Search results for: construction health and safety regulations
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 15607

Search results for: construction health and safety regulations

14887 The Asia-European Union (EU) Traffic Safety Benchmarking

Authors: Ghazwan Al-Haji

Abstract:

Traffic safety has become a major concern in Southeast Asia due to the increasing number of road accidents resulting in fatalities and injuries. Southeast Asia has one of the highest road traffic fatality rates in the world, in terms of both population and number of cars, nearly six times higher than the EU region. One of the reasons for this concerning trend is the increasing share of motorcycles as a form of transportation throughout Southeast Asia. The purpose of this study is to benchmark traffic safety situations and statistics in six countries in Asia and the EU, which Indonesia, Malaysia, Vietnam, Italy, Portugal and Sweden. The research will assess the priorities and causes of road accidents in the target nations. Further, the study will analyze the existing practices and promote best practices that can be implemented toward safer roads in Asian target countries. In order to achieve this goal, the study categorizes various factors contributing to traffic accidents and best practices into 4 pillars (Safer Behavior, Safer Roads, Safer Vehicles and Road Safety Management). The result of the study consists of a list of recommendations that can be applied by policymakers to promote safer roads in Asia towards 2030. The study is co-financed by the EU project ASIASAFE.

Keywords: traffic safety, ASIASAFE, Southeast Asia, EU project

Procedia PDF Downloads 69
14886 Weighted Risk Scores Method Proposal for Occupational Safety Risk Assessment

Authors: Ulas Cinar, Omer Faruk Ugurlu, Selcuk Cebi

Abstract:

Occupational safety risk management is the most important element of a safe working environment. Effective risk management can only be possible with accurate analysis and evaluations. Scoring-based risk assessment methods offer considerable ease of application as they convert linguistic expressions into numerical results. It can also be easily adapted to any field. Contrary to all these advantages, important problems in scoring-based methods are frequently discussed. Effective measurability is one of the most critical problems. Existing methods allow experts to choose a score equivalent to each parameter. Therefore, experts prefer the score of the most likely outcome for risk. However, all other possible consequences are neglected. Assessments of the existing methods express the most probable level of risk, not the real risk of the enterprises. In this study, it is aimed to develop a method that will present a more comprehensive evaluation compared to the existing methods by evaluating the probability and severity scores, all sub-parameters, and potential results, and a new scoring-based method is proposed in the literature.

Keywords: occupational health and safety, risk assessment, scoring based risk assessment method, underground mining, weighted risk scores

Procedia PDF Downloads 136
14885 Food Strategies in the Mediterranean Basin, Possible for Food Safety and Security

Authors: Lorenza Sganzetta, Nunzia Borrelli

Abstract:

The research intends to reflect on the current mapping of the Food Strategies, on the reasons why in the planning objectives panorama, such sustainability priorities are located in those geographic areas and on the evolutions of these priorities of the Mediterranean planning dispositions. The whirling population growth that is affecting global cities is causing an enormous challenge to conventional resource-intensive food production and supply and the urgent need to face food safety, food security and sustainability concerns. Urban or Territorial Food Strategies can provide an interesting path for the development of this new agenda within the imperative principle of sustainability. In the specific, it is relevant to explore what ‘sustainability’ means within these policies. Most of these plans include actions related to four main components and interpretations of sustainability that are food security and safety, food equity, environmental sustainability itself and cultural identity and, at the designing phase, they differ slightly from each other according to the degree of approximation to one of these dimensions. Moving from these assumptions, the article would analyze some practices and policies representatives of different Food Strategies of the world and focus on the Mediterranean ones, on the problems and negative externalities from which they start, on the first interventions that are implementing and on their main objectives. We will mainly use qualitative data from primary and secondary collections. So far, an essential observation could have been made about the relationship between these sustainability dimensions and geography. In statistical terms, the US and Canadian policies tended to devote a large research space to health issues and access to food; those northern European showed a special attention to the environmental issues and the shortening of the chain; and finally the policies that, even in limited numbers, were being developed in the Mediterranean basin, were characterized by a strong territorial and cultural imprint and their major aim was to preserve local production and the contact between the productive land and the end consumer. Recently, though, Mediterranean food planning strategies are focusing more on health related and food accessibility issues and analyzing our diets not just as a matter of culture and territorial branding but as tools for reducing public health costs and accessibility to fresh food for everyone. The article would reflect then on how Food Safety, Food Security and Health are entering the new agenda of the Mediterranean Food Strategies. The research hypothesis suggests that the economic crisis that in the last years invested both producers and consumers had a significant impact on the nutrition habits and on the redefinition of food poverty, even in the fatherland of the healthy Mediterranean diet. This trend and other variables influenced the orientation and the objectives of the food strategies.

