Search results for: planting schedule
712 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study
Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew
Abstract:
This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.Keywords: complexity, major projects, performance management, schedule risk management, uncertainty
Procedia PDF Downloads 95711 The Study of Seed Coating Effects on Germination Speed of Astragalus Adscendens under Different Moisture Conditions and Planting Depth in the Boroujerd Region
Authors: Hamidreza Mehrabi, Mandana Rezayee
Abstract:
The coated seed process is from amplifier ways that stick various materials on the outer surface of the seeds that minimize the negative environmental effects and increase the ability of Plant establishment. This study was done to assess the effects of coated seed on the germination speed of Astragalus adscendens in different conditions of drought stress and planting depth as it was conducted with a completely randomized factorial design with four replications. treatments of covering material was used in Four non coating levels (NC), mineral-based coating (CC), organic - based coating (OC) hydro gel-based coating (HC) ; treatment of moisture percent used in three levels of dried soil content, treatments of planting depth in two surfaces of planting and three times of the seed diameter was 9%, 14% and 21 % respectively. During the test, it was evaluated the germination speed attribute. The main results showed that moisture treatments and planting depth at a surface of 1% (P <0/01) was significant and has no significant effect of treatment materials. Also, In examining of the interaction between type of covering material and soil moisture were not observed significant differences for germination speed between covering treatments and controls covering, but there was a significant difference between treatments in 9% and 21%. Although in examining the triple interaction, increasing moisture and planting depth enhanced the speed of germination process, but it was not significant statistically, while it has made important differences in terms of description; because it had not growth in the moisture level of 9% and shallow cultivation (high stress). However, treatment of covered materials growth has developed significantly, so it can be useful in enhancing plant performance.Keywords: seed coating, soil moisture, sowing depth, germination percentage
Procedia PDF Downloads 274710 Evaluation of Green Infrastructure with Different Woody Plants Practice and Benefit Using the Stormwater Management-HYDRUS Model
Authors: Bei Zhang, Zhaoxin Zhang, Lidong Zhao
Abstract:
Green infrastructures (GIs) for rainwater management can directly meet the multiple purposes of urban greening and non-point source pollution control. To reveal the overall layout law of GIs dominated by typical woody plants and their impact on urban environmental effects, we constructed a HYDRUS-1D and Stormwater management (SWMM) coupling model to simulate the response of typical root woody plant planting methods on urban hydrological. The results showed that the coupling model had high adaptability to the simulation of urban surface runoff control effect under different woody plant planting methods (NSE ≥0.64 and R² ≥ 0.71). The regulation effect on surface runoff showed that the average runoff reduction rate of GIs increased from 60 % to 71 % with the increase of planting area (5% to 25%) under the design rainfall event of the 2-year recurrence interval. Sophora japonica with tap roots was slightly higher than that of without plants (control) and Malus baccata (M. baccata) with fibrous roots. The comprehensive benefit evaluation system of rainwater utilization technology was constructed by using an analytic hierarchy process. The coupling model was used to evaluate the comprehensive benefits of woody plants with different planting areas in the study area in terms of environment, economy, and society. The comprehensive benefit value of planting 15% M. baccata was the highest, which was the first choice for the planting of woody plants in the study area. This study can provide a scientific basis for the decision-making of green facility layouts of woody plants.Keywords: green infrastructure, comprehensive benefits, runoff regulation, woody plant layout, coupling model
Procedia PDF Downloads 69709 Green Roofs and Xeriscape Planting that Contribute to Sustainable Urban Green Space
Authors: Derya Sarı, Banu Karasah
Abstract:
In the recent years, urban green areas decrease dramatically as a result of increasing industrialization and population growth. At the same time, green spaces provide many ecosystem services such as controls of air pollution, noise reduction, prevents flooding and reduces the stress in the urban areas. Therefore, the plants help to these areas to get more livable and active, and also plants are one of the most significant identity elements in these open spaces. Roof gardens comes significant design comprehension as a result of global warming and also they contribute to cities with regard to ecological, economic, visual and recreational aspects. This study is mainly based on evaluation potential of green roofs and xeriscape planting design approach of Artvin (Turkey) known that generally has a remarkable floristic richness. Artvin is located on a sloping terrain, and the amount of green spaces that can be used is very limited in this city. Therefore, green roofs approach should be evaluated to supply urban green space sustainability. This study shows that it is appropriate about 20 perennial plants for green roofs and xeriscape planting design in Artvin city center. Usage of native plant species would be support to sustainable urban green spaces.Keywords: Artvin, green roofs, urban green spaces, xeriscape planting
Procedia PDF Downloads 473708 Estimation of Carbon Uptake of Seoul City Street Trees in Seoul and Plans for Increase Carbon Uptake by Improving Species
Authors: Min Woo Park, Jin Do Chung, Kyu Yeol Kim, Byoung Uk Im, Jang Woo Kim, Hae Yeul Ryu
Abstract:
Nine representative species of trees among all the street trees were selected to estimate the absorption amount of carbon dioxide emitted from street trees in Seoul calculating the biomass, amount of carbon saved, and annual absorption amount of carbon dioxide in each of the species. Planting distance of street trees in Seoul was 1,851,180 m, the number of planting lines was 1,287, the number of planted trees was 284,498 and 46 species of trees were planted as of 2013. According to the result of plugging the quantity of species of street trees in Seoul on the absorption amount of each of the species, 120,097 ton of biomass, 60,049.8 ton of amount of carbon saved, and 11,294 t CO2/year of annual absorption amount of carbon dioxide were calculated. Street ratio mentioned on the road statistics in Seoul in 2022 is 23.13%. If the street trees are assumed to be increased in the same rate, the number of street trees in Seoul was calculated to be 294,823. The planting distance was estimated to be 1,918,360 m, and the annual absorption amount of carbon dioxide was measured to be 11,704 t CO2/year. Plans for improving the annual absorption amount of carbon dioxide from street trees were established based on the expected amount of absorption. First of all, it is to improve the annual absorption amount of carbon dioxide by increasing the number of planted street trees after adjusting the planting distance of street trees. If adjusting the current planting distance to 6 m, it was turned out that 12,692.7 t CO2/year was absorbed on an annual basis. Secondly, it is to change the species of trees to tulip trees that represent high absorption rate. If increasing the proportion of tulip trees to 30% up to 2022, the annual absorption rate of carbon dioxide was calculated to be 17804.4 t CO2/year.Keywords: absorption of carbon dioxide, source of absorbing carbon dioxide, trees in city, improving species
Procedia PDF Downloads 361707 Enumerative Search for Crane Schedule in Anodizing Operations
Authors: Kanate Pantusavase, Jaramporn Hassamontr
Abstract:
This research aims to develop an algorithm to generate a schedule of multiple cranes that will maximize load throughputs in anodizing operation. The algorithm proposed utilizes an enumerative strategy to search for constant time between successive loads and crane covering range over baths. The computer program developed is able to generate a near-optimal crane schedule within reasonable times, i.e. within 10 minutes. Its results are compared with existing solutions from an aluminum extrusion industry. The program can be used to generate crane schedules for mixed products, thus allowing mixed-model line balancing to improve overall cycle times.Keywords: crane scheduling, anodizing operations, cycle time minimization
Procedia PDF Downloads 462706 An Advanced Match-Up Scheduling Under Single Machine Breakdown
Abstract:
When a machine breakdown forces a Modified Flow Shop (MFS) out of the prescribed state, the proposed strategy reschedules part of the initial schedule to match up with the preschedule at some point. The objective is to create a new schedule that is consistent with the other production planning decisions like material flow, tooling and purchasing by utilizing the time critical decision making concept. We propose a new rescheduling strategy and a match-up point determination procedure through a feedback mechanism to increase both the schedule quality and stability. The proposed approach is compared with alternative reactive scheduling methods under different experimental settings.Keywords: advanced critical task methods modified flow shop (MFS), Manufacturing, experiment, determination
Procedia PDF Downloads 405705 An Application of a Feedback Control System to Minimize Unforeseen Disruption in a Paper Manufacturing Industry in South Africa
Authors: Martha E. Ndeley
Abstract:
Operation management is the key element within the manufacturing process. However, during this process, there are a number of unforeseen disruptions that causes the process to a standstill which are, machine breakdown, employees absenteeism, improper scheduling. When this happens, it forces the shop flow to a rescheduling process and these strategy reschedules only a limited part of the initial schedule to match up with the pre-schedule at some point with the objective to create a new schedule that is reliable which in the long run gets disrupted. In this work, we have developed feedback control system that minimizes any form of disruption before the impact becomes severe, the model was tested in a paper manufacturing industries and the results revealed that, if the disruption is minimized at the initial state, the impact becomes unnoticeable.Keywords: disruption, machine, absenteeism, scheduling
Procedia PDF Downloads 305704 Development and Performance Evaluation of a Gladiolus Planter in Field for Planting Corms
Authors: T. P. Singh, Vijay Gautam
Abstract:
Gladiolus is an important cash crop and is grown mainly for its elegant spikes. Traditionally the gladiolus corms are planted manually which is very tedious, time consuming and labor intensive operation. So far, there is no planter available for planting of gladiolus corms. With a view to mechanize the planting operation of this horticultural crop, a prototype of 4-row gladiolus planter was developed and its performance was evaluated in-situ condition. Cup-chain type metering device was used to singulate the gladiolus corms while planting. Three levels of corm spacing viz 15, 20 and 25 cm and four levels of forward speed viz 1.0, 1.5, 2.0 and 2.5 km/h was taken as evaluation parameter for the planter. The performance indicators namely corm spacing in each row, coefficient of uniformity, missing index, multiple index, quality of feed index, number of corms per meter length, mechanical damage to the corms etc. were determined during the field test. The data was statistically analyzed using Completely Randomized Design (CRD) for testing the significance of the parameters. The result indicated that planter was able to drop the corms at required nominal spacing with minor variations. The highest deviation from the mean corm spacing was observed as 3.53 cm with maximum coefficient of variation as 13.88%. The highest missing and quality of feed indexes were observed as 6.33% and 97.45% respectively with no multiples. The performance of the planter was observed better at lower forward speed and wider corm spacing. The field capacity of the planter was found as 0.103 ha/h with an observed field efficiency of 76.57%.Keywords: coefficient of uniformity, corm spacing, gladiolus planter, mechanization
