Search results for: national projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6212

Search results for: national projects

5822 Evaluation Practices in Colombia: Between Beliefs and National Exams

Authors: Danilsa Lorduy, Liliana Valle

Abstract:

Assessment and evaluation are inextricable parts of the teaching learning process. Evaluation practices concerns are gaining popularity among curriculum developers an educational researchers, particularly in Colombian regions where English language is taught as a foreign language EFL. This study addressed one of those issues, which are the unbalanced in –services’ evaluation practices perceived in school classes. They present predominance on the written test among the procedures they use to evaluate; therefore, the purpose of this case study was to explore in-service teachers’ evaluation practices, their beliefs about evaluation and to establish an eventual connection between practices and beliefs. To this end, classroom observations, questionnaires, and a semi structured interview were applied to three in-service English teachers from different schools in a city in Colombia. The findings suggested that teachers’ beliefs indicate a formative inclination and they actually are using a variety of procedures different from test but they seem to have some issues regarding their appropriateness for application Moreover, it was found that teachers’ practices are being influenced by external factors such as school requirements and national policies. It could be concluded that the predominance in using tests is not only elicited by teachers’ beliefs but also by national test results 'Pruebas Saber' and law 115 demanding. It was also suggested that further quantitative research is needed to demonstrate connections between overuse of testing procedures and 'Pruebas Saber' national test.

Keywords: beliefs, evaluation, external factors, national test

Procedia PDF Downloads 148
5821 National Branding through Education: South Korean Image in Romania through the Language Textbooks for Foreigners

Authors: Raluca-Ioana Antonescu

Abstract:

The paper treats about the Korean public diplomacy and national branding strategies, and how the Korean language textbooks were used in order to construct the Korean national image. The field research of the paper stands at the intersection between Linguistics and Political Science, while the problem of the research is the role of language and culture in national branding process. The research goal is to contribute to the literature situated at the intersection between International Relations and Applied Linguistics, while the objective is to conceptualize the idea of national branding by emphasizing a dimension which is not much discussed, and that would be the education as an instrument of the national branding and public diplomacy strategies. In order to examine the importance of language upon the national branding strategies, the paper will answer one main question, How is the Korean language used in the construction of national branding?, and two secondary questions, How are explored in literature the relations between language and national branding construction? and What kind of image of South Korea the language textbooks for foreigners transmit? In order to answer the research questions, the paper starts from one main hypothesis, that the language is an essential component of the culture, which is used in the construction of the national branding influenced by traditional elements (like Confucianism) but also by modern elements (like Western influence), and from two secondary hypothesis, the first one is that in the International Relations literature there are little explored the connections between language and national branding, while the second hypothesis is that the South Korean image is constructed through the promotion of a traditional society, but also a modern one. In terms of methodology, the paper will analyze the textbooks used in Romania at the universities which provide Korean Language classes during the three years program B.A., following the dialogs, the descriptive texts and the additional text about the Korean culture. The analysis will focus on the rank status difference, the individual in relation to the collectivity, the respect for the harmony, and the image of the foreigner. The results of the research show that the South Korean image projected in the textbooks convey the Confucian values and it does not emphasize the changes suffered by the society due to the modernity and globalization. The Westernized aspect of the Korean society is conveyed more in an informative way about the Korean international companies, Korean internal development (like the transport or other services), but it does not show the cultural changed the society underwent. Even if the paper is using the textbooks which are used in Romania as a teaching material, it could be used and applied at least to other European countries, since the textbooks are the ones issued by the South Korean language schools, which other European countries are using also.

Keywords: confucianism, modernism, national branding, public diplomacy, traditionalism

Procedia PDF Downloads 215
5820 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 46
5819 A Critical Examination of the Iranian National Legal Regulation of the Ecosystem of Lake Urmia

Authors: Siavash Ostovar

Abstract:

The Iranian national Law on the Ramsar Convention (officially known as the Convention of International Wetlands and Aquatic Birds' Habitat Wetlands) was approved by the Senate and became a law in 1974 after the ratification of the National Council. There are other national laws with the aim of preservation of environment in the country. However, Lake Urmia which is declared a wetland of international importance by the Ramsar Convention in 1971 and designated a UNESCO Biosphere Reserve in 1976 is now at the brink of total disappearance due mainly to the climate change, water mismanagement, dam construction, and agricultural deficiencies. Lake Urmia is located in the north western corner of Iran. It is the third largest salt water lake in the world and the largest lake in the Middle East. Locally, it is designated as a National Park. It is, indeed, a unique lake both nationally and internationally. This study investigated how effective the national legal regulation of the ecosystem of Lake Urmia is in Iran. To do so, the Iranian national laws as Enforcement of Ramsar Convention in the country including three nationally established laws of (i) Five sets of laws for the programme of economic, social and cultural development of Islamic Republic of Iran, (ii) The Iranian Penal Code, (iii) law of conservation, restoration and management of the country were investigated. Using black letter law methods, it was revealed that (i) regarding the national five sets of laws; the benchmark to force the implementation of the legislations and policies is not set clearly. In other words, there is no clear guarantee to enforce these legislations and policies at the time of deviation and violation; (ii) regarding the Penal Code, there is lack of determining the environmental crimes, determining appropriate penalties for the environmental crimes, implementing those penalties appropriately, monitoring and training programmes precisely; (iii) regarding the law of conservation, restoration and management, implementation of this regulation is adjourned to preparation, announcement and approval of several categories of enactments and guidelines. In fact, this study used a national environmental catastrophe caused by drying up of Lake Urmia as an excuse to direct the attention to the weaknesses of the existing national rules and regulations. Finally, as we all depend on the natural world for our survival, this study recommended further research on every environmental issue including the Lake Urmia.

Keywords: conservation, environmental law, Lake Urmia, national laws, Ramsar Convention, water management, wetlands

Procedia PDF Downloads 181
5818 Terrorism: Definition, History and Different Approaches in the Analysis of Terrorism Phenomenon

Authors: Shabnam Dadparvar, Laijin Shen, Farzad Ravanbod

Abstract:

Nowadays, the political phenomenon of terrorism is considered as an effective factor on political, social, and economic changes. It has replaced the recognized political phenomena such as revolutions, wars (total war among two or more political units with distinct identities in the form of national states), coups d’état, insurgencies and etc. and has challenged political life in all its levels (sub national, national, and international political groups). In this paper by using descriptive-analytical method, the authors try to explain the spread of this political phenomenon across the world, its definition and types, also analyze different approaches to understand it. The authors believe that the Logical-Rational approach is the best way to explain and understand this phenomenon.

Keywords: logical approach, psychological- social approach, religious approach, terrorism

Procedia PDF Downloads 306
5817 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 319
5816 Analysing the Cost of Immigrants to the National Health System in Eastern Macedonia and Thrace

Authors: T. Theodosiou, P. Polychronidou, A. G. Karasavvoglou

Abstract:

The latest years the number of immigrants at Greece has increased dramatically. Their impact on the National Health System (NHS) has not been yet thoroughly investigated. This paper analyses the cost of immigrants to the NHS hospitals of the region of Eastern Macedonia and Thrace. The data are collected from 2005 to 2011 from five different hospitals and are analysed using linear mixed effects models in order to investigate the effects of nationality and year on the cost of hospitalization and treatment. The results show that generally the Greek nationality patients have a higher mean cost of hospitalization compared to the immigrants and that there is an increasing trend for the cost except for the year 2010.

Keywords: cost, Eastern Macedonia and Thrace, immigrants, national health system

Procedia PDF Downloads 218
5815 Manipulative Figurative Linguistic Violence of Contemporary National Anthems: A Socio-Cognitive Critical Discourse Analysis

Authors: Samson Olasunkanmi Oluga, Teh Chee Send, Gerard Sagaya Raj Rajo

Abstract:

It is ironical that the national anthems of many nations that are in the forefront of the global condemnation of violence of all forms have portions or expressions that propagate various forms of linguistic violence which advocate attacking opponents, going to war, shedding blood and sacrificing lives. These diametrically contradict contemporary yearnings for global tranquility and the ideals of the United Nations established for the maintenance of international peace and harmony aimed at making the world a safe haven for all and sundry. The linguistic violence of many national anthems is manipulatively constructed /presented via the instrumentality of the figurative or rhetorical language. This helps to linguistically embellish the violent ideas communicated and makes them sound somehow better or logical to the target audience with the intention of cognitively manipulating them to accept or rationalize such violent ideas. This paper, therefore, presents the outcome of a linguistic exploration/examination of national anthems which reveals elements or cases manipulative figurative linguistic violence in the anthems of twenty-one (21) nations. The paper details a Socio-Cognitive Critical Discourse Analysis of the manipulative figures of comparison, contrast, indirectness, association and sound used to convey the linguistic violence of the identified national anthems. Finally, the paper advocates the need for linguistic overhaul of affected anthems so that the language of anthems which epitomize nations can be pacific and in tandem with contemporary global trends.

