Search results for: final project cost
11639 Evaluation of Sugarcane (Saccharum officinarum L.) Genotypes, in modern method of Agriculture, using correlation and path coefficient Analyses
Authors: T. S. Bubuche, L. Abubakar, N.D. Ibrahim, A. A. Aliero, H. M. Sama, B. S. Haliru
Abstract:
A two-year study was conducted at the Fadama farm of Usmanu Danfodiyo University Sokoto, Nigeria. Correlations and path coefficients analysis were used to determine the interrelationship and importance of various characters as components of yield in sugarcane during 20011-012 and 2012-013 growing seasons. Fourteen sugarcane hybrids and a local check were evaluated. The experiment was laid out in a randomized complete block design (RCBD) and replicated three times. Significant and positive correlation were recorded between total cane weight/ha and single stalk weight, between single stalk weight and final brix and between stalk girth and stalk length while final brix and number of milliable cane/ha recorded no significant correlation. Traits that had high direct contribution to the final yield were number of stalk/stool, number of milliable cane/ha, single stalk weight and brix content while high indirect positive contributions were observed in growth habit, number of internode per stalk and stalk length..Keywords: correlation, path analysis, sugarcane, yield components
Procedia PDF Downloads 24911638 Decision-Making Tool for Planning the Construction of Infrastructure Projects
Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs
Abstract:
The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.Keywords: infrastructure, modularization, decision support, decision-making
Procedia PDF Downloads 5911637 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.Keywords: strategy, project management, strategy implementation, agile
Procedia PDF Downloads 11511636 Lessons Learned from Implementation of Remote Pregnant and Newborn Care Service for Vulnerable Women and Children During COVID-19 and Political Crisis in Myanmar
Authors: Wint Wint Thu, Htet Ko Ko Win, Myat Mon San, Zaw Lin Tun, Nandar Than Aye, Khin Nyein Myat, Hayman Nyo Oo, Nay Aung Lin, Kusum Thapa, Kyaw Htet Aung
Abstract:
Background: In Myanmar, the intense political instability happened to start in Feb-2021, while the COVID-19 pandemic waves are also threatening the public health system, which subsequently led to severe health sector crisis, including difficulties in accessing maternal and newborn health care for vulnerable women and children. The Remote Pregnant and Newborn Care (RPNC) uses a telehealth approach United States Agency for International Development (USAID)-funded Essential Health Project. Implementation: The Remote Pregnant and Newborn Care (RPNC) service has adapted to the MNCH needs of vulnerable pregnant women and was implemented to mitigate the risk of limited access to essential quality MNH care in Yangon, Myanmar, under women, and the project trained 13 service providers on a telehealth care package for pregnancy and newborn developed Jhpiego to ensure understanding of evidence-based MNCH care practices. The phone numbers of the pregnant women were gathered through the preexisting and functioning community volunteers, who reach the most vulnerable pregnant women in the project's targeted area. A total of 212 pregnant women have been reached by service providers for RPNC during the implementation period. The trained service providers offer quality antenatal and postnatal care, including newborn care, via telephone calls. It includes 24/7 incoming calls and time-allotted outgoing calls to the pregnant women during antenatal and postnatal periods, including the newborn care. The required data were collected daily in time with the calls, and the quality of the medical services is made assured with the track of the calls, ensuring data privacy and patient confidentiality. Lessons learned: The key lessons are 1) cost-effectiveness: RPNC service could reduce out of pocket expenditure of pregnant women as it only costs 1.6 United States dollars (USD) per one telehealth call while it costs 8 to 10 USD per one time in-person care service at private service providers, including transportation cost, 2) network of care: telehealth call could not replace the in-person antenatal and postnatal care services, and integration of telehealth calls with in-person care by local healthcare providers with the support of the community is crucial for accessibility to essential MNH services by poor and vulnerable women, and 3) sharing information on health access points: most of the women seem to have financial barriers in accessing private health facilities while public health system collapse and telehealthcare could provide information on low-cost facilities and connect women to relevant health facilities. These key lessons are important for future efforts regarding the implementation of remote pregnancy and newborn care in Myanmar, especially during the political crisis and COVID-19 pandemic situation.Keywords: telehealth, accessibility, maternal care, newborn care
