Search results for: Project managers
5667 Case Study Approach Using Scenario Analysis to Analyze Unabsorbed Head Office Overheads
Authors: K. C. Iyer, T. Gupta, Y. M. Bindal
Abstract:
Head office overhead (HOOH) is an indirect cost and is recovered through individual project billings by the contractor. Delay in a project impacts the absorption of HOOH cost allocated to that particular project and thus diminishes the expected profit of the contractor. This unabsorbed HOOH cost is later claimed by contractors as damages. The subjective nature of the available formulae to compute unabsorbed HOOH is the difficulty that contractors and owners face and thus dispute it. The paper attempts to bring together the rationale of various HOOH formulae by gathering contractor’s HOOH cost data on all of its project, using case study approach and comparing variations in values of HOOH using scenario analysis. The case study approach uses project data collected from four construction projects of a contractor in India to calculate unabsorbed HOOH costs from various available formulae. Scenario analysis provides further variations in HOOH values after considering two independent situations mainly scope changes and new projects during the delay period. Interestingly, one of the findings in this study reveals that, in spite of HOOH getting absorbed by additional works available during the period of delay, a few formulae depict an increase in the value of unabsorbed HOOH, neglecting any absorption by the increase in scope. This indicates that these formulae are inappropriate for use in case of a change to the scope of work. Results of this study can help both parties in deciding on an appropriate formula more objectively, considering the events on a project causing the delay and contractor's position in respect of obtaining new projects.Keywords: absorbed and unabsorbed overheads, head office overheads, scenario analysis, scope variation
Procedia PDF Downloads 1665666 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures
Authors: Sunaitan Al Mutairi
Abstract:
A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays
Procedia PDF Downloads 3185665 Parallel Computing: Offloading Matrix Multiplication to GPU
Authors: Bharath R., Tharun Sai N., Bhuvan G.
Abstract:
This project focuses on developing a Parallel Computing method aimed at optimizing matrix multiplication through GPU acceleration. Addressing algorithmic challenges, GPU programming intricacies, and integration issues, the project aims to enhance efficiency and scalability. The methodology involves algorithm design, GPU programming, and optimization techniques. Future plans include advanced optimizations, extended functionality, and integration with high-level frameworks. User engagement is emphasized through user-friendly interfaces, open- source collaboration, and continuous refinement based on feedback. The project's impact extends to significantly improving matrix multiplication performance in scientific computing and machine learning applications.Keywords: matrix multiplication, parallel processing, cuda, performance boost, neural networks
Procedia PDF Downloads 605664 Pareto Optimal Material Allocation Mechanism
Authors: Peter Egri, Tamas Kis
Abstract:
Scheduling problems have been studied by the algorithmic mechanism design research from the beginning. This paper is focusing on a practically important, but theoretically rather neglected field: the project scheduling problem where the jobs connected by precedence constraints compete for various nonrenewable resources, such as materials. Although the centralized problem can be solved in polynomial-time by applying the algorithm of Carlier and Rinnooy Kan from the Eighties, obtaining materials in a decentralized environment is usually far from optimal. It can be observed in practical production scheduling situations that project managers tend to cache the required materials as soon as possible in order to avoid later delays due to material shortages. This greedy practice usually leads both to excess stocks for some projects and materials, and simultaneously, to shortages for others. The aim of this study is to develop a model for the material allocation problem of a production plant, where a central decision maker—the inventory—should assign the resources arriving at different points in time to the jobs. Since the actual due dates are not known by the inventory, the mechanism design approach is applied with the projects as the self-interested agents. The goal of the mechanism is to elicit the required information and allocate the available materials such that it minimizes the maximal tardiness among the projects. It is assumed that except the due dates, the inventory is familiar with every other parameters of the problem. A further requirement is that due to practical considerations monetary transfer is not allowed. Therefore a mechanism without money is sought which excludes some widely applied solutions such as the Vickrey–Clarke–Groves scheme. In this work, a type of Serial Dictatorship Mechanism (SDM) is presented for the studied problem, including a polynomial-time algorithm for computing the material allocation. The resulted mechanism is both truthful and Pareto optimal. Thus the randomization over the possible priority orderings of the projects results in a universally truthful and Pareto optimal randomized mechanism. However, it is shown that in contrast to problems like the many-to-many matching market, not every Pareto optimal solution can be generated with an SDM. In addition, no performance guarantee can be given compared to the optimal solution, therefore this approximation characteristic is investigated with experimental study. All in all, the current work studies a practically relevant scheduling problem and presents a novel truthful material allocation mechanism which eliminates the potential benefit of the greedy behavior that negatively influences the outcome. The resulted allocation is also shown to be Pareto optimal, which is the most widely used criteria describing a necessary condition for a reasonable solution.Keywords: material allocation, mechanism without money, polynomial-time mechanism, project scheduling