Procedia PDF Downloads 238703 Researches on Attractive Flowered Natural Woody Plants of Bursa Flora in Terms of Landscape Design
Authors: Elvan Ender, Murat Zencirkıran
Abstract:
One of the most important criteria that increase the success of design in landscape architecture is the visual effect. The characteristics that affect visual appearance in plant design vary depending on the phenological periods of the plants. In plants, although different effects are observed in different periods of the year, this effect is felt most prominently in flowering periods. For this reason, knowing the flowering time, duration and flower characteristics should be considered as a factor increasing the success of plant design. In this study, flower characteristics of natural woody plants with attractive flowers have been examined. Because of the variability of these characteristics of plants in the region, consideration of these criteria in the planting design processes in the region may increase the success of the design. At the same time, when species selection is made considering the obtained data, visuality and sustainability of natural species can be possible in Bursa city with planting design.Keywords: Bursa, flower characteristics, natural plants, planting design
Procedia PDF Downloads 265702 Effect of Different Planting Times and Mulching Materials on Seed Quality and Yield of China Aster Cultivars
Authors: A. A. Bajad, B. P. Sharma, Y. C. Gupta, B. S. Dilt, R. K. Gupta
Abstract:
The present investigations were carried out at the experimental farm of Department of Floriculture and Landscape Architecture, Dr. Y. S. Parmar University of Horticulture and Forestry, Nauni, Solan, H.P. during 2015 and 2016. The experiment was laid out in a Randomized Block Design (factorial) consisting of 48 treatment combinations of four planting dates viz., D1- mid March, D2-mid April, D3-mid May and D4- mid June and two cultivars namely V1- Kamini and V2 -Poornima with six mulching materials M¬0¬- without mulch, M1- Black plastic mulch (100 µ), M2- Silver plastic mulch (100 µ), M3¬- Transparent plastic mulch (100 µ), M3-Transparent plastic mulch (100 µ), M4¬- Pine needle (100 µ) and M5- Grass (1 inch layer). Among different planting times, D4 i.e. mid June planting obtained best results for number of seed per flower (179.38), germination percent (83.92 %), electrical conductivity (0.97 ds/m), seedling length (7.93 cm), seedling dry weight (7.09 mg), seedling vigour index I (763.79), moisture content (7.83 %) and 1000 seed weight (1.94 g). However, seed yield per plant (14.30 g) was recorded to be maximum in mid of March. Among the cultivars, cv. ‘Poornima’ gave best results for number of seed per plant (187.30). However, cv. ‘Kamini’ recorded the best result for seed yield per plant (12.55), electrical conductivity (1.11 ds/m), germination percent (80.47 %), seedling length (6.39 cm), seedling dry weight (5.11 mg), seedling vigour index I (649.49), moisture content (9.28 %) and 1000 seed weight (1.70 g). Silver plastic obtained best results for number of seed per flower (170.10), seed yield per plant (15.66 g), germination percent (80.17 %), electrical conductivity (1.26 ds/m), seedling length (5.88 cm), seedling dry weight (4.46 mg), seedling vigour index I (616.78), Moisture content (9.35 %) and 100 seed weight (1.97 g).Keywords: cultivars, mulch materials, planting times, flowers
Procedia PDF Downloads 284701 Energy Efficient Plant Design Approaches: Case Study of the Sample Building of the Energy Efficiency Training Facilities
Authors: Idil Kanter Otcu
Abstract:
Nowadays, due to the growing problems of energy supply and the drastic reduction of natural non-renewable resources, the development of new applications in the energy sector and steps towards greater efficiency in energy consumption are required. Since buildings account for a large share of energy consumption, increasing the structural density of buildings causes an increase in energy consumption. This increase in energy consumption means that energy efficiency approaches to building design and the integration of new systems using emerging technologies become necessary in order to curb this consumption. As new systems for productive usage of generated energy are developed, buildings that require less energy to operate, with rational use of resources, need to be developed. One solution for reducing the energy requirements of buildings is through landscape planning, design and application. Requirements such as heating, cooling and lighting can be met with lower energy consumption through planting design, which can help to achieve more efficient and rational use of resources. Within this context, rather than a planting design which considers only the ecological and aesthetic features of plants, these considerations should also extend to spatial organization whereby the relationship between the site and open spaces in the context of climatic elements and planting designs are taken into account. In this way, the planting design can serve an additional purpose. In this study, a landscape design which takes into consideration location, local climate morphology and solar angle will be illustrated on a sample building project.Keywords: energy efficiency, landscape design, plant design, xeriscape landscape
Procedia PDF Downloads 258700 The Aspect of the Digital Formation in the Solar Community as One Prototype to Find the Algorithmic Sustainable Conditions in the Global Environment
Authors: Kunihisa Kakumoto
Abstract:
Purpose: The global environmental problem is now raised in the global dimension. The sprawl phenomenon over the natural limitation is to be made a forecast beforehand in an algorithmic way so that the condition of our social life can hopefully be protected under the natural limitation. The sustainable condition in the globe is now to be found to keep the balance between the capacity of nature and the possibility of our social lives. The amount of water on the earth is limited. Therefore, on the reason, sustainable conditions are strongly dependent on the capacity of water. The amount of water can be considered in relation to the area of the green planting because a certain volume of the water can be obtained in the forest, where the green planting can be preserved. We can find the sustainable conditions of the water in relation to the green planting area. The reduction of CO₂ by green planting is also possible. Possible Measure and the Methods: Until now, by the opportunity of many international conferences, the concept of the solar community as one prototype has been introduced by technical papers. The algorithmic trial calculation on the basic concept of the solar community can be taken into consideration. The concept of the solar community is based on the collected data of the solar model house. According to the algorithmic results of the prototype, the simulation work in the globe can be performed as the algorithmic conversion results. This algorithmic study can be simulated by the amount of water, also in relation to the green planting area. Additionally, the submission of CO₂ in the solar community and the reduction of CO₂ by green planting can be calculated. On the base of these calculations in the solar community, the sustainable conditions on the globe can be simulated as the conversion results in an algorithmic way. The digital formation in the solar community can also be taken into consideration by this opportunity. Conclusion: For the finding of sustainable conditions around the globe, the solar community as one prototype has been taken into consideration. The role of the water is very important because the capacity of the water supply is very limited. But, at present, the cycle of the social community is not composed by the point of the natural mechanism. The simulative calculation of this study can be shown by the limitation of the total water supply. According to this process, the total capacity of the water supply and the capable residential number of the population and the areas can be taken into consideration by the algorithmic calculation. For keeping enough water, the green planting areas are very important. The planting area is also very important to keep the balance of CO₂. The simulative calculation can be performed by the relation between the submission and the reduction of CO₂ in the solar community. For the finding of this total balance and the sustainable conditions, the green planting area and the total amount of water can be recognized by the algorithmic simulative calculation. The study for the finding of sustainable conditions can be performed by the simulative calculations on the algorithmic model in the solar community as one prototype. The example of one prototype can be in balance. The activity of the social life must be in the capacity of the natural mechanism. The capable capacity of the natural environment in our world is very limited.Keywords: the solar community, the sustainable condition, the natural limitation, the algorithmic calculation
Procedia PDF Downloads 109699 Evaluation of Buckwheat Genotypes to Different Planting Geometries and Fertility Levels in Northern Transition Zone of Karnataka
Authors: U. K. Hulihalli, Shantveerayya
Abstract:
Buckwheat (Fagopyrum esculentum Moench) is an annual crop belongs to family Poligonaceae. The cultivated buckwheat species are notable for their exceptional nutritive values. It is an important source of carbohydrates, fibre, macro, and microelements such as K, Ca, Mg, Na and Mn, Zn, Se, and Cu. It also contains rutin, flavonoids, riboflavin, pyridoxine and many amino acids which have beneficial effects on human health, including lowering both blood lipid and sugar levels. Rutin, quercetin and some other polyphenols are potent carcinogens against colon and other cancers. Buckwheat has significant nutritive value and plenty of uses. Cultivation of buckwheat in Sothern part of India is very meager. Hence, a study was planned with an objective to know the performance of buckwheat genotypes to different planting geometries and fertility levels. The field experiment was conducted at Main Agriculture Research Station, University of Agriculture Sciences, Dharwad, India, during 2017 Kharif. The experiment was laid-out in split-plot design with three replications having three planting geometries as main plots, two genotypes as sub plots and three fertility levels as sub-sub plot treatments. The soil of the experimental site was vertisol. The standard procedures are followed to record the observations. The planting geometry of 30*10 cm was recorded significantly higher seed yield (893 kg/ha⁻¹), stover yield (1507 kg ha⁻¹), clusters plant⁻¹ (7.4), seeds clusters⁻¹ (7.9) and 1000 seed weight (26.1 g) as compared to 40*10 cm and 20*10 cm planting geometries. Between the genotypes, significantly higher seed yield (943 kg ha⁻¹) and harvest index (45.1) was observed with genotype IC-79147 as compared to PRB-1 genotype (687 kg ha⁻¹ and 34.2, respectively). However, the genotype PRB-1 recorded significantly higher stover yield (1344 kg ha⁻¹) as compared to genotype IC-79147 (1173 kg ha⁻¹). The genotype IC-79147 was recorded significantly higher clusters plant⁻¹ (7.1), seeds clusters⁻¹ (7.9) and 1000 seed weight (24.5 g) as compared PRB-1 (5.4, 5.8 and 22.3 g, respectively). Among the fertility levels tried, the fertility level of 60:30 NP kg ha⁻¹ recorded significantly higher seed yield (845 kg ha-1) and stover yield (1359 kg ha⁻¹) as compared to 40:20 NP kg ha-1 (808 and 1259 kg ha⁻¹ respectively) and 20:10 NP kg ha-1 (793 and 1144 kg ha⁻¹ respectively). Within the treatment combinations, IC 79147 genotype having 30*10 cm planting geometry with 60:30 NP kg ha⁻¹ recorded significantly higher seed yield (1070 kg ha⁻¹), clusters plant⁻¹ (10.3), seeds clusters⁻¹ (9.9) and 1000 seed weight (27.3 g) compared to other treatment combinations.Keywords: buckwheat, planting geometry, genotypes, fertility levels
Procedia PDF Downloads 174698 Resource Constrained Time-Cost Trade-Off Analysis in Construction Project Planning and Control
Authors: Sangwon Han, Chengquan Jin
Abstract:
Time-cost trade-off (TCTO) is one of the most significant part of construction project management. Despite the significance, current TCTO analysis, based on the Critical Path Method, does not consider resource constraint, and accordingly sometimes generates an impractical and/or infeasible schedule planning in terms of resource availability. Therefore, resource constraint needs to be considered when doing TCTO analysis. In this research, genetic algorithms (GA) based optimization model is created in order to find the optimal schedule. This model is utilized to compare four distinct scenarios (i.e., 1) initial CPM, 2) TCTO without considering resource constraint, 3) resource allocation after TCTO, and 4) TCTO with considering resource constraint) in terms of duration, cost, and resource utilization. The comparison results identify that ‘TCTO with considering resource constraint’ generates the optimal schedule with the respect of duration, cost, and resource. This verifies the need for consideration of resource constraint when doing TCTO analysis. It is expected that the proposed model will produce more feasible and optimal schedule.Keywords: time-cost trade-off, genetic algorithms, critical path, resource availability
Procedia PDF Downloads 185697 Public-Private Partnership Transportation Projects: An Exploratory Study in the US
Authors: Medya Fathi
Abstract:
When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation
Procedia PDF Downloads 175696 Performance Evaluation of Production Schedules Based on Process Mining
Authors: Kwan Hee Han
Abstract:
External environment of enterprise is rapidly changing majorly by global competition, cost reduction pressures, and new technology. In these situations, production scheduling function plays a critical role to meet customer requirements and to attain the goal of operational efficiency. It deals with short-term decision making in the production process of the whole supply chain. The major task of production scheduling is to seek a balance between customer orders and limited resources. In manufacturing companies, this task is so difficult because it should efficiently utilize resource capacity under the careful consideration of many interacting constraints. At present, many computerized software solutions have been utilized in many enterprises to generate a realistic production schedule to overcome the complexity of schedule generation. However, most production scheduling systems do not provide sufficient information about the validity of the generated schedule except limited statistics. Process mining only recently emerged as a sub-discipline of both data mining and business process management. Process mining techniques enable the useful analysis of a wide variety of processes such as process discovery, conformance checking, and bottleneck analysis. In this study, the performance of generated production schedule is evaluated by mining event log data of production scheduling software system by using the process mining techniques since every software system generates event logs for the further use such as security investigation, auditing and error bugging. An application of process mining approach is proposed for the validation of the goodness of production schedule generated by scheduling software systems in this study. By using process mining techniques, major evaluation criteria such as utilization of workstation, existence of bottleneck workstations, critical process route patterns, and work load balance of each machine over time are measured, and finally, the goodness of production schedule is evaluated. By using the proposed process mining approach for evaluating the performance of generated production schedule, the quality of production schedule of manufacturing enterprises can be improved.Keywords: data mining, event log, process mining, production scheduling
Procedia PDF Downloads 279695 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation
Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee
Abstract:
In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior
Procedia PDF Downloads 140694 Implication to Environmental Education of Indigenous Knowledge and the Ecosystem of Upland Farmers in Aklan, Philippines
Authors: Emily Arangote
Abstract:
This paper defined the association between the indigenous knowledge, cultural practices and the ecosystem its implication to the environmental education to the farmers. Farmers recognize the need for sustainability of the ecosystem they inhabit. The cultural practices of farmers on use of indigenous pest control, use of insect-repellant plants, soil management practices that suppress diseases and harmful pests and conserve soil moisture are deemed to be ecologically-friendly. Indigenous plant materials that were more drought- and pest-resistant were grown. Crop rotation was implemented with various crop seeds to increase their disease resistance. Multi-cropping, planting of perennial crops, categorization of soil and planting of appropriate crops, planting of appropriate and leguminous crops, alloting land as watershed, and preserving traditional palay seed varieties were found to be beneficial in preserving the environment. The study also found that indigenous knowledge about crops are still relevant and useful to the current generation. This ensured the sustainability of our environment and incumbent on policy makers and educators to support and preserve for generations yet to come.Keywords: cultural practices, ecosystem, environmental education, indigenous knowledge
Procedia PDF Downloads 318693 Applying Energy Consumption Schedule and Comparing It with Load Shifting Technique in Residential Load
Authors: Amira M. Attia, Karim H. Youssef, Nabil H. Abbasy
Abstract:
Energy consumption schedule (ECS) technique shifts usage of loads from on peak hours and redistributes them throughout the day according to residents’ operating time preferences. This technique is used as form of indirect control from utility to improve the load curve and hence its load factor and reduce customer’s total electric bill as well. Similarly, load shifting technique achieves ECS purposes but as direct control form applied from utility. In this paper, ECS is simulated twice as optimal constrained mathematical formula, solved by using CVX program in MATLAB® R2013b. First, it is utilized for single residential building with ten apartments to determine max allowable energy consumption per hour for each residential apartment. Then, it is used for single apartment with number of shiftable domestic devices, where operating schedule is deduced using previous simulation output results as constraints. The paper ends by giving differences between ECS technique and load shifting technique via literature and simulation. Based on results assessment, it will be shown whether using ECS or load shifting is more beneficial to both customer and utility.Keywords: energy consumption schedule, load shifting, comparison, demand side mangement