Keywords: food security, food strategy, health, sustainability

Procedia PDF Downloads 223
14884 Rewilding the River: Assessing the Environmental Effects and Regulatory Influences of the Condit Dam Removal Process

Authors: Neda Safari, Jacob Petersen-Perlman

Abstract:

There are more than two million dams in the United States, and a considerable portion of them are either non-operational or approaching the end of their designed lifespan. However, this emerging trend is new, and the majority of dam sites have not undergone thorough research and assessments after their removal to determine the overall effectiveness of restoration initiatives, particularly in the case of large-scale dams that may significantly impact their surrounding areas. A crucial factor to consider is the lack of specific regulations pertaining to dam removal at the federal level. Consequently, other environmental regulations that were not originally designed with dam removal considerations are used to execute these projects. This can result in delays or challenges for dam removal initiatives. The process of removing dams is usually the most important first step to restore the ecological and biological health of the river, but often there is a lack of measurable indicators to assess if it has achieved its intended objectives. In addition, the majority of studies on dam removal are only short-term and focus on a particular measure of response. Therefore, it is essential to conduct extensive and continuous monitoring to analyze the river's response throughout every aspect. Our study is divided into two sections. The first section of my research will analyze the establishment and utilization of dam removal laws and regulations in the Condit Dam removal process. We will highlight the areas where the frameworks for policy and dam removal projects remain in need of improvement in order to facilitate successful dam removals in the future. In this part, We will review the policies and plans that affected the decision-making process to remove the Condit dam while also looking at how they impacted the physical changes to the river after the dam was removed. In the second section, we will look at the effects of the dam removal over a decade later and attempt to determine how the river's physical response has been impacted by this modification. Our study aims to investigate the Condit dam removal process and its impact on the ecological response of the river. We anticipate identifying areas for improvement in policies pertaining to dam removal projects and exploring ways to enhance them to ensure improved project outcomes in the future.

Keywords: dam removal, ecolocgical change, water related regulation, water resources

Procedia PDF Downloads 45
14883 A Resource-Based Understanding of Health and Social Care Regulation

Authors: David P. Horton, Gary Lynch-Wood

Abstract:

Western populations are aging, prone to various lifestyle health problems, and increasing their demand for health and social care services. This demand has created enormous fiscal and regulatory challenges. In response, government institutions have deployed strategies of behavior modification to encourage people to exercise greater personal responsibility over their health and care needs (i.e., welfare responsibilisation). Policy strategies are underpinned by the assumption that people if properly supported, will make better health and lifestyle selections. Not only does this absolve governments of the responsibility for meeting all health and care needs, but it also enables government institutions to assert fiscal control over welfare spending. Looking at the regulation of health and social care in the UK, the authors identify and outline a suite of regulatory tools that are designed to extract and manage the resources of health and social care services users and to encourage them to make (‘better’) use of these resources. This is important for our understanding of how health and social care regulation is responding to ongoing social and economic challenges. It is also important because there has been a failure to systematically examine the relevance of resources for regulation, which is surprising given that resources are crucial to how and whether regulation succeeds or fails. In particular, drawing from the regulatory welfare state concept, the authors analyse the key legal and regulatory changes and mechanisms that have been introduced since the 2008 financial crisis, focusing on critical measures such as the Health and Social Care Act and regulations introduced under the National Health Service Act. The authors show how three types of user resources (i.e., tangible, labor, and data) are being used to assert fiscal control and increase welfare responsibilisation. Amongst other things, the paper concludes that service users have become more than rule followers and targets of behavioral modification; rather, they are producers of resources that regulatory systems have come to rely on.

Keywords: health care, regulation, resources, social care

Procedia PDF Downloads 94
14882 Selecting a Material for an Aircraft Diesel Engine Block

Authors: Ksenia Siadkowska, Tytus Tulwin, Rafał Sochaczewski

Abstract:

Selecting appropriate materials is presently a complex task as material databases cover tens of thousands of different types of materials. Product designing proceeds in numerous stages and in most of them there are open questions with not only one correct solution but better and worse ones. This paper overviews the Diesel engine body construction materials mentioned in the literature and discusses a certain practical method to select materials for a cylinder head and a Diesel engine block as a prototype. The engine body, depending on its purpose, is most frequently iron or aluminum. If it is important to optimize parts to achieve low weight, aluminum alloys are usually applied, especially in the automotive and aviation industries. In the latter case, weight is even more important so new types of magnesium alloys which are even lighter than aluminum ones are developed and used. However, magnesium alloys are, for example, more flammable and not enough strong so, for safety reasons, this type of material is not used solely in engine bodies. Acknowledgement: This work has been realized in the cooperation with The Construction Office of WSK "PZL-KALISZ" S.A." and is part of Grant Agreement No. POIR.01.02.00-00-0002/15 financed by the Polish National Centre for Research and Development.

