10732 Empirical Study on Causes of Project Delays
Authors: Khan Farhan Rafat, Riaz Ahmed
Abstract:
Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.Keywords: causes of construction project delays, construction industry, construction management, power distance
Procedia PDF Downloads 21310731 Technology Identification, Evaluation and Selection Methodology for Industrial Process Water and Waste Water Treatment Plant of 3x150 MWe Tufanbeyli Lignite-Fired Power Plant
Authors: Cigdem Safak Saglam
Abstract:
Most thermal power plants use steam as working fluid in their power cycle. Therefore, in addition to fuel, water is the other main input for thermal plants. Water and steam must be highly pure in order to protect the systems from corrosion, scaling and biofouling. Pure process water is produced in water treatment plants having many several treatment methods. Treatment plant design is selected depending on raw water source and required water quality. Although working principle of fossil-fuel fired thermal power plants are same, there is no standard design and equipment arrangement valid for all thermal power plant utility systems. Besides that, there are many other technology evaluation and selection criteria for designing the most optimal water systems meeting the requirements such as local conditions, environmental restrictions, electricity and other consumables availability and transport, process water sources and scarcity, land use constraints etc. Aim of this study is explaining the adopted methodology for technology selection for process water preparation and industrial waste water treatment plant in a thermal power plant project located in Tufanbeyli, Adana Province in Turkey. Thermal power plant is fired with indigenous lignite coal extracted from adjacent lignite reserves. This paper addresses all above-mentioned factors affecting the thermal power plant water treatment facilities (demineralization + waste water treatment) design and describes the ultimate design of Tufanbeyli Thermal Power Plant Water Treatment Plant.Keywords: thermal power plant, lignite coal, pretreatment, demineralization, electrodialysis, recycling, ash dampening
Procedia PDF Downloads 48210730 Study on Mitigation Measures of Gumti Hydro Power Plant Using Analytic Hierarchy Process and Concordance Analysis Techniques
Authors: K. Majumdar, S. Datta
Abstract:
Electricity is recognized as fundamental to industrialization and improving the quality of life of the people. Harnessing the immense untapped hydropower potential in Tripura region opens avenues for growth and provides an opportunity to improve the well-being of the people of the region, while making substantial contribution to the national economy. Gumti hydro power plant generates power to mitigate the crisis of power in Tripura, India. The first unit of hydro power plant (5 MW) was commissioned in June 1976 & another two units of 5 MW was commissioned simultaneously. But out of 15 MW capacity at present only 8-9 MW power is produced from Gumti hydro power plant during rainy season. But during lean season the production reduces to 0.5 MW due to shortage of water. Now, it is essential to implement some mitigation measures so that the further atrocities can be prevented and originality will be possible to restore. The decision making ability of the Analytic Hierarchy Process (AHP) and Concordance Analysis Techniques (CAT) are utilized to identify the better decision or solution to the present problem. Some related attributes are identified by the method of surveying within the experts and the available reports and literatures. Similar criteria are removed and ultimately seven relevant ones are identified. All the attributes are compared with each other and rated accordingly to their importance over the other with the help of Pair wise Comparison Matrix. In the present investigation different mitigation measures are identified and compared to find the best suitable alternative which can solve the present uncertainties involving the existence of the Gumti Hydro Power Plant.Keywords: concordance analysis techniques, analytic hierarchy process, hydro power
Procedia PDF Downloads 35410729 Production Sharing Contracts Transparency Simulation
Authors: Chariton Christou, David Cornwell
Abstract:
Production Sharing Contract (PSC) is the type of contract that is being used widely in our time. The financial crisis made the governments tightfisted and they do not have the resources to participate in a development of a field. Therefore, more and more countries introduce the PSC. The companies have the power and the money to develop the field with their own way. The main problem is the transparency of oil and gas companies especially in the PSC and how this can be achieved. Many discussions have been made especially in the U.K. What we are suggesting is a dynamic financial simulation with the help of a flow meter. The flow meter will count the production of each field every day (it will be installed in a pipeline). The production will be the basic input of the simulation. It will count the profit, the costs and more according to the