16293 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria
Authors: Nnadi Ezekiel Ejiofor
Abstract:
In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.Keywords: construction, project management, strategic leadership, sustainability, waste reduction
Procedia PDF Downloads 5016292 Sustainable Project Management: Driving the Construction Industry Towards Sustainable Developmental Goals
Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Mewomo Cecilia, Opoku Alex
Abstract:
Purpose: The purpose of this research is to develop a framework for understanding how sustainable project management contributes to the construction industry's pursuit of sustainable development goals. Study design/methodology/approach: The study employed a theoretical methodology to review existing theories and models that support Sustainable Project Management (SPM) in the construction industry. Additionally, a comprehensive review of current literature on SPM is conducted to provide a thorough understanding of this study. Findings: Sustainable Project Management (SPM) practices, including stakeholder engagement and collaboration, resource efficiency, waste management, risk management, and resilience, play a crucial role in achieving the Sustainable Development Goals (SDGs) within the construction industry. Conclusion: Adopting Sustainable Project Management (SPM) practices in the Ghanaian construction industry enhances social inclusivity by engaging communities and creating job opportunities. The adoption of these practices faces significant challenges, including a lack of awareness and understanding, insufficient regulatory frameworks, financial constraints, and a shortage of skilled professionals. Recommendation: There should be a comprehensive approach to project planning and execution that includes stakeholders such as local communities, government bodies, and environmental organisations, the use of green building materials and technologies, and the implementation of effective waste management strategies, all of which will ensure the achievement of SDGs in Ghana's construction industry. Originality/value: This paper adds to the current literature by offering the various theories and models in Sustainable Project Management (SPM) and a detailed review of how Sustainable Project Management (SPM) contribute to the achievement of the Sustainable Development Goals (SDGs) in the Ghanaian Construction Industry.Keywords: sustainable development, sustainable development goals, construction industry, ghana, sustainable project management
Procedia PDF Downloads 2316291 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward
Authors: Abdullah Alsehaimi
Abstract:
Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.Keywords: construction delay, action research, constructive research, industrial engineering
Procedia PDF Downloads 42316290 Simulating the Interaction of Strategy Development and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.Keywords: strategy, simulation, project management, game theory
Procedia PDF Downloads 13816289 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board
Authors: Amina Umulisa
Abstract:
Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.Keywords: project success rates, investment strategies, training programs, cost management
Procedia PDF Downloads 5216288 Designing a Model for Preparing Reports on the Automatic Earned Value Management Progress by the Integration of Primavera P6, SQL Database, and Power BI: A Case Study of a Six-Storey Concrete Building in Mashhad, Iran
Authors: Hamed Zolfaghari, Mojtaba Kord
Abstract:
Project planners and controllers are frequently faced with the challenge of inadequate software for the preparation of automatic project progress reports based on actual project information updates. They usually make dashboards in Microsoft Excel, which is local and not applicable online. Another shortcoming is that it is not linked to planning software such as Microsoft Project, which lacks the database required for data storage. This study aimed to propose a model for the preparation of reports on automatic online project progress based on actual project information updates by the integration of Primavera P6, SQL database, and Power BI for a construction project. The designed model could be applicable to project planners and controller agents by enabling them to prepare project reports automatically and immediately after updating the project schedule using actual information. To develop the model, the data were entered into P6, and the information was stored on the SQL database. The proposed model could prepare a wide range of reports, such as earned value management, HR reports, and financial, physical, and risk reports automatically on the Power BI application. Furthermore, the reports could be published and shared online.Keywords: primavera P6, SQL, Power BI, EVM, integration management
Procedia PDF Downloads 10816287 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector
Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan
Abstract:
Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making
Procedia PDF Downloads 32816286 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays
Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof
Abstract:
Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.Keywords: final account closing, construction project, construction delay, supply chain management
Procedia PDF Downloads 36616285 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 30316284 Evaluation of Free Technologies as Tools for Business Process Management
Authors: Julio Sotomayor, Daniel Yucra, Jorge Mayhuasca
Abstract:
The article presents an evaluation of free technologies for business process automation, with emphasis only on tools compatible with the general public license (GPL). The compendium of technologies was based on promoting a service-oriented enterprise architecture (SOA) and the establishment of a business process management system (BPMS). The methodology for the selection of tools was Agile UP. This proposal allows businesses to achieve technological sovereignty and independence, in addition to the promotion of service orientation and the development of free software based on components.Keywords: BPM, BPMS suite, open-source software, SOA, enterprise architecture, business process management
Procedia PDF Downloads 28816283 Sustainable Project Management Necessarily Implemented in the Chinese Wine Market Due to Climate Variation
Authors: Ruixin Zhang, Joel Carboni, Songchenchen Gong
Abstract:
Since the Sustainable Development Goals (SDGs) officially became the 17 development goals set by the United Nations in 2015, it has become an inevitable trend in project management development globally. Since Sustainability and glob-alization are the main focus and trends in the 21st century, project management contains system-based optimization, and or-ganizational humanities, environmental protection, and economic development. As a populous country globally, with the advanced development of economy and technology, China becomes one of the biggest markets in the wine industry. However, the develop-ment of society also brings specific environmental issues. Climate changes have already brought severe impacts on the Chinese wine market, including consumer behavior, wine production activities, and organizational humanities. Therefore, the implementation of sustainable project management in Chinese wine market is essential. Surveys based analysis is the primary method to interpret how the climate variation effect the Chinese wine market and the importance of sustainable project management implementation for green market growth in China. This paper proposes the CWW Conceptual model that can be used in the wine industry, the new 7 Drivers Model, and SPM Framework to interpret the main drivers that impact project management implementation in the wine industry and to offer the directions to wine companies in China which would help them to achieve the green growth.Keywords: project management, sustainability, green growth, climate changes, Chinese wine market
Procedia PDF Downloads 12716282 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria
Authors: Shazali Abdulahi
Abstract:
Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.Keywords: effetive communication, ineffective communication, stakeholders, project delivery
Procedia PDF Downloads 5116281 Knowledge Management in the Tourism Industry in Project Management Paradigm
Authors: Olga A. Burukina
Abstract:
Tourism is a complex socio-economic phenomenon, partly regulated by national tourism industries. The sustainable development of tourism in a region, country or in tourist destination depends on a number of factors (political, economic, social, cultural, legal and technological), the understanding and correct interpretation of which is invariably anthropocentric. It is logical that for the successful functioning of a tour operating company, it is necessary to ensure its sustainable development. Sustainable tourism is defined as tourism that fully considers its current and future economic, social and environmental impacts, taking into account the needs of the industry, the environment and the host communities. For the business enterprise, sustainable development is defined as adopting business strategies and activities that meet the needs of the enterprise and its stakeholders today while protecting, sustaining and enhancing the human and natural resources that will be needed in the future. In addition to a systemic approach to the analysis of tourist destinations, each tourism project can and should be considered as a system characterized by a very high degree of variability, since each particular case of its implementation differs from the previous and subsequent ones, sometimes in a cardinal way. At the same time, it is important to understand that this variability is predominantly of anthropogenic nature (except for force majeure situations that are considered separately and afterwards). Knowledge management is the process of creating, sharing, using and managing the knowledge and information of an organization. It refers to a multidisciplinary approach to achieve organisational objectives by making the best use of knowledge. Knowledge management is seen as a key systems component that allows obtaining, storing, transferring, and maintaining information and knowledge in particular, in a long-term perspective. The study aims, firstly, to identify (1) the dynamic changes in the Italian travel industry in the last 5 years before the COVID19 pandemic, which can be considered the scope of force majeure circumstances, (2) the impact of the pandemic on the industry and (3) efforts required to restore it, and secondly, how project management tools can help to improve knowledge management in tour operating companies to maintain their sustainability, diminish potential risks and restore their pre-pandemic performance level as soon as possible. The pilot research is based upon a systems approach and has employed a pilot survey, semi-structured interviews, prior research analysis (aka literature review), comparative analysis, cross-case analysis, and modelling. The results obtained are very encouraging: PM tools can improve knowledge management in tour operating companies and secure the more sustainable development of the Italian tourism industry based on proper knowledge management and risk management.Keywords: knowledge management, project management, sustainable development, tourism industr
Procedia PDF Downloads 15516280 Effect of Institutional Structure on Project Managers Performance in Construction Projects: A Case Study in Nigeria
Authors: Ebuka Valentine Iroha, Tsunemi Watanabe, Satoshi Tsuchiya
Abstract:
Project management practices play an important role in construction project performance and are one of project managers' essential key performance indicators. Previous studies have explored the poor performance of the construction industry, with project delays and cost overruns identified to contribute largely to numerous abandoned projects. These challenges are attributed to insufficient project management practices and a lack of utilization of project managers. The actual causes of inadequate project management practices and underutilization of project managers have been rarely discussed. This study tends to bridge the gap by identifying and assessing the actual causes of insufficient project management practices and underutilization of project managers. This study differs from past studies investigating the causes of poor performance by using institutional analysis methods to identify and analyze the factors influencing project management practices and proper utilization of project managers. Based on a comprehensive literature review, this study identified some factors embedded in the construction industry that influence the institutional environment and weaken the laws and regulations. These factors were used as the basis for semi-structured interview questions to investigate their impacts on project management practices and project managers. The data collected were coded into a four-level framework for institutional analysis. This method was