Procedia PDF Downloads 182692 Drip Irrigation Timing and Its Effect on Tomato Yield for a Two-Day Schedule
Authors: T. Kizza, M. Muyinda
Abstract:
Irrigation schedules are normally given in terms of frequency (irrigation days). Specific timings within a given day are not usually included. This study examined the effect of irrigation timing for a two-day irrigation schedule of a surface drip-irrigated tomato field on yield. It was carried out for three dry seasons; July-Sept 2016, Jan-April 2017 and Jan-March 2018, at MuZARDI research station. Four irrigation treatments; T1 morning (8.00hrs), T2 noon (12:00hrs), T3 evening (17:00hr) and T4, a combination of morning and evening, were evaluated. The irrigation duration was one hour for T1-T3 and split into 30 minutes for T4. First season results indicated noon watering as having the best yield over other treatments at 51.59t/ha followed closely by morning watering at 50.6t/ha. Plants watered at noon had the highest number of fruits at 19/plant with an average weight of 94g/fruit. Plants watered in the morning had fruits with the highest average weight at 111.2g/fruit but they were the lowest number at 16 fruits/plant. The three-season data indicated the highest yield at 45.9t/ha for morning watering, followed by noon watering at 44.3t/ha and the least yield was for evening watering at 40.9t/ha. Watering tomatoes in the morning will give optimum yields for a two-day irrigation schedule.Keywords: drip irrigation, irrigation schedule, irrigation timing, tomato yield
Procedia PDF Downloads 137691 Establishment and Improvement of Oil Palm Liquid Culture for Clonal Propagation
Authors: Mohd Naqiuddin Bin Husri, Siti Rahmah Abd Rahman, Dalilah Abu Bakar, Dayang Izawati Abang Masli, Meilina Ong Abdullah
Abstract:
A serious shortage of prime agricultural land coupled with environmental concerns inland expansion has daunted efforts to increase the national yield average. To address this issue, maximising yield per unit hectare through quality planting material is of great importance. Breeding for improved planting materials has been a continuous effort since the early days of this industry, it is time-consuming, and the likelihood of segregation within the progenies further impedes progress in this area. Incorporation of the cloning technology in oil palm breeding programmes is therefore advantageous to expedite the development of commercial elite and high-yielding planting materials. After more than 22 years of research and development through this project, reliable protocols for liquid/suspension culture systems coupled with various innovative technologies which are effective at promoting proliferation and growth of oil palm culture have been established. Subsequently, clonal palms derived from the suspension culture system were extensively studied in the field, and the results have been encouraging. Clones such as CPS1, CPS2 and a few others recorded superior performance in comparison with D x P standard crosses.Keywords: tissue culture, suspension culture, oil palm, Elaeis guineensis
Procedia PDF Downloads 190690 The Role of Sustainable Financing Models for Smallholder Tree Growers in Ghana
Authors: Raymond Awinbilla
Abstract:
The call for tree planting has long been set in motion by the government of Ghana. The Forestry Commission encourages plantation development through numerous interventions including formulating policies and enacting legislations. However, forest policies have failed and that has generated a major concern over the vast gap between the intentions of national policies and the realities established. This study addresses three objectives;1) Assessing the farmers' response and contribution to the tree planting initiative, 2) Identifying socio-economic factors hindering the development of smallholder plantations as a livelihood strategy, and 3) Determining the level of support available for smallholder tree growers and the factors influencing it. The field work was done in 12 farming communities in Ghana. The article illuminates that farmers have responded to the call for tree planting and have planted both exotic and indigenous tree species. Farmers have converted 17.2% (369.48ha) of their total land size into plantations and have no problem with land tenure. Operations and marketing constraints include lack of funds for operations, delay in payment, low price of wood, manipulation of price by buyers, documentation by buyers, and no ready market for harvesting wood products. Environmental institutions encourage tree planting; the only exception is with the Lands Commission. Support availed to farmers includes capacity building in silvicultural practices, organisation of farmers, linkage to markets and finance. Efforts by the Government of Ghana to enhance forest resources in the country could rely on the input of local populations.Keywords: livelihood strategy, marketing constraints, environmental institutions, silvicultural practices
Procedia PDF Downloads 58689 Schedule a New Production Plan by Heuristic Methods
Authors: Hanife Merve Öztürk, Sıdıka Dalgan
Abstract:
In this project, a capacity analysis study is done at TAT A. Ş. Maret Plant. Production capacity of products which generate 80% of sales amount are determined. Obtained data entered the LEKIN Scheduling Program and we get production schedules by using heuristic methods. Besides heuristic methods, as mathematical model, disjunctive programming formulation is adapted to flexible job shop problems by adding a new constraint to find optimal schedule solution.Keywords: scheduling, flexible job shop problem, shifting bottleneck heuristic, mathematical modelling
Procedia PDF Downloads 400688 The Utilization of Particle Swarm Optimization Method to Solve Nurse Scheduling Problem
Authors: Norhayati Mohd Rasip, Abd. Samad Hasan Basari , Nuzulha Khilwani Ibrahim, Burairah Hussin
Abstract:
The allocation of working schedule especially for shift environment is hard to fulfill its fairness among them. In the case of nurse scheduling, to set up the working time table for them is time consuming and complicated, which consider many factors including rules, regulation and human factor. The scenario is more complicated since most nurses are women which have personnel constraints and maternity leave factors. The undesirable schedule can affect the nurse productivity, social life and the absenteeism can significantly as well affect patient's life. This paper aimed to enhance the scheduling process by utilizing the particle swarm optimization in order to solve nurse scheduling problem. The result shows that the generated multiple initial schedule is fulfilled the requirements and produces the lowest cost of constraint violation.Keywords: nurse scheduling, particle swarm optimisation, nurse rostering, hard and soft constraint
Procedia PDF Downloads 372687 The Importance of Urban Pattern and Planting Design in Urban Transformation Projects
Authors: Mustafa Var, Yasin Kültiğin Yaman, Elif Berna Var, Müberra Pulatkan
Abstract:
This study deals with real application of an urban transformation project in Trabzon, Turkey. It aims to highlight the significance of using native species in terms of planting design of transformation projects which will also promote sustainability of urban identity. Urban identity is a phenomenon shaped not only by physical, but also by natural, spatial, social, historical and cultural factors. Urban areas face with continuous change which can be whether positive or negative way. If it occurs in a negative way that may have some destructive effects on urban identity. To solve this problematic issue, urban renewal movements initally started after 1840s around the world especially in the cities with ports. This process later followed by the places where people suffered a lot from fires and has expanded to all over the world. In Turkey, those processes have been experienced mostly after 1980s as country experienced the worst effects of unplanned urbanization especially in 1950-1990 period. Also old squares, streets, meeting points, green areas, Ottoman bazaars have changed slowly. This change was resulted in alienation of inhabitants to their environments. As a solution, several actions were taken like Mass Housing Laws which was enacted in 1981 and 1984 or urban transformation projects. Although projects between 1990-2000 were tried to satisfy the expectations of local inhabitants by the help of several design solutions to promote cultural identity; unfortunately those modern projects has also been resulted in alienation of urban environments to the inhabitants. Those projects were initially done by TOKI (Housing Development Administration of Turkey) and later followed by the Ministry of Environment and Urbanization after 2011. Although they had significant potentials to create healthy urban environments, they could not use this opportunity in an effective way. The reason for their failure is that their architectural styles and planting designs are unrespectful to local identity and environments. Generally, it can be said that the most of the urban transformation projects implementing in Turkey nearly have no concerns about the locality. However, those projects can be used as a positive tool for enhanching the urban identity of cities by means of local planting material. For instance, Kyoto can be identified by Japanese Maple trees or Seattle can be specified by Dahlia. In the same way, in Turkey, Istanbul city can be identified by Judas and Stone Pine trees or Giresun city can be identified by Cherry trees. Thus, in this paper, the importance of conserving urban identity is discussed specificly with the help of using local planting elements. After revealing the mistakes that are made during urban transformation projects, the techniques and design criterias for preserving and promoting urban identity are examined. In the end, it is emphasized that every city should have their own original, local character and specific planting design which can be used for highlighting its identity as well as architectural elements.Keywords: urban identity, urban transformation, planting design, landscape architecture
Procedia PDF Downloads 546686 Plasma Treatment of Poppy and Flax Seeds in Fluidized Bed Reactor
Authors: Jakub Perner, Jindrich Matousek, Hana Malinska
Abstract:
Adverse environmental conditions at planting (especially water shortage) can lead into reduced germination rate of seeds. The plasma treatment is one of the possibilities that can solve this problem. Such treatment can increase the germination rate of seeds and make germs grow faster due to increased wettability of seeds surface or disrupted seed coat. This could lead to enhanced oxygen and water transport into the seed and improve germination. Poppy and flax seeds were treated in fluidized bed reactor, and discharge power ranging from 10 to 40 W was used. The working gas was air at pressure 100 Pa. Poppy seeds were then planted into Petri dishes on 7 layers of filter paper saturated with water, and the number of germinated seeds was observed from 3 to 6 days after planting. Every plasma treated sample showed improved germination rate compared to untreated seeds (75.5%) six days after planting. Samples treated in 40W discharge had the highest germination rate (81.2%). The decreased contact angle of water on treated poppy seeds was observed from 85° (untreated) to 30–35° (treated). Untreated flax seeds have a germination rate over 98%; therefore, the weight of seeds was taken to be a measure of the successful germination. Treated flax seeds had a slightly higher weight than untreated. Also, the contact angle of water decreased from 99° (untreated) to 65-73° (treated); therefore the treatment of both species is considered to be successful.Keywords: flax, germination, plasma treatment, poppy
Procedia PDF Downloads 177685 Effect of Different Media and Planting Time on the Cuttings of Cherry (Prunus Avium L.) Rootstock Colt Under the Agro Climatic Conditions of Temprate Region
Authors: Sajjad Ali Khan Sajjad Ali Khan, Gohar Ayub, Khalil Ur Rahman, Muhammad Sajid, Mumtaz Farooq, Mohammad Irshad, Haider Ali
Abstract:
A trail was carried out to know the effect of different soil media and planting time on the cuttings of cherry (Prunus avium L.) rootstock Colt at Agriculture Research Institute (ARI) Mingora swat, during winter 2011. The experiment was laid out in Randomized Complete Block Design (RCBD) with split plot arrangement and was replicated three times. Soil media (Silt, Garden soil and Silt+Garden soil+FYM) were assigned to main plots whereas, planting Dates (1st Jan, 11th Jan, 21st Jan, 1st Feb, 11th Feb, 21st Feb and 2nd March) subjected to sub plots. The data recorded on sprouting percentage, shoot diameter cutting-1, number of leaves cutting-1, rootstock height (cm), survival percentage, number of roots, root length (cm), root volume (cm3) and root weight (gm) were significantly affected by different soil media. Maximum sprouting percentage (100%), shoot diameter (1.72 mm), number of leaves cutting-1 (76.74), rootstock height (104.36 cm), survival percentage (41.67%), number of roots (76.35), root length (11.28 cm), root volume (4.43 cm3) and root weight (4.64 gm) were recorded in media M3 (Garden soil+silt+FYM). A significant response to various planting dates were observed for most of vegetative and rooting attributes of cherry rootstock Colt. 1st January plantation showed maximum sprouting percentage (100%), shoot diameter (1.99 mm), number of leaves (81.46), rootstock height (126.24 cm), survival percentage (58.12%), whereas 11th January plantation showed more number of roots (94.43), root length (10.60 cm), root volume (3.68 cm3) and root weight (3.71 gm). Based on the results from the experimental work, it is recommended that cherry cuttings should be planted in early January in soil media (Silt+Garden soil+ FYM) for better growth and development under the agro climatic conditions of temperate region.Keywords: soil media, cherry rootstock, planting dates, growth parameters
Procedia PDF Downloads 97684 Farmers’ Awareness of Pillars of Planting for Food and Jobs Programme in Ghana
Authors: Franklin Nantui Mabe, Gideon Danso-Abbeam, Dennis Sedem Ehiakpor
Abstract:
In order for the government of Ghana through the Ministry of Food and Agriculture to motivate farmers to adopt improved agricultural technologies, expand their farms and encourage youth to enter into agricultural production so as to increase crop productivity, “Planting for Food and Jobs” (PFJ) programme was launched in April 2017. The PFJ programme covers five pillars, namely, provision of subsidized and improved seeds; subsidized fertilizer; agricultural extension services; establishment of markets; and e-agriculture. This study assesses the awareness of farmers about the packages of these pillars using the Likert scale, paired t-test and Spearman’s rank correlation coefficient. The study adopted a mixed research design. A semi-structured questionnaire and checklist were used to collect data. The data collection was done using interviews and focus group discussions. The PFJ pillar farmers are much aware is a subsidy on fertilizer followed by a subsidy on improved seeds. Electronic agriculture is a pillar with the lowest level of awareness. There is a strong positive correlation between awareness of fertilizer and seed packages suggestion their complementarities. Lack of information/awareness of the packages of the programme can affect farmers’ participation in all the pillars. Farmers, in particular, should be educated for them to know what they are entitled to in each of the pillars. The programme implementation plan should also be made available to farmers as a guide.Keywords: awareness, planting for food and jobs, programme, farmers, likert scale
Procedia PDF Downloads 229683 Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques
Authors: Soheila Sadeghi
Abstract:
In the dynamic landscape of project management, scope changes are an inevitable reality that can significantly impact project performance. These changes, whether initiated by stakeholders, external factors, or internal project dynamics, can lead to cost overruns and schedule delays. Accurately predicting the consequences of these changes is crucial for effective project control and informed decision-making. This study aims to develop predictive models to estimate the impact of scope changes on project cost and schedule using machine learning techniques. The research utilizes a comprehensive dataset containing detailed information on project tasks, including the Work Breakdown Structure (WBS), task type, productivity rate, estimated cost, actual cost, duration, task dependencies, scope change magnitude, and scope change timing. Multiple machine learning models are developed and evaluated to predict the impact of scope changes on project cost and schedule. These models include Linear Regression, Decision Tree, Ridge Regression, Random Forest, Gradient Boosting, and XGBoost. The dataset is split into training and testing sets, and the models are trained using the preprocessed data. Cross-validation techniques are employed to assess the robustness and generalization ability of the models. The performance of the models is evaluated using metrics such as Mean Squared Error (MSE) and R-squared. Residual plots are generated to assess the goodness of fit and identify any patterns or outliers. Hyperparameter tuning is performed to optimize the XGBoost model and improve its predictive accuracy. The feature importance analysis reveals the relative significance of different project attributes in predicting the impact on cost and schedule. Key factors such as productivity rate, scope change magnitude, task dependencies, estimated cost, actual cost, duration, and specific WBS elements are identified as influential predictors. The study highlights the importance of considering both cost and schedule implications when managing scope changes. The developed predictive models provide project managers with a data-driven tool to proactively assess the potential impact of scope changes on project cost and schedule. By leveraging these insights, project managers can make informed decisions, optimize resource allocation, and develop effective mitigation strategies. The findings of this research contribute to improved project planning, risk management, and overall project success.Keywords: cost impact, machine learning, predictive modeling, schedule impact, scope changes
Procedia PDF Downloads 38