Search results for: project radio-television
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4874

Search results for: project radio-television

4424 Project Based Learning in Language Lab: An Analysis in ESP Learning Context

Authors: S. Priya

Abstract:

A project based learning assignment in English for Specific Purposes (ESP) context based on Communicative English as prescribed in the university syllabus for engineering students and its learning outcome from ESP context is the focus of analysis through this paper. The task based on Project Based Learning (PBL) was conducted in the digital language lab which had audio visual aids to support the team presentation. The total strength of 48 students of Mechanical Branch were divided into 6 groups, each consisting of 8 students. The group members were selected on random numbering basis. They were given a group task to represent a power point presentation on a topic related to their core branch. They had to discuss the issue and choose their topic and represent in a given format. It provided the individual role of each member in the presentation. A brief overview of the project and the outcome of its technical aspects were also had to be included. Each group had to highlight the contributions of that innovative technology through their presentation. The power point should be provided in a CD format. The variations in the choice of subjects, their usage of digital technologies, co-ordination for competition, learning experience of first time stage presentation, challenges of team cohesiveness were some criteria observed as their learning experience. For many other students undergoing the stages of planning, preparation and practice as steps for presentation had been the learning outcomes as given through their feedback form. The evaluation pattern is distributed for individual contribution and group effectiveness which promotes quality of presentation. The evaluated skills are communication skills, group cohesiveness, and audience response, quality of technicality and usage of technical terms. This paper thus analyses how project based learning improves the communication, life skills and technical skills in English for Specific learning context through PBL.

Keywords: language lab, ESP context, communicative skills, life skills

Procedia PDF Downloads 221
4423 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site

Authors: Fatmah Almathkour

Abstract:

Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.

Keywords: construction supply chain, inventory control supply chain, transshipment

Procedia PDF Downloads 102
4422 Incentivize Contracting Partners of Public Projects

Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee

Abstract:

Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.

Keywords: incentives, public accountability, project effectiveness, public opinions

Procedia PDF Downloads 37
4421 An Active Solar Energy System to Supply Heating Demands of the Teaching Staff Dormitory of Islamic Azad University Ramhormoz Branch

Authors: M. Talebzadegan, S. Bina, I. Riazi

Abstract:

The purpose of this paper is to present an active solar energy system to supply heating demands of the teaching staff dormitory of the Islamic Azad University of Ramhormoz. The design takes into account the solar radiations and climate data of Ramhormoz town and is based on the daily warm water consumption for health demands of 450 residents of the dormitory, which is equal to 27000 lit of 50-C° water, and building heating requirements with an area of 3500 m² well-protected by heatproof materials. First, heating demands of the building were calculated, then a hybrid system made up of solar and fossil energies was developed and finally, the design was economically evaluated. Since there is only roof space for using 110 flat solar water heaters, the calculations were made to hybridize solar water heating system with heat pumping system in which solar energy contributes 67% of the heat generated. According to calculations, the net present value “N.P.V.” of revenue stream exceeds “N.P.V.” of cash paid off in this project over three years, which makes economically quite promising. The return of investment and payback period of the project is 4 years. Also, the internal rate of return (IRR) of the project was 25%, which exceeds bank rate of interest in Iran and emphasizes the desirability of the project.

Keywords: Solar energy, Heat Demand, Renewable , Pollution

Procedia PDF Downloads 227
4420 Critical Path Segments Method for Scheduling Technique

Authors: Sherif M. Hafez, Remon F. Aziz, May S. A. Elalim

Abstract:

Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times which lead to greater efficiency in planning and control of projects. CPM was useful for scheduling construction projects, but researchers had highlighted a number of serious drawbacks that limit its use as a decision support tool and lacks the ability to clearly record and represent detailed information. This paper discusses the drawbacks of CPM as a scheduling technique and presents a modified critical path method (CPM) model which is called critical path segments (CPS). The CPS scheduling mechanism addresses the problems of CPM in three ways: decomposing the activity duration of separated but connected time segments; all relationships among activities are converted into finish–to–start relationship; and analysis and calculations are made with forward path. Sample cases are included to illustrate the shortages in CPM, CPS full analysis and calculations are explained in details, and how schedules can be handled better with the CPS technique.