used to analyze the interrelationships between the identified embedded factors, institutional laws and regulations, and construction organizations to understand how these influences result in the underutilization of project managers. The study found that the underutilization of project managers consists of two subsystems, including underutilization and lowering commitment. The first subsystem, corruption, political influence, religious and tribal discrimination, and organizational culture, were found to affect the institutional structure. These embedded factors weaken the industry’s governance mechanism, forcing project managers to prioritize corrupt practices over project demands. The ineffectiveness of the existing laws and regulations worsens the situation, supporting unfair working conditions and contributing to the underperformance of project managers. This situation leads to the development of the second subsystem, which is characterized by a lack of opportunities for career development and minimal incentives within construction organizations. The findings provide significant potential for addressing systemic challenges in the construction industry, particularly the underutilization of project managers and enhancing organizational support measures to improve project management practices and mitigate the adverse effects of corruption.Keywords: construction industry, project management, poor performance, embedded factors, project managers underutilization
Procedia PDF Downloads 3616279 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling
Authors: Dong Wu, Michael Grenn
Abstract:
Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction
Procedia PDF Downloads 7916278 Documentation Project on Boat Models from Saqqara, in the Grand Egyptian Museum
Authors: Ayman Aboelkassem, Mohamoud Ali, Rezq Diab
Abstract:
This project aims to document and preserve boat models which were discovered in the Saqqara by Czech Institute of Egyptology archeological mission at Saqqara (GEM numbers, 46007, 46008, 46009). These boat models dates back to Egyptian Old Kingdom and have been transferred to the Conservation Center of the Grand Egyptian Museum, to be displayed at the new museum.The project objectives making such boat models more visible to visitors through the use of 3D reconstructed models and high resolution photos which describe the history of using the boats during the Ancient Egyptian history. Especially, The Grand Egyptian Museum is going to exhibit the second boat of King Khufu from Old kingdom. The project goals are to document the boat models and arrange an exhibition, where such Models going to be displayed next to the Khufu Second Boat. The project shows the importance of using boats in Ancient Egypt, and connecting their usage through Ancient Egyptian periods till now. The boat models had a unique Symbolized in ancient Egypt and connect the public with their kings. The Egyptian kings allowed high ranked employees to put boat models in their tombs which has a great meaning that they hope to fellow their kings in the journey of the afterlife.Keywords: archaeology, boat models, 3D digital tools for heritage management, museums
Procedia PDF Downloads 13716277 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement
Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov
Abstract:
One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.Keywords: logic, fuzzy sets, performance measurement, project analysis
Procedia PDF Downloads 38116276 Transforming the Human Resources of the Company in Innovation Factors: Educational Tools
Authors: Ciolomic Ioana Andreea, Farcas Teodora, Tiron-Tudor Adriana
Abstract:
Investments in research and innovation are widely acknowledged as being crucial drivers for economic growth, for job-creation and to secure social and economic welfare. The aim of this article is to disseminate the results of a Leonardo da Vinci Innovation Transfer project, AdapTykes Adaptation of trainings based up on the Finnish Workplace Development Programme. This project aims to analyses the adaptability of the Finnish model to the economic and political environment of the two emergent countries Romania and Hungary, in order to develop workplace innovation. The focus of this paper is to present the adaptability of the Finnish model to the Romanian context.Keywords: innovation, human resources, education, tools
Procedia PDF Downloads 52916275 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry
Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq
Abstract:
Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.Keywords: construction, project completion, risk management, uncertainties
Procedia PDF Downloads 15316274 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers
Authors: Mamoon Mousa Atout
Abstract:
The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities
Procedia PDF Downloads 29916273 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project
Authors: Mohmd Sarireh
Abstract:
The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.Keywords: geotechnical, management, progress, risk, soil unseen conditions management
Procedia PDF Downloads 22416272 A Risk-Based Approach to Construction Management
Authors: Chloe E. Edwards, Yasaman Shahtaheri
Abstract:
Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering
Procedia PDF Downloads 10716271 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals
Authors: Abdulaziz Alnajem, Amit Sharma
Abstract:
Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays
Procedia PDF Downloads 21716270 Techniques of Construction Management in Civil Engineering
Authors: Mamoon M. Atout
Abstract:
The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.Keywords: construction management, control process, cost control, planning and scheduling
Procedia PDF Downloads 24716269 Information Technology Service Management System Measurement Using ISO20000-1 and ISO15504-8
Authors: Imam Asrowardi, Septafiansyah Dwi Putra, Eko Subyantoro
Abstract:
Process assessments can improve IT service management system (IT SMS) processes but the assessment method is not always transparent. This paper outlines a project to develop a solution- mediated process assessment tool to enable transparent and objective SMS process assessment. Using the international standards for SMS and process assessment, the tool is being developed following the International standard approach in collaboration and evaluate by expert judgment from committee members and ITSM practitioners.Keywords: SMS, tools evaluation, ITIL, ISO service
Procedia PDF Downloads 48016268 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.