Keywords: national anthems, linguistic violence, figurative language, cognitive, manipulation, CDA

Procedia PDF Downloads 305
5814 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 32
5813 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)

Procedia PDF Downloads 524
5812 Professional Stakeholders Perspectives on Community Participation in Transit-Oriented Development Projects: A Johannesburg Case Study

Authors: Kofi Quartey, Kola Ijasan

Abstract:

Achieving densification around transit-oriented development projects has proven the most ideal way of facilitating urban sprawl whilst increasing the mobility of the majority of the urban populations, making parts of the city that were inaccessible, accessible. Johannesburg has undertaken TOD vision, which was initially called the corridors of freedom. The TOD, in line with the Sustainable Development Goal 11, seeks to establish inclusive, sustainable cities and, in line with the Joburg Growth Development Strategy, aims to create an equitable world-class African city. Equity and inclusivity should occur from the onset of planning and implementation of TOD projects through meaningful community participation. Stakeholder engagement literature from various disciplinary backgrounds has documented dissatisfaction of communities regarding the lack of meaningful participation in government-led development initiatives. The views of other project stakeholders such as project policy planners and project implementors and their challenges in undertaking community participation are, however, not taken into account in such instances, leaving room for a biased perspective. Document analysis was undertaken to determine what is expected of the Project stakeholders according to policy and whether they carried out their duties) seven interviews were also conducted with city entities and community representatives to determine their experiences and challenges with community participation in the various TOD projects attributed to the CoF vision. The findings of the study indicated that stakeholder engagement processes were best described as an ‘educative process’; where local communities were limited to being informed from the onset rather than having an active involvement in the planning processes. Most community members felt they were being informed and educated as to what was going to happen in spite of having their views and opinions collected – primarily due to project deadlines and budget constraints, as was confirmed by professional stakeholders. Some community members exhibited reluctance to change due to feelings of having projects being imposed on them, and the implications of the projects on their properties and lifestyles. It is recommended that community participation should remain a participatory and engaging process that creates an exchange of knowledge and understanding in the form of a dialogue between communities and project stakeholders until a consensus is reached.

Keywords: stakeholder engagement, transit oriented development, community participation, Johannesburg

Procedia PDF Downloads 103
5811 Computer-Based versus Paper-Based Tests: A Comparative Study of Two Types of Indonesian National Examination for Senior High School Students

Authors: Faizal Mansyur

Abstract:

The objective of this research is to find out whether there is a significant difference in the English language scores of senior high school students in the Indonesia National Examination for students tested by using computer-based and paper-based tests. The population of this research is senior high school students in South Sulawesi Province who sat the Indonesian National Examination for 2015/2016 academic year. The samples of this research are 800 students’ scores from 8 schools taken by employing the multistage random sampling technique. The data of this research is a secondary data since it is obtained from the education office for South Sulawesi. In analyzing the collected data, the researcher employed the independent samples T-Test with the help of SPSS v.24 program. The finding of this research reveals that there is a significant difference in the English language scores of senior high school students in the Indonesia National Examination for students tested by using computer-based and paper-based Tests (p < .05). Moreover, students tested by using PBT (Mean = 63.13, SD = 13.63) achieve higher score than those tested by using CBT (Mean = 46.33, SD = 14.68).

Keywords: computer-based test, paper-based test, Indonesian national examination, testing

Procedia PDF Downloads 150
5810 Matlab Method for Exclusive-or Nodes in Fuzzy GERT Networks

Authors: Roland Lachmayer, Mahtab Afsari

Abstract:

Research is the cornerstone for advancement of human communities. So that it is one of the indexes for evaluating advancement of countries. Research projects are usually cost and time-consuming and do not end in result in short term. Project scheduling is one of the integral parts of project management. The present article offers a new method by using C# and Matlab software to solve Fuzzy GERT networks for Exclusive-OR kind of nodes to schedule the network. In this article we concentrate on flowcharts that we used in Matlab to show how we apply Matlab to schedule Exclusive-OR nodes.

