Search results for: safety of construction projects
7475 The Role of People and Data in Complex Spatial-Related Long-Term Decisions: A Case Study of Capital Project Management Groups
Authors: Peter Boyes, Sarah Sharples, Paul Tennent, Gary Priestnall, Jeremy Morley
Abstract:
Significant long-term investment projects can involve complex decisions. These are often described as capital projects, and the factors that contribute to their complexity include budgets, motivating reasons for investment, stakeholder involvement, interdependent projects, and the delivery phases required. The complexity of these projects often requires management groups to be established involving stakeholder representatives; these teams are inherently multidisciplinary. This study uses two university campus capital projects as case studies for this type of management group. Due to the interaction of projects with wider campus infrastructure and users, decisions are made at varying spatial granularity throughout the project lifespan. This spatial-related context brings complexity to the group decisions. Sensemaking is the process used to achieve group situational awareness of a complex situation, enabling the team to arrive at a consensus and make a decision. The purpose of this study is to understand the role of people and data in the complex spatial related long-term decision and sensemaking processes. The paper aims to identify and present issues experienced in practical settings of these types of decision. A series of exploratory semi-structured interviews with members of the two projects elicit an understanding of their operation. From two stages of thematic analysis, inductive and deductive, emergent themes are identified around the group structure, the data usage, and the decision making within these groups. When data were made available to the group, there were commonly issues with the perception of veracity and validity of the data presented; this impacted the ability of group to reach consensus and, therefore, for decisions to be made. Similarly, there were different responses to forecasted or modelled data, shaped by the experience and occupation of the individuals within the multidisciplinary management group. This paper provides an understanding of further support required for team sensemaking and decision making in complex capital projects. The paper also discusses the barriers found to effective decision making in this setting and suggests opportunities to develop decision support systems in this team strategic decision-making process. Recommendations are made for further research into the sensemaking and decision-making process of this complex spatial-related setting.Keywords: decision making, decisions under uncertainty, real decisions, sensemaking, spatial, team decision making
Procedia PDF Downloads 1327474 Diversity of Microbial Ground Improvements
Authors: V. Ivanov, J. Chu, V. Stabnikov
Abstract:
Low cost, sustainable, and environmentally friendly microbial cements, grouts, polysaccharides and bioplastics are useful in construction and geotechnical engineering. Construction-related biotechnologies are based on activity of different microorganisms: urease-producing, acidogenic, halophilic, alkaliphilic, denitrifying, iron- and sulphate-reducing bacteria, cyanobacteria, algae, microscopic fungi. The bio-related materials and processes can be used for the bioaggregation, soil biogrouting and bioclogging, biocementation, biodesaturation of water-satured soil, bioencapsulation of soft clay, biocoating, and biorepair of the concrete surface. Altogether with the most popular calcium- and urea based biocementation, there are possible and often are more effective such methods of ground improvement as calcium- and magnesium based biocementation, calcium phosphate strengthening of soil, calcium bicarbonate biocementation, and iron- or polysaccharide based bioclogging. The construction-related microbial biotechnologies have a lot of advantages over conventional construction materials and processes.Keywords: ground improvement, biocementation, biogrouting, microorganisms
Procedia PDF Downloads 2297473 Concerns, Attitudes and Perceptions of Mothers about Child Vulnerability for Sexual Abuse
Authors: Rukhsana Kausar, Khadija Rasheed
Abstract:
This research explored general concerns, attitudes and perceptions of Pakistani mothers about their children’s vulnerability for sexual abuse and it also examined the effect of education and work status of mothers on their concerns and attitudes about the safety of their children. The sample consisted of 166 mothers comprising of 4 groups i.e. educated-working mothers, uneducated working mothers, educated non-working mothers and uneducated non-working mothers. This research comprised of two studies. Study 1 was carried out to construct two separate scales namely Maternal Concerns and Attitudes Scale for safety of Daughters (MCA-SD) and Maternal Concerns and Attitudes Scale for safety of Sons (MCA-SS) for assessing maternal concerns and attitudes about safety and protection of daughters and sons. These scales were used in study 2 with the objective to explore mothers’ general concerns, attitudes and perceptions of about child vulnerability for sexual abuse. Data were analyzed using two-way analysis of variance and independent-samples t-test. Educated mothers had more sense of responsibility, ensured more safety and provide more information about self-protection to their children as compared to uneducated mothers. Similarly non-working mothers showed more sense of responsibility and provided more information on self-protection to their children as compared to working mothers. Moreover, mothers living in nuclear family system trusted more on their relatives and other people for the protection of their children and ensured more safety of children than those living in joint family system. Findings have very important implications for protecting children from likely sexual abuse.Keywords: mothers’ concerns, attitudes, perceptions, child vulnerability, child sexual abuse