Authors: Firas Mohamad Al-Sabek
Abstract:
The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.Keywords: construction project, total quality management, management commitment, cost, theoretical framework
Procedia PDF Downloads 42616267 Application of Facilities Management Practice in High Rise Commercial Properties: Jos in Perpective
Authors: Aliyu Ahmad Aliyu, Abubakar Ahmad, Muhammad Umar Bello, Rozilah Kasim, David Martin
Abstract:
The article studied the application of facilities management practice in high rise commercial properties. Convenience sampling technique was used in administering questionnaires to the 60 respondents who responded to the survey. It was found out that the extent of application of facilities management in the subject properties is better described as below average. Similarly, the most frequently tools of facilities management in use and employed in the properties were outsourcing and in-house sourcing. This was influenced by the level of their familiarity with the tools. Planned and Preventive maintenance should be taken regularly in other to enhance the effectiveness of the facilities management and to satisfy both the owner and customers of the organization.Keywords: commercial properties, facilities management, high-rise buildings, Jos metropolis and outsourcing
Procedia PDF Downloads 54516266 Waste Generation in Iranian Building Industry: Addressing a Theory
Authors: Golnaz Moghimi, Alireza Afsharghotli, Alireza Rezaei
Abstract:
Construction waste has been gradually increased as a result of upsizing construction projects which are occurred within the lifecycle of buildings. Since waste management is a major priority and has profound impacts on the volume of waste generated in construction stage, the majority of efforts have been attempted to reuse, recycle and reduce waste. However, there is still room to study on lack of sufficient knowledge about waste management in construction industry. This paper intends to provide an insight into the effect of project management knowledge areas on waste management solely on construction stage. To this end, a survey among Iranian building construction industry contractors was conducted to identify the effectiveness of project management knowledge areas on three jobsite key factors including ‘Site activity’, ‘Training’, and ‘Awareness’. As a result, four management disciplines were identified as most influential ones on amount of construction waste. These disciplines were Project Cost Management, Quality Management, Human Resource Management, and Integration Management. Based on the research findings, a new model was presented to develop effective construction waste strategies.Keywords: awareness, PMBOK, site activity, training, waste management
Procedia PDF Downloads 35516265 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram
Abstract:
The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems
Procedia PDF Downloads 35616264 Leading Virtual Project Teams in the Post Pandemic Era: Trust and Conflict Management Strategies
Authors: Vidya Badrinarayanan, Appa Iyer Sivakumar
Abstract:
The coronavirus pandemic has sent an important message that future project teams need to be trained to work under virtual conditions, which has already become the new norm in organizations across the world. As organizations increasingly rely on virtual teams to achieve project objectives, it is essential to comprehend how leadership functions in virtual project teams. The purpose of this research is to analyze the leadership behaviors exhibited by project managers for building trust and managing conflicts effectively in virtual project teams. This convergent parallel mixed method research was conducted by surveying 185 virtual leaders and conducting a semi-structured interview with 13 senior virtual leaders involved in managing projects across the industry sectors. The research findings indicate that establishing trust and managing conflicts were ranked as significant challenges in leading virtual project teams in the post-pandemic era. In contrast to earlier findings, our research findings suggest that productivity was not ranked as a significant challenge in leading virtual project teams. This indeed is a positive finding for organizations to consider adopting virtual project teams in the long run. Additionally, the research findings recommend that virtual leaders need to strive to build a high-trust environment and develop effective conflict resolution skills to improve the effectiveness of virtual project teams. As the project management profession struggles with low project success rates, mixed-method research aims to contribute to the knowledge in the growing research area of virtual project leadership. This research contributes to the knowledge by offering first-person accounts from senior virtual leaders on the innovative strategies they had implemented for building trust and resolving conflicts effectively in the virtual project when there were limited opportunities for face-to-face interaction on account of the pandemic. In addition, the leadership framework created as a part of this research for trust development and conflict management in virtual project teams will guide project managers to improve virtual project team effectiveness.Keywords: conflict management, trust building, virtual leadership, virtual teams
Procedia PDF Downloads 189