Keywords: research projects, fuzzy GERT, fuzzy CPM, CPM, α-cuts, scheduling

Procedia PDF Downloads 371
5809 Evaluating the Possibility of Expanding National Health Insurance Funding From Zakat, Sudan

Authors: Fawzia Mohammed Idris

Abstract:

Zakat is an Islamic procedure for wealth distribution as a social protection mechanism for needy people. This study aimed to assess the possibility to expand the share of fund for national health insurance fund from zakat funds allocated for poor people by measuring the reduction of poverty that result from the investing on direct payment to the needy or by covering them in social health insurance. This study used stata regression as a statistical analysis tool and the finding clarified that there is no significant relationship between the poverty rate as the main indicator and, the number of poor people covered by national health insurance on one hand and the number of benefits poor people from the distribution of zakat fund. This study experienced many difficulties regarding the quality and the consistency of the data. The study suggested that a joint mission between national health insurance fund and zakat chamber to conduct study to assess the efficient use of zakat fund allocated to poor people.

Keywords: health finance, poverty, social health insurance, zakat

Procedia PDF Downloads 122
5808 The Use of AI to Measure Gross National Happiness

Authors: Riona Dighe

Abstract:

This research attempts to identify an alternative approach to the measurement of Gross National Happiness (GNH). It uses artificial intelligence (AI), incorporating natural language processing (NLP) and sentiment analysis to measure GNH. We use ‘off the shelf’ NLP models responsible for the sentiment analysis of a sentence as a building block for this research. We constructed an algorithm using NLP models to derive a sentiment analysis score against sentences. This was then tested against a sample of 20 respondents to derive a sentiment analysis score. The scores generated resembled human responses. By utilising the MLP classifier, decision tree, linear model, and K-nearest neighbors, we were able to obtain a test accuracy of 89.97%, 54.63%, 52.13%, and 47.9%, respectively. This gave us the confidence to use the NLP models against sentences in websites to measure the GNH of a country.

Keywords: artificial intelligence, NLP, sentiment analysis, gross national happiness

Procedia PDF Downloads 79
5807 Web-GIS Technology: A Tool for Farm-to-Market Road Project Profiling and Proposal Prioritization of the Philippines’ Department of Agriculture

Authors: Elbert S. Moyon, Edsel Matt O. Morales, Jaymer M. Jayoma, Kent C. Espejon, Jayson C. Dollete, Mark Phil B. Pacot

Abstract:

This research paper focuses on the potential of using Web-GIS technology in prioritizing farm-to-market road projects by the Philippines’ Department of Agriculture (DA). The study aimed to explore the benefits of Web-GIS in addressing the limitations faced by the DA in terms of Farm to Market Road profiling and project prioritization, which include a lack of access to updated data, limited spatial analysis capabilities, and difficulties in sharing information between stakeholders. The research methodology involves a comprehensive literature review and a case study of a Web-GIS application developed for the DA, which was used to profile and prioritize farm-to-market road projects in the Philippines. The results showed that the Web-GIS technology provides the DA with an effective tool for analyzing and visualizing data, which can help in profiling and prioritizing road projects based on various criteria such as economic, social, and environmental impacts. The study also showed that Web-GIS technology could help in reducing the time and effort required for road project prioritization and improve communication between stakeholders.

Keywords: GIS, web application, farm-to-market road, FMR prioritization, Django, GeoServer

Procedia PDF Downloads 59
5806 School Partners in Initial Teacher Education: An Including or Excluding Approach When Engaging Schools

Authors: Laila Niklasson

Abstract:

The aim of the study is to critically discuss how partner schools are engaged during Initial teacher education, ITE. The background is an experiment in Sweden where the practicum organization is reorganized due to a need to enhance quality during practicum. It is a national initiative from the government, supported by the National Agency of Education and lasts 2014-2019. The main features are concentration of students to school with a certain amount of mentors, mentors who have a mentor education and teachers with relevant subject areas and where there could be a mentor team with a leader at the school. An expected outcome is for example that the student teachers should be engaged in peer-learning. The schools should be supported by extra lectures from university teachers during practicum and also extra research projects where the schools should be engaged. A case study of one university based ITE was carried out to explore the consequences for the schools not selected. The result showed that from engaging x schools in a region, x was engaged. The schools are both in urban and rural areas, mainly in the latter. There is also a tendency that private schools are not engaged. On a unit level recruitment is perceived as harder for schools not engaged. In addition they cannot market themselves as ´selected school´ which can affect parent´s selection of school for their children. Also, on unit level, but with consequences for professional development, they are not selected for research project and thereby are not fully supported during school development. The conclusion is that from an earlier inclusive approach concerning professions where all teachers were perceived as possible mentors, there is a change to an exclusive approach where selected schools and selected teachers should be engaged. The change could be perceived as a change in governance mentality, but also in how professions are perceived, and development work is pursued.