Keywords: aluminum alloy, cylinder head, Diesel engine, materials selection

Procedia PDF Downloads 395
14881 Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

Authors: Lars Laußat, Manfred Helmus, Kamil Szczesny, Markus König

Abstract:

As one result of the project “Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation”, a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers.

Keywords: auto-ID, construction logistic, fuzzy, monitoring, RFID, scheduling

Procedia PDF Downloads 513
14880 Application of Value Engineering Approach for Improving the Quality and Productivity of Ready-Mixed Concrete Used in Construction and Hydraulic Projects

Authors: Adel Mohamed El-Baghdady, Walid Sayed Abdulgalil, Ahmad Asran, Ibrahim Nosier

Abstract:

This paper studies the effectiveness of applying value engineering to actual concrete mixtures. The study was conducted in the State of Qatar on a number of strategic construction projects with international engineering specifications for the 2022 World Cup projects. The study examined the concrete mixtures of Doha Metro project and the development of KAHRAMAA’s (Qatar Electricity and Water Company) Abu Funtas Strategic Desalination Plant, in order to generally improve the quality and productivity of ready-mixed concrete used in construction and hydraulic projects. The application of value engineering to such concrete mixtures resulted in the following: i) improving the quality of concrete mixtures and increasing the durability of buildings in which they are used; ii) reducing the waste of excess materials of concrete mixture, optimizing the use of resources, and enhancing sustainability; iii) reducing the use of cement, thus reducing CO₂ emissions which ensures the protection of environment and public health; iv) reducing actual costs of concrete mixtures and, in turn, reducing the costs of construction projects; and v) increasing the market share and competitiveness of concrete producers. This research shows that applying the methodology of value engineering to ready-mixed concrete is an effective way to save around 5% of the total cost of concrete mixtures supplied to construction and hydraulic projects, improve the quality according to the technical requirements and as per the standards and specifications for ready-mixed concrete, improve the environmental impact, and promote sustainability.

Keywords: value management, cost of concrete, performance, optimization, sustainability, environmental impact

Procedia PDF Downloads 353
14879 Developing Fire Risk Factors for Existing Small-Scale Hospitals

Authors: C. L. Wu, W. W. Tseng

Abstract:

From the National Health Insurance (NHI) system was introduced in Taiwan in 2000, there have been some problems in transformed small-scale hospitals, such as mobility of patients, shortage of nursing staff, medical pipelines breaking fire compartments and insufficient fire protection systems. Due to shrinking of the funding scale and the aging society, fire safety in small-scale hospitals has recently given cause for concern. The aim of this study is to determine fire risk index for small-scale hospital through a systematic approach The selection of fire safety mitigation methods can be regarded as a multi-attribute decision making process which must be guaranteed by expert groups. First of all, identify and select safety related factors and identify evaluation criteria through literature reviews and experts group. Secondly, application of the Fuzzy Analytic Hierarchy Process method is used to ascertain a weighted value which enables rating of the importance each of the selected factors. Overall, Sprinkler type and Compartmentation are the most crucial indices in mitigating fire, that is to say, structural approach play an important role to decrease losses in fire events.

Keywords: Fuzzy Delphi Method, fuzzy analytic hierarchy, process risk assessment, fire events

Procedia PDF Downloads 447
14878 Examining How Youth Use Mobile Devices for Health Information: Preliminary Findings of a Survey Study with High School Students in Croatia

Authors: Sung Un Kim, Ivana Martinović, Snježana Stanarević Katavić

Abstract:

As more and more youth use mobile devices, such as tablets and smartphones, for information seeking in their everyday lives, the purpose of this study is to understand the behaviors of youth seeking health information on mobile devices. The specific objective of this study is to examine 1) for what health issues youth use mobile devices, 2) for what reasons youth use mobile devices to obtain health information, 3) in what ways youth use mobile devices for health information, and 4) the features of health applications that youth find useful. The researchers devised a questionnaire for this study. Four hundred eight students from two high schools, located in Osijek, Croatia, participated by answering the questionnaire (281 girls and 127 boys). The collected data were analyzed using descriptive statistics and content analysis. The results show that among all participants, about 85 percent (n = 344) reported having used mobile devices for health information. The most frequent health topic for which they had been using mobile devices is physical activity (n = 273), followed by eating issues and nutrition (n = 224), mental health (n = 160), sexual health (n = 157), alcohol, drugs, and tobacco (n = 125), safety (n = 96) and particular diseases (n = 62). They use mobile devices to obtain health information due to the ease of use (n = 342), the ease of sharing health information (n = 281), portability (n = 215), timeliness (n = 162), and the ease of tracking/recording/monitoring health status (n = 147). Of those who have used mobile devices for health information, three-quarters (n = 261) use mobile devices to search health information, while 32.8% (n =113) use applications and 31.7% (n =109) browse information. Those who have used applications for health information (n = 113) consider the alert feature (n=107) as the most useful, followed by the tracking/recording/monitoring feature (n =92), the customized information feature (n = 86), the video feature (n = 58), and the sharing feature (n =39). It is notable that although health applications have been actively developed and studied, a majority of the participants search for or browse information on mobile devices, instead of using applications. The researchers will discuss reasons that some of them did not use mobile devices to obtain health information, students’ concerns about using health applications, and features that they wish to have in health applications.