Procedia PDF Downloads 4417472 Damage Assessment and Repair for Older Brick Buildings
Authors: Tim D. Sass
Abstract:
The experience of engineers and architects practicing today is typically limited to current building code requirements and modern construction methods and materials. However, many cities have a mix of new and old buildings with many buildings constructed over one hundred years ago when building codes and construction methods were much different. When a brick building sustains damage, a structural engineer is often hired to determine the cause of damage as well as determine the necessary repairs. Forensic studies of dozens of brick buildings shows an appreciation of historical building methods and materials is needed to correctly identify the cause of damage and design an appropriate repair. Damage on an older, brick building can be mistakenly attributed to storms or seismic events when the real source of the damage is deficient original construction. Assessing and remediating damaged brickwork on older brick buildings requires an understanding of the original construction, an understanding of older repair methods, and, an understanding of current building code requirements.Keywords: brick, damage, deterioration, facade
Procedia PDF Downloads 2287471 Beyond Learning Classrooms: An Undergraduate Experience at Instituto Politecnico Nacional Mexico
Authors: Jorge Sandoval Lezama, Arturo Ivan Sandoval Rodriguez, Jose Arturo Correa Arredondo
Abstract:
This work aims to share innovative educational experiences at IPN Mexico, that involve collaborative learning at institutional and global level through course competition and global collaboration projects. Students from universities in China, USA, South Korea, Canada and Mexico collaborate to design electric vehicles to solve global urban mobility problems. The participation of IPN students in the 2015-2016 global competition (São Paolo, Brazil and Cincinnati, USA) Reconfigurable Shared-Use Mobility Systems allowed to apply pedagogical strategies of groups of collaboration and of learning based on projects where they shared activities, commitments and goals, demonstrating that students were motivated to develop / self-generate their knowledge with greater meaning and understanding. One of the most evident achievements is that the students are self-managed, so the most advanced students train the students who join the project with CAD, CAE, CAM tools. Likewise, the motivation achieved is evident since in 2014 there were 12 students involved in the project, and there are currently more than 70 students.Keywords: collaboration projects, global competency, course competition, active learning
Procedia PDF Downloads 2757470 Evaluating the Implementation of Machine Learning Techniques in the South African Built Environment
Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo
Abstract:
The future of machine learning (ML) in building may seem like a distant idea that will take decades to materialize, but it is actually far closer than previously believed. In reality, the built environment has been progressively increasing interest in machine learning. Although it could appear to be a very technical, impersonal approach, it can really make things more personable. Instead of eliminating humans out of the equation, machine learning allows people do their real work more efficiently. It is therefore vital to evaluate the factors influencing the implementation and challenges of implementing machine learning techniques in the South African built environment. The study's design was one of a survey. In South Africa, construction workers and professionals were given a total of one hundred fifty (150) questionnaires, of which one hundred and twenty-four (124) were returned and deemed eligible for study. Utilizing percentage, mean item scores, standard deviation, and Kruskal-Wallis, the collected data was analyzed. The results demonstrate that the top factors influencing the adoption of machine learning are knowledge level and a lack of understanding of its potential benefits. While lack of collaboration among stakeholders and lack of tools and services are the key hurdles to the deployment of machine learning within the South African built environment. The study came to the conclusion that ML adoption should be promoted in order to increase safety, productivity, and service quality within the built environment.Keywords: machine learning, implementation, built environment, construction stakeholders
Procedia PDF Downloads 1337469 A Study of Shigeru Ban's Environmentally-Sensitive Design Approach
Authors: Duygu Merve Bulut, Fehime Yesim Gurani
Abstract:
The Japanese architect Shigeru Ban has succeeded in bringing a different understanding to the modern architectural design approach with both the material selection and the techniques he used while combining the material with the design. Ban, who reflects his respect to people and nature with his designs, has encouraged that design should be done with economic materials, easily accessible and understandable for everyone. Because of this, Ban has attracted attention and appreciated in the architectural world with his environmentally-sensitive design ideology and humanitarian projects. In order to understand Ban’s environmentally-sensitive design approach, with this article, Ban’s projects which have used natural materials; the projects of Ban’s Japenese Pavilion in Germany, Papertainer Museum in South Korea, Centre Pompidou-Metz in France and Cardboard Cathedral in New Zealand were examined and analyzed. In the following parts, 'paper tube' technology that creates awareness in architectural area, which developed and applied by Ban; has been examined in terms of building material and structure of sustainable space design. As a result of this review, Ban’s approach is evaluated in terms of its contribution to the understanding of sustainable design.Keywords: ecological design, environmentally-sensitive design, paper tube, Shigeru Ban, sustainability
Procedia PDF Downloads 5027468 Cloud Computing Impact on e-Government Adoption