Keywords: construction management, scheduling, critical path method, critical path segments, forward pass, float, project control

Procedia PDF Downloads 334
4419 Information Technology (IT) Outsourcing and the Challenges of Implementation in Financial Industries: A Case Study of Guarantee Trust Assurance PLC

Authors: Salim Ahmad, Ahamed Sani Kazaure, Haruna Musa

Abstract:

Outsourcing had been the contractual relationship in which the responsibility for a function or task is handed over to an outside firm for a fixed period of time which is not the same as contracting where a specific one-off task is allocated to an external business; therefore in information technology a specialist area such as maintenance of web servers is controlled by an outside firm or if the department is not a critical factor the whole IT section may be outsourced. Organisation contracts is frequently a major area in successful outsourcing relationship, whereby the contracts specify the right, liability and expectation of the vendor and contracts are mostly of high value and last for very long. Therefore, in this research one particular project that is been outsourced for the financial industry (Guarantee Trust Assurance PlC) is been discussed along with the approach used and the various problems encountered, though Outsourcing is not necessarily a perfect and easy way out for business. It is extremely critical for a company to look at all the aspect of outsourcing before deciding to use it as an instrument for development. Moreover, critical analysis of the management issues encountered while implementing the outsourcing project have been fully discussed in the paper.

Keywords: outsourcing, techniques used in outsourcing, challenges of outsourcing implementation, management issues during implementation of outsourcing project

Procedia PDF Downloads 353
4418 Engineering Management and Practice in Nigeria

Authors: Harold Jideofor

Abstract:

The application of Project Management (PM) tools and techniques in the public sector is gradually becoming an important issue in developing economies, especially in a country like Nigeria where projects of different size and structures are undertaken. The paper examined the application of the project management practice in the public sector in Nigeria. The PM lifecycles, tools, and techniques were presented. The study was carried out in Lagos because of its metropolitan nature and rapidly growing economy. Twenty-three copies of questionnaire were administered to 23 public institutions in Lagos to generate primary data. The descriptive analysis techniques using percentages and table presentations coupled with the coefficient of correlation were used for data analysis. The study revealed that application of PM tools and techniques is an essential management approach that tends to achieve specified objectives within specific time and budget limits through the optimum use of resources. Furthermore, the study noted that there is a lack of in-depth knowledge of PM tools and techniques in public sector institutions sampled, also a high cost of the application was also observed by the respondents. The study recommended among others that PM tools and techniques should be applied gradually especially in old government institutions where resistance to change is perceived to be high.

Keywords: project management, public sector, practice, Nigeria

Procedia PDF Downloads 304
4417 Black-Brown and Yellow-Brown-Red Skin Pigmentation Elements are Shared in Common: Using Art and Science for Multicultural Education

Authors: Mary Kay Bacallao

Abstract:

New research on the human genome has revealed secrets to the variation in skin pigmentation found in all human populations. Application of this research to multicultural education has a profound effect on students from all backgrounds. This paper identifies the four locations in the human genome that code for variation in skin pigmentation worldwide. The research makes this new knowledge accessible to students of all ages as they participate in an art project that brings these scientific multicultural concepts to life. Students participate in the application of breakthrough scientific principles through hands-on art activities where they simulate the work of the DNA coding to create their own skin tone using the colors expressed to varying degrees in every people group. As students create their own artwork handprint from the pallet of colors, they realize that each color on the pallet is essential to creating every tone of skin. This research project serves to bring people together and appreciate the variety and diversity in skin tones. As students explore the variations, they create pigmentation with the use of the eumelanins, which are the black-brown sources of pigmentation, and the pheomelanins, which are the yellow-reddish-brown sources of pigmentation. The research project dispels myths about skin tones that have divided people in the past. As a group project, this research leads to greater appreciation and understanding of the diverse family groups.

Keywords: diversity, multicultural, skin pigmentation, eumelanins, pheomelanins, handprint, artwork, science, genome, human

Procedia PDF Downloads 42
4416 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 229
4415 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework

Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise

Abstract:

The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.

Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D

Procedia PDF Downloads 145
4414 Dataset Quality Index:Development of Composite Indicator Based on Standard Data Quality Indicators

Authors: Sakda Loetpiparwanich, Preecha Vichitthamaros

Abstract:

Nowadays, poor data quality is considered one of the majority costs for a data project. The data project with data quality awareness almost as much time to data quality processes while data project without data quality awareness negatively impacts financial resources, efficiency, productivity, and credibility. One of the processes that take a long time is defining the expectations and measurements of data quality because the expectation is different up to the purpose of each data project. Especially, big data project that maybe involves with many datasets and stakeholders, that take a long time to discuss and define quality expectations and measurements. Therefore, this study aimed at developing meaningful indicators to describe overall data quality for each dataset to quick comparison and priority. The objectives of this study were to: (1) Develop a practical data quality indicators and measurements, (2) Develop data quality dimensions based on statistical characteristics and (3) Develop Composite Indicator that can describe overall data quality for each dataset. The sample consisted of more than 500 datasets from public sources obtained by random sampling. After datasets were collected, there are five steps to develop the Dataset Quality Index (SDQI). First, we define standard data quality expectations. Second, we find any indicators that can measure directly to data within datasets. Thirdly, each indicator aggregates to dimension using factor analysis. Next, the indicators and dimensions were weighted by an effort for data preparing process and usability. Finally, the dimensions aggregate to Composite Indicator. The results of these analyses showed that: (1) The developed useful indicators and measurements contained ten indicators. (2) the developed data quality dimension based on statistical characteristics, we found that ten indicators can be reduced to 4 dimensions. (3) The developed Composite Indicator, we found that the SDQI can describe overall datasets quality of each dataset and can separate into 3 Level as Good Quality, Acceptable Quality, and Poor Quality. The conclusion, the SDQI provide an overall description of data quality within datasets and meaningful composition. We can use SQDI to assess for all data in the data project, effort estimation, and priority. The SDQI also work well with Agile Method by using SDQI to assessment in the first sprint. After passing the initial evaluation, we can add more specific data quality indicators into the next sprint.

Keywords: data quality, dataset quality, data quality management, composite indicator, factor analysis, principal component analysis

Procedia PDF Downloads 113
4413 An Exploration of Architecture Design Methods in Urban Fringe Belt Based on Typo-Morphological Research- A Case of Expansion Project of the Second Middle School in Xuancheng, China

Authors: Dong Yinan, Zhou Zijie

Abstract:

Urban fringe belt is an important part of urban morphology research. Different from the relatively fixed central district of city, the position of fringe belt is changing. In the process of urban expansion, the original fringe belt is likely to be merged by the new-built city, even become new city public center. During the change, we are facing the dialectic between restoring the organicity of old urban form and creating new urban image. There are lots of relevant research in urban scale, but when we focus on building scale, rare design method can be proposed, thus some new individual building cannot match the overall urban planning intent. The expansion project of the second middle school in Xuancheng is facing this situation. The existing campus is located in the south fringe belt of Xuancheng, Anhui province, China, adjacent to farmland and ponds. While based on the Xucheng urban planning, the farmland and ponds will be transformed into a big lake, around which new public center will be built; the expansion of the school becomes an important part of the boundary of the new public center. Therefore, the expansion project faces challenges from both urban and building scale. In urban scale, we analyze and summarize the fringe belt characters through the reading of existing and future urban organism, in order to determine the form of the expansion project. Meanwhile, in building scale, we study on different types of school buildings and select appropriate type which can satisfy to both urban form and school function. This research attempts to investigate design methods based on an under construction project in Xuancheng, a historic city in southeast China. It also aims to bridge the gap from urban design to individual building design through the typo-morphological research.

Keywords: design methods, urban fringe belt, typo-morphological research, middle school

Procedia PDF Downloads 469
4412 Managing Inter-Organizational Innovation Project: Systematic Review of Literature

Authors: Lamin B Ceesay, Cecilia Rossignoli

Abstract:

Inter-organizational collaboration is a growing phenomenon in both research and practice. The partnership between organizations enables firms to leverage external resources, experiences, and technology that lie with other firms. This collaborative practice is a source of improved business model performance, technological advancement, and increased competitive advantage for firms. However, the competitive intents, and even diverse institutional logics of firms, make inter-firm innovation-based partnership even more complex, and its governance more challenging. The purpose of this paper is to present a systematic review of research linking the inter-organizational relationship of firms with their innovation practice and specify the different project management issues and gaps addressed in previous research. To do this, we employed a systematic review of the literature on inter-organizational innovation using two complementary scholarly databases - ScienceDirect and Web of Science (WoS). Article scoping relies on the combination of keywords based on similar terms used in the literature:(1) inter-organizational relationship, (2) business network, (3) inter-firm project, and (4) innovation network. These searches were conducted in the title, abstract, and keywords of conceptual and empirical research papers done in English. Our search covers between 2010 to 2019. We applied several exclusion criteria including Papers published outside the years under the review, papers in a language other than English, papers neither listed in WoS nor ScienceDirect and papers that are not sharply related to the inter-organizational innovation-based partnership were removed. After all relevant search criteria were applied, a final list of 84 papers constitutes the data for this review. Our review revealed an increasing evolution of inter-organizational relationship research during the period under the review. The descriptive analysis of papers according to Journal outlets finds that International Journal of Project Management (IJPM), Journal of Industrial Marketing, Journal of Business Research (JBR), etc. are the leading journal outlets for research in the inter-organizational innovation project. The review also finds that Qualitative methods and quantitative approaches respectively are the leading research methods adopted by scholars in the field. However, literature review and conceptual papers constitute the least in the field. During the content analysis of the selected papers, we read the content of each paper and found that the selected papers try to address one of the three phenomena in inter-organizational innovation research: (1) project antecedents; (2) project management and (3) project performance outcomes. We found that these categories are not mutually exclusive, but rather interdependent. This categorization also helped us to organize the fragmented literature in the field. While a significant percentage of the literature discussed project management issues, we found fewer extant literature on project antecedents and performance. As a result of this, we organized the future research agenda addressed in several papers by linking them with the under-researched themes in the field, thus providing great potential to advance future research agenda especially, in the under-researched themes in the field. Finally, our paper reveals that research on inter-organizational innovation project is generally fragmented which hinders a better understanding of the field. Thus, this paper contributes to the understanding of the field by organizing and discussing the extant literature to advance the theory and application of inter-organizational relationship.

Keywords: inter-organizational relationship, inter-firm collaboration, innovation projects, project management, systematic review

Procedia PDF Downloads 89
4411 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 238
4410 Promoting Physical Activity through Urban Active Environments: Learning from Practice and Policy Implementation in the EU Space Project

Authors: Rosina U. Ndukwe, Diane Crone, Nick Cavill

Abstract:

Active transport (i.e. walking to school, cycle to work schemes etc.) is an effective approach with multiple social and environmental benefits for transforming urban environments into active urban environments. Although walking and cycling often remain on the margins of urban planning and infrastructure, there are new approaches emerging, along with policy intervention relevant for the creation of sustainable urban active environments conductive to active travel, increasing physical activity levels of involved communities and supporting social inclusion through more active participation. SPAcE - Supporting Policy and Action for Active Environments is a 3 year Erasmus+ project that aims to integrate active transport programmes into public policy across the EU. SPAcE focuses on cities/towns with recorded low physical activity levels to support the development of active environments in 5 sites: Latvia [Tukums], Italy [Palermo], Romania [Brasov], Spain [Castilla-La Mancha] and Greece [Trikala]. The first part of the project involved a review of good practice including case studies from across the EU and project partner countries. This has resulted in the first output from the project, an evidence of good practice summary with case study examples. In the second part of the project, working groups across the 5 sites have carried out co-production to develop Urban Active Environments (UActivE) Action Plans aimed at influencing policy and practice for increasing physical activity primarily through the use of cycling and walking. Action plans are based on international evidence and guidance for healthy urban planning. Remaining project partners include Universities (Gloucestershire, Oxford, Zurich, Thessaly) and Fit for Life programme (National physical activity promotion program, Finland) who provide support and advice incorporating current evidence, healthy urban planning and mentoring. Cooperation and co-production with public health professionals, local government officers, education authorities and transport agencies has been a key approach of the project. The third stage of the project has involved training partners in the WHO HEAT tool to support the implementation of the Action Plans. Project results show how multi-agency, transnational collaboration can produce real-life Action Plans in five EU countries, based on published evidence, real-life experience, consultation and collaborative working with other organisations across the EU. Learning from the processes adopted within this project will demonstrate how public health, local government and transport agencies across the EU, can work together to create healthy environments that have the aim of facilitating active behaviour, even in times of constrained public budgets. The SPAcE project has captured both the challenges and solutions for increasing population physical activity levels, health and wellness in urban spaces and translating evidence into policy and practice ensuring innovation at policy level. Funding acknowledgment: SPAcE (www.activeenvironments.eu) is co-funded by the Sport action of the ERASMUS+ programme.