Keywords: Croatia, health information, information seeking behaviors, mobile devices, youth

Procedia PDF Downloads 402
14877 The Safety Transfer in Acute Critical Patient by Telemedicine (START) Program at Udonthani General Hospital

Authors: Wisit Wichitkosoom

Abstract:

Objective:The majority of the hisk-risk patients (ST-elevation myocardial infarction (STEMI), Acute cerebrovascular accident, Sepsis, Acute Traumatic patient ) are admitted to district or lacal hospitals (average 1-1.30 hr. from Udonthani general hospital, Northeastern province, Thailand) without proper facilities. The referral system was support to early care and early management at pre-hospital stage and prepare for the patient data to higher hospital. This study assessed the reduction in treatment delay achieved by pre-hospital diagnosis and referral directly to Udonthani General Hospital. Methods and results: Four district or local hospitals without proper facilities for treatment the very high-risk patient were serving the study region. Pre-hospital diagnoses were established with the simple technology such as LINE, SMS, telephone and Fax for concept of LEAN process and then the telemedicine, by ambulance monitoring (ECG, SpO2, BT, BP) in both real time and snapshot mode was administrated during the period of transfer for safety transfer concept (inter-hospital stage). The standard treatment for patients with STEMI, Intracranial injury and acute cerebrovascular accident were done. From 1 October 2012 to 30 September 2013, the 892 high-risk patients transported by ambulance and transferred to Udonthani general hospital were registered. Patients with STEMI diagnosed pre-hospitally and referred directly to the Udonthani general hospital with telemedicine closed monitor (n=248). The mortality rate decreased from 11.69% in 2011 to 6.92 in 2012. The 34 patients were arrested on the way and successful to CPR during transfer with the telemedicine consultation were 79.41%. Conclusion: The proper innovation could apply for health care system. The very high-risk patients must had the closed monitoring with two-way communication for the “safety transfer period”. It could modified to another high-risk group too.

Keywords: safety transfer, telemedicine, critical patients, medical and health sciences

Procedia PDF Downloads 306
14876 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 92
14875 Bridge Construction and Type of Bridges and Their Construction Methods

Authors: Mokhtar Nikgoo

Abstract:

Definition of bridge: A bridge is a structure that allows people to pass through the communication road with two points. There are many different types of bridges, each of which is designed to perform a specific function. This article introduces the concept, history, components, uses, types, construction methods, selected factors, damage factors and principles of bridge maintenance. A bridge is a structure to cross a passage such as a water, valley or road without blocking another path underneath. This structure makes it possible to pass obstacles that are difficult or impossible to pass. There are different designs for bridge construction, each of which is used for a particular function and condition. In the old definition, a bridge is an arch over a river, valley, or any type of passage that makes traffic possible. But today, in the topic of urban management, the bridge is considered as a structure to cross physical barriers, so that while using space (not just the surface of the earth), it can facilitate the passage and access to places. The useful life of bridges may be between 30 and 80 years depending on the location and the materials used. But with proper maintenance and improvement, their life may last for hundreds of years.

Keywords: bridge, road construction, surveying, transportation

Procedia PDF Downloads 512
14874 Advancing Sustainable Development in the Construction Industry: A Theoretical Framework for Integrating Sustainable Project Management

Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Nelly Bondinuba

Abstract:

Purpose: The study proposes a theoretical framework for integrating sustainable project management in the construction sector, addressing the need for sustainable development practices. Methodology: The study adopts a theoretical approach by reviewing existing literature on sustainable development and project management in the construction industry. It analyses various concepts, theories, and frameworks to develop a comprehensive theoretical framework for integrating sustainable project management. Findings: The study emphasizes the importance of incorporating sustainable development practices into construction project management, focusing on collaboration, stakeholder engagement, and continuous improvement to achieve environmental conservation, social responsibility, and economic viability. Conclusion: Sustainable Project Management (SPM) in Ghana's construction industry is challenging due to lack of awareness, regulatory frameworks, financial constraints, and skill shortages, despite its benefits in promoting social inclusivity, job creation, and environmental resilience. Recommendation: The construction industry in Ghana should adopt a comprehensive approach involving local communities, government bodies, and environmental organizations. It should utilize green materials and technologies and effectively manage waste. Originality: This study presents a theoretical framework for sustainable project management in construction. It emphasizes collaboration and stakeholder engagement for long-term sustainable outcomes and considers environmental, social, and economic aspects.