Authors: Ali Elshabrawy
Abstract:
Cloud computing is expected to be important for e Government in near future. Governments need it for solving some of its e Government, financial, infrastructure, legacy systems and integration problems. It reduces information technology (IT) infrastructure needs and support costs, and offers on-demand infrastructure and computational power, improved collaboration capabilities, which are important for e Government projects start up and sustainability. Budget pressures will continue to drive more and more government IT to hybrid and even public clouds, and more cooperation between cloud service providers and governmental agencies are expected, Or developing governmental private, community clouds. Motivation to convince governments to use cloud computing services, will create a pressure on cloud service providers to cope with government's requirements for interoperability, security standards, open data and integration between their cloud systems There will be significant legal action arising out of governmental uses of cloud computing, and legislation addressing both IT and business needs and consumer fears and protections. Cloud computing is a considered a revolution for IT and E business in general and e commerce, e Government in particular. As governments faces increasing challenges regarding IT infrastructure required for e Government projects implementation. As a result of Lack of required financial resources allocated for e Government projects in developed and developing countries. Cloud computing can play a major role to solve some of e Government projects challenges such as, lack of financial resources, IT infrastructure, Human resources trained to manage e Government applications, interoperability, cost efficiency challenges. If we could solve some security issues related to cloud computing usage which considered critical for e Government projects. Pretty sure it’s Just a matter of time before cloud service providers will find out solutions to attract governments as major customers for their business.Keywords: cloud computing, e-government, adoption, supply side barriers, e-government requirements, challenges
Procedia PDF Downloads 3477467 Transformative Leadership and Learning Management Systems Implementation: Leadership Practices in Instructional Design for Online Learning
Authors: Felix Brito
Abstract:
With the growth of online learning, several higher education institutions have attempted to incorporate technology in their curriculum. Successful technology implementation projects really on technology infrastructure and on the acceptance of education professionals towards innovation. This research study is aimed at illustrating the relevance of the human component in technology implementation projects in higher education by describing the Learning Management System implementation project executed by instructional designers working for a higher education institution in the southeast region of the United States. An analysis of the Transformative Leadership Theory, the Technology Acceptance Model, and the Diffusion of Innovation Process provide the support for a solid understanding of this issue and address recommendations for future technology implementation projects in higher education institutions.Keywords: diffusion of innovation process, instructional design, leadership, learning management systems, online learning, technology acceptance model, transformative leadership theory
Procedia PDF Downloads 3337466 Health and Safety of Red Cross Workers in Long-Term Homes during Early Days of the COVID-19 Pandemic: A Human Performance Perspective
Authors: Douglas J. Kube
Abstract:
At the beginning of the COVID-19 pandemic, the Canadian Red Cross deployed workers into long-term care homes across Canada to support our most vulnerable citizens. It began by recruiting and training small teams of workers to provide non-clinical services for facilities in outbreak. Deployed workers were trained on an approach based on successful Red Cross deployments used with Ebola in which zones were established, levels of protection used, and strict protocols followed to prevent exposure. This paper addresses aspects of human performance through a safety culture lens. The Red Cross deployments highlight valuable insights and are an excellent case study in the principles of human performance and organizational culture. This paper looks at human performance principles, including human fallibility, predictability of error-likely situations, avoiding events by understanding reasons mistakes occur, and the influence on behaviour by organizational factors. This study demonstrates how the Red Cross’s organizational culture and work design positively influenced performance to protect workers and residents/clients. Lastly, this paper shares lessons that can be applied in many workplaces to improve worker health and safety and safety culture. This critical examination is based on the author’s experience as a Senior Occupational Health and Safety Advisor with the Red Cross during the pandemic as part of the team responsible for developing and implementing biological safety practices in long-term care deployments.Keywords: COVID, human performance, organizational culture, work design
Procedia PDF Downloads 587465 Characterizing Multivariate Thresholds in Industrial Engineering
Authors: Ali E. Abbas
Abstract:
This paper highlights some of the normative issues that might result by setting independent thresholds in risk analyses and particularly with safety regions. A second objective is to explain how such regions can be specified appropriately in a meaningful way. We start with a review of the importance of setting deterministic trade-offs among target requirements. We then show how to determine safety regions for risk analysis appropriately using utility functions.Keywords: decision analysis, thresholds, risk, reliability
Procedia PDF Downloads 3137464 On the Construction of Some Optimal Binary Linear Codes
Authors: Skezeer John B. Paz, Ederlina G. Nocon
Abstract:
Finding an optimal binary linear code is a central problem in coding theory. A binary linear code C = [n, k, d] is called optimal if there is no linear code with higher minimum distance d given the length n and the dimension k. There are bounds giving limits for the minimum distance d of a linear code of fixed length n and dimension k. The lower bound which can be taken by construction process tells that there is a known linear code having this minimum distance. The upper bound is given by theoretic results such as Griesmer bound. One way to find an optimal binary linear code is to make the lower bound of d equal to its higher bound. That is, to construct a binary linear code which achieves the highest possible value of its minimum distance d, given n and k. Some optimal binary linear codes were presented by Andries Brouwer in his published table on bounds of the minimum distance d of binary linear codes for 1 ≤ n ≤ 256 and k ≤ n. This was further improved by Markus Grassl by giving a detailed construction process for each code exhibiting the lower bound. In this paper, we construct new optimal binary linear codes by using some construction processes on existing binary linear codes. Particularly, we developed an algorithm applied to the codes already constructed to extend the list of optimal binary linear codes up to 257 ≤ n ≤ 300 for k ≤ 7.Keywords: bounds of linear codes, Griesmer bound, construction of linear codes, optimal binary linear codes
Procedia PDF Downloads 7577463 Seismic Integrity Determination of Dams in Urban Areas
Authors: J. M. Mayoral, M. Anaya
Abstract:
The urban and economic development of cities demands the construction of water use and flood control infrastructure. Likewise, it is necessary to determine the safety level of the structures built with the current standards and if it is necessary to define the reinforcement actions. The foregoing is even more important in structures of great importance, such as dams, since they imply a greater risk for the population in case of failure or undesirable operating conditions (e.g., seepage, cracks, subsidence). This article presents a methodology for determining the seismic integrity of dams in urban areas. From direct measurements of the dynamic properties using geophysical exploration and ambient seismic noise measurements, the seismic integrity of the concrete-faced rockfill dam selected as a case of study is evaluated. To validate the results, two accelerometer stations were installed (e.g., free field and crest of the dam). Once the dynamic properties were determined, three-dimensional finite difference models were developed to evaluate the dam seismic performance for different intensities of movement, considering the site response and soil-structure interaction effects. The seismic environment was determined from the uniform hazard spectra for several return periods. Based on the results obtained, the safety level of the dam against different seismic actions was determined, and the effectiveness of ambient seismic noise measurements in dynamic characterization and subsequent evaluation of the seismic integrity of urban dams was evaluated.Keywords: risk, seismic, soil-structure interaction, urban dams
Procedia PDF Downloads 1197462 Intercultural Intelligence: How to Turn Cultural Difference into a Key Added Value with Tree Lighting Design Project Examples
Authors: Fanny Soulard
Abstract:
Today work environment is more multicultural than ever: spatial limits have been blown out, encouraging people and ideas mobility all around the globe. Indeed, opportunities to design with culturally diverse team workers, clients, or end-users, have become within everyone's reach. We enjoy traveling to discover other civilizations, but when it comes to business, we often take for granted that our own work methodology will be generic enough to federate each party and cover the project needs. This paper aims to explore why, by skipping cultural awareness, we often create misunderstandings, frustration, and even counterproductive design. Tree lighting projects successively developed by a French lighting studio, a Vietnamese lighting studio, and an Australian Engineering company will be assessed from their concept stage to completion. All these study cases are based in Vietnam, where the construction market is equally led by local and international consultants. Core criteria such as lighting standard reference, service scope, communication tools, internal team organization, delivery package content, key priorities, and client relationship will help to spot and list when and how cultural diversity has impacted the design output and effectiveness. On the second hand, we will demonstrate through the same selected projects how intercultural intelligence tools and mindset can not only respond positively to previous situations and avoid major clashes but also turn cultural differences into a key added value to generate significant benefits for individuals, teams, and companies. By understanding the major importance of including a cultural factor within any design, intercultural intelligence will quickly turn out as a “must have” skill to be developed and acquired by any designer.Keywords: intercultural intelligence, lighting design, work methodology, multicultural diversity
Procedia PDF Downloads 957461 Characterizing Compressive Strength of Compressed Stabilized Earth Blocks as a Function of Mix Design
Authors: Robert K. Hillyard, Jonathan Thomas, Brett A. Story
Abstract:
Compressed Stabilized Earth Blocks (CSEB) are masonry units that combine soil, sand, stabilizer, and water under pressure to form an earth block. These CSEB’s offer a cost-effective building solution for remote construction, using local resources and labor to minimize transportation and material costs. However, CSEB’s, and earthen construction generally have not been widely adopted as standardized construction materials. One shortcoming is the difficulty in standardizing strength values of CSEB units and systems due to the inherent variations in mix design, including production compression. This research presents findings on compressive strengths of full-scale CSEB’s from 60 different mix designs as a function of the amount of cement, sand, soil, and water added to the mixture. The full-scale results are compared with CSEB cylinder cores.Keywords: CSEB, compressive strength, earth construction, mix design
