14785 Managing Multiple Change Projects in Supply Chains: A Case Study of a Moroccan Multi-Technical Services Company

Authors: Abdelouahab Errida, Bouchra Lotfi, Elalami Semma

Abstract:

In this paper, we try to address the topic of multiple change management by adopting an engineered research methodology, conducted within a Moroccan company during its implementation of several change projects that aim at improving its supply chain management performance. Firstly, we present the key concepts related to our research, namely change management, multiproject management and supply chain management. Then, we try to assess how the change management and multi-project management are applied in this company. Finally, we try to propose an approach that will help managers in dealing with multiple change projects. This approach proposes to integrate change management, project management and multi-project management for managing change projects according to three organizational levels: executive level, project portfolio level and change project level.

Keywords: change management, multi-project management, project management, change portfolio, supply chain management,

Procedia PDF Downloads 205
14784 Promoting Non-Formal Learning Mobility in the Field of Youth

Authors: Juha Kettunen

Abstract:

The purpose of this study is to develop a framework for the assessment of research and development projects. The assessment map is developed in this study based on the strategy map of the balanced scorecard approach. The assessment map is applied in a project that aims to reduce the inequality and risk of exclusion of young people from disadvantaged social groups. The assessment map denotes that not only funding but also necessary skills and qualifications should be carefully assessed in the implementation of the project plans so as to achieve the objectives of projects and the desired impact. The results of this study are useful for those who want to develop the implementation of the Erasmus+ Programme and the project teams of research and development projects.

Keywords: non-formal learning, youth work, social inclusion, innovation

Procedia PDF Downloads 270
14783 An Architecture of Ingenuity and Empowerment

Authors: Timothy Gray

Abstract:

This paper will present work and discuss lessons learned during a semester-long travel study based in Southeast Asia, which was run in the Spring Semester of 2019 and again in the summer of 2023. The first travel group consisted of fifteen students, and the second group consisted of twelve students ranging from second-year to graduate level, student participants majoring in either architecture or planning. Students worked in interdisciplinary teams, each team beginning their travel study, living together in a separate small town for over a month in (relatively) remote conditions in rural Thailand. Students became intimately familiar with these towns, forged strong personal relationships, and built reservoirs of knowledge one conversation at a time. Rather than impose external ideas and solutions, students were asked to learn from and be open to lessons from the people and the place. The following design statement was used as a point of departure for their investigations: It is our shared premise that architecture exists in small villages and towns of Southeast Asia in the ingenuity of the people, that architecture exists in a shared language of making, modifying, and reusing. It is a modest but vibrant architecture, an architecture that is alive and evolving, an architecture that is small in scale, accessible, and one that emerges from the people. It is an architecture that can exist in a modified bicycle, a woven bamboo bridge, or a self-built community. Students were challenged to engage in existing conditions as design professionals, both empowering and lending coherence to the energies that already existed in the place. As one of the student teams noted in their design narrative: “During our field study, we had the unique opportunity to tour a number of informal settlements and meet and talk to residents through interpreters. We found that many of the residents work in nearby factories for dollars a day. Others find employment in self-generated informal economies such as hand carving and textiles. Despite extreme poverty, we found these places to be vibrant and full of life as people navigate these challenging conditions to live lives with purpose and dignity.” Students worked together with local community members and colleagues to develop a series of varied proposals that emerged from their interrogations of place and partnered with community members and professional colleagues in the development of these proposals. Project partners included faculty and student colleagues Yangon University, the mayor's Office, Planning Department Officials and religious leaders in Sawankhalok, Thailand, and community leaders in Natonchan, Thailand, to name a few. This paper will present a series of student community-based design projects that emerged from these conditions. The paper will also discuss this model of travel study as a way of building an architecture which uses social and cultural issues as a catalyst for design. The paper will discuss lessons relative to sustainable development that the Western students learned through their travels in Southeast Asia.