Keywords: construction industry, theoretical framework, integration, project management, sustainable development

Procedia PDF Downloads 32
14873 Enhancing Project Management Performance in Prefabricated Building Construction under Uncertainty: A Comprehensive Approach

Authors: Niyongabo Elyse

Abstract:

Prefabricated building construction is a pioneering approach that combines design, production, and assembly to attain energy efficiency, environmental sustainability, and economic feasibility. Despite continuous development in the industry in China, the low technical maturity of standardized design, factory production, and construction assembly introduces uncertainties affecting prefabricated component production and on-site assembly processes. This research focuses on enhancing project management performance under uncertainty to help enterprises navigate these challenges and optimize project resources. The study introduces a perspective on how uncertain factors influence the implementation of prefabricated building construction projects. It proposes a theoretical model considering project process management ability, adaptability to uncertain environments, and collaboration ability of project participants. The impact of uncertain factors is demonstrated through case studies and quantitative analysis, revealing constraints on implementation time, cost, quality, and safety. To address uncertainties in prefabricated component production scheduling, a fuzzy model is presented, expressing processing times in interval values. The model utilizes a cooperative co-evolution evolution algorithm (CCEA) to optimize scheduling, demonstrated through a real case study showcasing reduced project duration and minimized effects of processing time disturbances. Additionally, the research addresses on-site assembly construction scheduling, considering the relationship between task processing times and assigned resources. A multi-objective model with fuzzy activity durations is proposed, employing a hybrid cooperative co-evolution evolution algorithm (HCCEA) to optimize project scheduling. Results from real case studies indicate improved project performance in terms of duration, cost, and resilience to processing time delays and resource changes. The study also introduces a multistage dynamic process control model, utilizing IoT technology for real-time monitoring during component production and construction assembly. This approach dynamically adjusts schedules when constraints arise, leading to enhanced project management performance, as demonstrated in a real prefabricated housing project. Key contributions include a fuzzy prefabricated components production scheduling model, a multi-objective multi-mode resource-constrained construction project scheduling model with fuzzy activity durations, a multi-stage dynamic process control model, and a cooperative co-evolution evolution algorithm. The integrated mathematical model addresses the complexity of prefabricated building construction project management, providing a theoretical foundation for practical decision-making in the field.

Keywords: prefabricated construction, project management performance, uncertainty, fuzzy scheduling

Procedia PDF Downloads 50
14872 Probabilistic Analysis of Bearing Capacity of Isolated Footing using Monte Carlo Simulation

Authors: Sameer Jung Karki, Gokhan Saygili

Abstract:

The allowable bearing capacity of foundation systems is determined by applying a factor of safety to the ultimate bearing capacity. Conventional ultimate bearing capacity calculations routines are based on deterministic input parameters where the nonuniformity and inhomogeneity of soil and site properties are not accounted for. Hence, the laws of mathematics like probability calculus and statistical analysis cannot be directly applied to foundation engineering. It’s assumed that the Factor of Safety, typically as high as 3.0, incorporates the uncertainty of the input parameters. This factor of safety is estimated based on subjective judgement rather than objective facts. It is an ambiguous term. Hence, a probabilistic analysis of the bearing capacity of an isolated footing on a clayey soil is carried out by using the Monte Carlo Simulation method. This simulated model was compared with the traditional discrete model. It was found out that the bearing capacity of soil was found higher for the simulated model compared with the discrete model. This was verified by doing the sensitivity analysis. As the number of simulations was increased, there was a significant % increase of the bearing capacity compared with discrete bearing capacity. The bearing capacity values obtained by simulation was found to follow a normal distribution. While using the traditional value of Factor of safety 3, the allowable bearing capacity had lower probability (0.03717) of occurring in the field compared to a higher probability (0.15866), while using the simulation derived factor of safety of 1.5. This means the traditional factor of safety is giving us bearing capacity that is less likely occurring/available in the field. This shows the subjective nature of factor of safety, and hence probability method is suggested to address the variability of the input parameters in bearing capacity equations.