information of the flow meter. In addition it will include the terms of the contract and the costs that have been paid. By all these parameters the simulation will be able to present in real time the information of a field (taxes, employees, R-factor). By this simulation the company will share some information with the government but not all of them. The government will know the taxes that should be paid and what is the sharing percentage of it. All of the other information could be confidential for the company. Furthermore, oil company could control the R-factor by changing the production each day to maximize its sharing percentages and as a result of this the profit. This idea aims to change the way that governments 'control' oil companies and bring a transparency evolution in the industry. With the help of a simulation every country could be next to the company and have a better collaboration.Keywords: production sharing contracts, transparency, simulation
Procedia PDF Downloads 37510728 Transmission Network Expansion Planning in Deregulated Power Systems to Facilitate Competition under Uncertainties
Authors: Hooshang Mohammad Alikhani, Javad Nikoukar
Abstract:
Restructuring and deregulation of power industry have changed the objectives of transmission expansion planning and increased the uncertainties. Due to these changes, new approaches and criteria are needed for transmission planning in deregulated power systems. The objective of this research work is to present a new approach for transmission expansion planning with considering new objectives and uncertainties in deregulated power systems. The approach must take into account the desires of all stakeholders in transmission expansion planning. Market based criteria must be defined to achieve the new objectives. Combination of market based criteria, technical criteria and economical criteria must be used for measuring the goodness of expansion plans to achieve market requirements, technical requirements, and economical requirements altogether.Keywords: deregulated power systems, transmission network, stakeholder, energy systems
Procedia PDF Downloads 65210727 Concept, Design and Implementation of Power System Component Simulator Based on Thyristor Controlled Transformer and Power Converter
Authors: B. Kędra, R. Małkowski
Abstract:
This paper presents information on Power System Component Simulator – a device designed for LINTE^2 laboratory owned by Gdansk University of Technology in Poland. In this paper, we first provide an introductory information on the Power System Component Simulator and its capabilities. Then, the concept of the unit is presented. Requirements for the unit are described as well as proposed and introduced functions are listed. Implementation details are given. Hardware structure is presented and described. Information about used communication interface, data maintenance and storage solution, as well as used Simulink real-time features are presented. List and description of all measurements is provided. Potential of laboratory setup modifications is evaluated. Lastly, the results of experiments performed using Power System Component Simulator are presented. This includes simulation of under frequency load shedding, frequency and voltage dependent characteristics of groups of load units, time characteristics of group of different load units in a chosen area.Keywords: power converter, Simulink Real-Time, Matlab, load, tap controller
Procedia PDF Downloads 24210726 Solar Power Monitoring and Control System using Internet of Things
Authors: Oladapo Tolulope Ibitoye
Abstract:
It has become imperative to harmonize energy poverty alleviation and carbon footprint reduction. This is geared towards embracing independent power generation at local levels to reduce the popular ambiguity in the transmission of generated power. Also, it will contribute towards the total adoption of electric vehicles and direct current (DC) appliances that are currently flooding the global market. Solar power system is gaining momentum as it is now an affordable and less complex alternative to fossil fuel-based power generation. Although, there are many issues associated with solar power system, which resulted in deprivation of optimum working capacity. One of the key problems is inadequate monitoring of the energy pool from solar irradiance, which can then serve as a foundation for informed energy usage decisions and appropriate solar system control for effective energy pooling. The proposed technique utilized Internet of Things (IoT) in developing a system to automate solar irradiance pooling by controlling solar photovoltaic panels autonomously for optimal usage. The technique is potent with better solar irradiance exposure which results into 30% voltage pooling capacity than a system with static solar panels. The evaluation of the system show that the developed system possesses higher voltage pooling capacity than a system of static positioning of solar panel.Keywords: solar system, internet of things, renewable energy, power monitoring
Procedia PDF Downloads 8310725 Energy and Exergy Performance Optimization on a Real Gas Turbine Power Plant