Procedia PDF Downloads 1007460 A Review of Process Safety Management for Small and Medium Business in Malaysia
Authors: Muhammad Afiq Anaqi Bin Baharudin, Muhammad Izamuddin Bin Mohd Nasir, Syarifuddin Bin Sujuanda, Muhammad Syahmi Rusyaidi Bin Sham Suddin, Danish Hakimi Bin kamaruzaman, Muhammad Haqimi Nazim Bin Hasmanizam, Mohammad Akmal Zakwan Bin Amran, Muhammad Alparizi Bin Latif
Abstract:
In particular, for small and medium enterprises (SMBs) in Malaysia, process safety management (PSM) is a crucial component of industrial safety. Limited resources, a lack of technical know-how, and linguistic and cultural obstacles are just a few of the difficulties SMBs in Malaysia encounter while putting PSM programmes into practice. A number of studies have emphasised the significance of leadership commitment, hazard identification and assessment, and employee involvement in the execution of effective PSM programmes, which are crucial for preventing accidents and incidents. In the literature, there has been a lot of discussion on the creation of specialised PSM frameworks for SMBs in Malaysia. Several studies have proposed implementation frameworks for PSM programmes that are based on recognised worldwide standards. Despite the significance of PSM in ensuring industrial safety, there are still a number of gaps in the literature on PSM in Malaysian SMBs. These gaps include the need for additional research on the efficiency of PSM programmes in reducing accidents and incidents in SMBs as well as the development of more specialised approaches to implementing PSM programmes in SMBs with limited resources and technical expertise. The goal of this review is to give a thorough overview of the body of research on PSM in Malaysian SMBs while highlighting important findings, points of contention, and knowledge gaps that need to be filled in.Keywords: process safety management, occupational safety and health (OSH), small businesses, medium businesses, malaysia
Procedia PDF Downloads 1277459 Case-Based Reasoning Application to Predict Geological Features at Site C Dam Construction Project
Authors: Shahnam Behnam Malekzadeh, Ian Kerr, Tyson Kaempffer, Teague Harper, Andrew Watson
Abstract:
The Site C Hydroelectric dam is currently being constructed in north-eastern British Columbia on sub-horizontal sedimentary strata that dip approximately 15 meters from one bank of the Peace River to the other. More than 615 pressure sensors (Vibrating Wire Piezometers) have been installed on bedding planes (BPs) since construction began, with over 80 more planned before project completion. These pressure measurements are essential to monitor the stability of the rock foundation during and after construction and for dam safety purposes. BPs are identified by their clay gouge infilling, which varies in thickness from less than 1 to 20 mm and can be challenging to identify as the core drilling process often disturbs or washes away the gouge material. Without the use of depth predictions from nearby boreholes, stratigraphic markers, and downhole geophysical data, it is difficult to confidently identify BP targets for the sensors. In this paper, a Case-Based Reasoning (CBR) method was used to develop an empirical model called the Bedding Plane Elevation Prediction (BPEP) to help geologists and geotechnical engineers to predict geological features and bedding planes at new locations in a fast and accurate manner. To develop CBR, a database was developed based on 64 pressure sensors already installed on key bedding planes BP25, BP28, and BP31 on the Right Bank, including bedding plane elevations and coordinates. Thirteen (20%) of the most recent cases were selected to validate and evaluate the accuracy of the developed model, while the similarity was defined as the distance between previous cases and recent cases to predict the depth of significant BPs. The average difference between actual BP elevations and predicted elevations for above BPs was ±55cm, while the actual results showed that 69% of predicted elevations were within ±79 cm of actual BP elevations while 100% of predicted elevations for new cases were within ±99cm range. Eventually, the actual results will be used to develop the database and improve BPEP to perform as a learning machine to predict more accurate BP elevations for future sensor installations.Keywords: case-based reasoning, geological feature, geology, piezometer, pressure sensor, core logging, dam construction
Procedia PDF Downloads 817458 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy
Abstract:
Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.Keywords: fuzzy sets, uncertainty, qualitative factors, decision making
Procedia PDF Downloads 6557457 Structural Reliability of Existing Structures: A Case Study
Authors: Z. Sakka, I. Assakkaf, T. Al-Yaqoub, J. Parol
Abstract:
A reliability-based methodology for the analysis assessment and evaluation of reinforced concrete structural elements of concrete structures is presented herein. The results of the reliability analysis and assessment for structural elements are verified by the results obtained from the deterministic methods. The analysis outcomes of reliability-based analysis are compared against the safety limits of the required reliability index β according to international standards and codes. The methodology is based on probabilistic analysis using reliability concepts and statistics of the main random variables that are relevant to the subject matter, and for which they are to be used in the performance-function equation(s) related to the structural elements under study. These methodology techniques can result in reliability index β, which is commonly known as the reliability index or reliability measure value that can be utilized to assess and evaluate the safety, human risk, and functionality of the structural component. Also, these methods can result in revised partial safety factor values for certain target reliability indices that can be used for the purpose of redesigning the reinforced concrete elements of the building and in which they could assist in considering some other remedial actions to improve the safety and functionality of the member.Keywords: structural reliability, concrete structures, FORM, Monte Carlo simulation
