Search results for: software development projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 21164

Search results for: software development projects

20804 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 287
20803 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods

Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal

Abstract:

Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.

Keywords: cost forecasting, earned value management, project control, project management, risk analysis, simulation

Procedia PDF Downloads 405
20802 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques

Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah

Abstract:

Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.

Keywords: BIM, construction projects, cost estimation, NRM, ontology

Procedia PDF Downloads 551
20801 A Comparative Study of Three Major Performance Testing Tools

Authors: Abdulaziz Omar Alsadhan, Mohd Mudasir Shafi

Abstract:

Performance testing is done to prove the reliability of any software product. There are a number of tools available in the markets that are used to perform performance testing. In this paper we present a comparative study of the three most commonly used performance testing tools. These tools cover the major share of the performance testing market and are widely used. In this paper we compared the tools on five evaluation parameters which are; User friendliness, portability, tool support, compatibility and cost. The conclusion provided at the end of the paper is based on our study and does not support any tool or company.

Keywords: software development, software testing, quality assurance, performance testing, load runner, rational testing, silk performer

Procedia PDF Downloads 608
20800 Assessment of the Impact of Road Transportation Improvement on Rural Development

Authors: Mohammad Mirwais Arghandiwal, Fujita Motohiro, Wisinee Wisetjindawat

Abstract:

Since 2001, the new government of Afghanistan addressed the improvement of transportation in rural areas as one of the key issues for the country development. This paper thus, aims to show the impotency of transportation in the rural area of Kabul province. A field survey in Kabul Province capital of Afghanistan has been conducted during March, 2015, and 201 questionnaires were collected from four districts named Shakar Dara, Paghman, Char Asyab, and Khak Jabar to investigate the impacts of road transportation on the people’s daily life. The districts had their road projects constructed during the last 3-5 years. The interviewees are chosen randomly from a different category of districts residences. As transportation is one of the most important factors for the development of the communities, during the survey it was very easily to observe a positive effect on the life of people. The improvement on the accessibility has had a positive impact on the land and land price. In this paper, a model is created to show the relationship between different factors and the land price improvement. In the end, a recommendation is presented on the establishment of the community council for a better use and maintenance of road projects. We emphasize on a public and private partnership at a community level in the districts during the construction period too. In addition, the communities should be encouraged on their positive role in the improvement of transportation through their participation and collaboration with the local government.

Keywords: accessibility, Afghanistan, poverty, rural area, transportation development

Procedia PDF Downloads 439
20799 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 351
20798 A Comparative Analysis of Zotero and Mendeley Reference Management Software

Authors: Sujit K. Basak

Abstract:

This paper presents a comparison of the reference management software between Zotero and Mendeley and the results were drawn by comparing the two software’s. The novelty of this paper is the comparative analysis of the software and it has shown that Mendeley can import more information from the Google Scholar for the researchers. This finding can help to know researchers to use the reference management software.

Keywords: analysis, comparative analysis, zotero, researchers, Mendeley

Procedia PDF Downloads 614
20797 Statistical Investigation Projects: A Way for Pre-Service Mathematics Teachers to Actively Solve a Campus Problem

Authors: Muhammet Şahal, Oğuz Köklü

Abstract:

As statistical thinking and problem-solving processes have become increasingly important, teachers need to be more rigorously prepared with statistical knowledge to teach their students effectively. This study examined preservice mathematics teachers' development of statistical investigation projects using data and exploratory data analysis tools, following a design-based research perspective and statistical investigation cycle. A total of 26 pre-service senior mathematics teachers from a public university in Turkiye participated in the study. They formed groups of 3-4 members voluntarily and worked on their statistical investigation projects for six weeks. The data sources were audio recordings of pre-service teachers' group discussions while working on their projects in class, whole-class video recordings, and each group’s weekly and final reports. As part of the study, we reviewed weekly reports, provided timely feedback specific to each group, and revised the following week's class work based on the groups’ needs and development in their project. We used content analysis to analyze groups’ audio and classroom video recordings. The participants encountered several difficulties, which included formulating a meaningful statistical question in the early phase of the investigation, securing the most suitable data collection strategy, and deciding on the data analysis method appropriate for their statistical questions. The data collection and organization processes were challenging for some groups and revealed the importance of comprehensive planning. Overall, preservice senior mathematics teachers were able to work on a statistical project that contained the formulation of a statistical question, planning, data collection, analysis, and reaching a conclusion holistically, even though they faced challenges because of their lack of experience. The study suggests that preservice senior mathematics teachers have the potential to apply statistical knowledge and techniques in a real-world context, and they could proceed with the project with the support of the researchers. We provided implications for the statistical education of teachers and future research.