Keywords: bearing capacity, factor of safety, isolated footing, montecarlo simulation

Procedia PDF Downloads 187
14871 Framework for Implementation of National Electrical Safety Grounding Standards for Communication Infrastructure

Authors: Atif Mahmood, Mohammad Inayatullah Khan Babar

Abstract:

Communication infrastructure has been installed, operated, and maintained all over the world according to defined electrical safety standards for separate or joint structures. These safety standards have been set for the safeguard of public, utility workers (employees and contractors), utility facilities, electrical communication equipment’s connected to the utility facilities and other facilities or premise adjacent to utility facilities. Different communication utilities in Pakistan use standards of different countries due to the absence of Common National Electrical Safety Standards of Pakistan. It is really important to devise a framework for implementation of a uniform standard for strict compliance. In this context, it is important to explore the compliance of safety standards for communication conductors and equipment for separate or joint structures for which NESC standards are taken as reference. Specific reference to grounding techniques including grounding AC/DC systems and its frames, leaving Fences, Messenger wires and special circuits used for the protection for lightning etc, ungrounded so recommendations are also given after in-depth analysis of current technical practices for the installation and maintenance of communication infrastructure.

Keywords: utility facilities, grounding electrodes, special circuits, grounding conductor

Procedia PDF Downloads 348
14870 A Review on the Necessities of Green Building in Bangladesh and Its Construction Process

Authors: Syeda Afsana Azad

Abstract:

Climate change, due to the release of greenhouse gases into the atmosphere has been recognized as one of the biggest threats to the present world. The condition of the earth is getting worse day by day due to climate change. Bangladesh is considered to be one of the most vulnerable countries to climate change due to large population, sharp urbanization, etc. Construction of green building is a very good solution to reduce the greenhouse effect. Green building technology refers to that kind of structures which are environmentally friendly and resource-efficient throughout a building’s service life. This technology can provide at least 50% energy saving opportunity to the nation. The necessity of the construction of structures in an environment-friendly way is increasing now. This study shows the scenario of rapid population growth, urbanization, necessity of green building in Bangladesh and also discusses the construction process of green building. As the present climate condition of Bangladesh is not friendly, construction of green building is very much needed. To battle climate change, it is mandatory to construct green building.

Keywords: Bangladesh, climate change, green building, green house effect

Procedia PDF Downloads 377
14869 Investigating the Systematic Implications of Plastic Waste Additions to Concrete Taking a Circular Approach

Authors: Christina Cheong, Naomi Keena

Abstract:

In the face of growing urbanization the construction of new buildings is inevitable and with current construction methods leading to environmental degradation much questioning is needed around reducing the environmental impact of buildings. This paper explores the global environmental issue of concrete production in parallel with the problem of plastic waste, and questions if new solutions into plastic waste additions in concrete is a viable sustainable solution with positive systematic implications to living systems, both human and non-human. We investigate how certification programs can be used to access the sustainability of the new concrete composition. With this classification we look to the health impacts as well as reusability of such concrete in a second or third life cycle. We conclude that such an approach has benefits to the environment and that taking a circular approach to its development, in terms of the overall life cycle of the new concrete product, can help understand the nuances in terms of the material’s environmental and human health impacts.

Keywords: Concrete, Plastic waste additions to concrete, sustainability ratings, sustainable materials

Procedia PDF Downloads 149
14868 Reinforced Concrete Design Construction Issues and Earthquake Failure-Damage Responses

Authors: Hasan Husnu Korkmaz, Serra Zerrin Korkmaz

Abstract:

Earthquakes are the natural disasters that threat several countries. Turkey is situated on a very active earthquake zone. During the recent earthquakes, thousands of people died due to failure of reinforced concrete structures. Although Turkey has a very sufficient earthquake code, the design and construction mistakes were repeated for old structures. Lack of the control mechanism during the construction process may be the most important reason of failure. The quality of the concrete and poor detailing of steel or reinforcement is the most important headings. In this paper, the reasons of failure of reinforced concrete structures were summarized with relevant photos. The paper is beneficial for civil engineers as well as architect who are in the process of construction and design of structures in earthquake zones.

Keywords: earthquake, reinforced concrete structure, failure, material

Procedia PDF Downloads 365
14867 External Networking for Innovation in Construction Industry in Malaysia

Authors: Megat Zuhairy, Megat Tajuddin, Hadijah Iberahim, Noraini Ismail

Abstract:

This paper aims to discuss the impact of external networking on innovation and organizational performance in the construction industry. In Malaysia, the construction industry is known to be one of the industries that contribute significantly towards her economic growth. The construction industry is described as a fragmented and complex product system as construction projects implementation requires involvement of varying combination of large and small organizations across the supply chain spectrum. The innovation and performance of Malaysian construction industry are reported to be at underachieving and efforts for its improvement have inspired this study initiative. External networking among industry players is capable in bringing them to work together as a team, reducing the adversarial relationships among them for innovation effort and greater performance. The instrument in measuring innovation and organizational performance specific to the construction industry was developed by adapting measures introduced by several scholars in these fields. Contractors and consulting companies were the sampling frames of this study representing the construction industry in Malaysia. The population lists were developed from the lists provided by CIDB, BEM, BOA and BQSM. The samples were selected based on a stratified sampling method to gauge representation of the different groups in the population. Regression analysis was performed in this quantitative study to assess relationships amongst variables. The results revealed that principally, external networking is significant in influencing both innovation and organizational performance. Nevertheless, external networking with different industry players has a different impact on innovation and organizational performance. The study revealed that external networking with project players is significant on project performance but not on innovation. On the other hand, external networking with government agencies, academic institutions and professional bodies is significant in influencing innovation but not on organizational performance.

Keywords: innovation, external networking, organizational performance, construction industry

Procedia PDF Downloads 305
14866 Legal Regulation and Critical Analysis for an Effectively Treatment of Pharmaceutical Waste

Authors: Merita Dauti, Edita Alili-Idrizi, Sihana Ahmeti –Lika, Ledjan Malaj

Abstract:

The extermination and proper disposal of pharmaceutical wastes from expired and unused medications remains a disputable issue due to their specific nature and characteristics. Even though the hazards from these wastes are already well known in terms of environment and human health, people still treat them as usual wastes. At a national level, in many countries the management of pharmaceutical and medical wastes has been one of the main objectives in order to protect people’s health and the environment. Even though many legal regulations exist in this respect, there has not been a single law that would clearly explain the procedures of returning medicines, ways of selection, treatment and extermination of pharmaceutical wastes. This paper aims at analyzing the practices of pharmaceutical waste management and treatment in some European countries as well as a review of the legislation and official guidelines in managing these kinds of wastes and protecting the environment and human health. A suitable treatment and management of expired medications and other similar wastes would be in the interest of public health in the first place, as well as in the interest of healthcare institutions and other bodies engaged in environment protection.

Keywords: pharmaceutical waste, legal regulation, proper disposal, environment pollution

Procedia PDF Downloads 333
14865 A Preparatory Method for Building Construction Implemented in a Case Study in Brazil

Authors: Aline Valverde Arroteia, Tatiana Gondim do Amaral, Silvio Burrattino Melhado

Abstract:

During the last twenty years, the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However, this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the construction site. At the same time, the greatest amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. Face this problem, the aim of this research was to implement a French method named PEO which means preparation for building construction (in Portuguese) seeking to understand the design management process and its interface with the building construction phase. The research method applied was qualitative, and it was carried out through two case studies in the city of Goiania, in Goias, Brazil. The research was divided into two stages called pilot study at Company A and implementation of PEO at Company B. After the implementation; the results demonstrated the PEO method's effectiveness and feasibility while a booster on the quality improvement of design management. The analysis showed that the method has a purpose to improve the design and allow the reduction of failures, errors and rework commonly found in the production of buildings. Therefore, it can be concluded that the PEO is feasible to be applied to real estate and building companies. But, companies need to believe in the contribution they can make to the discovery of design failures in conjunction with other stakeholders forming a construction team. The result of PEO can be maximized when adopting the principles of simultaneous engineering and insertion of new computer technologies, which use a three-dimensional model of the building with BIM process.

Keywords: communication, design and construction interface management, preparation for building construction (PEO), proactive coordination (CPA)

Procedia PDF Downloads 161
14864 Structural Safety of Biocomposites under Cracking: A Fracture Analytical Approach using the Gғ-Concept

Authors: Brandtner-Hafner Martin

Abstract:

Biocomposites have established themselves as a sustainable material class in the industry. Their advantages include lower density, lower price, and easier recycling compared to conventional materials. Now there are a variety of ways to measure their technical performance. One possibility is mechanical tests, which are widely used and standardized. However, these provide only very limited insights into damage capacity, which is particularly problematic under cracking conditions. To overcome such shortcomings, experimental tests were performed applying the fracture energetically GF-concept to study the structural safety of the interface under crack opening (mode-I loading). Two different types of biocomposites based on extruded henequen-fibers (NFRP) and wood-particles (WPC) in an HDPE matrix were evaluated. The results show that the fracture energy values obtained are higher than those given in the literature. This suggests that alternatives to previous linear elastic testing methods are needed to perform authentic safety evaluations of green plastics.