Procedia PDF Downloads 3335663 Developing a Systems Dynamics Model for Security Management
Authors: Kuan-Chou Chen
Abstract:
This paper will demonstrate a simulation model of an information security system by using the systems dynamic approach. The relationships in the system model are designed to be simple and functional and do not necessarily represent any particular information security environments. The purpose of the paper aims to develop a generic system dynamic information security system model with implications on information security research. The interrelated and interdependent relationships of five primary sectors in the system dynamic model will be presented in this paper. The integrated information security systems model will include (1) information security characteristics, (2) users, (3) technology, (4) business functions, and (5) policy and management. Environments, attacks, government and social culture will be defined as the external sector. The interactions within each of these sectors will be depicted by system loop map as well. The proposed system dynamic model will not only provide a conceptual framework for information security analysts and designers but also allow information security managers to remove the incongruity between the management of risk incidents and the management of knowledge and further support information security managers and decision makers the foundation for managerial actions and policy decisions.Keywords: system thinking, information security systems, security management, simulation
Procedia PDF Downloads 4315662 Police Violence, Activism, and the Changing Rural United States: A Digital History and Mapping Narrative
Authors: Joel Zapata
Abstract:
Chicana/o Activism in the Southern Plains Through Time and Space, a digital history project available at PlainsMovement.com, helps reveal an understudied portion of the Chicana/o Civil Rights Movement: the way it unfolded on the Southern Plains. The project centers around an approachable interactive map and timeline along with a curated collection of materials. Therefore, the project provides a digital museum experience that has not emerged within the region’s museums. That is, this digital history project takes scholarly research to the wider public, making it is also a publicly facing history project. In this way, the project adds to both scholarly and socially significant conversations, showing that the region was home to a burgeoning wing of the Chicana/o Movement and that instances of police brutality largely spurred this wing of the social justice movement. Moreover, the curated collection of materials demonstrates that police brutality united the plains’ Mexican population across political ideology, a largely overlooked aspect within the study of Mexican American civil rights movements. Such a finding can be of use today since contemporary Latina/o social justice organizations generally ignore policing issues even amid a rise in national awareness regarding police abuse. In making history accessible to Mexican origin and Latina/o communities, these same communities may in-turn use the knowledge gained from historical research towards the betterment of their social positions—the foundational goal of Chicana/o history and the related field of Chicana/o Studies. Ultimately, this digital history project is intended to draw visitors to further explore the Chicana/o Civil Rights Movement within and beyond the plains.Keywords: Chicana/o Movement, digital history, police brutality, newspapers, protests, student activism
Procedia PDF Downloads 1235661 Management of the Experts in the Research Evaluation System of the University: Based on National Research University Higher School of Economics Example
Authors: Alena Nesterenko, Svetlana Petrikova
Abstract:
Research evaluation is one of the most important elements of self-regulation and development of researchers as it is impartial and independent process of assessment. The method of expert evaluations as a scientific instrument solving complicated non-formalized problems is firstly a scientifically sound way to conduct the assessment which maximum effectiveness of work at every step and secondly the usage of quantitative methods for evaluation, assessment of expert opinion and collective processing of the results. These two features distinguish the method of expert evaluations from long-known expertise widespread in many areas of knowledge. Different typical problems require different types of expert evaluations methods. Several issues which arise with these methods are experts’ selection, management of assessment procedure, proceeding of the results and remuneration for the experts. To address these issues an on-line system was created with the primary purpose of development of a versatile application for many workgroups with matching approaches to scientific work management. Online documentation assessment and statistics system allows: - To realize within one platform independent activities of different workgroups (e.g. expert officers, managers). - To establish different workspaces for corresponding workgroups where custom users database can be created according to particular needs. - To form for each workgroup required output documents. - To configure information gathering for each workgroup (forms of assessment, tests, inventories). - To create and operate personal databases of remote users. - To set up automatic notification through e-mail. The next stage is development of quantitative and qualitative criteria to form a database of experts. The inventory was made