Authors: Farhat Hajer, Khir Tahar, Cherni Rafik, Dakhli Radhouen, Ammar Ben Brahim
Abstract:
This paper presents the energy and exergy optimization of a real gas turbine power plant performance of 100 MW of power, installed in the South East of Tunisia. A simulation code is established using the EES (Engineering Equation Solver) software. The parameters considered are those of the actual operating conditions of the gas turbine thermal power station under study. The results show that thermal and exergetic efficiency decreases with the increase of the ambient temperature. Air excess has an important effect on the thermal efficiency. The emission of NOx rises in the summer and decreases in the winter. The obtained rates of NOx are compared with measurements results.Keywords: efficiency, exergy, gas turbine, temperature
Procedia PDF Downloads 28410724 High Power Low Loss CMOS SPDT Antenna Switch for LTE-A Front End Module
Authors: Ki-Jin Kim, Suk-Hui LEE, Sanghoon Park, K. H. Ahn
Abstract:
A high power, low loss asymmetric single pole double through(SPDT) antenna switch for LTE-A Front-End Module(FEM) is presented in this paper by using CMOS technology. For the usage of LTE-A applications, low loss and high linearity are the key features which are very challenging works under CMOS process. To enhance insertion loss(IL) and power handling capability, this paper adopts asymmetric Transmitter (TX) and RX (Receiver) structure, floating body technique, multi-stacked structure, and feed forward capacitor technique. The designed SPDT switch shows TX IL 0.34 dB, RX IL 0.73 dB, P1dB 38.9 dBm at 0.9 GHz and TX IL 0.37 dB, RX IL 0.95 dB, P1dB 39.1 dBm at 2.5 GHz respectively.Keywords: CMOS switch, SPDT switch, high power CMOS switch, LTE-A FEM
Procedia PDF Downloads 36410723 STATCOM’s Contribution to the Improvement of Voltage Plan and Power Flow in an Electrical Transmission Network
Authors: M. Adjabi, A. Amiar, P. O. Logerais
Abstract:
Flexible Alternative Current Systems Transmission (FACTS) are used since nearly four decades and present very good dynamic performances. The purpose of this work is to study the behavior of a system where Static Compensator (STATCOM) is located at the midpoint of a transmission line which is the idea of the project functioning in disturbed modes with various levels of load. The studied model and starting from the analysis of various alternatives will lead to the checking of the aptitude of the STATCOM to maintain the voltage plan and to improve the power flow in electro-energetic system which is the east region of Algerian 400 kV transmission network. The steady state performance of STATCOM’s controller is analyzed through computer simulations with Matlab/Simulink program. The simulation results have demonstrated that STATCOM can be effectively applied in power transmission systems to solve the problems of poor dynamic performance and voltage regulation.Keywords: STATCOM, reactive power, power flow, voltage plan, Algerian network
Procedia PDF Downloads 56910722 STATCOM's Contribution to the Improvement of Voltage Plan and Power Flow in an Electrical Transmission Network
Authors: M. Adjabi, A. Amiar, P. O. Logerais
Abstract:
Flexible Alternative Current Systems Transmission (FACTS) are used since nearly four decades and present very good dynamic performances. The purpose of this work is to study the behavior of a system where Static Compensator (STATCOM) is located at the midpoint of a transmission line which is the idea of the project functioning in disturbed modes with various levels of load. The studied model and starting from the analysis of various alternatives will lead to the checking of the aptitude of the STATCOM to maintain the voltage plan and to improve the power flow in electro-energetic system which is the east region of Algerian 400 kV transmission network. The steady state performance of STATCOM’s controller is analyzed through computer simulations with Matlab/Simulink program. The simulation results have demonstrated that STATCOM can be effectively applied in power transmission systems to solve the problems of poor dynamic performance and voltage regulation.Keywords: STATCOM, reactive power, power flow, voltage plan, Algerian network
Procedia PDF Downloads 59910721 Improved Qualitative Modeling of the Magnetization Curve B(H) of the Ferromagnetic Materials for a Transformer Used in the Power Supply for Magnetron
Authors: M. Bassoui, M. Ferfra, M. Chrayagne
Abstract:
This paper presents a qualitative modeling for the nonlinear B-H curve of the saturable magnetic materials for a transformer with shunts used in the power supply for the magnetron. This power supply is composed of a single phase leakage flux transformer supplying a cell composed of a capacitor and a diode, which double the voltage and stabilize the current, and a single magnetron at the output of the cell. A procedure consisting of a fuzzy clustering method and a rule processing algorithm is then employed for processing the constructed fuzzy modeling rules to extract the qualitative properties of the curve.Keywords: B(H) curve, fuzzy clustering, magnetron, power supply