Keywords: initial teacher education, practicum schools, profession, quality development

Procedia PDF Downloads 125
5805 Ethnic and National Determinants in the Process of Building Peace in Afghanistan After the Withdrawal of Western Forces in 2021

Authors: Małgorzata Cichy

Abstract:

Afghanistan is a source of conflicts that affect security on a global scale. The role of ethnic and national determinants in the peacebuilding process in this country remains an extremely important factor in this respect. Research methods include literature and data analysis (scientific literature, documents of governmental and non-governmental organizations, statistical data and media reports), institutional and legal analysis, as well as decision-making method. The main objective of the research is a comprehensive answer to the question of how ethnic and national factors affect the process of building peace in Afghanistan after 2021 and what impact it has on international security.

Keywords: Afghanistan, pashtuns, peace, taliban

Procedia PDF Downloads 59
5804 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 192
5803 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 233
5802 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 155
5801 Attitude of Tertiary Students on Multiculturalism in Indonesia

Authors: Budi Annisa Sidi

Abstract:

Present-day Indonesia maintains a narrative of a culturally plural but unified nation. At the same time, multicultural policies extend different degrees of recognition, accommodation, toleration and even discrimination towards different socio-cultural groups. In conjunction with different ethnographic landscapes across regions in Indonesia, this approach leads to a varied experience and understanding of national identity and multiculturalism among people. As a result, governments seeking to maintain national unity while practicing multiculturalism have to juggle different expectations. This situation is examined through the microcosms of university students using questionnaires followed up by focus group discussions and personal interviews. A comparison between university students across four different provinces in Indonesia (Aceh, Jakarta, West Java and the Moluccas) highlights the influence of one’s surroundings on their perception of multiculturalism. Students in the more heterogeneous areas generally show more acceptance towards diversity compared to students in primarily homogenous areas who have little actual experience in dealing with diversity. Regardless of their environment, students claim to have positive feelings and a strong sense of attachment to Indonesia but hold different ideas of what constitutes an ideal Indonesian national identity.

Keywords: Indonesia, multiculturalism, national identity, nationalism

Procedia PDF Downloads 214
5800 Risk Assessment on Construction Management with “Fuzzy Logy“

Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi

Abstract:

Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.

Keywords: fuzzy logy, risk, prioritization, assessment

Procedia PDF Downloads 569
5799 Terrorism and National Development: A Critique of Its Aftermath on Educational Attainment

Authors: David Chapola Nggada

Abstract:

Although the concept of terrorism is not a new phenomenon to Nigeria, the protracted terrorist activities experiencing in the north-eastern part of the country since 2009, had left an indelible mark on virtually every aspects of lives whether directly or indirectly, particularly the educational sector. Indeed, since the abduction of over 200 schoolgirls at Chibok in 2014 by the insurgence, education had witnessed a setback as most school remains closed for sometimes. The aftermath of this development on education and its future multiplier effect on national development is a source of concern. Consequently, this paper is designed to examine the consequences of terrorism on educational attainment and national development among the Chibok community of Borno State. The technique employed involves a mixture of both qualitative and quantitative research work on a sample size of 79 secondary school students currently displaced from Chibok, Damboa and Askira-Uba, now residing as internally displaced persons(IDPs) in Biu, Gombe, Maiduguri. A random sample technique is used. Structured and semi-unstructured questionnaire were administered. The result shows that, a significant number of students over these years, lacked access to education and this posed a great danger to national development. Recommendations towards reinvigorating education as a panacea to social, economic cum political vices were articulated. Concerted effort should be made to create confidence in the community.

Keywords: education, effect, terrorism, national, development

Procedia PDF Downloads 237
5798 Value for Money in Investment Projects

Authors: Jan Ceselsky

Abstract:

Construction and reconstruction of settlements and individual municipalities, environmental management and the creation, deployment of the forces of production and building transport and technical equipment requires a large expenditure of material and human resources. That is why the economic aspects of the majority decision in these planes built in the foreground and are often decisive. Thereby but more serious is that the economic aspects of the settlement, the creation and function remain in their whole, unprocessed, and can not speak of a set of individual techniques and methods traditional indicators and experiments with new approaches. This is true both at the level of the national economy, and in their own urban designs. Still a few remain identified specific economic shaping patterns of settlement and the less it is possible to speak of their control. Also practical assessing economics of specific solutions are often used non-apt indicators in addition to economics usually identifies with the lowest acquisition cost or high-intensity land use with little regard for functional efficiency and little studied much higher operating and maintenance costs.