Procedia PDF Downloads 5187456 Lessons from Implementation of a Network-Wide Safety Huddle in Behavioral Health
Authors: Deborah Weidner, Melissa Morgera
Abstract:
The model of care delivery in the Behavioral Health Network (BHN) is integrated across all five regions of Hartford Healthcare and thus spans the entirety of the state of Connecticut, with care provided in seven inpatient settings and over 30 ambulatory outpatient locations. While safety has been a core priority of the BHN in alignment with High Reliability practices, safety initiatives have historically been facilitated locally in each region or within each entity, with interventions implemented locally as opposed to throughout the network. To address this, the BHN introduced a network wide Safety Huddle during 2022. Launched in January, the BHN Safety Huddle brought together internal stakeholders, including medical and administrative leaders, along with executive institute leadership, quality, and risk management. By bringing leaders together and introducing a network-wide safety huddle into the way we work, the benefit has been an increase in awareness of safety events occurring in behavioral health areas as well as increased systemization of countermeasures to prevent future events. One significant discussion topic presented in huddles has pertained to environmental design and patient access to potentially dangerous items, addressing some of the most relevant factors resulting in harm to patients in inpatient and emergency settings for behavioral health patients. The safety huddle has improved visibility of potential environmental safety risks through the generation of over 15 safety alerts cascaded throughout the BHN and also spurred a rapid improvement project focused on standardization of patient belonging searches to reduce patient access to potentially dangerous items on inpatient units. Safety events pertaining to potentially dangerous items decreased by 31% as a result of standardized interventions implemented across the network and as a result of increased awareness. A second positive outcome originating from the BHN Safety Huddle was implementation of a recommendation to increase the emergency Narcan®(naloxone) supply on hand in ambulatory settings of the BHN after incidents involving accidental overdose resulted in higher doses of naloxone administration. By increasing the emergency supply of naloxone on hand in all ambulatory and residential settings, colleagues are better prepared to respond in an emergency situation should a patient experience an overdose while on site. Lastly, discussions in safety huddle spurred a new initiative within the BHN to improve responsiveness to assaultive incidents through a consultation service. This consult service, aligned with one of the network’s improvement priorities to reduce harm events related to assaultive incidents, was borne out of discussion in huddle in which it was identified that additional interventions may be needed in providing clinical care to patients who are experiencing multiple and/ or frequent safety events.Keywords: quality, safety, behavioral health, risk management
Procedia PDF Downloads 837455 A Preliminary Study of the Subcontractor Evaluation System for the International Construction Market
Authors: Hochan Seok, Woosik Jang, Seung-Heon Han
Abstract:
The stagnant global construction market has intensified competition since 2008 among firms that aim to win overseas contracts. Against this backdrop, subcontractor selection is identified as one of the most critical success factors in overseas construction project. However, it is difficult to select qualified subcontractors due to the lack of evaluation standards and reliability. This study aims to identify the problems associated with existing subcontractor evaluations using a correlations analysis and a multiple regression analysis with pre-qualification and performance evaluation of 121 firms in six countries.Keywords: subcontractor evaluation system, pre-qualification, performance evaluation, correlation analysis, multiple regression analysis
Procedia PDF Downloads 3707454 Analysis of Human Mental and Behavioral Models for Development of an Electroencephalography-Based Human Performance Management System
Authors: John Gaber, Youssef Ahmed, Hossam A. Gabbar, Jing Ren
Abstract:
Accidents at Nuclear Power Plants (NPPs) occur due to various factors, notable among them being poor safety management and poor safety culture. During abnormal situations, the likelihood of human error is many-fold higher due to the higher cognitive workload. The most common cause of human error and high cognitive workload is mental fatigue. Electroencephalography (EEG) is a method of gathering the electromagnetic waves emitted by a human brain. We propose a safety system by monitoring brainwaves for signs of mental fatigue using an EEG system. This requires an analysis of the mental model of the NPP operator, changes in brain wave power in response to certain stimuli, and the risk factors on mental fatigue and attention that NPP operators face when performing their tasks. We analyzed these factors and developed an EEG-based monitoring system, which aims to alert NPP operators when levels of mental fatigue and attention hinders their ability to maintain safety.Keywords: brain imaging, EEG, power plant operator, psychology
Procedia PDF Downloads 1057453 Analysis of Economic Order Quantity, Safety Stock, Maximum Inventory Control, Lot Size and Reorder Point for Engro Polymers and Chemicals
