Search results for: international EPC project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8249

Search results for: international EPC project

7739 Ecological and Historical Components of the Cultural Code of the City of Florence as Part of the Edutainment Project Velonotte International

Authors: Natalia Zhabo, Sergey Nikitin, Marina Avdonina, Mariya Nikitina

Abstract:

The analysis of the activities of one of the events of the international educational and entertainment project Velonotte is provided: an evening bicycle tour with children around Florence. The aim of the project is to develop methods and techniques for increasing the sensitivity of the cycling participants and listeners of the radio broadcasts to the treasures of the national heritage, in this case, to the historical layers of the city and the ecology of the Renaissance epoch. The block of educational tasks is considered, and the issues of preserving the identity of the city are discussed. Methods. The Florentine event was prepared during more than a year. First of all the creative team selected such events of the history of the city which seem to be important for revealing the specifics of the city, its spirit - from antiquity to our days – including the forums of Internet with broad public opinion. Then a route (seven kilometers) was developed, which was proposed to the authorities and organizations of the city. The selection of speakers was conducted according to several criteria: they should be authors of books, famous scientists, connoisseurs in a certain sphere (toponymy, history of urban gardens, art history), capable and willing to talk with participants directly at the points of stops, in order to make a dialogue and so that performances could be organized with their participation. The music was chosen for each part of the itinerary to prepare the audience emotionally. Cards for coloring with images of the main content of each stop were created for children. A site was done to inform the participants and to keep photos, videos and the audio files with speakers’ speech afterward. Results: Held in April 2017, the event was dedicated to the 640th Anniversary of the Filippo Brunelleschi, Florentine architect, and to the 190th anniversary of the publication of Florence guide by Stendhal. It was supported by City of Florence and Florence Bike Festival. Florence was explored to transfer traditional elements of culture, sometimes unfairly forgotten from ancient times to Brunelleschi and Michelangelo and Tschaikovsky and David Bowie with lectures by professors of Universities. Memorable art boards were installed in public spaces. Elements of the cultural code are deeply internalized in the minds of the townspeople, the perception of the city in everyday life and human communication is comparable to such fundamental concepts of the self-awareness of the townspeople as mental comfort and the level of happiness. The format of a fun and playful walk with the ICT support gives new opportunities for enriching the city's cultural code of each citizen with new components, associations, connotations.

Keywords: edutainment, cultural code, cycling, sensitization Florence

Procedia PDF Downloads 196
7738 Innovations in the Organization of Adaptation Program for International Students in Russia Based on Human Capital Approach

Authors: Kalinina Anastasiya, Pevnaya Mariya

Abstract:

The authors present the results of research of educational and cultural habitat of international students at Ural Federal University, revealing problem zones in the organization of adaptation program in 2014-2015 as well as innovations in adaptation program for 2015-2016. The research is based on U-curve theory of culture shock and theory of human capital. The authors provide also the first results for all stakeholders of practically implemented pilot adaptation program for foreign students which was based on the human capital approach.

Keywords: adaptation, human capital, international students, student volunteering, social community, youth politics

Procedia PDF Downloads 328
7737 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 316
7736 Analysis and Evaluation of the Public Responses to Traffic Congestion Pricing Schemes in Urban Streets

Authors: Saeed Sayyad Hagh Shomar

Abstract:

Traffic congestion pricing in urban streets is one of the most suitable options for solving the traffic problems and environment pollutions in the cities of the country. Unlike its acceptable outcomes, there are problems concerning the necessity to pay by the mass. Regarding the fact that public response in order to succeed in this strategy is so influential, studying their response and behavior to get the feedback and improve the strategies is of great importance. In this study, a questionnaire was used to examine the public reactions to the traffic congestion pricing schemes at the center of Tehran metropolis and the factors involved in people’s decision making in accepting or rejecting the congestion pricing schemes were assessed based on the data obtained from the questionnaire as well as the international experiences. Then, by analyzing and comparing the schemes, guidelines to reduce public objections to them are discussed. The results of reviewing and evaluating the public reactions show that all the pros and cons must be considered to guarantee the success of these projects. Consequently, with targeted public education and consciousness-raising advertisements, prior to initiating a scheme and ensuring the mechanism of the implementation after the start of the project, the initial opposition is reduced and, with the gradual emergence of the real and tangible benefits of its implementation, users’ satisfaction will increase.