Procedia PDF Downloads 10011635 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach
Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis
Abstract:
The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company
Procedia PDF Downloads 11011634 A Cost-Evaluation Study on the Use of Negative Pressure Wound Therapy with Instillation for Salvage of Infected Implant-Based Breast Reconstructions
Authors: S. Haque, M. Kanapathy, E. Bollen, I. Younis, A. Mosahebi
Abstract:
Background: Implant loss due to infection is the most devastating complication of implant-based breast reconstruction. The use of negative pressure wound therapy with instillation (NPWTi) for salvage of infected implant-based breast reconstructions has shown promising results to allow early reinsertion of a new implant as an alternative to current management of delayed reinsertion. This study compares the cost implication of NPWTi against current management of delayed reinsertion of infected breast implants. Methods: 20 cases of an infected breast implant treated with NPWTi (V.A.C. VERAFLO™ Therapy) followed by early re-insertion of a new implant were compared with 20 cases who had delayed reinsertion (non-NPWTi). Average cost per person was calculated using total operative expenses, cost of inpatient stay, cost of investigations, cost of antibiotics, and cost of outpatient visits. Results: Treatment with NPWTi allowed for earlier re-insertion of a new implant (NPWTi: 9.04 ± 2.92 days vs. non-NPWTi: 236.25 ± 123.89 days). The average cost per patient for NPWTi and non-NPWTi was £14,343.13 ± £2,786.70 and £8,920.31 ± £3,005.73 respectively. All patients treated with NPWTi had one admission and spent 11.9 ± 4.1days as an inpatient while non-NPWTi patients had 2.1 ± 0.3 admissions with total length of inpatient stay of 7.1 ± 5.8days. Patients treated with NPWTi had more surgeries (NPWTi: 3.35 ± 0.81 vs. non-NPWTi: 2.2 ± 0.41), however 3 non-NPWTi cases required flap reconstruction. Patients treated with NPWTi had fewer total outpatient visits (NPWTi: 12 ± 6 vs. non-NPWTi: 14.2 ± 6.3). Conclusion: Patients treated with NPWTi incurred higher average cost per patient, longer inpatient stay, and more procedures; however, had early re-insertion of new implants and fewer admissions and outpatient visits. A further study on patient-reported outcome is essential to compare cost against patient benefit.Keywords: breast reconstruction, cost evaluation, infection, negative pressure wound therapy
Procedia PDF Downloads 12411633 Building Information Modeling and Its Application in the State of Kuwait
Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad
Abstract:
Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.Keywords: building information modeling, BIM, construction industry, Kuwait
Procedia PDF Downloads 37611632 Investigating the Influence of the Ferro Alloys Consumption on the Slab Product Standard Cost with Different Grades Using Regression Analysis (A Case Study of Iran's Iron and Steel Industry)
Authors: Iman Fakhrian, Ali Salehi Manzari
Abstract:
Consistent Profitability is one of the most important priorities in manufacturing companies. One of the fundamental factors for increasing the companies profitability is cost management. Isfahan's mobarakeh steel company is one of the largest producers of the slab product grades in the middle east. Raw material cost constitutes about 70% of the company's expenditures. The costs of the ferro alloys have a remarkable contribution of the raw material costs. This research aims to determine the ferro alloys which have significant effect on the variability of the standard cost of the slab product grades. Used data in this study were collected from standard costing system of isfahan's mobarakeh steel company in 2022. The results of conducting the regression analysis model show that expense items: 03020, 03045, 03125, 03130 and 03150 have dominant role in variability of the standard cost of the slab product grades. In other words, the mentioned ferro alloys have noticeable and significant role in variability of the standard cost of the slab product grades.Keywords: consistent profitability, ferro alloys, slab product grades, regression analysis
Procedia PDF Downloads 7011631 The Development of Traffic Devices Using Natural Rubber in Thailand
Authors: Weeradej Cheewapattananuwong, Keeree Srivichian, Godchamon Somchai, Wasin Phusanong, Nontawat Yoddamnern
Abstract:
Natural rubber used for traffic devices in Thailand has been developed and researched for several years. When compared with Dry Rubber Content (DRC), the quality of Rib Smoked Sheet (RSS) is better. However, the cost of admixtures, especially CaCO₃ and sulphur, is higher than the cost of RSS itself. In this research, Flexible Guideposts and Rubber Fender Barriers (RFB) are taken into consideration. In case of flexible guideposts, the materials used are both RSS and DRC60%, but for RFB, only RSS is used due to the controlled performance tests. The objective of flexible guideposts and RFB is to decrease a number of accidents, fatal rates, and serious injuries. Functions of both devices are to save road users and vehicles as well as to absorb impact forces from vehicles so as to decrease of serious road accidents. This leads to the mitigation methods to remedy the injury of motorists, form severity to moderate one. The solution is to find the best practice of traffic devices using natural rubber under the engineering concepts. In addition, the performances of materials, such as tensile strength and durability, are calculated for the modulus of elasticity and properties. In the laboratory, the simulation of crashes, finite element of materials, LRFD, and concrete technology methods are taken into account. After calculation, the trials' compositions of materials are mixed and tested in the laboratory. The tensile test, compressive test, and weathering or durability test are followed and based on ASTM. Furthermore, the Cycle-Repetition Test of Flexible Guideposts will be taken into consideration. The final decision is to fabricate all materials and have a real test section in the field. In RFB test, there will be 13 crash tests, 7 Pickup Truck tests, and 6 Motorcycle Tests. The test of vehicular crashes happens for the first time in Thailand, applying the trial and error methods; for example, the road crash test under the standard of NCHRP-TL3 (100 kph) is changed to the MASH 2016. This is owing to the fact that MASH 2016 is better than NCHRP in terms of speed, types, and weight of vehicles and the angle of crash. In the processes of MASH, Test Level 6 (TL-6), which is composed of 2,270 kg Pickup Truck, 100 kph, and 25 degree of crash-angle is selected. The final test for real crash will be done, and the whole system will be evaluated again in Korea. The researchers hope that the number of road accidents will decrease, and Thailand will be no more in the top tenth ranking of road accidents in the world.Keywords: LRFD, load and resistance factor design, ASTM, american society for testing and materials, NCHRP, national cooperation highway research program, MASH, manual for assessing safety hardware
Procedia PDF Downloads 12711630 Software Defined Storage: Object Storage over Hadoop Platform
Authors: Amritesh Srivastava, Gaurav Sharma
Abstract:
The purpose of this project is to develop an open source object storage system that is highly durable, scalable and reliable. There are two representative systems in cloud computing: Google and Amazon. Their storage systems for Google GFS and Amazon S3 provide high reliability, performance and stability. Our proposed system is highly inspired from Amazon S3. We are using Hadoop Distributed File System (HDFS) Java API to implement our system. We propose the architecture of object storage system based on Hadoop. We discuss the requirements of our system, what we expect from our system and what problems we may encounter. We also give detailed design proposal along with the abstract source code to implement it. The final goal of the system is to provide REST based access to our object storage system that exists on top of HDFS.Keywords: Hadoop, HBase, object storage, REST
Procedia PDF Downloads 33611629 A Translog Analysis of Insurance Economies in Nigeria
Authors: Prince Ayodeji Yusuph
Abstract:
Recapitalization process that has recently become an imperative process in the Nigerian Financial industry has implications for the survival of insurance sector, especially on their service delivery efficiency. This study therefore seeks to investigate the problem of inefficiency in the Nigerian Insurance market from the perspective of their cost structures. The study takes advantage of secondary data of financial reports of thirty randomly selected insurance firms which span over a period of ten years and applied transcendental logarithm model to evaluate their performance from the cost structures strategy. The results indicate that only large scale firms enjoy cost saving advantages. Twenty percent firms sampled belong to this category. The result suggests that premium income would contribute to insurance firm’s performance, only when a sound investment decisions are made.Keywords: transcedental logarithm, cost structures, insurance firms and efficiency, Nigeria
Procedia PDF Downloads 24811628 Cartel Formation with Differentiated Products, Asymmetric Cost, and Quantity Competition: The Case of Three Firms
Authors: Burkhard Hehenkamp, Tahmina Faizi
Abstract:
In this paper, we analyze the formation of cartels along with the stability of the cartel for the case of three firms that produce differentiated products and differ in their cost of production. Both cost and demand are linear, and firms compete in quantities once a cartel has been formed (or not). It turns out that the degree of product differentiation has a direct effect on the incentive to form a cartel. Firstly, when goods are complements or close substitutes, firms form a grand coalition. Secondly, for weak and medium substitutes, the firm with the lowest cost prefers to remain independent, while both other firms form a coalition. We also find that the producer profit of the stable coalition structure is nonmonotonic in the degree of product differentiation.Keywords: collusion, cartel formation, cartel stability, differentiated market, quantity competition, oligopolies