Keywords: travel study, CAPasia, architecture of empowerment, modular housing

Procedia PDF Downloads 29
14782 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 541
14781 Biophilic Design Strategies: Four Case-Studies from Northern Europe

Authors: Carmen García Sánchez

Abstract:

The UN's 17 Sustainable Development Goals – specifically the nº 3 and nº 11- urgently call for new architectural design solutions at different design scales to increase human contact with nature in the health and wellbeing promotion of primarily urban communities. The discipline of Interior Design offers an important alternative to large-scale nature-inclusive actions which are not always possible due to space limitations. These circumstances provide an immense opportunity to integrate biophilic design, a complex emerging and under-developed approach that pursues sustainable design strategies for increasing the human-nature connection through the experience of the built environment. Biophilic design explores the diverse ways humans are inherently inclined to affiliate with nature, attach meaning to and derive benefit from the natural world. It represents a biological understanding of architecture which categorization is still in progress. The internationally renowned Danish domestic architecture built in the 1950´s and early 1960´s - a golden age of Danish modern architecture - left a leading legacy that has greatly influenced the domestic sphere and has further led the world in terms of good design and welfare. This study examines how four existing post-war domestic buildings establish a dialogue with nature and her variations over time. The case-studies unveil both memorable and unique biophilic resources through sophisticated and original design expressions, where transformative processes connect the users to the natural setting and reflect fundamental ways in which they attach meaning to the place. In addition, fascinating analogies in terms of this nature interaction with particular traditional Japanese architecture inform the research. They embody prevailing lessons for our time today. The research methodology is based on a thorough literature review combined with a phenomenological analysis into how these case-studies contribute to the connection between humans and nature, after conducting fieldwork throughout varying seasons to document understanding in nature transformations multi-sensory perception (via sight, touch, sound, smell, time and movement) as a core research strategy. The cases´ most outstanding features have been studied attending the following key parameters: 1. Space: 1.1. Relationships (itineraries); 1.2. Measures/scale; 2. Context: Context: Landscape reading in different weather/seasonal conditions; 3. Tectonic: 3.1. Constructive joints, elements assembly; 3.2. Structural order; 4. Materiality: 4.1. Finishes, 4.2. Colors; 4.3. Tactile qualities; 5. Daylight interplay. Departing from an artistic-scientific exploration this groundbreaking study provides sustainable practical design strategies, perspectives, and inspiration to boost humans´ contact with nature through the experience of the interior built environment. Some strategies are associated with access to outdoor space or require ample space, while others can thrive in a dense urban context without direct access to the natural environment. The objective is not only to produce knowledge, but to phase in biophilic design in the built environment, expanding its theory and practice into a new dimension. Its long-term vision is to efficiently enhance the health and well-being of urban communities through daily interaction with Nature.

Keywords: sustainability, biophilic design, architectural design, interior design, nature, Danish architecture, Japanese architecture

Procedia PDF Downloads 64
14780 Experimental Investigation on the Mechanical Behaviour of Three-Leaf Masonry Walls under In-Plane Loading

Authors: Osama Amer, Yaser Abdel-Aty, Mohamed Abd El Hady

Abstract:

The present paper illustrates an experimental approach to provide understanding of the mechanical behavior and failure mechanisms of different typologies of unreinforced three-leaf masonry walls of historical Islamic architectural heritage in Egypt. The main objective of this study is to investigate the propagation of possible cracking, ultimate load, deformations and failure mechanisms. Experimental data on interface-shear and compression tests on large scale three-leaf masonry wallets are provided. The wallets were built basically of Egyptian limestone and modified lime mortar. External wallets were built of stone blocks while the inner leaf was built of rubble limestone. Different loading conditions and dimensions of core layer for two types of collar joints (with and without shear keys) are considered in the tests. Mechanical properties of the constituent materials of masonry were tested and a database of characteristic properties was created. The results of the experiments will highlight the properties, force-displacement curves, stress distribution of multiple-leaf masonry walls contributing to the derivation of rational design rules and validation of numerical models.