Procedia PDF Downloads 23610720 Enhanced Efficiency of Thermoelectric Generator by Optimizing Mechanical and Electrical Structures
Authors: Kewen Li
Abstract:
Much attention has been paid to the application of low temperature thermal resources, especially for power generation in recent years. Most of the current commercialized thermal, including geothermal, power-generation technologies convert thermal energy to electric energy indirectly, that is, making mechanical work before producing electricity. Technology using thermoelectric generator (TEG), however, can directly transform thermal energy into electricity by using Seebeck effect. TEG technology has many advantages such as compactness, quietness, and reliability because there are no moving parts. One of the big disadvantages of TEGs is the low efficiency from thermal to electric energy. For this reason, we redesigned and modified our previous 1 KW (at a temperature difference of around 120 °C) TEG system. The efficiency of the system was improved significantly, about 20% greater. Laboratory experiments have been conducted to measure the output power, including both open and net power, at different conditions: different modes of connections between TEG modules, different mechanical structures, different temperature differences between hot and cold sides. The cost of the TEG power generator has been reduced further because of the increased efficiency and is lower than that of photovoltaics (PV) in terms of equivalent energy generated. The TEG apparatus has been pilot tested and the data will be presented. This kind of TEG power system can be applied in many thermal and geothermal sites with low temperature resources, including oil fields where fossil and geothermal energies are co-produced.Keywords: TEG, direct power generation, efficiency, thermoelectric effect
Procedia PDF Downloads 24010719 Proton Irradiation Testing on Commercial Enhancement Mode GaN Power Transistor
Authors: L. Boyaci
Abstract:
Two basic equipment of electrical power subsystem of space satellites are Power Conditioning Unit (PCU) and Power Distribution Unit (PDU). Today, the main switching element used in power equipment in satellites is silicon (Si) based radiation-hardened MOSFET. GaNFETs have superior performances over MOSFETs in terms of their conduction and switching characteristics. GaNFET has started to take MOSFET’s place in many applications in industry especially by virtue of its switching performances. If GaNFET can also be used in equipment for space applications, this would be great revolution for future space power subsystem designs. In this study, the effect of proton irradiation on Gallium Nitride based power transistors was investigated. Four commercial enhancement mode GaN power transistors from Efficient Power Conversion Corporation (EPC) are irradiated with 30MeV protons while devices are switching. Flux of 8.2x10⁹ protons/cm²/s is applied for 12.5 seconds to reach ultimate fluence of 10¹¹ protons/cm². Vgs-Ids characteristics are measured and recorded for each device before, during and after irradiation. It was observed that if there would be destructive events. Proton induced permanent damage on devices is not observed. All the devices remained healthy and continued to operate. For two of these devices, further irradiation is applied with same flux for 30 minutes up to a total fluence level of 1.476x10¹³ protons/cm². We observed that GaNFETs are fully functional under this high level of radiation and no destructive events and irreversible failures took place for transistors. Results reveal that irradiated GaNFET in this experiment has radiation tolerance under proton testing and very important candidate for being one of the future power switching element in space.Keywords: enhancement mode GaN power transistors, proton irradiation effects, radiation tolerance
Procedia PDF Downloads 15210718 India’s Role in Afghanistan in the Post 9/11 Era
Authors: Fayiz Saifurahman
Abstract:
Afghanistan's geopolitically and geo-strategically location has remained the attention of Indian policy. On 11 September 2001, the terrorist attacks in the United States and the announcement of the United States, fight for international war against the Taliban in November 2001 provided India a chance to pursue its foreign policy goals of achieving a good position in the region and emerging as an international power. Therefore, post-9/11, India strengthened its efforts to re-establish its power in Afghanistan. The objectives of this study are to study the India-Afghanistan relation in the post 9/11 and to discuss the initial role of India in Afghanistan. The research method was conducted on a qualitative method based on descriptive. The research findings propose that; Indian foreign policy should be analyzed and increase its soft power. Afghanistan has definitely provided a significant occasion for India to increase its power in Afghanistan. In this linkage, Indian determinations have been to intrude all parts in Afghanistan to make them reliant on Indian cooperation.Keywords: Afghanistan, war, power, policy.