Keywords: demand management, international experiences, traffic congestion pricing, public acceptance, public reactions, public objection

Procedia PDF Downloads 225
7735 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: tunnelling, geology, HRT, rockmass

Procedia PDF Downloads 236
7734 Components of Effective Learning Environments: Global Perspectives on Student Perceptions

Authors: Victoria Appatova

Abstract:

internal and external, that are largely shaped by the student’s perceptions. Since 2006, the ELE concept has been studied by an international group of scholars through the creation of an ELE survey which was administered in nine countries and translated into five languages. The survey compares students’ perceptions of their learning environments and self-efficacy across A student’s effective learning environment (ELE) is comprised of multiple factors, both cultures as well as distinguishes similarities and differences in the students’ needs related to their learning. The main objectives of this international project include the following: Determine a system of components constituting ELE from the perspective of students and other academic populations Analyze students’ expectations, and their chances to succeed in college based on their expectations Conceptualize a comprehensive approach for assessing the effectiveness of a learning environment Compare the actualization of the ELE concept in American schools versus other national educational systems Compare student perceptions of ELE with those of faculty, administrators, and professional staff Four major factors influencing student learning across cultures and various national educational systems were determined: students’ initiative in using support services; learning skills; external comfort; and curriculum. Recent changes in the students’ perceptions, resulting from technology advances and a rapid shift to online learning, are being explored. The findings call for administrative and pedagogical actions which would cultivate more equitable education systems.

Keywords: learning environment, student perception, global perspectives, self-efficacy

Procedia PDF Downloads 70
7733 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project

Authors: Balázs Kulcsár

Abstract:

Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.

Keywords: sustainability, ecosystem service, land use conflict, landscape utilization

Procedia PDF Downloads 142
7732 Humanitarian Aid and National Sovereignty: The Case of Kosovo

Authors: Nick Papanikolaou

Abstract:

In modern world politics, International relations are very complex not only in their construction but also in their interpretation the ex-Yugoslavian(western Balkans) countries, due to the establishment of independent states, have also risen pending geopolitical and territorial issues such as the Kosovo dispute widely known as an active frozen conflict. Science of anthropology and its subfield of anthropology of conflict can suggest a sustainable plan of communities coexistence and abolishment of fondamentalism. The 1244 Security Council Resolution provides a framework of implementation of a transitional international joint international armed presence for ensuring control and stability in the territory. The changing international relations landscape and the rise of the integration of the Western Balkans in the European Union have brought the question of Kosovo and all the till now internationally controlled system of governance to a dead end. A new solution that will ensure a sustainable future needs to be applied in order to solve this case in a way that rights of both albanians and Serbians will be equally respected and both populations will coexist peacefully. What this presentation aims for is to present a plan for the peaceful coexistence and sovreignty of habitants of Kosovo in a whole new way of governance.

Keywords: sovereignty, Kosovo, Western Balkans, anthropology of conflict

Procedia PDF Downloads 56
7731 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage

Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek

Abstract:

This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.

Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS

Procedia PDF Downloads 402
7730 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches

Authors: Maria Ledinskaya

Abstract:

This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: project management, conservation, waterfall, agile, lean, hybrid

Procedia PDF Downloads 84
7729 Empowering Youth Through Pesh Poultry: A Transformative Approach to Addressing Unemployment and Fostering Sustainable Livelihoods in Busia District, Uganda

Authors: Bisemiire Anthony,

Abstract:

PESH Poultry is a business project proposed specifically to solve unemployment and income-related problems affecting the youths in the Busia district. The project is intended to transform the life of the youth in terms of economic, social and behavioral, as well as the domestic well-being of the community at large. PESH Poultry is a start-up poultry farm that will be engaged in the keeping of poultry birds, broilers and layers for the production of quality and affordable poultry meat and eggs respectively and other poultry derivatives targeting consumers in eastern Uganda, for example, hotels, restaurants, households and bakeries. We intend to use a semi-intensive system of farming, where water and some food are provided in a separate nighttime shelter for the birds; our location will be in Lumino, Busia district. The poultry project will be established and owned by Bisemiire Anthony, Nandera Patience, Naula Justine, Bwire Benjamin and other investors. The farm will be managed and directed by Nandera Patience, who has five years of work experience and business administration knowledge. We will sell poultry products, including poultry eggs, chicken meat, feathers and poultry manure. We also offer consultancy services for poultry farming. Our eggs and chicken meat are hygienic, rich in protein and high quality. We produce processes and packages to meet the standard organization of Uganda and international standards. The business project shall comprise five (5) workers on the key management team who will share various roles and responsibilities in the identified business functions such as marketing, finance and other related poultry farming activities. PESH Poultry seeks 30 million Ugandan shillings in long-term financing to cover start-up costs, equipment, building expenses and working capital. Funding for the launch of the business will be provided primarily by equity from the investors. The business will reach positive cash flow in its first year of operation, allowing for the expected repayment of its loan obligations. Revenue will top UGX 11,750,000, and net income will reach about UGX115 950,000 in the 1st year of operation. The payback period for our project is 2 years and 3 months. The farm plans on starting with 1000 layer birds and 1000 broiler birds, 20 workers in the first year of operation.

Keywords: chicken, pullets, turkey, ducks

Procedia PDF Downloads 69
7728 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 84
7727 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 277
7726 Renegotiating International Contract Clauses: The Case of Investment Environment Changes in Egypt

Authors: Marwa Zein

Abstract:

The long-term of the contract is one of the major features that distinguish international trade and investment contracts from other internal contracts. This is due to the nature of the contract and the huge works required to be performed from one hand or the desire of the parties to achieve stability in their transactions. However, long-term contracts might expose them to certain events and circumstances that impact the capability of the parties to execute their obligations pursuant to these contracts. During the year 2016, the Egyptian government has taken series of economic decisions which greatly impacted the economic and investment environment. Consequently, many contracts have encountered many problems in their execution due to such changes that greatly influence the performance of their obligation, a matter that necessitated the renegotiation of the conditions of these contracts on the basis of the unpredicted changes that could be listed under the Force Majeure Clause. The principle of fair and equitable treatment in investment placed on an obligation on the Egyptian government to consider the renegotiation of contract clauses based on the new conditions. This paper will discuss the idea of renegotiating international trade and investment contracts in Egypt with reference to the changes the economic environment has witnessed lately.

Keywords: change of circumstances, international contracts, investment contracts, renegotiation

Procedia PDF Downloads 180
7725 Isotype and Logical Positivism: A Critical Understanding through Intersemiotic Translation

Authors: Satya Girish Goparaju, Sushmita Pareek

Abstract:

This paper examines two sets of pictograms published in Neurath’s books Basic by Isotype and International Pictorial Language in order to investigate the reasons for pictorial language having become an end in itself despite its potential to be relevant, especially in the 21st century digital age of heightened interlingual engagement. ISOTYPE was developed by Otto Neurath to be an ‘international language’ (pictorial) in the late 1920s. It was derived from the philosophy of logical positivism (of the Vienna Circle), which believed that language can be reduced to sets of direct experiences as bare symbols, devoid of the emotive and expressive functions. In his book International Picture Language, Neurath noted that any language is less clear-cut in one or the other way, and hence the pictorial language was justified. However, Isotype, as an ambitious version of logical positivism in practice distanced itself from the semiotic theories of language, and therefore his pictograms were defined as an independent set of signs rather than signs as a part of the language. This paper attempts to investigate intersemiotic translation in the form of Isotypes and trace the effects of logical positivism on Neurath’s concept of isotypes; the ‘international language’.