Keywords: design-based study, pre-service mathematics teachers, statistical investigation projects, statistical model

Procedia PDF Downloads 87
20796 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 325
20795 A Systematic Review on Assistive Technology Robotics in Lower and Middle-Income Settings

Authors: Sumudu Sameera Perera Kimmantudawage, Chapal Khasnabis

Abstract:

Technology is changing at a rapid rate, with innovations in robotics being hailed and tested in countries such as Japan, the United States and Australia, however the conversation in a public health context is stagnant. While obvious barriers to robotics use in low and middle-income countries and regions exist, the avoidance of attempting to address these regions of the world may potentially lead to an ever-increasing divide between those of high income countries and those of less. A systematic review was undertaken to determine the number of projects involving research, development and testing of robotics considered low and middle-income regions. Major findings indicate that an overwhelmingly significant number of projects failed to consider low and middle-income countries or regions. These results are unsurprising however alarming, as bridging the divide is an important step forward in achieving the UN Sustainable Development Goals by 2030. It is hoped that this research would spawn future robotics research that focusses on lower and middle-income regions.

Keywords: assistive technology, health equality, robotics, socioeconomic

Procedia PDF Downloads 236
20794 Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective

Authors: Charles Mothobiso

Abstract:

This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.

Keywords: construction clients, design team, green buildings, procurement

Procedia PDF Downloads 300
20793 Risk Assessment of Building Information Modelling Adoption in Construction Projects

Authors: Amirhossein Karamoozian, Desheng Wu, Behzad Abbasnejad

Abstract:

Building information modelling (BIM) is a new technology to enhance the efficiency of project management in the construction industry. In addition to the potential benefits of this useful technology, there are various risks and obstacles to applying it in construction projects. In this study, a decision making approach is presented for risk assessment in BIM adoption in construction projects. Various risk factors of exerting BIM during different phases of the project lifecycle are identified with the help of Delphi method, experts’ opinions and related literature. Afterward, Shannon’s entropy and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Situation) are applied to derive priorities of the identified risk factors. Results indicated that lack of knowledge between professional engineers about workflows in BIM and conflict of opinions between different stakeholders are the risk factors with the highest priority.

Keywords: risk, BIM, fuzzy TOPSIS, construction projects

Procedia PDF Downloads 231
20792 Influence of Procurement Methods on Cost Performance of Building Projects in Gombe State, Nigeria

Authors: S. U. Kunya, S. Abdulkadir, M. A. Anas, L. Z. Adam

Abstract:

Procurement methods is described as systems of contractual arrangements used by the contractor in order to secure the design and construction services based on the stipulated cost and within the required time and quality. Despite that, major projects in the Nigerian construction industry failed because of wrong procurement methods with major consequences leads to cost overrun which needs to find lasting solution. The aim of the study is to evaluate the influence of procurement methods on cost performance of building projects in Gombe State, Nigeria. Study adopts descriptive and explorative design approach. Data were collected through administering of one hundred questionnaire using convenient sampling techniques. Data analyses using percentages, mean value and Anova analysis. Major finding show that more than fifty percent (50%) of procurement methods available are mainly utilized in the study area and the top procurement methods that have high impacts on cost performance as compare with the other methods is project management and direct labour procurement methods. The results of hypothesis’ tests with pvalue 0.12 and 0.07 validated that there was no significant variation in the perception of stakeholders’ on the impacts of procurements methods on cost performance. Therefore, the study concluded that projects management and direct labour are the most appropriate procurement methods that will ensure successful completion of project at stipulated cost in building projects.

