable relevant to the problem, by employing a set of natural seismic records selected in compliance with L’Aquila (Italy) seismic hazard as provided from NTC08. Several non-linear dynamic analyses considering the three components of each ground motion have been performed with the aim to evaluate the seismic reliability of the superstructure, substructure, and isolation level, also taking into account the seizure event of the isolation devices. Finally, a design solution aimed at increasing the seismic robustness of the base-isolated systems with FPS is analyzed.Keywords: FP devices, seismic reliability, seismic robustness, seizure
Procedia PDF Downloads 4136003 Reliability Analysis of Geometric Performance of Onboard Satellite Sensors: A Study on Location Accuracy
Authors: Ch. Sridevi, A. Chalapathi Rao, P. Srinivasulu
Abstract:
The location accuracy of data products is a critical parameter in assessing the geometric performance of satellite sensors. This study focuses on reliability analysis of onboard sensors to evaluate their performance in terms of location accuracy performance over time. The analysis utilizes field failure data and employs the weibull distribution to determine the reliability and in turn to understand the improvements or degradations over a period of time. The analysis begins by scrutinizing the location accuracy error which is the root mean square (RMS) error of differences between ground control point coordinates observed on the product and the map and identifying the failure data with reference to time. A significant challenge in this study is to thoroughly analyze the possibility of an infant mortality phase in the data. To address this, the Weibull distribution is utilized to determine if the data exhibits an infant stage or if it has transitioned into the operational phase. The shape parameter beta plays a crucial role in identifying this stage. Additionally, determining the exact start of the operational phase and the end of the infant stage poses another challenge as it is crucial to eliminate residual infant mortality or wear-out from the model, as it can significantly increase the total failure rate. To address this, an approach utilizing the well-established statistical Laplace test is applied to infer the behavior of sensors and to accurately ascertain the duration of different phases in the lifetime and the time required for stabilization. This approach also helps in understanding if the bathtub curve model, which accounts for the different phases in the lifetime of a product, is appropriate for the data and whether the thresholds for the infant period and wear-out phase are accurately estimated by validating the data in individual phases with Weibull distribution curve fitting analysis. Once the operational phase is determined, reliability is assessed using Weibull analysis. This analysis not only provides insights into the reliability of individual sensors with regards to location accuracy over the required period of time, but also establishes a model that can be applied to automate similar analyses for various sensors and parameters using field failure data. Furthermore, the identification of the best-performing sensor through this analysis serves as a benchmark for future missions and designs, ensuring continuous improvement in sensor performance and reliability. Overall, this study provides a methodology to accurately determine the duration of different phases in the life data of individual sensors. It enables an assessment of the time required for stabilization and provides insights into the reliability during the operational phase and the commencement of the wear-out phase. By employing this methodology, designers can make informed decisions regarding sensor performance with regards to location accuracy, contributing to enhanced accuracy in satellite-based applications.Keywords: bathtub curve, geometric performance, Laplace test, location accuracy, reliability analysis, Weibull analysis
Procedia PDF Downloads 656002 Asynchronous Low Duty Cycle Media Access Control Protocol for Body Area Wireless Sensor Networks
Authors: Yasin Ghasemi-Zadeh, Yousef Kavian
Abstract:
Wireless body area networks (WBANs) technology has achieved lots of popularity over the last decade with a wide range of medical applications. This paper presents an asynchronous media access control (MAC) protocol based on B-MAC protocol by giving an application for medical issues. In WBAN applications, there are some serious problems such as energy, latency, link reliability (quality of wireless link) and throughput which are mainly due to size of sensor networks and human body specifications. To overcome these problems and improving link reliability, we concentrated on MAC layer that supports mobility models for medical applications. In the presented protocol, preamble frames are divided into some sub-frames considering the threshold level. Actually, the main reason for creating shorter preambles is the link reliability where due to some reasons such as water, the body signals are affected on some frequency bands and causes fading and shadowing on signals, therefore by increasing the link reliability, these effects are reduced. In case of mobility model, we use MoBAN model and modify that for some more areas. The presented asynchronous MAC protocol is modeled by OMNeT++ simulator. The results demonstrate increasing the link reliability comparing to B-MAC protocol where the packet reception ratio (PRR) is 92% also covers more mobility areas than MoBAN protocol.Keywords: wireless body area networks (WBANs), MAC protocol, link reliability, mobility, biomedical
Procedia PDF Downloads 3696001 Mecano-Reliability Coupled of Reinforced Concrete Structure and Vulnerability Analysis: Case Study
Authors: Kernou Nassim
Abstract:
The current study presents a vulnerability and a reliability-mechanical approach that focuses on evaluating the seismic performance of reinforced concrete structures to determine the probability of failure. In this case, the performance function reflecting the non-linear behavior of the structure is modeled by a response surface to establish an analytical relationship between the random variables (strength of concrete and yield strength of steel) and mechanical responses of the structure (inter-floor displacement) obtained by the pushover results of finite element simulations. The push over-analysis is executed by software SAP2000. The results acquired prove that properly designed frames will perform well under seismic loads. It is a comparative study of the behavior of the existing structure before and after reinforcement using the pushover method. The coupling indirect mechanical reliability by response surface avoids prohibitive calculation times. Finally, the results of the proposed approach are compared with Monte Carlo Simulation. The comparative study shows that the structure is more reliable after the introduction of new shear walls.Keywords: finite element method, surface response, reliability, reliability mechanical coupling, vulnerability
Procedia PDF Downloads 1176000 Fault Tree Analysis (FTA) of CNC Turning Center
Authors: R. B. Patil, B. S. Kothavale, L. Y. Waghmode
Abstract:
Today, the CNC turning center becomes an important machine tool for manufacturing industry worldwide. However, as the breakdown of a single CNC turning center may result in the production of an entire plant being halted. For this reason, operations and preventive maintenance have to be minimized to ensure availability of the system. Indeed, improving the availability of the CNC turning center as a whole, objectively leads to a substantial reduction in production loss, operating, maintenance and support cost. In this paper, fault tree analysis (FTA) method is used for reliability analysis of CNC turning center. The major faults associated with the system and the causes for the faults are presented graphically. Boolean algebra is used for evaluating fault tree (FT) diagram and for deriving governing reliability model for CNC turning center. Failure data over a period of six years has been collected and used for evaluating the model. Qualitative and quantitative analysis is also carried out to identify critical sub-systems and components of CNC turning center. It is found that, at the end of the warranty period (one year), the reliability of the CNC turning center as a whole is around 0.61628.Keywords: fault tree analysis (FTA), reliability analysis, risk assessment, hazard analysis
Procedia PDF Downloads 4145999 Reliability Analysis of Computer Centre at Yobe State University Nigeria under Different Repair Policies
Authors: Vijay Vir Singh
Abstract:
In this paper, we focus on the reliability and performance analysis of Computer Centre (CC) at Yobe State University, Damaturu, Nigeria. The CC consists of three servers: one database mail server, one redundant and one for sharing with the client computers in the CC (called as local server). Observing the different possibilities of functioning of the CC, analysis has been done to evaluate the various reliability characteristics of the system. The system can completely fail due to failure of router, redundant server before repairing the mail server, and switch failure. The system can also partially fail when local server fails. The system can also fail completely due to a cooling failure, electricity failure or some natural calamity like earthquake, fire etc. All the failure rates are assumed to be constant while repair follows two types of distributions: general and Gumbel-Hougaard family copula.Keywords: reliability, availability Gumbel-Hougaard family copula, MTTF, internet data centre
Procedia PDF Downloads 461