Keywords: intersemiotic translation, isotype, logical positivism, Otto Neurath, translation studies

Procedia PDF Downloads 228
7724 Process Modeling in an Aeronautics Context

Authors: Sophie Lemoussu, Jean-Charles Chaudemar, Robertus A. Vingerhoeds

Abstract:

Many innovative projects exist in the field of aeronautics, each addressing specific areas so to reduce weight, increase autonomy, reduction of CO2, etc. In many cases, such innovative developments are being carried out by very small enterprises (VSE’s) or small and medium sized-enterprises (SME’s). A good example concerns airships that are being studied as a real alternative to passenger and cargo transportation. Today, no international regulations propose a precise and sufficiently detailed framework for the development and certification of airships. The absence of such a regulatory framework requires a very close contact with regulatory instances. However, VSE’s/SME’s do not always have sufficient resources and internal knowledge to handle this complexity and to discuss these issues. This poses an additional challenge for those VSE’s/SME’s, in particular those that have system integration responsibilities and that must provide all the necessary evidence to demonstrate their ability to design, produce, and operate airships with the expected level of safety and reliability. The main objective of this research is to provide a methodological framework enabling VSE’s/SME’s with limited resources to organize the development of airships while taking into account the constraints of safety, cost, time and performance. This paper proposes to provide a contribution to this problematic by proposing a Model-Based Systems Engineering approach. Through a comprehensive process modeling approach applied to the development processes, the regulatory constraints, existing best practices, etc., a good image can be obtained as to the process landscape that may influence the development of airships. To this effect, not only the necessary regulatory information is taken on board, also other international standards and norms on systems engineering and project management are being modeled and taken into account. In a next step, the model can be used for analysis of the specific situation for given developments, derive critical paths for the development, identify eventual conflicting aspects between the norms, standards, and regulatory expectations, or also identify those areas where not enough information is available. Once critical paths are known, optimization approaches can be used and decision support techniques can be applied so to better support VSE’s/SME’s in their innovative developments. This paper reports on the adopted modeling approach, the retained modeling languages, and how they all fit together.

Keywords: aeronautics, certification, process modeling, project management, regulation, SME, systems engineering, VSE

Procedia PDF Downloads 143
7723 Integrated Management System of Plant Genetic Resources: Collection, Conservation, Regeneration and Characterization of Cucurbitaceae and Solanaceae of DOA Genebank, Thailand

Authors: Kunyaporn Pipithsangchan, Alongkorn Korntong, Assanee Songserm, Phatchara Piriyavinit, Saowanee Dechakampoo

Abstract:

The Kingdom of Thailand is one of the South East Asian countries. From its area of 514,000 square kilometers (51 million ha), at least 18,000 plant species (8% of the world total) have been estimated to be found in the country. As a result, the conservation of plant genetic diversity, particularly food crops, is becoming important and is an assurance for the national food security. Department of Agriculture Genebank or DOA Genebank, Thailand is responsible for the conservation of plant germplasm by participating and accomplishing several collaborative projects both at national and international levels. Integrated Management System of Plant Genetic Resources or IMPGR is one of the most outstandingly successful cooperation. It is a multilateral project under the Asian Food and Agriculture Cooperation Initiative (AFACI) supported by the Rural Development Administration (RDA) of South Korea. The member countries under the project consist of 11 nations namely Bangladesh, Cambodia, Indonesia, Laos PDR, Mongolia, Nepal, Philippines, Sri Lanka, Thailand, Vietnam and South Korea. The project enabled the members to jointly address the global issues in plant genetic resource (PGR) conservation and strengthen their network in this aspect. The 1st phase of IMPGR project, entitled 'Collection, Conservation, Regeneration and Characterization of Cucurbitaceae and Solanaceae 2012-2014', comprises three main objectives that are: 1) To improve management in storage facilities, collection, and regeneration, 2) To improve linkage between Genebank and material sources (for regeneration), and 3) To improve linkage between Genebank and other field crop or/and horticultural research centers. The project was done for three years from 2012 to 2014. The activities of the project can be described as following details: In the 1st year, there were 9 target provinces for completing plant genetic resource survey and collection. 108 accessions of PGR were collected. In the 2nd year, PGR were continuously surveyed and collected from 9 provinces. The total number of collection was 140 accessions. In addition, the process of regeneration of 237 accessions collected from 1st and 2nd year was started at several sites namely Biotechnology Research and Development Office, Sukothai Horticultural Research Center, Tak Research, and Development Center and Nakhon Ratchasima Research and Development Center. In the 3rd year, besides survey and collection of 115 accessions from 9 target provinces, PGR characterization and evaluation were done for 206 accessions. Moreover, safety duplication of 253 PGR at the World Seed Vault, RDA, was also done according to Standard Agreement on Germplasm Safety Duplication between Department of Agriculture, Ministry of Agriculture and Cooperatives, the Kingdom of Thailand and the National Agrobiodiversity Center, Rural Development Administration of the Republic of Korea. The success of the 1st phase project led to the second phase which entitled 'Collection and Characterization for Effective Conservation of Local Capsicum spp., Solanum spp. and Lycopersicon spp. in Thailand 2015-2017'.