Keywords: cost, effects, performance, procurement, projects

Procedia PDF Downloads 224
20791 Requirements Management in Agile

Authors: Ravneet Kaur

Abstract:

The concept of Agile Requirements Engineering and Management is not new. However, the struggle to figure out how traditional Requirements Management Process fits within an Agile framework remains complex. This paper talks about a process that can merge the organization’s traditional Requirements Management Process nicely into the Agile Software Development Process. This process provides Traceability of the Product Backlog to the external documents on one hand and User Stories on the other hand. It also gives sufficient evidence that the system will deliver the right functionality with good quality in the form of various statistics and reports. In the nutshell, by overlaying a process on top of Agile, without disturbing the Agility, we are able to get synergic benefits in terms of productivity, profitability, its reporting, and end to end visibility to all Stakeholders. The framework can be used for just-in-time requirements definition or to build a repository of requirements for future use. The goal is to make sure that the business (specifically, the product owner) can clearly articulate what needs to be built and define what is of high quality. To accomplish this, the requirements cycle follows a Scrum-like process that mirrors the development cycle but stays two to three steps ahead. The goal is to create a process by which requirements can be thoroughly vetted, organized, and communicated in a manner that is iterative, timely, and quality-focused. Agile is quickly becoming the most popular way of developing software because it fosters continuous improvement, time-boxed development cycles, and more quickly delivering value to the end users. That value will be driven to a large extent by the quality and clarity of requirements that feed the software development process. An agile, lean, and timely approach to requirements as the starting point will help to ensure that the process is optimized.

Keywords: requirements management, Agile

Procedia PDF Downloads 370
20790 Suburban Large Residential Area Development Strategy with an Example of Liangzhu Culture Village in Hangzhou

Authors: Liang Fang

Abstract:

The development of the large suburban residential area is a product of the leap development during the rapid urbanization process in China. On the process of the large-scale development of large settlements in a short time, various problems arose in the suburban residential area, such as spatial layout being disorder, basic facilities construction lagging behind and being unreasonable, residential neighborhood space and street culture missing. Aimed at the contradictions mentioned above, exploring a way is imminent to construct appropriate residential area. We select a typical Liangzhu Culture Village in Hangzhou and put forward functional composite residential area of fine development strategy, along which business promotes and assists community autonomy and then a good community culture is constructed. All in all, the development and construction mode, contributing to an all-people and full-time participation, is beneficial to create a harmonious community of sustainable development, which gives good implication to a single enterprise development city real estate projects.

Keywords: community autonomy, development and construction mode, functional composite, suburban large residential area

Procedia PDF Downloads 359
20789 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 255
20788 AIPM:An Integrator and Pull Request Matching Model in Github

Authors: Zhifang Liao, Yanbing Li, Li Xu, Yan Zhang, Xiaoping Fan, Jinsong Wu

Abstract:

Pull Request (PR) is the primary method for code contributions from the external contributors in Github. PR review is an essential part of open source software developments for maintaining the quality of software. Matching a new PR of an appropriate integrator will make the PR review more effective. However, PR and integrator matching are now organized manually in Github. To reduce this cost, we presented an AIPM model to predict highly relevant integrator of incoming PRs. AIPM uses topic model to extract topics from the PRs, and builds a one-to-one correspondence between topics and integrators. Then, AIPM finds the most suitable integrator according to the maximum entry of the topic-document distribution. On average, AIPM can reach a precision of 60%, and even in some projects, can reach a precision of 80%.

Keywords: pull Request, integrator matching, Github, open source project, topic model

Procedia PDF Downloads 302
20787 Optimisation Model for Maximising Social Sustainability in Construction Scheduling

Authors: Laura Florez

Abstract:

The construction industry is labour intensive, and the behaviour and management of workers have a direct impact on the performance of construction projects. One of the issues it currently faces is how to recruit and maintain its workers. Construction is known as an industry where workers face the problem of short employment durations, frequent layoffs, and periods of unemployment between jobs. These challenges not only creates pressures on the workers but also project managers have to constantly train new workers, face skills shortage, and uncertainty on the quality of the workers it will attract. To consider worker’s needs and project managers expectations, one practice that can be implemented is to schedule construction projects to maintain a stable workforce. This paper proposes a mixed integer programming (MIP) model to schedule projects with the objective of maximising social sustainability of construction projects, that is, maximise labour stability. Aside from the social objective, the model accounts for equipment and financial resources required by the projects during the construction phase. To illustrate how the solution strategy works, a construction programme comprised of ten projects is considered. The projects are scheduled to maximise labour stability while simultaneously minimising time and minimising cost. The tradeoff between the values in terms of time, cost, and labour stability allows project managers to consider their preferences and identify which solution best suits their needs. Additionally, the model determines the optimal starting times for each of the projects, working patterns for the workers, and labour costs. This model shows that construction projects can be scheduled to not only benefit the project manager, but also benefit current workers and help attract new workers to the industry. Due to its practicality, it can be a valuable tool to support decision making and assist construction stakeholders when developing schedules that include social sustainability factors.

Keywords: labour stability, mixed-integer programming (MIP), scheduling, workforce management

Procedia PDF Downloads 253
20786 Electronic Payment Recording with Payment History Retrieval Module: A System Software

Authors: Adrian Forca, Simeon Cainday III

Abstract:

The Electronic Payment Recording with Payment History Retrieval Module is developed intendedly for the College of Science and Technology. This system software innovates the manual process of recording the payments done in the department through the development of electronic payment recording system software shifting from the slow and time-consuming procedure to quick yet reliable and accurate way of recording payments because it immediately generates receipts for every transaction. As an added feature to its software process, generation of recorded payment report is integrated eliminating the manual reporting to a more easy and consolidated report. As an added feature to the system, all recorded payments of the students can be retrieved immediately making the system transparent and reliable payment recording software. Viewing the whole process, the system software will shift from the manual process to an organized software technology because the information will be stored in a logically correct and normalized database. Further, the software will be developed using the modern programming language and implement strict programming methods to validate all users accessing the system, evaluate all data passed into the system and information retrieved to ensure data accuracy and reliability. In addition, the system will identify the user and limit its access privilege to establish boundaries of the specific access to information allowed for the store, modify, and update making the information secure against unauthorized data manipulation. As a result, the System software will eliminate the manual procedure and replace with an innovative modern information technology resulting to the improvement of the whole process of payment recording fast, secure, accurate and reliable software innovations.

Keywords: collection, information system, manual procedure, payment

Procedia PDF Downloads 168
20785 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects

Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius

Abstract:

Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.

Keywords: delays, external factors, funding, general factors, Internal factors

Procedia PDF Downloads 148
20784 Annotation Ontology for Semantic Web Development

Authors: Hadeel Al Obaidy, Amani Al Heela

Abstract:

The main purpose of this paper is to examine the concept of semantic web and the role that ontology and semantic annotation plays in the development of semantic web services. The paper focuses on semantic web infrastructure illustrating how ontology and annotation work to provide the learning capabilities for building content semantically. To improve productivity and quality of software, the paper applies approaches, notations and techniques offered by software engineering. It proposes a conceptual model to develop semantic web services for the infrastructure of web information retrieval system of digital libraries. The developed system uses ontology and annotation to build a knowledge based system to define and link the meaning of a web content to retrieve information for users’ queries. The results are more relevant through keywords and ontology rule expansion that will be more accurate to satisfy the requested information. The level of results accuracy would be enhanced since the query semantically analyzed work with the conceptual architecture of the proposed system.

Keywords: semantic web services, software engineering, semantic library, knowledge representation, ontology

Procedia PDF Downloads 174
20783 Public-Private Partnership Transportation Projects: An Exploratory Study in the US

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.

Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation

Procedia PDF Downloads 177
20782 Object-Oriented Program Comprehension by Identification of Software Components and Their Connexions

Authors: Abdelhak-Djamel Seriai, Selim Kebir, Allaoua Chaoui

Abstract:

During the last decades, object oriented program- ming has been massively used to build large-scale systems. However, evolution and maintenance of such systems become a laborious task because of the lack of object oriented programming to offer a precise view of the functional building blocks of the system. This lack is caused by the fine granularity of classes and objects. In this paper, we use a post object-oriented technology namely software components, to propose an approach based on the identification of the functional building blocks of an object oriented system by analyzing its source code. These functional blocks are specified as software components and the result is a multi-layer component based software architecture.