Keywords: biocomposites, structural safety, Gғ-concept, fracture analysis

Procedia PDF Downloads 159
14863 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 375
14862 Research for Hollow Reinforced Concrete Bridge Piers in Korea

Authors: Ho Young Kim, Jae Hoon Lee, Do Kyu Hwang, Im Jong Kwahk, Tae Hoon Kim, Seung Hoon Lee

Abstract:

Hollow section for bridge columns has some advantages. However, current seismic design codes do not provide design regulations for hollow bridge piers. There have been many experimental studied for hollow reinforced concrete piers in the world. But, Study for hollow section for bridge piers in Korea has been begun with approximately 2000s. There has been conducted experimental study for hollow piers of flexural controlled sections by Yeungnam University, Sung kyunkwan University, Korea Expressway Corporation in 2009. This study concluded that flexural controlled sections for hollow piers showed the similar behavior to solid sections. And there have been conducted experimental study for hollow piers of compression controlled sections by Yeungnam University, Korea Institute of Construction Technology in 2012. This study concluded that compression controlled sections for hollow piers showed compression fracture of concrete in inside wall face. Samsung C&T Engineering & Construction Group has been conducted study with Yeungnam University for reduce the quantity of reinforcement details about hollow piers. Reduce the quantity of reinforcement details are triangular cross tie. This study concluded that triangular reinforcement details showed the similar behavior as compared with existing reinforcement details.

Keywords: hollow pier, flexural controlled section, compression controlled section, reduce the quantity of reinforcement, details

Procedia PDF Downloads 417
14861 Occupational Health Hazards of Itinerant Waste Buyers (IWBs) in Kathmandu, Nepal

Authors: Ashish Khanal, Suja Giri

Abstract:

The scrap collection work is associated with multiple health hazards. Cut and scratches during collection and transportation of scraps are common. IWBs purchase the scraps mainly papers, cartoons, glass bottles and metals from the households. This study was conducted in Kathmandu, the capital city of Nepal. The location was chosen because Kathmandu is the biggest city of Nepal with highest number of IWBs. The research used a case study strategy to examine the occupational health hazards of IWBs. The only mode of collecting and transporting of scraps in Kathmandu is the bicycle. They have to do this regular work even during the scorching sun and chilled winter. The musculoskeletal and gastrointestinal disorders are the common health problem shared by IWBs in Kathmandu, Nepal. Despite of these problems, IWBs don’t take it seriously and rarely goes for the health check-up. There is need of personal protective equipment and guidance for safety of IWBs. IWBs need to wear closed shoes and use gloves to avoid cuts during the collection and transportation of the recyclables.

Keywords: itinerant waste buyers, Kathmandu, occupational health, scrap

Procedia PDF Downloads 180
14860 Food Traceability System: Current State and Future Needs of the Nigerian Poultry and Poultry Product Supply Chain

Authors: Hadiza Kabir Bako, Munir Abba Dandago

Abstract:

The fright of food-borne diseases as a result of animal health across the globe is creating the need for origin confirmation, safety of food and method of identification of food produce within the supply chain. In this paper, we investigated two commercial and one backyard poultry farm; live poultry, poultry meat and egg. We propose various implementation options for the poultry traceability system with respect to trace and track, and food recall and withdrawal requirements. With the intention that farmers, Investors or Regulatory agencies would find it useful for the Nigerian poultry sector and we highlight the future needs and challenges that lie ahead in the two most significant system of poultry production in Nigeria: the commercial poultry and backyard breeding.

Keywords: farm, food safety, food traceability, poultry

Procedia PDF Downloads 192
14859 Construction Unit Rate Factor Modelling Using Neural Networks

Authors: Balimu Mwiya, Mundia Muya, Chabota Kaliba, Peter Mukalula

Abstract:

Factors affecting construction unit cost vary depending on a country’s political, economic, social and technological inclinations. Factors affecting construction costs have been studied from various perspectives. Analysis of cost factors requires an appreciation of a country’s practices. Identified cost factors provide an indication of a country’s construction economic strata. The purpose of this paper is to identify the essential factors that affect unit cost estimation and their breakdown using artificial neural networks. Twenty-five (25) identified cost factors in road construction were subjected to a questionnaire survey and employing SPSS factor analysis the factors were reduced to eight. The 8 factors were analysed using the neural network (NN) to determine the proportionate breakdown of the cost factors in a given construction unit rate. NN predicted that political environment accounted 44% of the unit rate followed by contractor capacity at 22% and financial delays, project feasibility, overhead and profit each at 11%. Project location, material availability and corruption perception index had minimal impact on the unit cost from the training data provided. Quantified cost factors can be incorporated in unit cost estimation models (UCEM) to produce more accurate estimates. This can create improvements in the cost estimation of infrastructure projects and establish a benchmark standard to assist the process of alignment of work practises and training of new staff, permitting the on-going development of best practises in cost estimation to become more effective.

Keywords: construction cost factors, neural networks, roadworks, Zambian construction industry

Procedia PDF Downloads 363
14858 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 431