Keywords: characterization, conservation, DOA genebank, plant genetic resources

Procedia PDF Downloads 163
7722 Key Drivers Motivating Prospective International Students to Study Abroad and Their Attitude to University Rankings

Authors: Dasha Karzunina, Laura Bridgestock

Abstract:

Our oral presentation will be based on our qualitative and quantitative findings into motivations and challenges faced by international and UK students when choosing a university abroad. The insight was gathered through a series of over 60 focus groups held with prospective university students all over the world, including masters and PhD applicants. We spoke to students face-to-face in Latin America, North American, India, China, South East Asia and the major European cities. A survey was carried out alongside, to gather additional insight on their priorities and attitudes to universities’ reputation, collecting over 1,800 responses. The session’s aims are to break down some of the myths about the perspectives of international students and inform university leaders interested in recruiting more highly talented students from abroad and those currently working with international students. As a provider of one of the most demanded resources in higher education, QS World University Rankings, we specialize in understanding universities’ performance, their institutional brand and the impact of rankings on student recruitment. We therefore feel we are well placed to carry out and present this research. We hope for our findings to act as a bridge between bright students and their future universities abroad. We intend for our session to be interactive and so are happy to go into more depth on any of the destinations we visited, depending on what the audience is most interested in and which questions we receive.

Keywords: international student recruitment, market research, rankings, study abroad

Procedia PDF Downloads 218
7721 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 37
7720 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.

Keywords: strategy, project management, strategy implementation, agile

Procedia PDF Downloads 94
7719 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: building information modeling, BIM, construction industry, Kuwait

Procedia PDF Downloads 359
7718 A Modernist Project: An Analysis on Dupont’s Translations of Faulkner’s Works

Authors: Edilei Reis, Jose Carlos Felix

Abstract:

This paper explores Waldir Dupont’s translations of William Faulkner’s novels to Brazilian Portuguese language in order to comprehend how his translation project regarding Faulkner’s works has addressed modernist traits of the novelist fiction, particularly the ambivalence of language, multiple and fragmented points of view and syntax. Wladir Dupont (1939-2014) was a prolific Brazilian journalist who benefitted from his experiences as an international correspondent living abroad (EUA and Mexico) to become an acclaimed translator later in life. He received a Jabuiti Award (Brazilian most prestigious literary award) for his translation of ‘La Otra Voz’ (1994), by Mexican poet, critic and translator Octavio Paz, a writer to whom he devoted the first years of his carrier as a translator. As Dupont pointed out in some interviews, the struggles in finding a way out to overcome linguistic and cultural obstacles in the process of translating texts from Spanish to Portuguese was paramount for ascertaining his engagement in the long-term project of translating to Brazilian Portuguese the fiction of William Faulkner. His first enterprise was the translation of Faulkner’s trilogy Snopes: The Hamlet (1940) and The Town (1957), the first two novels, were published in 1997 as O povoado and A cidade; in 1999 the last novel, The mansion (1959), was published as A mansão. In 2001, Dupont tackled what is considered one of the most challenging novels by the author due to his use of multiple points of view, As I lay dying (1930). In 2003, The Reivers (1962) was published under the title Os invictos. His enterprise finishes in 2012 with the publication of an anthology of Faulkner’s thriller short-stories Knight’s Gambit (1932) as Lance mortal. Hence, in this paper we will consider the Dupont’s trajectory as a translator, paying special attention to the way in which his identity as such is constituted through the process of translating Faulkner’s works.