Procedia PDF Downloads 9511627 The Cost-Effectiveness of Pancreatic Surgical Cancer Care in the US vs. the European Union: Results of a Review of the Peer-Reviewed Scientific Literature
Authors: Shannon Hearney, Jeffrey Hoch
Abstract:
While all cancers are costly to treat, pancreatic cancer is a notoriously costly and deadly form of cancer. Across the world there are a variety of treatment centers ranging from small clinics to large, high-volume hospitals as well as differing structures of payment and access. It has been noted that centers that treat a high volume of pancreatic cancer patients have higher quality of care, it is unclear if that care is cost-effective. In the US there is no clear consensus on the cost-effectiveness of high-volume centers for the surgical care of pancreatic cancer. Other European countries, like Finland and Italy have shown that high-volume centers have lower mortality rates and can have lower costs, there however, is still a gap in knowledge about these centers cost-effectiveness globally. This paper seeks to review the current literature in Europe and the US to gain a better understanding of the state of high-volume pancreatic surgical centers cost-effectiveness while considering the contextual differences in health system structure. A review of major reference databases such as Medline, Embase and PubMed will be conducted for cost-effectiveness studies on the surgical treatment of pancreatic cancer at high-volume centers. Possible MeSH terms to be included, but not limited to, are: “pancreatic cancer”, “cost analysis”, “cost-effectiveness”, “economic evaluation”, “pancreatic neoplasms”, “surgical”, “Europe” “socialized medicine”, “privatized medicine”, “for-profit”, and “high-volume”. Studies must also have been available in the English language. This review will encompass European scientific literature, as well as those in the US. Based on our preliminary findings, we anticipate high-volume hospitals to provide better care at greater costs. We anticipate that high-volume hospitals may be cost-effective in different contexts depending on the national structure of a healthcare system. Countries with more centralized and socialized healthcare may yield results that are more cost-effective. High-volume centers may differ in their cost-effectiveness of the surgical care of pancreatic cancer internationally especially when comparing those in the United States to others throughout Europe.Keywords: cost-effectiveness analysis, economic evaluation, pancreatic cancer, scientific literature review
Procedia PDF Downloads 9011626 Perinatal Optimisation for Preterm Births Less than 34 Weeks at OLOL, Drogheda, Ireland
Authors: Stephane Maingard, Babu Paturi, Maura Daly, Finnola Armstrong
Abstract:
Background: Perinatal optimization involves the implementation of twelve intervention bundles of care at Our Lady of Lourdes Hospital, reliably delivering evidence-based interventions in the antenatal, intrapartum, and neonatal period to improve preterm outcomes. These key interventions (e.g. Antenatal steroids, Antenatal counselling, Optimal cord management, Respiratory management etc.) are based on WHO (World Health Organization, BAPM (British Association of Perinatal Medicine), and the latest 2022 European Consensus guidelines recommendations. Methodology: In February 2023, a quality improvement project team (pediatricians, neonatologists, obstetricians, clinical skills managers) was established, and a project implementation plan was developed. The Program Study Act implemented the following: 1. Antenatal consultation pathway, 2. Creation and implementation of a perinatal checklist for preterm births less than 34 weeks of gestation, 3. Process changes to ensure the checklist is completed, 4. Completion of parent and staff surveys, 5. Ongoing training. We collected and compared a range of data before and after implementation. Results: Preliminary analysis so far at 1 month demonstrates improvement in the following areas: 50% increase in antenatal counselling. Right place of birth increased from 85% to 100%. Magnesium sulphate increased from 56% to 100%. No change was observed in buccal colostrum administration (28%), delayed cord clamping (75%), caffeine administration (100%), blood glucose level at one hour of life > 2,6mmol (85%). There was also no change noted in respiratory support at resuscitation, CPAP only (47%), IPPV with CPAP (45%), IPPV with intubation (20%), and surfactant administration (28%). A slight decrease in figures was noted in the following: steroid administration from 80% to 75% and thermal care obtaining optimal temperature on admission (65% to 50%). Discussion: Even though the findings are preliminary, the directional improvement shows promise. Improved communication has been achieved