Keywords: action plans, active transport, SPAcE, UActivE urban active environments, walking and cycling

Procedia PDF Downloads 240
4409 Design and Development of a Prototype Vehicle for Shell Eco-Marathon

Authors: S. S. Dol

Abstract:

Improvement in vehicle efficiency can reduce global fossil fuels consumptions. For that sole reason, Shell Global Corporation introduces Shell Eco-marathon where student teams require to design, build and test energy-efficient vehicles. Hence, this paper will focus on design processes and the development of a fuel economic vehicle which satisfying the requirements of the competition. In this project, three components are designed and analyzed, which are the body, chassis and powertrain of the vehicle. Optimum design for each component is produced through simulation analysis and theoretical calculation in which improvement is made as the project progresses.

Keywords: energy efficient, drag force, chassis, powertrain

Procedia PDF Downloads 303
4408 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement

Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov

Abstract:

One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.

Keywords: logic, fuzzy sets, performance measurement, project analysis

Procedia PDF Downloads 351
4407 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration

Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen

Abstract:

In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.

Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate

Procedia PDF Downloads 152
4406 Engineering of E-Learning Content Creation: Case Study for African Countries

Authors: María-Dolores Afonso-Suárez, Nayra Pumar-Carreras, Juan Ruiz-Alzola

Abstract:

This research addresses the use of an e-Learning creation methodology for learning objects. Throughout the process, indicators are being gathered, to determine if it responds to the main objectives of an engineering discipline. These parameters will also indicate if it is necessary to review the creation cycle and readjust any phase. Within the project developed for this study, apart from the use of structured methods, there has been a central objective: the establishment of a learning atmosphere. A place where all the professionals involved are able to collaborate, plan, solve problems and determine guides to follow in order to develop creative and innovative solutions. It has been outlined as a blended learning program with an assessment plan that proposes face to face lessons, coaching, collaboration, multimedia and web based learning objects as well as support resources. The project has been drawn as a long term task, the pilot teaching actions designed provide the preliminary results object of study. This methodology is been used in the creation of learning content for the African countries of Senegal, Mauritania and Cape Verde. It has been developed within the framework of the MACbioIDi, an Interreg European project for the International cooperation and development. The educational area of this project is focused in the training and advice of professionals of the medicine as well as engineers in the use of applications of medical imaging technology, specifically the 3DSlicer application and the Open Anatomy Browser.

Keywords: teaching contents engineering, e-learning, blended learning, international cooperation, 3dslicer, open anatomy browser

Procedia PDF Downloads 146
4405 Using Digitally Reconstructed Radiographs from Magnetic Resonance Images to Localize Pelvic Lymph Nodes on 2D X-Ray Simulator-Based Brachytherapy Treatment Planning

Authors: Mohammad Ali Oghabian, Reza Reiazi, Esmaeel Parsai, Mehdi Aghili, Ramin Jaberi

Abstract:

In this project a new procedure has been introduced for utilizing digitally reconstructed radiograph from MRI images in Brachytherapy treatment planning. This procedure enables us to localize the tumor volume and delineate the extent of critical structures in vicinity of tumor volume. The aim of this project was to improve the accuracy of dose delivered to targets of interest in 2D treatment planning system.

Keywords: brachytherapy, cervix, digitally reconstructed radiographs, lymph node

Procedia PDF Downloads 504
4404 Mass Customization of Chemical Protective Clothing

Authors: Eugenija Strazdiene, Violeta Bytautaite, Daivute Krisciuniene

Abstract:

The object of the investigation is the suit for chemical protection, which totally covers human body together with breathing apparatus, breathing mask and helmet (JSC Ansell Protective Solutions Lithuania). The end users of such clothing are the members of rescue team – firefighters. During the presentation, the results of 3D scanning with stationary Human Solutions scanner and portable Artec Eva scanner will be compared on the basis of the efficiency of scanning procedure and scanning accuracy. Also, the possibilities to exporting scanned bodies into specialized CAD systems for suit design development and material consumption calculation will be analyzed. The necessity to understand and to implement corresponding clothing material properties during 3D visualization of garment on CAD systems will be presented. During the presentation, the outcomes of the project ‘Smart and Safe Work Wear Clothing SWW’ will be discussed. The project is carried out under the Interreg Baltic Sea Region Program as 2014-2020 European territorial cooperation objective. Thematic priority is Capacity for Innovation. The main goal of the project is to improve competitiveness and to increase business possibilities for work wear enterprises in the Baltic Sea Region. The project focuses on mass customization of products for various end users. It engages textile and clothing manufacturing technology researchers, work wear producers, end users, as well as national textile and clothing branch organizations in Finland, Lithuania, Latvia, Estonia and Poland.