Keywords: literary translation, translator’s identity, William Faulkner, Wladir DuPont

Procedia PDF Downloads 222
7717 The Development of Open Access in Latin America and Caribbean: Mapping National and International Policies and Scientific Publications of the Region

Authors: Simone Belli, Sergio Minniti, Valeria Santoro

Abstract:

ICTs and technology transfer can benefit and move a country forward in economic and social development. However, ICT and access to the Internet have been inequitably distributed in most developing countries. In terms of science production and dissemination, this divide articulates itself also through the inequitable distribution of access to scientific knowledge and networks, which results in the exclusion of developing countries from the center of science. Developing countries are on the fringe of Science and Technology (S&T) production due not only to low investment in research but also to the difficulties to access international scholarly literature. In this respect, Open access (OA) initiatives and knowledge infrastructure represent key elements for both producing significant changes in scholarly communication and reducing the problems of developing countries. The spreading of the OA movement in the region, exemplified by the growth of regional and national initiatives, such as the creation of OA institutional repositories (e.g. SciELO and Redalyc) and the establishing of supportive governmental policies, provides evidence of the significant role that OA is playing in reducing the scientific gap between Latin American countries and improving their participation in the so-called ‘global knowledge commons’. In this paper, we map OA publications in Latin America and observe how Latin American countries are moving forward and becoming a leading force in widening access to knowledge. Our analysis, developed as part of the H2020 EULAC Focus research project, is based on mixed methods and consists mainly of a bibliometric analysis of OA publications indexed in the most important scientific databases (Web of Science and Scopus) and OA regional repositories, as well as the qualitative analysis of documents related to the main OA initiatives in Latin America. Through our analysis, we aim at reflecting critically on what policies, international standards, and best practices might be adapted to incorporate OA worldwide and improve the infrastructure of the global knowledge commons.

Keywords: open access, LAC countries, scientific publications, bibliometric analysis

Procedia PDF Downloads 192
7716 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 149
7715 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan

Authors: Ghaleb Y. Abbasi, Satanay Alhiary

Abstract:

This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.

Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing

Procedia PDF Downloads 438
7714 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 406
7713 Women Participation in Agriculture and Rural Development Activities in Kwacciyar-Lalle and Mogonho Communities of Sokoto State, Nigeria

Authors: B. Z. Abubakar, J. P. Voh, B. F. Umar, S. Khalid, A. A. Barau, J. Aigbe

Abstract:

The study was conducted to identify and assess the various community development programmes designed and executed by Sokoto Agricultural and Community Development Project (SACDP) with the assistance of International Funds for Agricultural Development (IFAD) among women beneficiaries in Kwacciyar-lalle and Mogonho communities of Sokoto state. A simple random sampling technique was employed to select 20 project beneficiaries in each of the selected communities, making a total of 40 beneficiaries. Structured questionnaire, descriptive statistics such as frequencies and percentages and also participatory methodologies such as focus group discussion and pair wise ranking were used to analyze the data. Results showed that majority of the beneficiaries (75%) were married and undertook animal rearing as their major occupation. Results further showed that (85%) of the beneficiaries were involved in decision making, which enhanced their participation. Pair-wise ranking showed dug well as the most preferred activity, followed by construction of Islamic school in Kwacciyar-lalle while well construction followed by provision of improved animal species were most preferred in Mogonho. Recommendations made in the light of achieving people’s participation include provision of more infrastructural facilities and working materials.