Procedia PDF Downloads 23110717 The Effects of Menstrual Phase on Upper and Lower Body Anaerobic Performance in College-Aged Women
Authors: Kelsey Scanlon
Abstract:
Introduction: With the rate of female collegiate and professional athletes on the rise in recent decades, fluctuations in physical performance in relation to the menstrual cycle is an important area of study. PURPOSE: The purpose of this research was to compare differences in upper and lower body maximal anaerobic capacities across a single menstrual cycle. Methode: Participants (n=11) met a total of four times; once for familiarization and again on day 1 of menses (follicular phase), day 14 (ovulation), and day 21 (luteal phase) respectively. Upper body power was assessed using a bench press weight of ~50% of the participant’s predetermined 1-repetition maximum (1-RM) on a ballistic measurement system and variables included peak force (N), mean force (N), peak power (W), mean power (W), and peak velocity (m/s). Lower body power output was collected using a standard Wingate test. The variables of interest were anaerobic capacity (w/kg), peak power (W), mean power (W), fatigue index (W/s), and total work (J). Result: Statistical significance was not observed (p > 0.05) in any of the aforementioned variables after completing multiple one ways of analyses of variances (ANOVAs) with repeated measures on time. Conclusion: Within the parameters of this research, neither female upper nor lower body power output differed across the menstrual cycle when analyzed using 50% of one repetition (1RM) maximal bench press and the 30-second maximal effort cycle ergometer Wingate test. Therefore, researchers should not alter their subject populations due to the incorrect assumption that power output may be influenced by the menstrual cycle.Keywords: anaerobic, athlete, female, power
Procedia PDF Downloads 14610716 Techno-Economic Analysis of Motor-Generator Pair System and Virtual Synchronous Generator for Providing Inertia of Power System
Authors: Zhou Yingkun, Xu Guorui, Wei Siming, Huang Yongzhang
Abstract:
With the increasing of the penetration of renewable energy in power system, the whole inertia of the power system is declining, which will endanger the frequency stability of the power system. In order to enhance the inertia, virtual synchronous generator (VSG) has been proposed. In addition, the motor-generator pair (MGP) system is proposed to enhance grid inertia. Both of them need additional equipment to provide instantaneous energy, so the economic problem should be considered. In this paper, the basic working principle of MGP system and VSG are introduced firstly. Then, the technical characteristics and economic investment of MGP/VSG are compared by calculation and simulation. The results show that the MGP system can provide same inertia with less cost than VSG.Keywords: high renewable energy penetration, inertia of power system, motor-generator pair (MGP) system, virtual synchronous generator (VSG), techno-economic analysis
Procedia PDF Downloads 45210715 Comparison of Power Consumption of WiFi Inbuilt Internet of Things Device with Bluetooth Low Energy
Authors: Darshana Thomas, Edward Wilkie, James Irvine
Abstract:
The Internet of things (IoT) is currently a highly researched topic, especially within the context of the smart home. These are small sensors that are capable of gathering data and transmitting it to a server. The majority of smart home products use protocols such as ZigBee or Bluetooth Low Energy (BLE). As these small sensors are increasing in number, the need to implement these with much more capable and ubiquitous transmission technology is necessary. The high power consumption is the reason that holds these small sensors back from using other protocols such as the most ubiquitous form of communication, WiFi. Comparing the power consumption of existing transmission technologies to one with WiFi inbuilt, would provide a better understanding for choosing between these technologies. We have developed a small IoT device with WiFi capability and proven that it is much more efficient than the first protocol, 433 MHz. We extend our work in this paper and compare WiFi power consumption with the other most widely used protocol BLE. The experimental results in this paper would conclude whether the developed prototype is capable in terms of power consumption to replace the existing protocol BLE with WiFi.Keywords: bluetooth, internet of things (IoT), power consumption, WiFi
Procedia PDF Downloads 26710714 Design and Implementation of Embedded FM Transmission Control SW for Low Power Battery System
Authors: Young-Su Ryu, Kyung-Won Park, Jae-Hoon Song, Ki-Won Kwon
Abstract:
In this paper, an embedded frequency modulation (FM) transmission control software (SW) for a low power battery system is designed and implemented. The simultaneous translation systems for various languages are needed as so many international conferences and festivals are held in world wide. Especially in portable transmitting and receiving systems, the ability of long operation life is used for a measure of value. This paper proposes an embedded FM transmission control SW for low power battery system and shows the results of the SW implemented on a portable FM transmission system.Keywords: FM transmission, simultaneous translation system, portable transmitting and receiving systems, low power embedded control SW