Authors: Ali Akber Jaffri, Asad Naseem, Javeria Khan, Zubair Hamza, Ishtiaq
Abstract:
The purpose of this study is to determine safety stock, maximum inventory level, reordering point, and reordering quantity by rearranging lot sizes for supplier and customer in MRO (maintenance repair operations) warehouse of Engro Polymers & Chemicals. To achieve the aim, physical analysis method and excel commands were carried out to elicit the customer and supplier data provided by the company. Initially, we rearranged the current lot sizes and MOUs (measure of units) in SAP software. Due to change in lot sizes, we have to determine the new quantities for safety stock, maximum inventory, reordering point and reordering quantity as per company's demand. By proposed system, we saved extra cost in terms of reducing time of receiving from vendor and in issuance to customer, ease of material handling in MRO warehouse and also reduce human efforts.Keywords: maintenance repair operation, maximum inventory, reorder quantity, safety stock
Procedia PDF Downloads 2787452 Incentivize Contracting Partners of Public Projects
Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee
Abstract:
Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.Keywords: incentives, public accountability, project effectiveness, public opinions
Procedia PDF Downloads 727451 Facility Layout Improvement: Based on Safety and Health at Work and Standards of Food Production Facility
Authors: Asifa Fitriani, Galih Prakoso
Abstract:
This study aims to improve the design layout of a Micro, Small and Medium Enterprises (SMEs) to minimize material handling and redesigning the layout of production facilities based on the safety and health and standards of food production facilities. Problems layout in the one of chip making industry mushrooms in Indonesia is cross movement between work stations, work accidents, and the standard of facilities that do not conform with the standards of the food industry. Improvement layout design using CORELAP and 5S method to give recommendation and implementation of occupational health and safety standards of food production facilities. From the analysis, improved layout using CORELAP provide a smaller displacement distance is 155.84 meters from the initial displacement distance of 335.9 meters, and providing a shorter processing time than the original 112.726 seconds to 102.831 seconds. 5S method also has recommended the completion of occupational health and safety issues as well as the standard means of food production by changing the working environment better.Keywords: Layout Design, Corelap, 5S
Procedia PDF Downloads 5347450 Case of an Engineering Design Class in Architectural Engineering
Authors: Myunghoun Jang
Abstract:
Most engineering colleges in South Korea have engineering design classes in order to develop and enhance a student's creativity and problem-solving ability. Many cases about engineering design class are shown in journals and magazines, but a case lasting many years is few. The engineering design class in the Department of Architectural Engineering, Jeju National University was open in 2009 and continues to this year. 3-5 teams in every year set up their problems found their solutions and produced good results. Three of the results obtained patents. The class also provides students with opportunities to improve communication skill because they have many discussions in solving their problems.Keywords: engineering design, architectural engineering, team-based learning, construction safety
Procedia PDF Downloads 2367449 Smart BIM Documents - the Development of the Ontology-Based Tool for Employer Information Requirements (OntEIR), and its Transformation into SmartEIR
Authors: Shadan Dwairi
Abstract:
Defining proper requirements is one of the key factors for a successful construction projects. Although there have been many attempts put forward in assist in identifying requirements, but still this area is under developed. In Buildings Information Modelling (BIM) projects. The Employer Information Requirements (EIR) is the fundamental requirements document and a necessary ingredient in achieving a successful BIM project. The provision on full and clear EIR is essential to achieving BIM Level-2. As Defined by PAS 1192-2, EIR is a “pre-tender document that sets out the information to be delivered and the standards and processes to be adopted by the supplier as part of the project delivery process”. It also notes that “EIR should be incorporated into tender documentation to enable suppliers to produce an initial BIM Execution Plan (BEP)”. The importance of effective definition of EIR lies in its contribution to a better productivity during the construction process in terms of cost and time, in addition to improving the quality of the built asset. Proper and clear information is a key aspect of the EIR, in terms of the information it contains and more importantly the information the client receives at the end of the project that will enable the effective management and operation of the asset, where typically about 60%-80% of the cost is spent. This paper reports on the research done in developing the Ontology-based tool for Employer Information Requirements (OntEIR). OntEIR has proven the ability to produce a full and complete set of EIRs, which ensures that the clients’ information needs for the final model delivered by BIM is clearly defined from the beginning of the process. It also reports on the work being done into transforming OntEIR into a smart tool for Defining Employer Information Requirements (smartEIR). smartEIR transforms the OntEIR tool into enabling it to develop custom EIR- tailored for the: Project Type, Project Requirements, and the Client Capabilities. The initial idea behind smartEIR is moving away from the notion “One EIR fits All”. smartEIR utilizes the links made in OntEIR and creating a 3D matrix that transforms it into a smart tool. The OntEIR tool is based on the OntEIR framework that utilizes both Ontology and the Decomposition of Goals to elicit and extract the complete set of requirements needed for a full and comprehensive EIR. A new ctaegorisation system for requirements is also introduced in the framework and tool, which facilitates the understanding and enhances the clarification of the requirements especially for novice clients. Findings of the evaluation of the tool that was done with experts in the industry, showed that the OntEIR tool contributes towards effective and efficient development of EIRs that provide a better understanding of the information requirements as requested by BIM, and support the production of a complete BIM Execution Plan (BEP) and a Master Information Delivery Plan (MIDP).Keywords: building information modelling, employer information requirements, ontology, web-based, tool