between all stakeholders, including our patients, who are key team members. Adherence to the bundles of care will help to improve survival and neurodevelopmental outcomes as well as reduce the length of stay, thereby overall reducing the financial cost, considering the lifetime cost of cerebral palsy is estimated at €800,000 and reducing the length of stay can result in savings of up to €206,000. Conclusion: Preliminary results demonstrate improvements across a range of patient, process, staff, and financial outcomes. Our future goal is a seamless pathway of patient centered care for babies and their families. This project is an interdisciplinary collaboration to implement best practices for a vulnerable patient cohort. Our two main challenges are changing our organization’s culture as well as ensuring the sustainability of the project.Keywords: perinatal, optimization, antenatal, counselling, IPPV
Procedia PDF Downloads 1611625 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland
Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben
Abstract:
Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning
Procedia PDF Downloads 17011624 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan
Authors: Ghaleb Y. Abbasi, Satanay Alhiary
Abstract:
This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing
Procedia PDF Downloads 45411623 Green Hydrogen: Exploring Economic Viability and Alluring Business Scenarios
Authors: S. Sakthivel
Abstract:
Currently, the global economy is based on the hydrocarbon economy, which is referencing the global hydrocarbon industry. Problems of using these fossil fuels (like oil, NG, coal) are emitting greenhouse gases (GHGs) and price fluctuation, supply/distribution, etc. These challenges can be overcome by using clean energy as hydrogen. The hydrogen economy is the use of hydrogen as a low carbon fuel, particularly for hydrogen vehicles, alternative industrial feedstock, power generation, and energy storage, etc. Engineering consulting firms have a significant role in this ambition and green hydrogen value chain (i.e., integration of renewables, production, storage, and distribution to end-users). Typically, the cost of green hydrogen is a function of the price of electricity needed, the cost of the electrolyser, and the operating cost to run the system. This article focuses on economic viability and explores the alluring business scenarios globally. Break-even analysis was carried out for green hydrogen production and in order to evaluate and compare the impact of the electricity price on the production costs of green hydrogen and relate it to fossil fuel-based brown/grey/blue hydrogen costs. It indicates that the cost of green hydrogen production will fall drastically due to the declining costs of renewable electricity prices and along with the improvement and scaling up of electrolyser manufacturing. For instance, in a scenario where electricity prices are below US$ 40/MWh, green hydrogen cost is expected to reach cost competitiveness.Keywords: green hydrogen, cost analysis, break-even analysis, renewables, electrolyzer
Procedia PDF Downloads 14111622 A General Iterative Nonlinear Programming Method to Synthesize Heat Exchanger Network
Authors: Rupu Yang, Cong Toan Tran, Assaad Zoughaib
Abstract:
The work provides an iterative nonlinear programming method to synthesize a heat exchanger network by manipulating the trade-offs between the heat load of process heat exchangers (HEs) and utilities. We consider for the synthesis problem two cases, the first one without fixed cost for HEs, and the second one with fixed cost. For the no fixed cost problem, the nonlinear programming (NLP) model with all the potential HEs is optimized to obtain the global optimum. For the case with fixed cost, the NLP model is iterated through adding/removing HEs. The method was applied in five case studies and illustrated quite well effectiveness. Among which, the approach reaches the lowest TAC (2,904,026$/year) compared with the best record for the famous Aromatic plants problem. It also locates a slightly better design than records in literature for a 10 streams case without fixed cost with only 1/9 computational time. Moreover, compared to the traditional mixed-integer nonlinear programming approach, the iterative NLP method opens a possibility to consider constraints (such as controllability or dynamic performances) that require knowing the structure of the network to be calculated.Keywords: heat exchanger network, synthesis, NLP, optimization
Procedia PDF Downloads 15911621 Management Systems as a Tool to Limit the End-Users Impacts on Energy Savings Achievements
Authors: Margarida Plana
Abstract:
The end-users behavior has been identified in the last years as one of the main responsible for the success degree of the energy efficiency improvements. It is essential to create tools to limit their impact on the final consumption. This paper is focused on presenting the results of the analysis developed on the basis of real projects’ data in order to quantify the impact of end-users behavior. The analysis is focused on how the behavior of building’s occupants can vary the achievement of the energy savings targets and how they can be limited. The results obtained show that the management systems are one of the main tools available to control and limit the end-users interaction with the equipment operation. In fact, the results will present the management systems as ‘a must’ on any energy efficiency project.Keywords: end-users impacts, energy efficiency, energy savings, management systems
Procedia PDF Downloads 26011620 The Effect of Principled Human Resource Management and Training Based on Existing Standards in Order to Improve the Quality of Construction Projects
Authors: Arsalan Salahi
Abstract:
Today, the number of changes in the construction industry and urban mass house building is increasing, which makes you need to pay more attention to targeted planning for human resource management and training. The human resources working in the construction industry have various problems and deficiencies, and in order to solve these problems, there is a need for basic management and training of these people in order to lower the construction costs and increase the quality of the projects, especially in mass house building projects. The success of any project in reaching short and long-term professional goals depends on the efficient combination of work tools, financial resources, raw materials, and most importantly, human resources. Today, due to the complexity and diversity of each project, specialized management fields have emerged to maximize the potential benefits of each component of that project. Human power is known as the most important resource in construction projects for its successful implementation, but unfortunately, due to the low cost of human power compared to other resources, such as materials and machinery, little attention is paid to it. With the correct management and training of human resources, which depends on its correct planning and development, it is possible to improve the performance of construction projects. In this article, the training and motivation of construction industry workers and their effects on the effectiveness of projects in this industry have been researched. In this regard, some barriers to the training and motivation of construction workers and personnel have been identified and solutions have been provided for construction companies. Also, the impact of workers and unskilled people on the efficiency of construction projects is investigated. The results of the above research show that by increasing the use of correct and basic training for human resources, we will see positive results and effects on the performance of construction projects.Keywords: human resources, construction industry, principled training, skilled and unskilled workers
Procedia PDF Downloads 9211619 Investigation on Cost Reflective Network Pricing and Modified Cost Reflective Network Pricing Methods for Transmission Service Charges
Authors: K. Iskandar, N. H. Radzi, R. Aziz, M. S. Kamaruddin, M. N. Abdullah, S. A. Jumaat
Abstract:
Nowadays many developing countries have been undergoing a restructuring process in the power electricity industry. This process has involved disaggregating former state-owned monopoly utilities both vertically and horizontally and introduced competition. The restructuring process has been implemented by the Australian National Electricity Market (NEM) started from 13 December 1998, began operating as a wholesale market for supply of electricity to retailers and end-users in Queensland, New South Wales, the Australian Capital Territory, Victoria and South Australia. In this deregulated market, one of the important issues is the transmission pricing. Transmission pricing is a service that recovers existing and new cost of the transmission system. The regulation of the transmission pricing is important in determining whether the transmission service system is economically beneficial to both side of the users and utilities. Therefore, an efficient transmission pricing methodology plays an important role in the Australian NEM. In this paper, the transmission pricing methodologies that have been implemented by the Australian NEM which are the Cost Reflective Network Pricing (CRNP) and Modified Cost Reflective Network Pricing (MCRNP) methods are investigated for allocating the transmission service charges to the transmission users. A case study using 6-bus system is used in order to identify the best method that reflects a fair and equitable transmission service charge.Keywords: cost-reflective network pricing method, modified cost-reflective network pricing method, restructuring process, transmission pricing
Procedia PDF Downloads 44411618 Capacitated Multiple Allocation P-Hub Median Problem on a Cluster Based Network under Congestion
Authors: Çağrı Özgün Kibiroğlu, Zeynep Turgut
Abstract:
This paper considers a hub location problem where the network service area partitioned into predetermined zones (represented by node clusters is given) and potential hub nodes capacity levels are determined a priori as a selection criteria of hub to investigate congestion effect on network. The objective is to design hub network by determining all required hub locations in the node clusters and also allocate non-hub nodes to hubs such that the total cost including transportation cost, opening cost of hubs and penalty cost for exceed of capacity level at hubs is minimized. A mixed integer linear programming model is developed introducing additional constraints to the traditional model of capacitated multiple allocation hub location problem and empirically tested.Keywords: hub location problem, p-hub median problem, clustering, congestion
Procedia PDF Downloads 48911617 Artificial Neural Network in FIRST Robotics Team-Based Prediction System
Authors: Cedric Leong, Parth Desai, Parth Patel
Abstract:
The purpose of this project was to develop a neural network based on qualitative team data to predict alliance scores to determine winners of matches in the FIRST Robotics Competition (FRC). The game for the competition changes every year with different objectives and game objects, however the idea was to create a prediction system which can be reused year by year using some of the statistics that are constant through different games, making our system adaptable to future games as well. Aerial Assist is the FRC game for 2014, and is played in alliances of 3 teams going against one another, namely the Red and Blue alliances. This application takes any 6 teams paired into 2 alliances of 3 teams and generates the prediction for the final score between them.Keywords: artifical neural network, prediction system, qualitative team data, FIRST Robotics Competition (FRC)
Procedia PDF Downloads 51111616 Performance Evaluation and Cost Analysis of Standby Systems
Authors: Mohammed A. Hajeeh
Abstract:
Pumping systems are an integral part of water desalination plants, their effective functioning is vital for the operation of a plant. In this research work, the reliability and availability of pressurized pumps in a reverse osmosis desalination plant are studied with the objective of finding configurations that provides optimal performance. Six configurations of a series system with different number of warm and cold standby components were examined. Closed form expressions for the mean time to failure (MTTF) and the long run availability are derived and compared under the assumption that the time between failures and repair times of the primary and standby components are exponentially distributed. Moreover, a cost/ benefit analysis is conducted in order to identify a configuration with the best performance and least cost. It is concluded that configurations with cold standby components are preferable especially when the pumps are of the size.Keywords: availability, cost/benefit, mean time to failure, pumps
Procedia PDF Downloads 28111615 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks
Authors: Salman Ali Nisar, Suzuki Koji
Abstract:
In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.Keywords: project management, scheduling, critical path method, time constraint, non-interruptible tasks
Procedia PDF Downloads 50111614 Using Design Sprint For Software Engineering Undergraduate Student Projects: A Method Paper
Authors: Sobhani U. Pilapitiya, Tharanga Peiris
Abstract:
Software Engineering curriculums generally consist of industry-based practices such as project-based learning (PBL) which mainly focuses on efficient and innovative product development. These approaches can be tailored and used in project-based modules in software engineering curriculums. However, there are very limited attempts in the area especially related to the Sri Lankan context. This paper describes a tailored pedagogical approach and its results of using design sprint which can be used for project-based modules in SE curriculums. A controlled group of second-year software engineering students was selected for the study. The study results indicate that 100% of students agreed that the Design Sprint approach is effective in group-based projects and 83% of students stated that it minimized the re-work compared to traditional project approaches. The tailored process was effective, easy to implement and produced desired results at the end of the session while providing students an enjoyable experience.Keywords: design sprint, PBL, software engineering, curriculum
Procedia PDF Downloads 20211613 The Transfer of Low-Cost Housing in South Africa: Problems and Impediments
Authors: Gert Van Schalkwyk, Chris Cloete
Abstract:
South Africa is experiencing a massive housing backlog in urban low-cost housing. A backlog in the transfer of low-cost housing units is exacerbated by various impediments and delays that exist in the current legal framework. Structured interviews were conducted with forty-five practicing conveyancers and fifteen deeds office examiners at the Deeds Office in Pretoria, South Africa. One of the largest, the Deeds Office in Pretoria implements a uniform registration process and can be regarded as representative of other deeds offices in South Africa. It was established that a low percentage of low-cost properties are freely transferable. The main economic impediments are the absence of financing and the affordability or payment of rates and taxes to local government. Encroachment of buildings on neighboring stands caused by the enlargement of existing small units on small stands also causes long-term unresolved legal disputes. In addition, as the transfer of properties is dependent on the proper functioning of administrative functions of various government departments, the adverse service delivery of government departments hampers transfer. Addressing the identified problems will contribute to a more sustainable process for the transfer of low-cost housing units in South Africa.Keywords: conveyancing, low-cost housing, South Africa, tenure, titling, transfer
Procedia PDF Downloads 13411612 Evidence on Scale Economies in National Bank of Pakistan
Authors: Sohail Zafar, Sardar Javaid Iqbal Khan
Abstract:
We use a parametric approach within a translog cost function framework to estimate the economies of scale in National Bank of Pakistan from 1997 to 2013. The results indicate significant economies of scale throughout the sample at aggregates and disaggregates taking in account size subject to stipulation ownership. The factor markets often produce scale inefficiencies in the banking of developing countries like Pakistan such inefficiencies are common due to distortion in factor markets leading to the use of inappropriate factor proportions. The findings suggest that National Bank of Pakistan diversify their asset portfolios that it has cost advantage, therefore, expansion in size should be encouraged under current technology because it appears to be cost effective. In addition, our findings support the implementation of universal banking model in Pakistan.Keywords: scale economies, cost function, disaggregates, aggregates
Procedia PDF Downloads 32311611 Optimal Cropping Pattern in an Irrigation Project: A Hybrid Model of Artificial Neural Network and Modified Simplex Algorithm
Authors: Safayat Ali Shaikh
Abstract:
Software has been developed for optimal cropping pattern in an irrigation project considering land constraint, water availability constraint and pick up flow constraint using modified Simplex Algorithm. Artificial Neural Network Models (ANN) have been developed to predict rainfall. AR (1) model used to generate 1000 years rainfall data to train the ANN. Simulation has been done with expected rainfall data. Eight number crops and three types of soil class have been considered for optimization model. Area under each crop and each soil class have been quantified using Modified Simplex Algorithm to get optimum net return. Efficacy of the software has been tested using data of large irrigation project in India.Keywords: artificial neural network, large irrigation project, modified simplex algorithm, optimal cropping pattern
Procedia PDF Downloads 20211610 Methodology of the Turkey’s National Geographic Information System Integration Project
Authors: Buse A. Ataç, Doğan K. Cenan, Arda Çetinkaya, Naz D. Şahin, Köksal Sanlı, Zeynep Koç, Akın Kısa
Abstract:
With its spatial data reliability, interpretation and questioning capabilities, Geographical Information Systems make significant contributions to scientists, planners and practitioners. Geographic information systems have received great attention in today's digital world, growing rapidly, and increasing the efficiency of use. Access to and use of current and accurate geographical data, which are the most important components of the Geographical Information System, has become a necessity rather than a need for sustainable and economic development. This project aims to enable sharing of data collected by public institutions and organizations on a web-based platform. Within the scope of the project, INSPIRE (Infrastructure for Spatial Information in the European Community) data specifications are considered as a road-map. In this context, Turkey's National Geographic Information System (TUCBS) Integration Project supports sharing spatial data within 61 pilot public institutions as complied with defined national standards. In this paper, which is prepared by the project team members in the TUCBS Integration Project, the technical process with a detailed methodology is explained. In this context, the main technical processes of the Project consist of Geographic Data Analysis, Geographic Data Harmonization (Standardization), Web Service Creation (WMS, WFS) and Metadata Creation-Publication. In this paper, the integration process carried out to provide the data produced by 61 institutions to be shared from the National Geographic Data Portal (GEOPORTAL), have been trying to be conveyed with a detailed methodology.Keywords: data specification, geoportal, GIS, INSPIRE, Turkish National Geographic Information System, TUCBS, Turkey's national geographic information system
Procedia PDF Downloads 141