Procedia PDF Downloads 44210713 Using a Hybrid Method to Eradicate Bamboo Growth along the Route of Overhead Power Lines
Authors: Miriam Eduful
Abstract:
The Electricity Company of Ghana (ECG) is under obligation, demanded by the Public Utility and Regulation Commission to meet set performance indices. However, in certain parts of the country, bamboo related power interruptions have become a challenge. Growth rate of the bamboo is such that the cost of regular vegetation maintenance along route of the overhead power lines has become prohibitive. To address the problem, several methods and techniques of bamboo eradication have being used. Some of these methods involved application of chemical compounds that are considered inimical and dangerous to the environment. In this paper, three methods of bamboo eradication along the route of the ECG overhead power lines have been investigated. A hybrid method has been found to be very effective and ecologically friendly. The method is locally available and comparatively inexpensive to apply.Keywords: bamboo, eradication, hybrid method, gly gold
Procedia PDF Downloads 36610712 Sliding Mode Power System Stabilizer for Synchronous Generator Stability Improvement
Authors: J. Ritonja, R. Brezovnik, M. Petrun, B. Polajžer
Abstract:
Many modern synchronous generators in power systems are extremely weakly damped. The reasons are cost optimization of the machine building and introduction of the additional control equipment into power systems. Oscillations of the synchronous generators and related stability problems of the power systems are harmful and can lead to failures in operation and to damages. The only useful solution to increase damping of the unwanted oscillations represents the implementation of the power system stabilizers. Power system stabilizers generate the additional control signal which changes synchronous generator field excitation voltage. Modern power system stabilizers are integrated into static excitation systems of the synchronous generators. Available commercial power system stabilizers are based on linear control theory. Due to the nonlinear dynamics of the synchronous generator, current stabilizers do not assure optimal damping of the synchronous generator’s oscillations in the entire operating range. For that reason the use of the robust power system stabilizers which are convenient for the entire operating range is reasonable. There are numerous robust techniques applicable for the power system stabilizers. In this paper the use of sliding mode control for synchronous generator stability improvement is studied. On the basis of the sliding mode theory, the robust power system stabilizer was developed. The main advantages of the sliding mode controller are simple realization of the control algorithm, robustness to parameter variations and elimination of disturbances. The advantage of the proposed sliding mode controller against conventional linear controller was tested for damping of the synchronous generator oscillations in the entire operating range. Obtained results show the improved damping in the entire operating range of the synchronous generator and the increase of the power system stability. The proposed study contributes to the progress in the development of the advanced stabilizer, which will replace conventional linear stabilizers and improve damping of the synchronous generators.Keywords: control theory, power system stabilizer, robust control, sliding mode control, stability, synchronous generator
Procedia PDF Downloads 22210711 Analysis of Transformer Reactive Power Fluctuations during Adverse Space Weather
Authors: Patience Muchini, Electdom Matandiroya, Emmanuel Mashonjowa
Abstract:
A ground-end manifestation of space weather phenomena is known as geomagnetically induced currents (GICs). GICs flow along the electric power transmission cables connecting the transformers and between the grounding points of power transformers during significant geomagnetic storms. Geomagnetically induced currents have been studied in other regions and have been noted to affect the power grid network. In Zimbabwe, grid failures have been experienced, but it is yet to be proven if these failures have been due to GICs. The purpose of this paper is to characterize geomagnetically induced currents with a power grid network. This paper analyses data collected, which is geomagnetic data, which includes the Kp index, DST index, and the G-Scale from geomagnetic storms and also analyses power grid data, which includes reactive power, relay tripping, and alarms from high voltage substations and then correlates the data. This research analysis was first theoretically analyzed by studying geomagnetic parameters and then experimented upon. To correlate, MATLAB was used as the basic software to analyze the data. Latitudes of the substations were also brought into scrutiny to note if they were an impact due to the location as low latitudes areas like most parts of Zimbabwe, there are less severe geomagnetic variations. Based on theoretical and graphical analysis, it has been proven that there is a slight relationship between power system failures and GICs. Further analyses can be done by implementing measuring instruments to measure any currents in the grounding of high-voltage transformers when geomagnetic storms occur. Mitigation measures can then be developed to minimize the susceptibility of the power network to GICs.Keywords: adverse space weather, DST index, geomagnetically induced currents, KP index, reactive power