so that the experts may not only submit their personal data, place of work and scientific degree but also keywords according to their expertise, academic interests, ORCID, Researcher ID, SPIN-code RSCI, Scopus AuthorID, knowledge of languages, primary scientific publications. For each project, competition assessments are processed in accordance to ordering party demands in forms of apprised inventories, commentaries (50-250 characters) and overall review (1500 characters) in which expert states the absence of conflict of interest. Evaluation is conducted as follows: as applications are added to database expert officer selects experts, generally, two persons per application. Experts are selected according to the keywords; this method proved to be good unlike the OECD classifier. The last stage: the choice of the experts is approved by the supervisor, the e-mails are sent to the experts with invitation to assess the project. An expert supervisor is controlling experts writing reports for all formalities to be in place (time-frame, propriety, correspondence). If the difference in assessment exceeds four points, the third evaluation is appointed. As the expert finishes work on his expert opinion, system shows contract marked ‘new’, managers commence with the contract and the expert gets e-mail that the contract is formed and ready to be signed. All formalities are concluded and the expert gets remuneration for his work. The specificity of interaction of the examination officer with other experts will be presented in the report.Keywords: expertise, management of research evaluation, method of expert evaluations, research evaluation
Procedia PDF Downloads 2085660 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram
Abstract:
The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems
Procedia PDF Downloads 3575659 The Role of Law Corruption and Culture in Investment Fund Manager Fees
Authors: Samir Assal
Abstract:
This paper considers an international sample of venture capital and private equity funds to assess the role of law, corruption and culture in setting fund manager fees in terms of their fixed management fees, carried interest performance fees, clawbacks of fees and cash versus share distributions of fees. The data highlight a role of legal conditions in shaping fees paid to fund managers. In countries with better legal conditions, fixed fees are lower, carried interest fees are higher, clawbacks are less likely, and share distributions are more likely. These findings suggest legal conditions help to align the interests of managers and shareholders. More specifically, we examine which element of legal conditions matter most, and discover that corruption levels play a pronounced role in shaping fund manager fee contracts. We also show that cultural forces such as Hofstede’s measures of power distance and uncertainty avoidance likewise play a role in influencing fees.Keywords: managerial compensation, incentive contracts, private equity, law and finance
Procedia PDF Downloads 3105658 Project-Based Learning Application: Applying Systems Thinking Concepts to Assure Continuous Improvement
Authors: Kimberley Kennedy
Abstract:
The major findings of this study discuss the importance of understanding and applying Systems thinking concepts to ensure an effective Project-Based Learning environment. A pilot project study of a major pedagogical change was conducted over a five year period with the goal to give students real world, hands-on learning experiences and the opportunity to apply what they had learned over the past two years of their business program. The first two weeks of the fifteen week semester utilized teaching methods of lectures, guest speakers and design thinking workshops to prepare students for the project work. For the remaining thirteen weeks of the semester, the students worked with actual business owners and clients on projects and challenges. The first three years of the five year study focused on student feedback to ensure a quality learning experience and continuous improvement process was developed. The final two years of the study, examined the conceptual understanding and perception of learning and teaching by faculty using Project-Based Learning pedagogy as compared to lectures and more traditional teaching methods was performed. Relevant literature was reviewed and data collected from program faculty participants who completed pre-and post-semester interviews and surveys over a two year period. Systems thinking concepts were applied to better understand the challenges for faculty using Project-Based Learning pedagogy as compared to more traditional teaching methods. Factors such as instructor and student fatigue, motivation, quality of work and enthusiasm were explored to better understand how to provide faculty with effective support and resources when using Project-Based Learning pedagogy as the main teaching method. This study provides value by presenting generalizable, foundational knowledge by offering suggestions for practical solutions to assure student and teacher engagement in Project-Based Learning courses.Keywords: continuous improvement, project-based learning, systems thinking, teacher engagement
Procedia PDF Downloads 1225657 'Enjoying the Czech Traditions with All Sences!': Tourism Product Promotion
Authors: Tomas Seidl
Abstract:
'Enjoy the Czech traditions with all sences!' is the main communication headline of one of the major current marketing project representing the intangible cultural heritage of the Czech Republic to its visitors. The project CZ.1.06/4.1.00/12.08915 and CZ.1.06/4.1.00/12.08916 which is solved in the period 2013-2015 is co-financed form the EU financial sources from the Integrated Operational Programme. The primary goal of the project was to analyze the dislocation and potential of the intangible cultural heritage in the Czech Republic. Further goal was to prepare a useful regionalization. An as solution based on the outcomes the creative and media strategy was created and prepared. The processor – CzechTourism expect the following web and mobile application development and successful marketing campaign in 2015.Keywords: traditions, intangible cultural heritage, Czech Republic, CzechTourism, digital performance