Keywords: software comprehension, software component, object oriented, software architecture, reverse engineering

Procedia PDF Downloads 416
20781 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 477
20780 A Study on Factors Affecting (Building Information Modelling) BIM Implementation in European Renovation Projects

Authors: Fatemeh Daneshvartarigh

Abstract:

New technologies and applications have radically altered construction techniques in recent years. In order to anticipate how the building will act, perform, and appear, these technologies encompass a wide range of visualization, simulation, and analytic tools. These new technologies and applications have a considerable impact on completing construction projects in today's (architecture, engineering and construction)AEC industries. The rate of changes in BIM-related topics is different worldwide, and it depends on many factors, e.g., the national policies of each country. Therefore, there is a need for comprehensive research focused on a specific area with common characteristics. Therefore, one of the necessary measures to increase the use of this new approach is to examine the challenges and obstacles facing it. In this research, based on the Delphi method, at first, the background and related literature are reviewed. Then, using the knowledge obtained from the literature, a primary questionnaire is generated and filled by experts who are selected using snowball sampling. It covered the experts' attitudes towards implementing BIM in renovation projects and their view of the benefits and obstacles in this regard. By analyzing the primary questionnaire, the second group of experts is selected among the participants to be interviewed. The results are analyzed using Theme analysis. Six themes, including Management support, staff resistance, client willingness, Cost of software and implementation, the difficulty of implementation, and other reasons, are obtained. Then a final questionnaire is generated from the themes and filled by the same group of experts. The result is analyzed by the Fuzzy Delphi method, showing the exact ranking of the obtained themes. The final results show that management support, staff resistance, and client willingness are the most critical barrier to BIM usage in renovation projects.

Keywords: building information modeling, BIM, BIM implementation, BIM barriers, BIM in renovation

Procedia PDF Downloads 167
20779 An Orphan Software Engineering Course: Supportive Ways toward a True Software Engineer

Authors: Haya Sammana

Abstract:

A well-defined curricula must be adopted to meet the increasing complexity and diversity in the software applications. In reality, some IT majors such as computer science and computer engineering receive the software engineering education in a single course which is considered as a big challenged for the instructors and universities. Also, it requires students to gain the most of practical experiences that simulate the real work in software companies. Furthermore, we have noticed that there is no consensus on how, when and what to teach in that introductory course to gain the practical experiences that are required by the software companies. Because all of software engineering disciplines will not fit in just one course, so the course needs reasonable choices in selecting its topics. This arises an important question which is an essential one to ask: Is this course has the ability to formulate a true software engineer that meets the needs of industry? This question arises a big challenge in selecting the appropriate topics. So answering this question is very important for the next undergraduate students. During teaching this course in the curricula, the feedbacks from an undergraduate students and the keynotes of the annual meeting for an advisory committee from industrial side provide a probable answer for the proposed question: it is impossible to build a true software engineer who possesses all the essential elements of software engineering education such teamwork, communications skills, project management skills and contemporary industrial practice from one course and it is impossible to have a one course covering all software engineering topics. Besides the used teaching approach, the author proposes an implemented three supportive ways aiming for mitigating the expected risks and increasing the opportunity to build a true software engineer.

Keywords: software engineering course, software engineering education, software experience, supportive approach

Procedia PDF Downloads 361
20778 Software Assessment Using Ant Colony Optimization Algorithm

Authors: Saad M. Darwish

Abstract:

Recently, software quality issues have come to be seen as important subject as we see an enormous growth of agencies involved in software industries. However,these agencies cannot guarantee the quality of their products, thus leaving users in uncertainties. Software certification is the extension of quality by means that quality needs to be measured prior to certification granting process. This research participates in solving the problem of software assessment by proposing a model for assessment and certification of software product that uses a fuzzy inference engine to integrate both of process–driven and application-driven quality assurance strategies. The key idea of the on hand model is to improve the compactness and the interpretability of the model’s fuzzy rules via employing an ant colony optimization algorithm (ACO), which tries to find good rules description by dint of compound rules initially expressed with traditional single rules. The model has been tested by case study and the results have demonstrated feasibility and practicability of the model in a real environment.