Procedia PDF Downloads 11410710 The Power House of Mind: Determination of Action
Authors: Sheetla Prasad
Abstract:
The focus issue of this article is to determine the mechanism of mind with geometrical analysis of human face. Research paradigm has been designed for study of spatial dynamic of face and it was found that different shapes of face have their own function for determine the action of mind. The functional ratio (FR) of face has determined the behaviour operation of human beings. It is not based on the formulistic approach of prediction but scientific dogmatism and mathematical analysis is the root of the prediction of behaviour. For analysis, formulae were developed and standardized. It was found that human psyche is designed in three forms; manipulated, manifested and real psyche. Functional output of the psyche has been determined by degree of energy flow in the psyche and reserve energy for future. Face is the recipient and transmitter of energy but distribution and control is the possible by mind. Mind directs behaviour. FR indicates that the face is a power house of energy and as per its geometrical domain force of behaviours has been designed and actions are possible in the nature of individual. The impact factor of this study is the promotion of human capital for job fitness objective and minimization of criminalization in society.Keywords: functional ratio, manipulated psyche, manifested psyche, real psyche
Procedia PDF Downloads 45210709 Evaluation of Energy Supply and Demand Side Management for Residential Buildings in Ekiti State, Nigeria
Authors: Oluwatosin Samuel Adeoye
Abstract:
Ekiti State is an agrarian state located in south western part of Nigeria. The injected power to the Ado-Ekiti and the entire state are 25MW and 37.6 MW respectively. The estimated power demand for Ado Ekiti and Ekiti state were 29.01MW and 224.116MW respectively. The distributed power to the consumers is characterized with shortcomings which include: in-adequate supply, poor voltage regulation, improper usage, illiteracy and wastage. The power generation in Nigeria is presently 1680.60MW which does not match the estimated power demand of 15,000MW with a population of over 170 million citizens. This paper evaluates the energy utilization in Ado Ekiti metropolis, the wastage and its economic implication as well as effective means of its management. The use of direct interviews, administration of questionnaires, measurements of current and voltage with clamp multimeter, and simple mathematical approach were used for the purpose of evaluation. Recommendations were made with the view of reducing energy waste from mean value of 10.84% to 2% in order to reduce the cost implication such that the huge financial waste can be injected to other parts of the economy as well as the management of energy in Ekiti state.Keywords: consumers, demand, energy, management, power supply, waste
Procedia PDF Downloads 34010708 Evaluation of Longitudinal and Hoop Stresses and a Critical Study of Factor of Safety (FoS) in Design of a Glass-Fiber Pressure Vessel
Authors: Zainul Huda, Mohammed Hani Ajani
Abstract:
The design, manufacture, and operation of thin-walled pressure vessels must be based on maximum safe operating pressure and an adequate factor of safety (FoS). This research paper first reports experimental evaluation of longitudinal and hoops stresses based on working pressure as well as maximum pressure; and then includes a critical study of factor of safety (FoS) in the design of a glass fiber pressure vessel. Experimental work involved the use of measuring instruments and the readings from pressure gauges. Design calculations involved the computations of design stress and FoS; the latter was based on breaking strength of 55 MPa for the glass fiber (pressure-vessel material). The experimentally determined FoS value has been critically compared with the general FoS allowed in the design of glass fiber pressure vessels.Keywords: thin-walled pressure vessel, hoop stress, longitudinal stress, factor of safety (FoS), fiberglass
Procedia PDF Downloads 48810707 Evaluation of Longitudinal and Hoops Stresses and a Critical Study of Factor of Safety (Fos) in the Design of a Glass-Fiber Pressure Vessel
Authors: Zainul Huda, Mohammad Hani Ajani
Abstract:
The design, manufacture, and operation of thin-walled pressure vessels must be based on maximum safe operating pressure and an adequate factor of safety (FoS). This research paper first reports experimental evaluation of longitudinal and hoops stresses based on working pressure as well as maximum pressure; and then includes a critical study of factor of safety (FoS) in the design of a glass fiber pressure vessel. Experimental work involved the use of measuring instruments and the readings from pressure gauges. Design calculations involved the computations of design stress and FoS; the latter was based on breaking strength of 55 MPa for the glass fiber (pressure-vessel material). The experimentally determined FoS value has been critically compared with the general FoS allowed in the design of glass fiber pressure vessels.Keywords: thin-walled pressure vessel, hoop stress, longitudinal stress, factor of safety (FoS), fiberglass
Procedia PDF Downloads 49110706 The Contribution of Shell Correction of Targets ²⁷₁₃Al,⁶³₂₉Cu,¹⁹⁷₇₉Au in the Calculation of Stopping Power of Charged Particles ¹H,⁴He,⁷Li,¹²C,¹⁶O for Speeds V≥V₀Z₁²/³