Keywords: CAD systems, mass customization, 3D scanning, safe work wear

Procedia PDF Downloads 172
4403 Personnel Training of Automotive Manufacturers in Virtual Reality

Authors: Mirza Ahsan Baig, Paul Evans

Abstract:

Due to the high demand for automobiles, manufacturers have to run their production lines non-stop for long periods. At such a scale, unplanned downtime could cost up to $50 billion annually. Improper training of new hires could lead to safety issues causing unplanned downtimes. The project developed a virtual reality simulation that could train personnel for key operations on an automobile manufacturing floor, reducing the risk of unplanned downtime while eliminating any disruption (due to training) on the assembly line. An automation firm sponsored it to explore the possibilities the likes of Jaguar and BMW are yet to achieve! The project was inspired by Bentley, the only company that succeeded in simulation training scenarios within virtual space. The project aims to inspire other significant firms to do the same. It was increasing employee safety, eliminating downtimes, and improving efficiency. The developed prototype uncovered various limitations within existing simulation providers and was able to simulate state-of-the-art training scenarios. It also explored the possibility of a multiuser interface and resolved complex issues such as lack of movement space within the training area.

Keywords: virtual reality, scenario training, limited movement, multiuser

Procedia PDF Downloads 58
4402 Applying the Integrative Design Process in Architectural Firms: An Analytical Study on Egyptian Firms

Authors: Carole A. El Raheb, Hassan K. Abdel-Salam, Ingi Elcherif

Abstract:

An architect carrying the design process alone is the main reason for the deterioration of the quality of the architectural product as the complexity of the projects makes it a multi-disciplinary work; then, the Integrative Design Process (IDP) must be applied in the architectural firm especially from the early design phases to improve the product’s quality and to eliminate the ignorance of the principles of design causing the occurrence of low-grade buildings. The research explores the Integrative Design (ID) principles that fit in the architectural practice. Constraints facing this application are presented with strategies and solutions to overcome them. A survey questionnaire was conducted to collect data from a number of recognized Egyptian Architecture, Engineering and Construction (AEC) firms that explores their opinions on using the IDP. This survey emphasizes the importance of the IDP in firms and presents the reasons preventing the firms from applying the IDP. The aim here is to investigate the potentials of integrating this approach into architectural firms emphasizing the importance of this application which ensures the realization of the project’s goal and eliminates the reduction in the project’s quality.

Keywords: application, architectural firms, integrative design principles, integrative design process, the project quality

Procedia PDF Downloads 199
4401 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 131
4400 Stakeholders' Engagement Process in the OBSERVE Project

Authors: Elisa Silva, Rui Lança, Fátima Farinha, Miguel José Oliveira, Manuel Duarte Pinheiro, Cátia Miguel

Abstract:

Tourism is one of the global engines of development. With good planning and management, it can be a positive force, bringing benefits to touristic destinations around the world. However, without constrains, boundaries well established and constant survey, tourism can be very harmful and induce destination’s degradation. In the interest of the tourism sector and the community it is important to develop the destination maintaining its sustainability. The OBSERVE project is an instrument for monitoring and evaluating the sustainability of the region of Algarve. Its main priority is to provide environmental, economic, social-cultural and institutional indicators to support the decision-making process towards a sustainable growth. In the pursuit of the objectives, it is being developed a digital platform where the significant indicators will be continuously updated. It is known that the successful development of a touristic region depends from the careful planning with the commitment of central and regional government, industry, services and community stakeholders. Understand the different perspectives of stakeholders is essential to engage them in the development planning. However, actual stakeholders’ engagement process is complex and not easy to accomplish. To create a consistent system of indicators designed to monitor and evaluate the sustainability performance of a touristic region it is necessary to access the local data and the consideration of the full range of values and uncertainties. This paper presents the OBSERVE project and describes the stakeholders´ engagement process highlighting the contributions, ambitions and constraints.