Keywords: optimization technique, quality assurance, software certification model, software assessment

Procedia PDF Downloads 487
20777 KBASE Technological Framework - Requirements

Authors: Ivan Stanev, Maria Koleva

Abstract:

Automated software development issues are addressed in this paper. Layers and packages of a Common Platform for Automated Programming (CPAP) are defined based on Service Oriented Architecture, Cloud computing, Knowledge based automated software engineering (KBASE) and Method of automated programming. Tools of seven leading companies (AWS of Amazon, Azure of Microsoft, App Engine of Google, vCloud of VMWare, Bluemix of IBM, Helion of HP, OCPaaS of Oracle) are analyzed in the context of CPAP. Based on the results of the analysis CPAP requirements are formulated

Keywords: automated programming, cloud computing, knowledge based software engineering, service oriented architecture

Procedia PDF Downloads 302
20776 Multi-Stakeholder Involvement in Construction and Challenges of Building Information Modeling Implementation

Authors: Zeynep Yazicioglu

Abstract:

Project development is a complex process where many stakeholders work together. Employers and main contractors are the base stakeholders, whereas designers, engineers, sub-contractors, suppliers, supervisors, and consultants are other stakeholders. A combination of the complexity of the building process with a large number of stakeholders often leads to time and cost overruns and irregular resource utilization. Failure to comply with the work schedule and inefficient use of resources in the construction processes indicate that it is necessary to accelerate production and increase productivity. The development of computer software called Building Information Modeling, abbreviated as BIM, is a major technological breakthrough in this area. The use of BIM enables architectural, structural, mechanical, and electrical projects to be drawn in coordination. BIM is a tool that should be considered by every stakeholder with the opportunities it offers, such as minimizing construction errors, reducing construction time, forecasting, and determination of the final construction cost. It is a process spreading over the years, enabling all stakeholders associated with the project and construction to use it. The main goal of this paper is to explore the problems associated with the adoption of BIM in multi-stakeholder projects. The paper is a conceptual study, summarizing the author’s practical experience with design offices and construction firms working with BIM. In the transition period to BIM, three of the challenges will be examined in this paper: 1. The compatibility of supplier companies with BIM, 2. The need for two-dimensional drawings, 3. Contractual issues related to BIM. The paper reviews the literature on BIM usage and reviews the challenges in the transition stage to BIM. Even on an international scale, the supplier that can work in harmony with BIM is not very common, which means that BIM's transition is continuing. In parallel, employers, local approval authorities, and material suppliers still need a 2-D drawing. In the BIM environment, different stakeholders can work on the same project simultaneously, giving rise to design ownership issues. Practical applications and problems encountered are also discussed, providing a number of suggestions for the future.

Keywords: BIM opportunities, collaboration, contract issues about BIM, stakeholders of project

Procedia PDF Downloads 102
20775 The Level of Disclosure of Intellectual Capital at Jordanian Development Banks

Authors: Firas A. N. Al-Dalabih

Abstract:

This study aims at identifying the level of disclosure of intellectual capital at the Jordanian development banks. The study sample composed of (100) individuals working at the National Bank to Finance Small Projects around the different governorates of the Hashemite Kingdom of Jordan. A questionnaire has been prepared and distributed over the study sample. (95) Questionnaires have been retrieved; valid for the statistical analysis purposes with a percentage of (95%). The study results showed that the level of disclosure of intellectual capital with all its dimensions (human capital, customer capital and structural capital) at the Jordanian development banks was of a high level. The results also showed that there is a high level of awareness performed by the Jordanian development banks’ employees in regard to the necessity and importance of the intellectual capital’s disclosure. The study was concluded with a number of recommendations among which were that the Jordanian development banks shall take notice toward increasing their workers’ awareness regarding the importance of intellectual capital’s disclosure, as well as applying this study over commercial and Islamic banks for the purposes of carrying out a comparison between them and the development banks.

Keywords: intellectual capital, Jordanian development banks, the level of disclosure

Procedia PDF Downloads 158