Procedia PDF Downloads 3715656 Introducing Standardized Nursing Language in Reporting Nursing Care in Resource-Limited Care Environments: An Exploratory Study
Authors: Naomi Mutea, Jossete Jones
Abstract:
The project aimed at exploring the views and perceptions of nurse leaders and educators regarding use of International Classification for Nursing Practice (ICNP) in an informal approach which involved face to face discussions, after which a decision would be made on whether to proceed and propose introduction of ICNP project in Kenya as a pilot project which would mean all nurses would use a standard approach to reporting and documenting nursing care. In addition the project was to determine the best approaches/methods that can be used to introduce ICNP in the Kenyan nursing education and practice environment using the findings of the pilot project. Further four cardex reports were reviewed to establish if nurses on the bedside used a standardized language in documenting and reporting care processes. The cardex reports showed that nurses do not use ICNP or any other standardized language. The results of the discussions revealed that this would be a challenge due to several challenges experienced in conducting nursing research in resource-limited environments. The following questions were asked during the informal discussions with the educators/leaders: •What is currently being taught in terms of standardized nursing language? •Are you familiar with ICNP? •Do you view it advantageous to have a standardized language? •What is the greatest need at the moment in terms of curriculum development for BSN regarding use of standardized nursing language? •If you had a wish to change something in your curriculum, what would that be?Keywords: nursing, standardized language, ICNP, resource-limited care environments
Procedia PDF Downloads 4185655 Managing Organizational Change for a Transformation Project: The Billing and Customer Relationship Management Journey
Authors: Sharifah I. N. A. Syed Azmi, Nazarina Mohd Nasir
Abstract:
The Billing & Customer Relationship Management (BCRM) project is an important enabler towards realizing customer experience transformation. It involves technological shifts for future scalability, revision of multiple business processes and adoption of change by the users and impacted employees. This massive transition, if not managed properly, may result in the decline of business performance due to productivity drop. Organizational change management is an essential element in BCRM project implementation to ensure the system is well understood and embraced by all stakeholders. In order to move impacted employees from unaware state or denial mode to full-acceptance mindset and committing themselves in using the new system, their involvement in the whole change process starting from the initial stage is imperative. Through the BCRM Change Management Plan, a holistic approach was taken whereby the strategy and program for five key components namely executive sponsorship, continuous communication, process change readiness, organizational readiness and individual readiness were all carefully established. Roles of the project sponsor, change agents, change ambassadors and community of practice (CoP) were clearly defined in gaining high commitment and support across the entire organization. Continuous communication and engagement initiatives throughout project implementation have been carried out to reach all stakeholders. The business readiness was constantly monitored and assessed including effectiveness of end-user training, thorough review of process documentation and completion of roles realignment exercise.Keywords: BCRM, change management, organizational change, transformation project
Procedia PDF Downloads 1415654 Awareness and Recognition: A Legitimate-Geographic Model for Analyzing the Determinants of Corporate Perceptions of Climate Change Risk
Authors: Seyedmohammad Mousavian, Hanlu Fan, Quingliang Tang
Abstract:
Climate change is emerging as a severe threat to our society, so businesses are expected to take actions to mitigate carbon emissions. However, the actions to be taken depend on managers’ perceptions of climate change risks. Yet, there is scant research on this issue, and understanding of the determinants of corporate perceptions of climate change is extremely limited. The purpose of this study is to close this gap by examining the relationship between perceptions of climate risk and firm-level and country-level factors. In this study, climate change risk captures physical, regulatory, and other risks, and we use data from European companies that participated in CDP from 2010 to 2017. This study reveals those perceptions of climate change risk are significantly positively associated with the environmental, social, and governance score, firm size, and membership in a carbon-intensive sector. In addition, we find that managers in firms operating in a geographic area that is sensitive to the consequences of global warming are more likely to perceive and formally recognize carbon-related risks in their CDP reports.Keywords: carbon actions, CDP, climate change risk, risk perception
Procedia PDF Downloads 2935653 The Mineral and Petroleum Sectors of Papua New Guinea: An Overview
Authors: James Wapyer, Simon A. Kawagle
Abstract:
The current downturn in the metal and oil prices has significantly affected the mineral and petroleum sectors of Papua New Guinea. The sectors have not grown substantially in the last three years compared to previous years. Resources of several projects have not been proved up as well as feasibility studies not undertaken on advanced projects. In the 2012-2015 periods, however, development licences for four projects have been granted - the Solwara-1 project in the Manus Basin, the Woodlark project, the Crater Mountains project and the Stanley gas-condensate project. There has been some progress on three advanced projects – Frieda River copper-gold porphyry, Mount Kare gold, and the Wafi-Golpu projects. The oilfields are small by world standard but have been high rates of production. The developments of liquefied natural gas projects are progressing well and the first LNG project with ExxonMobil and partners shipped its first cargo in May 2014, the second with Total and partners involving Elk-Antelope gas-condensate fields is in its development stage, and the third with Horizon Oil and partners involving gas fields in the western Papuan basin is in the planning stage. Significantly, in the years 2012-2015, the country has exported liquefied natural gas, nickel, cobalt and chromium, and has granted exploration licences for iron-sands and coal measures for the first time.Keywords: exploration, mineral, Papua New Guinea, petroleum
Procedia PDF Downloads 2725652 The Advancement of Environmental Impact Assessment for 5th Transmission Natural Gas Pipeline Project in Thailand
Authors: Penrug Pengsombut, Worawut Hamarn, Teerawuth Suwannasri, Kittiphong Songrukkiat, Kanatip Ratanachoo
Abstract:
PTT Public Company Limited or simply PTT has played an important role in strengthening national energy security of the Kingdom of Thailand by transporting natural gas to customers in power, industrial and commercial sectors since 1981. PTT has been constructing and operating natural gas pipeline system of over 4,500-km network length both onshore and offshore laid through different area classifications i.e., marine, forest, agriculture, rural, urban, and city areas. During project development phase, an Environmental Impact Assessment (EIA) is conducted and submitted to the Office of Natural Resources and Environmental Policy and Planning (ONEP) for approval before project construction commencement. Knowledge and experiences gained and revealed from EIA in the past projects definitely are developed to further advance EIA study process for newly 5th Transmission Natural Gas Pipeline Project (5TP) with approximately 415 kilometers length. The preferred pipeline route is selected and justified by SMARTi map, an advance digital one-map platform with consists of multiple layers geographic and environmental information. Sensitive area impact focus (SAIF) is a practicable impact assessment methodology which appropriate for a particular long distance infrastructure project such as 5TP. An environmental modeling simulation is adopted into SAIF methodology for impact quantified in all sensitive areas whereas other area along pipeline right-of-ways is typically assessed as an impact representative. Resulting time and cost deduction is beneficial to project for early start.Keywords: environmental impact assessment, EIA, natural gas pipeline, sensitive area impact focus, SAIF
Procedia PDF Downloads 4095651 Investigating the Application of Social Sustainability: A Case Study in the Egyptian Retailing Sector
Authors: Lobna Hafez, Eman Elakkad
Abstract:
Sustainability is no longer a choice for firms. To achieve sustainable supply chain, all three dimensions of sustainability should be considered. Unlike the economic and environmental aspects, social sustainability has been rarely given attention. The problem surrounding social sustainability and employees’ welfare in Egypt is complex and remains unsolved. The aim of this study is to qualitatively assess the current level of application of social sustainability in the retailing sector in Egypt through using the social sustainability indicators identified in the literature. The purpose of this investigation is to gain knowledge about the complexity of the system involved. A case study is conducted on one of the largest retailers in Egypt. Data were collected through semi-structured interviews with managers and employees to determine the level of application and identify the major obstacles affecting the social sustainability in the retailing context. The work developed gives insights about the details and complexities of the application of social sustainability in developing countries, from the retailing perspective. The outcomes of this study will help managers to understand the enablers of social sustainability and will direct them to methods of sound implementation.Keywords: developing countries, Egyptian retailing sector, sustainability, social sustainability
Procedia PDF Downloads 1405650 A Case Study in Using the Can-Sized Satellite Platforms for Interdisciplinary Problem-Based Learning in Aeronautical and Electronic Engineering
Authors: Michael Johnson, Vincenzo Oliveri
Abstract:
This work considers an interdisciplinary Problem-Based Learning (PBL) project developed by lecturers from the Aeronautical and Electronic and Computer Engineering departments at the University of Limerick. This “CANSAT” project utilises the CanSat can-sized satellite platform in order to allow students from aeronautical and electronic engineering to engage in a mixed format (online/face-to-face), interdisciplinary PBL assignment using a real-world platform and application. The project introduces students to the design, development, and construction of the CanSat system over the course of a single semester, enabling student(s) to apply their aeronautical and technical skills/capabilities to the realisation of a working CanSat system. In this case study, the CanSat kits are used to pivot the real-world, discipline-relevant PBL goal of designing, building, and testing the CanSat system with payload(s) from a traditional module-based setting to an online PBL setting. Feedback, impressions, benefits, and challenges identified through the semester are presented. Students found the project to be interesting and rewarding, with the interdisciplinary nature of the project appealing to them. Challenges and difficulties encountered are also addressed, with solutions developed between the students and facilitators to overcoming these discussed.Keywords: problem-based learning, interdisciplinary, engineering, CanSATs