Procedia PDF Downloads 1277448 Balanced Scorecard (BSC) Project : A Methodological Proposal for Decision Support in a Corporate Scenario
Authors: David de Oliveira Costa, Miguel Ângelo Lellis Moreira, Carlos Francisco Simões Gomes, Daniel Augusto de Moura Pereira, Marcos dos Santos
Abstract:
Strategic management is a fundamental process for global companies that intend to remain competitive in an increasingly dynamic and complex market. To do so, it is necessary to maintain alignment with their principles and values. The Balanced Scorecard (BSC) proposes to ensure that the overall business performance is based on different perspectives (financial, customer, internal processes, and learning and growth). However, relying solely on the BSC may not be enough to ensure the success of strategic management. It is essential that companies also evaluate and prioritize strategic projects that need to be implemented to ensure they are aligned with the business vision and contribute to achieving established goals and objectives. In this context, the proposition involves the incorporation of the SAPEVO-M multicriteria method to indicate the degree of relevance between different perspectives. Thus, the strategic objectives linked to these perspectives have greater weight in the classification of structural projects. Additionally, it is proposed to apply the concept of the Impact & Probability Matrix (I&PM) to structure and ensure that strategic projects are evaluated according to their relevance and impact on the business. By structuring the business's strategic management in this way, alignment and prioritization of projects and actions related to strategic planning are ensured. This ensures that resources are directed towards the most relevant and impactful initiatives. Therefore, the objective of this article is to present the proposal for integrating the BSC methodology, the SAPEVO-M multicriteria method, and the prioritization matrix to establish a concrete weighting of strategic planning and obtain coherence in defining strategic projects aligned with the business vision. This ensures a robust decision-making support process.Keywords: MCDA process, prioritization problematic, corporate strategy, multicriteria method
Procedia PDF Downloads 827447 The Analysis of the Protection of Historical and Cultural Heritage in the Development of Cities: Taking Quzhou Ancient City as an Example
Authors: Zhen Shu
Abstract:
The historical and cultural heritage demonstrates the wisdom of the entire nation and it has left its own traces in the process of urban construction. It has very important instructional significance for the construction of modern cities and the development of cultural aspects of modern people. The Protection of historical and cultural heritage has become an inevitable choice for the development of modern civilization. This paper discusses the relationship between urban development and historic preservation. And it emphasizes the important value of strengthening the protection of historical and cultural heritage in urban construction, introduces the value of cultural heritage, the process of historic preservation and its problems in Quzhou, Zhejiang Province. In conclusion, we puts forward some Suggestions for strengthening the protection of historical heritage in the process of urban construction.Keywords: cultural heritage, historic preservation, Quzhou ancient city, urban development
Procedia PDF Downloads 2797446 Reliability-Based Method for Assessing Liquefaction Potential of Soils
Authors: Mehran Naghizaderokni, Asscar Janalizadechobbasty
Abstract:
This paper explores probabilistic method for assessing the liquefaction potential of sandy soils. The current simplified methods for assessing soil liquefaction potential use a deterministic safety factor in order to determine whether liquefaction will occur or not. However, these methods are unable to determine the liquefaction probability related to a safety factor. A solution to this problem can be found by reliability analysis.This paper presents a reliability analysis method based on the popular certain liquefaction analysis method. The proposed probabilistic method is formulated based on the results of reliability analyses of 190 field records and observations of soil performance against liquefaction. The results of the present study show that confidence coefficient greater and smaller than 1 does not mean safety and/or liquefaction in cadence for liquefaction, and for assuring liquefaction probability, reliability based method analysis should be used. This reliability method uses the empirical acceleration attenuation law in the Chalos area to derive the probability density distribution function and the statistics for the earthquake-induced cyclic shear stress ratio (CSR). The CSR and CRR statistics are used in continuity with the first order and second moment method to calculate the relation between the liquefaction probability, the safety factor and the reliability index. Based on the proposed method, the liquefaction probability related to a safety factor can be easily calculated. The influence of some of the soil parameters on the liquefaction probability can be quantitatively evaluated.Keywords: liquefaction, reliability analysis, chalos area, civil and structural engineering
Procedia PDF Downloads 470