Keywords: community development, focus group, pair-wise ranking, infrastructure

Procedia PDF Downloads 355
7712 Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques

Authors: Soheila Sadeghi

Abstract:

In the dynamic landscape of project management, scope changes are an inevitable reality that can significantly impact project performance. These changes, whether initiated by stakeholders, external factors, or internal project dynamics, can lead to cost overruns and schedule delays. Accurately predicting the consequences of these changes is crucial for effective project control and informed decision-making. This study aims to develop predictive models to estimate the impact of scope changes on project cost and schedule using machine learning techniques. The research utilizes a comprehensive dataset containing detailed information on project tasks, including the Work Breakdown Structure (WBS), task type, productivity rate, estimated cost, actual cost, duration, task dependencies, scope change magnitude, and scope change timing. Multiple machine learning models are developed and evaluated to predict the impact of scope changes on project cost and schedule. These models include Linear Regression, Decision Tree, Ridge Regression, Random Forest, Gradient Boosting, and XGBoost. The dataset is split into training and testing sets, and the models are trained using the preprocessed data. Cross-validation techniques are employed to assess the robustness and generalization ability of the models. The performance of the models is evaluated using metrics such as Mean Squared Error (MSE) and R-squared. Residual plots are generated to assess the goodness of fit and identify any patterns or outliers. Hyperparameter tuning is performed to optimize the XGBoost model and improve its predictive accuracy. The feature importance analysis reveals the relative significance of different project attributes in predicting the impact on cost and schedule. Key factors such as productivity rate, scope change magnitude, task dependencies, estimated cost, actual cost, duration, and specific WBS elements are identified as influential predictors. The study highlights the importance of considering both cost and schedule implications when managing scope changes. The developed predictive models provide project managers with a data-driven tool to proactively assess the potential impact of scope changes on project cost and schedule. By leveraging these insights, project managers can make informed decisions, optimize resource allocation, and develop effective mitigation strategies. The findings of this research contribute to improved project planning, risk management, and overall project success.

Keywords: cost impact, machine learning, predictive modeling, schedule impact, scope changes

Procedia PDF Downloads 17
7711 Corporate Social Responsibility: An Ethical or a Legal Framework?

Authors: Pouira Askary

Abstract:

Indeed, in our globalized world which is facing with various international crises, the transnational corporations and other business enterprises have the capacity to foster economic well-being, development, technological improvement and wealth, as well as causing adverse impacts on human rights. The UN Human Rights Council declared that although the primary responsibility to protect human rights lie with the State but the transnational corporations and other business enterprises have also a responsibility to respect and protect human rights in the framework of corporate social responsibility. In 2011, the Human Rights Council endorsed the Guiding Principles on Business and Human Rights, a set of guidelines that define the key duties and responsibilities of States and business enterprises with regard to business-related human rights abuses. In UN’s view, the Guiding Principles do not create new legal obligations but constitute a clarification of the implications of existing standards, including under international human rights law. In 2014 the UN Human Rights Council decided to establish a working group on transnational corporations and other business enterprises whose mandate shall be to elaborate an international legally binding instrument to regulate, in international human rights law, the activities of transnational corporations and other business enterprises. Extremely difficult task for the working group to codify a legally binding document to regulate the behavior of corporations on the basis of the norms of international law! Concentration of this paper is on the origins of those human rights applicable on business enterprises. The research will discuss that the social and ethical roots of the CSR are much more institutionalized and elaborated than the legal roots. Therefore, the first step is to determine whether and to what extent corporations, do have an ethical responsibility to respect human rights and if so, by which means this ethical and social responsibility is convertible to legal commitments.

Keywords: CSR, ethics, international law, human rights, development, sustainable business

Procedia PDF Downloads 362
7710 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 134