Procedia PDF Downloads 1295649 Encouraging Skills and Entrepreneurial Spirit to Improve Employability of Young Artists
Authors: Olga Lasaga, Carmen Parra
Abstract:
Within the EU 'New Skills for New Jobs' initiative, the art and music sector is considered one of the most vulnerable. Its graduates are faced with the threat of the dole or of not finding work in the sector in which they trained. In this regard, an increasing number of students are graduating every year from European Conservatories and Fine Arts Centres, while the number of job opportunities in this sector has stagnated or decreased. Moreover, the traditional teaching of these institutes does not favour the acquisition of basic skills, such as team building, entrepreneurship, marketing, website design and the design of events, which are among the most important facets of project management and are precisely those aspects that are often most related to the improvement of employability in the art world. To remedy this situation, the results of the European Erasmus+ OMEGA project (Opening More Employment Gates for Art and Music Students) are presented. The OMEGA project aims to increase the employability of art and music students by equipping them with additional skills needed for the search for work. As a result of this project, a manual has been created, a pilot course has been designed and taught, and a comparative study has been conducted on the state of play of the participating countries.Keywords: artists, employability, entrepreneurship, musicians, skills
Procedia PDF Downloads 2455648 MEET (Maximise the Erasmus Experience Together): Gains, Challenges and Proposals
Authors: Susana Olmos, Catherine Spencer
Abstract:
Every year our School in DIT (Dublin Institute of Technology) hosts approximately 80 Erasmus students from partner universities across Europe. Our own students are required to spend a compulsory 3rd year abroad on study and/or work placements. This is an extremely rewarding experience for all of the students, however, it can also be a challenging one. With this in mind, we started a project which aimed to make this transition as easy and productive as possible. The project, which is called MEET: Maximise the Erasmus Experience Together, focuses on the students’ own active engagement in learning and preparation – outside of the classroom –and their own self-directed pursuit of opportunities to develop their confidence and preparedness, which would work as an important foundation for the transformative learning that study abroad implies. We focussed on creating more structured opportunities where Erasmus students from our partner universities (currently studying at DIT) and our second-year students could interact and learn from each other, and in so doing improve both their language and intercultural skills. Our experience so far has been quite positive and we have seen how students taking part in this project have developed as autonomous learners as well as enhanced both their linguistic and intercultural knowledge. As the linguistic element of our project was one of our main priorities, we asked the students to keep a reflective diary on the activities that were organised by the group in the TL. Also, we use questionnaires as well as personal interviews to assess their development. However, there are challenges and proposals we would make to bring this project forward for the near future.Keywords: erasmus, intercultural competence, linguistic competence, extra curriculum activities
Procedia PDF Downloads 3785647 Talent Management through Integration of Talent Value Chain and Human Capital Analytics Approaches
Authors: Wuttigrai Ngamsirijit
Abstract:
Talent management in today’s modern organizations has become data-driven due to a demand for objective human resource decision making and development of analytics technologies. HR managers have been faced with some obstacles in exploiting data and information to obtain their effective talent management decisions. These include process-based data and records; insufficient human capital-related measures and metrics; lack of capabilities in data modeling in strategic manners; and, time consuming to add up numbers and make decisions. This paper proposes a framework of talent management through integration of talent value chain and human capital analytics approaches. It encompasses key data, measures, and metrics regarding strategic talent management decisions along the organizational and talent value chain. Moreover, specific predictive and prescriptive models incorporating these data and information are recommended to help managers in understanding the state of talent, gaps in managing talent and the organization, and the ways to develop optimized talent strategies.Keywords: decision making, human capital analytics, talent management, talent value chain
Procedia PDF Downloads 1885646 Interface between Personal Values and Social Entrepreneurship in Social Projects That Develop Sports Practice
Authors: Leticia Lengler, Jefferson Oliveira, Vania Estivalete, Jordana Marques Kneipp
Abstract:
The context of social, economic and environmental transformations has driven innumerable changes in the organizational environment, influencing the social interactions that occur in this scenario. In this sense, social entrepreneurship emerges as a unique opportunity to challenge, question, rethink certain concepts and traditional theories widely discussed in relation to entrepreneurship. Therefore, the interest in studying personal values has been based on the idea that they might be predictors of the behavior of individuals. As an attempt to relate personal values with the characteristics of social entrepreneurs, this study aims to investigate the salient values and the social entrepreneurship perceptions that occur in two social projects responsible for developing sports skills among the students. For purposes of analysis, it is intended to consider: (i) a description of both Social Projects and their respective institutions, considering their history and relevance in the context; (ii) analysis of the personal values of the idealizers and teachers responsible for the projects, (iii) identification of the characteristics of social entrepreneurship manifested in the two projects, and (iv) discussion of similarities and disparities of the categories identified among the participants of the projects. Therefore, this study will carry a qualitative analysis from the interviews with 10 participants of each social project (named Projeto Remar/ASENA and Projeto Mãos Dadas/JUDÔ SANTA MARIA): 2 projects coordinators, 2 students, 2 parents of students, 2 physical education internships and 2 businessmen who stablished a partnership with each project. The data collection will be done through semi-structured interviews that are going to last around 30 minutes each, being recorded, transcribed and later analyzed, through the categorical analysis. The option for categorical analysis is supported by the fact that it is the best alternative when one wants to study values, opinions, attitudes and beliefs, through qualitative ones. In the present research, the pre-analysis phase consisted of an organization of the material collected during the research with Remar and Mãos Dadas Project, and a dynamic reading of this material, seeking to identify the characteristics of social entrepreneurship and values addressed in the study. In the analytical description phase, a more in-depth analysis of the material collected in the research will be carried out. The third phase, referred to as referential interpretation or treatment of results obtained will allow to verify the homogeneity and the heterogeneity among the participants' perceptions of the projects. Some preliminary results coming from the first interviews revealed the projects are guided by values such as cooperation, respect, well-being and nature preservation. These values are linked to the social entrepreneurship perception of the projects managers, who established their activities in behalf of the local community.Keywords: personal values, social entrepreneurship, social projects, sports participants
Procedia PDF Downloads 3655645 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects
Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang
Abstract:
Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict
Procedia PDF Downloads 2185644 HEXAFLY-INT Project: Design of a High Speed Flight Experiment
Authors: S. Di Benedetto, M. P. Di Donato, A. Rispoli, S. Cardone, J. Riehmer, J. Steelant, L. Vecchione
Abstract:
Thanks to a coordinated funding by the European Space Agency (ESA) and the European Commission (EC) within the 7th framework program, the High-Speed Experimental Fly Vehicles – International (HEXAFLY-INT) project is aimed at the flight validation of hypersonics technologies enabling future trans-atmospheric flights. The project, which is currently involving partners from Europe, Russian Federation and Australia operating under ESA/ESTEC coordination, will achieve the goal of designing, manufacturing, assembling and flight testing an unpowered high speed vehicle in a glider configuration by 2018. The main technical challenges of the project are specifically related to the design of the vehicle gliding configuration and to the complexity of integrating breakthrough technologies with standard aeronautical technologies, e.g. high temperature protection system and airframe cold structures. Also, the sonic boom impact, which is one of the environmental challenges of the high speed flight, will be assessed. This paper provides a comprehensive and detailed update on all the current projects activities carried out to date on both the vehicle and mission design.Keywords: design, flight testing, HEXAFLY-INT, hypersonics
Procedia PDF Downloads 4695643 Earnings Management and Tone Management: Evidence from the UK
Authors: Salah Kayed Kayed, Jessica Hong Yang
Abstract:
This study investigates, whether earnings management in the audited financial statements is associated with tone management in the narrative sections of the annual report in the UK. Earnings management and narrative disclosure are communication strategies used from managers to communicate with investors or other users. Because earnings management and narrative disclosure stem from managers, they can exploit this by doing manipulation in their earnings, and simultaneously disclosing qualitative text (narrative information) in their reports as a tone of words, which will affect users’ perception, and hence users will be misinformed. The association between earnings and tone management can be explained by the self-serving, through cognitive reference points, theory. The sample period lasts from 2010 to 2015, and the sample comprises all non-financial firms that consider under FTSE 350 in any year during the sample period. A list of words from previous research is used to measure the tone in the narrative sections of the annual report. Because this study focuses on the managerial strategic choice and the subjective issues that come from management, it uses the abnormal tone to capture the managerial discretion on tone, and a number of different discretionary accruals proxies to measure earnings management, where accruals management is considered as a