Authors: Foul Sihem, Chekirine Mamoun, Sidoumou Mohamed
Abstract:
The modified Bethe-Bloch formula depends on several corrective terms; the most important of these is undoubtedly the shell correction, especially for energies of a few MeV/u and whose contribution can exceed 10% of the stopping power. The charge state of the incident ions also influences this latter, particularly heavy ions at intermediates speeds 2Z₁V₀≥V≥V₀Z₁²/³. In the present work, we calculated the shell corrections of the targets ²⁷₁₃Al,⁶³₂₉Cu,¹⁹⁷₇₉Au, the effective charge and the stopping power of the ¹H,⁴He, ⁷Li,¹²C,¹⁶O ions by using the Bethe-Bloch formula at energies ranging from 1 to 100 MeV/ u. The stopping power values of the ¹H,⁴He, ⁷Li,¹²C,¹⁶O ions in the targets ²⁷₁₃Al,⁶³₂₉Cu,¹⁹⁷₇₉Au were compared to those generated by the SRIM- 2013, PSTAR, ASTAR, and MSTAR calculation codes. In this study, we found that the contribution of the shell corrections could reach 13% of stopping power, especially for medium and heavy targets at energies of a few MeV/u.Keywords: shell correction, stopping power, modified Bethe-Bloch formula, V≥V₀Z₁²/³, ¹H, ⁴He, ⁷Li, ¹²C, ¹⁶O, ²⁷₁₃Al, ⁶³₂₉Cu, ¹⁹⁷₇₉Au
Procedia PDF Downloads 8910705 The Study of Power as a Pertinent Motive among Tribal College Students of Assam
Authors: K. P. Gogoi
Abstract:
The current research study investigates the motivational pattern viz Power motivation among the tribal college students of Assam. The sample consisted of 240 college students (120 tribal and 120 non-tribal) ranging from 18-24 years, 60 males and 60 females for both tribal’s and non-tribal’s. Attempts were made to include all the prominent tribes of Assam viz. Thematic Apperception Test, Power motive Scale and a semi structured interview schedule were used to gather information about their family types, parental deprivation, parental relations, social and political belongingness. Mean, Standard Deviation, and t-test were the statistical measures adopted in this 2x2 factorial design study. In addition to this discriminant analysis has been worked out to strengthen the predictive validity of the obtained data. TAT scores reveal significant difference between the tribal’s and non-tribal on power motivation. However results obtained on gender difference indicates similar scores among both the cultures. Cross validation of the TAT results was done by using the power motive scale by T. S. Dapola which confirms the results on need for power through TAT scores. Power motivation has been studied in three directions i.e. coercion, inducement and restraint. An interesting finding is that on coercion tribal’s score high showing significant difference whereas in inducement or seduction the non-tribal’s scored high showing significant difference. On the other hand on restraint no difference exists between both cultures. Discriminant analysis has been worked out between the variables n-power, coercion, inducement and restraint. Results indicated that inducement or seduction (.502) is the dependent measure which has the most discriminating power between these two cultures.Keywords: power motivation, tribal, social, political, predictive validity, cross validation, coercion, inducement, restraint
Procedia PDF Downloads 48610704 Effects of Varied Packages of Plyometric Traning on Leg Explosive Power and VO2 Max Among College Men Students
Authors: Nisithkumar Datta, Rakesh Bharti
Abstract:
The purpose of the study was to find out the effects of varied packages of plyometric training on leg explosive power and VO2 max among college men students. Sixty male students were selected and divided into four equal groups. Group I underwent low-intensity plyometric training, Group II underwent medium intensity plyometric training and Group III underwent high-intensity plyometric training for three days per week for twelve weeks. Group IV acted as control group. The variables namely leg explosive power and VO2 max were selected as dependent variables. The analysis of covariance was used to analyze the significant difference. The 0.05 level of confidence was fixed as the level of significance to test the ‘F’ ratio obtained by the analysis of covariance. The result of the study indicates due to varied packages of plyometric training, the leg explosive power and VO2 max has been improved significantly.Keywords: leg explosive power, plyometric exercise, VO2 max, men students
Procedia PDF Downloads 37710703 Power MOSFET Models Including Quasi-Saturation Effect
Authors: Abdelghafour Galadi
Abstract:
In this paper, accurate power MOSFET models including quasi-saturation effect are presented. These models have no internal node voltages determined by the circuit simulator and use one JFET or one depletion mode MOSFET transistors controlled by an “effective” gate voltage taking into account the quasi-saturation effect. The proposed models achieve accurate simulation results with an average error percentage less than 9%, which is an improvement of 21 percentage points compared to the commonly used standard power MOSFET model. In addition, the models can be integrated in any available commercial circuit simulators by using their analytical equations. A description of the models will be provided along with the parameter extraction procedure.Keywords: power MOSFET, drift layer, quasi-saturation effect, SPICE model
Procedia PDF Downloads 194