Keywords: investment, municipal engineering, value for money, construction

Procedia PDF Downloads 263
5797 Understanding the Influence of Cross-National Distances on Tourist Expenditure

Authors: Wei-Ting Hung

Abstract:

Inbound tourist expenditure might not only have influenced by individual tourist characteristics but may also be affected by nationality characteristics. The cross national distance effects on tourist consumption behavior should be incorporated in the analytical framework. Additionally, the often used factor analysis, cluster analysis and regression analysis overlook the hierarchical tourist consumption data structure and may lead to misleading results. The objectives of the present study were twofold. First, we propose a multilevel model that takes individual and cross-national differences into account under a hierarchical framework. Second, we further sought to determine the types of cross-national differences affecting tourist expenditure. Thus, this study incorporates the individual tourist effects and cross national distance effects simultaneously, uses the data of 2010 Annual Survey Report on Visitors’ Expenditure and Trends in Taiwan to investigate the determinants of inbound tourist expenditure. Multilevel analysis was used to investigate the influence of individual tourist effects and cross national distance effects on inbound tourist expenditure. The empirical results show that cross national distance plays a crucial role in tourist consumption behavior. Our findings also indicate age and income have positive influence on tourism expenditure., whereas education and gender do not have significant impact. Regarding macro-level factors, geographic and cultural differences exhibited significant positive relationships on tourism expenditure, while economic differences did not. Based on the above empirical results, it is suggested that tour operators should take tourists’ individual attributes, particularly their income and age, into consideration when arranging tours. In addition, nationality holds sway over tourists’ consumption behavior, of which geographic and cultural differences are the two major factors at play. The empirical results of this study serve as practical suggestions for tourism marketing strategies and policy implications for government policies.

Keywords: cross national distance, inbound tourist, multilevel analysis, tourist expenditure

Procedia PDF Downloads 331
5796 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 92
5795 Progress and Challenges of Smart Cities in India: An Exploratory Study

Authors: Sushil K. Sharma, Jeff Zhang, Saeed Tabar

Abstract:

Worldwide, several governments are utilizing the Internet of Things (IoT) and other information and communication technologies (ICTs) to create smart city infrastructures to improve both the quality of government services and citizen welfare. Over 700 cities from around the world have already started implementing their smart city projects. Smart City utilizes the network of connected things, or the Internet of Things (IoT), that interconnects devices and various components across city infrastructure, making them work together seamlessly to enhance the quality, performance, and interactivity of urban services, optimize resources, and reduce costs. Without developing smart cities, the accelerating growth of cities, and their disproportionate consumption of physical and social resources are unsustainable. In 2016, the Indian Government released a list of 100 cities with the intention of kick-starting the process of developing them into 'smart cities’ as part of the Smart Cities Mission. This study reports the progress and challenges of Smart City projects in India. The data were collected through the city/state government websites, media reports, and focus group discussions/interviews. The preliminary results indicate that smart city projects are not only behind in their implementation and scope but also lacks the sincerity for its implementation.

Keywords: smart city, smart government, Internet of Things, digital government

Procedia PDF Downloads 152
5794 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 436
5793 A Structural Equation Model of Risk Perception of Rockfall for Revisit Intention

Authors: Ya-Fen Lee, Yun-Yao Chi

Abstract:

The study aims to explore the relationship between risk perceptions of rockfall and revisit intention using a Structural Equation Modelling (SEM) analysis. A total of 573 valid questionnaires are collected from travelers to Taroko National Park, Taiwan. The findings show the majority of travellers have the medium perception of rockfall risk, and are willing to revisit the Taroko National Park. The revisit intention to Taroko National Park is influenced by hazardous preferences, willingness-to-pay, obstruction and attraction. The risk perception has an indirect effect on revisit intention through influencing willingness-to-pay. The study results can be a reference for mitigation the rockfall disaster.

Keywords: risk perception, rockfall, revisit intention, structural equation modelling

Procedia PDF Downloads 405