manipulation tool from managers to change the users' perception. This research is motivated to fulfil the literature gap by examining the association between earnings and tone management. Moreover, if firms that apply earnings management use tone management to mislead investors, it is beneficial for investors, policy makers, standard setters, or other users to know whether there is an association between earnings management and tone management. Clearly, we believe that this study is fundamental in the accounting context, where it evaluates the communication strategies that are used in firms' financial reports. Consistent with prior research, it is expected that tone management is positively associated with earnings management. This means that firms that use earnings management have incentives to manipulate in their narrative disclosure through tone of words, to reflect a good perception for users, which will conceal the earnings management techniques used in their reporting.Keywords: earnings management, FTSE 350, narrative disclosure, tone management
Procedia PDF Downloads 2845642 Corporate Codes of Ethics and Earnings Discretion: International Evidence
Authors: Chu Chen, Giorgio Gotti, Tony Kang, Michael Wolfe
Abstract:
This study examines the role of codes of ethics in reducing the extent to which managers’ act opportunistically in reporting earnings. Corporate codes of ethics, by clarifying the boundaries of ethical corporate behaviors and making relevant social norms more salient, have the potential to deter managers from engaging in opportunistic financial reporting practices. In a sample of international companies, we find that the quality of corporate codes of ethics is associated with higher earnings quality, i.e., lower discretionary accruals. Our results are confirmed for a subsample of firms more likely to be engaging in opportunistic reporting behavior, i.e., firms that just meet or beat analysts’ forecasts. Further, codes of ethics play a greater role in reducing earnings management for firms in countries with weaker investor protection mechanisms. Our results suggest that corporate codes of ethics can be a viable alternative to country-level investor protection mechanisms in curbing aggressive reporting behaviors.Keywords: corporate ethics policy, code of ethics, business ethics, earnings discretion, accruals
Procedia PDF Downloads 2885641 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase
Authors: Samart Homthong, Wutthipong Moungnoi
Abstract:
Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.Keywords: critical success factors, procurement phase, project life cycle, project performance
Procedia PDF Downloads 1835640 Assessing Effectiveness of Manager-Subordinate Relationships at Workplace
Authors: Anant Sagar, Manisha Rana, Surabhi Singhal
Abstract:
This study was aimed at analysing the effectiveness of manager-subordinate relationship and the different factors contributing to its effectiveness in a mid-sized IT organization. To define effectiveness in context of a manager-subordinate relationship, a model was framed which analyses personal and professional need fulfilment of subordinates. On basis of this need satisfaction based effectiveness model, relationships are categorized into four types anchored on two scales; Personal Need Satisfaction and Professional Need Satisfaction. These spatial effectiveness scores of a managerial relationship are further mapped with the relationship style of the manager to identify relationship styles which are associated with different effectiveness levels. The relationship style is analysed by using Impact Message Inventory-Circumplex (IMI-C). The results show that managerial relationship’s effectiveness is contingent on manager’s affiliation scores, subordinate’s previous work experience and the ability of managers to influence the personal and professional needs of employees through organizational policies. The findings reflect that effectiveness of manager-subordinate relationship increased in a friendly workplace where managers were adequately empowered to acknowledge employee needs.Keywords: relationship effectiveness, need fulfilment, managerial style, impact message inventory-circumplex
Procedia PDF Downloads 3815639 Project Paulina: A Human-Machine Interface for Individuals with Limited Mobility and Conclusions from Research and Development
Authors: Radoslaw Nagay
Abstract:
The Paulina Project aims to address the challenges faced by immobilized individuals, such as those with multiple sclerosis, muscle dystrophy, or spinal cord injuries, by developing a flexible hardware and software solution. This paper presents the research and development efforts of our team, which commenced in 2019 and is now in its final stage. Recognizing the diverse needs and limitations of individuals with limited mobility, we conducted in-depth testing with a group of 30 participants. The insights gained from these tests led to the complete redesign of the system. Our presentation covers the initial project ideas, observations from in-situ tests, and the newly developed system that is currently under construction. Moreover, in response to the financial constraints faced by many disabled individuals, we propose an affordable business model for the future commercialization of our invention. Through the Paulina Project, we strive to empower immobilized individuals, providing them with greater independence and improved quality of life.Keywords: UI, human-machine interface, social inclusion, multiple sclerosis, muscular dystrophy, spinal cord injury, quadriplegic
Procedia PDF Downloads 725638 A Prediction of Electrical Cost for High-Rise Building Construction
Authors: Picha Sriprachan
Abstract:
The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.Keywords: high-rise building construction, electrical cost, construction phase, architectural phase
Procedia PDF Downloads 391