Keywords: sustainable tourism, stakeholders' engagement, OBSERVE project, Algarve region

Procedia PDF Downloads 143
4399 Promoting Public Participation in the Digital Memory Project: Experience from My Peking Memory Project(MPMP)

Authors: Xiaoshuang Jia, Huiling Feng, Li Niu, Wei Hai

Abstract:

Led by Humanistic Beijing Studies Center in Renmin University of China, My Peking Memory Project(MPMP) is a long-time digital memory project under guarantee of public participation to enable the cultural and intellectual memory of Beijing to be collected, organized, preserved and promoted for discovery and research. Taking digital memory as a new way, MPMP is an important part of Peking Memory Project(PMP) which is aimed at using digital technologies to protect and (re)present the cultural heritage in Beijing. The key outcome of MPMP is the co-building of a total digital collection of knowledge assets about Beijing. Institutional memories are central to Beijing’s collection and consist of the official published documentary content of Beijing. These have already fall under the archival collection purview. The advances in information and communication technology and the knowledge form social memory theory have allowed us to collect more comprehensively beyond institutional collections. It is now possible to engage citizens on a large scale to collect private memories through crowdsourcing in digital formats. Private memories go beyond official published content to include personal narratives, some of which are just in people’s minds until they are captured by MPMP. One aim of MPMP is to engage individuals, communities, groups or institutions who have formed memories and content about Beijing, and would like to contribute them. The project hopes to build a culture of remembering and it believes ‘Every Memory Matters’. Digital memory contribution was achieved through the development of the MPMP. In reducing barriers to digital contribution and promoting high public Participation, MPMP has taken explored the harvesting of transcribe service for digital ingestion, mobile platform and some off-line activities like holding social forum. MPMP has also cooperated with the ‘Implementation Plan of Support Plan for Growth of Talents in Renmin University of China’ to get manpower and intellectual support. After six months of operation, now MPMP have more than 2000 memories added and 7 Special Memory Collections now online. The work of MPMP has ultimately helped to highlight the important role in safeguarding the documentary heritage and intellectual memory of Beijing.

Keywords: digital memory, public participation, MPMP, cultural heritage, collection

Procedia PDF Downloads 145
4398 Understanding Team Member Autonomy and Team Collaboration: A Qualitative Study

Authors: Ayşen Bakioğlu, Gökçen Seyra Çakır

Abstract:

This study aims to explore how research assistants who work in project teams experience team member autonomy and how they reconcile team member autonomy with team collaboration. The study utilizes snowball sampling. 20 research assistants who work the faculties of education in Marmara University and Yıldız Technical University have been interviewed. The analysis of data involves a content analysis MAXQDAPlus 11 which is a qualitative data analysis software is used as the data analysis tool. According to the findings of this study, emerging themes include team norm formation, team coordination management, the role of individual tasks in team collaboration, leadership distribution. According to the findings, interviewees experience team norm formation process in terms of processes, which pertain to task fulfillment, and processes, which pertain to the regulation of team dynamics. Team norm formation process instills a sense of responsibility amongst individual team members. Apart from that, the interviewees’ responses indicate that the realization of the obligation to work in a team contributes to the team norm formation process. The participants indicate that individual expectations are taken into consideration during the coordination of the team. The supervisor of the project team also has a crucial role in maintaining team collaboration. Coordination problems arise when an individual team member does not relate his/her academic field with the research topic of the project team. The findings indicate that the leadership distribution in the project teams involves two leadership processes: leadership distribution which is based on the processes that focus on individual team members and leadership distribution which is based on the processes that focus on team interaction. Apart from that, individual tasks serve as a facilitator of collaboration amongst team members. Interviewees also indicate that individual tasks also facilitate the expression of individuality.

Keywords: project teams in higher education, research assistant teams, team collaboration, team member autonomy

Procedia PDF Downloads 335
4397 Youth Health Promotion Project for Indigenous People in Canada: Together against Bullying and Cyber-Dependence

Authors: Mohamed El Fares Djellatou, Fracoise Filion

Abstract:

The Ashukin program that means bridge in Naskapi or Atikamekw language, has been designed to offer a partnership between nursing students and an indigenous community. The students design a health promotion project tailored to the needs of the community. The issues of intimidation in primary school and cyber-dependence in high school were some concerns in a rural Atikamekw community. The goal of the project was to have a conversation with indigenous youths, aged 10-16 years old, on the challenges presented by intimidation and cyber dependence as well as promoting healthy relationships online and within the community. Methods: Multiple progressive inquiry questions (PIQs) were used to assess the feasibility and importance of this project for the Atikamekw nation, and to determine a plan to follow. The theoretical foundations to guide the conception of the project were the Population Health Promotion Model (PHPM), the First Nations Holistic Lifelong Learning Model, and the Medicine Wheel. A broad array of social determinants of health were addressed, including healthy childhood development, personal health practices, and coping skills, and education. The youths were encouraged to participate in interactive educational sessions, using PowerPoint presentations and pamphlets as the main effective strategies. Additional tools such as cultural artworks and physical activities were introduced to strengthen the inter-relational and team spirit within the Indigenous population. A quality assurance tool (QAT) was developed specifically to determine the appropriateness of these health promotion tools. Improvements were guided by the feedback issued by the indigenous schools’ teachers and social workers who filled the QATs. Post educational sessions, quantitative results have shown that 93.48% of primary school students were able to identify the different types of intimidation, 72.65% recognized more than two strategies, and 52.1% were able to list at least four resources to diffuse intimidation. On the other hand, around 75% of the adolescents were able to name at least three negative effects, and 50% listed three strategies to reduce cyber-dependence. This project was meant to create a bridge with the First Nation through health promotion, a population that is known to be disadvantaged due to systemic health inequity and disparities. Culturally safe care was proposed to deal with the two identified priority issues, and an educational toolkit was given to both schools to ensure the sustainability of the project. The project was self-financed through fundraising activities, and it yielded better results than expected.

Keywords: indigenous, first nation, bullying, cyber-dependence, internet addiction, intimidation, youth, adolescents, school, community nursing, health promotion

Procedia PDF Downloads 80
4396 Availability of Metals in Fired Bricks Incorporating Harbour Sediments

Authors: Fabienne Baraud, Lydia Leleyter, Sandra Poree, Melanie Lemoine, Fatiha Oudghiri

Abstract:

Alternative solutions to immersion at sea are searched for the huge amounts of dredged sediments around the world that might contain various types of contaminants. Possible re-uses of such materials in civil engineering appear as sustainable solutions. The French SEDIBRIC project (valorisation de SEDIments en BRIQues et tuiles) aims to replace a part of natural clays with dredged sediments in the preparation of fired bricks. The potential environmental impact of this re-use is explored to complete the technical and economic feasibility of the study. As part of the project, we investigate the environmental availability of metallic elements (Al, Ca, Cd, Co, Cr, Cu, Fe, Ni, Mg, Mn, Pb, Ti, and Zn) initially present in the dredged sediments selected for the project. Leaching tests (with H₂O, HCl, or EDTA) are conducted in the sediments than in the final bricks in order to evaluate the possible influence of some steps of the bricks manufacturing (desalination pre-treatment, firing, etc.). The desalination pre-treatment using tap water has no or few impacts on the environmental availability of the studied elements. On the opposite, the firing process (900°C) affects the value of the total content of elements detected in the bricks but also the environmental availability for various elements. For instance, Cd, Cu, Pb, and Zn are stabilized in the bricks, whereas the availability of some other elements (i.e., Cr, Ni) increases, depending on the nature of the extracting solution.

Keywords: availability, bricks, dredged sediments, metals

Procedia PDF Downloads 111
4395 The Eathquake Discourse as a Strategy of an Urban Renewal: A Case Study into the Karapınar Valley Regeneration Project in Eskişehir, Turkey

Authors: Cansu Civelek

Abstract:

The flexible and uneven character of neoliberalism has provided adaptation of urban strategies into the constantly changing circumstances in order to renew and reproduce the neoliberal accumulation model. Instrumentalization of catastrophic events to this end has been one of those global urban strategies. Regarding Turkey, exploitation of natural disasters has been the latest tactic of the Justice and Development Party (JDP) government to achieve radical economic goals. ‘Unhealthy’ and ‘risky’ structures of squatter settlements have often been articulated while the regenerations, expropriations, and exclusions have been sugarcoated through the discourses of ‘reintegrating the shanty zones into the cities’, ‘supplying healthy housing’, and ‘win-win’ character of the projects. Being the first regeneration project of Eskişehir, the Karapınar Regeneration Project has been initiated in 2011 by the partnership of the Odunpazarı Municipality of the JDP and the Mass Housing Organization. Discourses around the forthcoming disasters, ‘risky structures’ of the squatters, and the importance of the ‘security of life and property’ have been utilized, even though the zone is situated on a geotechnically stable area. Yet, many of the locals are worried about the payments while some have already decided to move elsewhere at the outskirts of the city.

Keywords: neoliberal urbanism, urban regeneration, illegal settlements, discourses

Procedia PDF Downloads 417