Keywords: masonry, three-leaf walls, mechanical behavior, testing, architectural heritage

Procedia PDF Downloads 270
14779 Implementation of Building Information Modeling in Turkish Government Sector Projects

Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali

Abstract:

In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.

Keywords: building information modelling, BIM implementations, Turkish construction industry, Turkish government sector projects

Procedia PDF Downloads 115
14778 Value Engineering Change Proposal Application in Construction of Road-Building Projects

Authors: Mohammad Mahdi Hajiali

Abstract:

Many of construction projects estimated in Iran have been influenced by the limitations of financial resources. As for Iran, a country that is developing, and to follow this development-oriented approach which many numbers of projects each year run in, if we can reduce the cost of projects by applying a method we will help greatly to minimize the cost of major construction projects and therefore projects will finish faster and more efficiently. One of the components of transportation infrastructure are roads that are considered to have a considerable share of the country budget. In addition, major budget of the related ministry is spending to repair, improve and maintain roads. Value Engineering is a simple and powerful methodology over the past six decades that has been successful in reducing the cost of many projects. Specific solution for using value engineering in the stage of project implementation is called value engineering change proposal (VECP). It was tried in this research to apply VECP in one of the road-building projects in Iran in order to enhance the value of this kind of projects and reduce their cost. In this case study after applying VECP, an idea was raised. It was about use of concrete pavement instead of hot mixed asphalt (HMA) and also using fiber in order to improve concrete pavement performance. VE group team made a decision that for choosing the best alternatives, get expert’s opinions in pavement systems and use Fuzzy TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) for ranking opinions of the experts. Finally, Jointed Plain Concrete Pavement (JPCP) was selected. Group also experimented concrete samples with available fibers in Iran and the results of experiments showed a significant increment in concrete specifications such as flexural strength. In the end, it was shown that by using of fiber-reinforced concrete pavement instead of asphalt pavement, we can achieve a significant saving in cost, time and also increment in quality, durability, and longevity.

Keywords: road-building projects, value engineering change proposal (VECP), Jointed Plain Concrete Pavement (JPCP), Fuzzy TOPSIS, fiber-reinforced concrete

Procedia PDF Downloads 170
14777 Reverse Engineering Genius: Through the Lens of World Language Collaborations

Authors: Cynthia Briggs, Kimberly Gerardi

Abstract:

Over the past six years, the authors have been working together on World Language Collaborations in the Middle School French Program at St. Luke's School in New Canaan, Connecticut, USA. Author 2 brings design expertise to the projects, and both teachers have utilized the fabrication lab, emerging technologies, and collaboration with students. Each year, author 1 proposes a project scope, and her students are challenged to design and engineer a signature project. Both partners have improved the iterative process to ensure deeper learning and sustained student inquiry. The projects range from a 1:32 scale model of the Eiffel Tower that was CNC routed to a fully functional jukebox that plays francophone music, lights up, and can hold up to one thousand songs powered by Raspberry Pi. The most recent project is a Fragrance Marketplace, culminating with a pop-up store for the entire community to discover. Each student will learn the history of fragrance and the chemistry behind making essential oils. Students then create a unique brand, marketing strategy, and concept for their signature fragrance. They are further tasked to use the industrial design process (bottling, packaging, and creating a brand name) to finalize their product for the public Marketplace. Sometimes, these dynamic projects require maintenance and updates. For example, our wall-mounted, three-foot francophone clock is constantly changing. The most recent iteration uses Chat GPT to program the Arduino to reconcile the real-time clock shield and keep perfect time as each hour passes. The lights, motors, and sounds from the clock are authentic to each region, represented with laser-cut embellishments. Inspired by Michel Parmigiani, the history of Swiss watch-making, and the precision of time instruments, we aim for perfection with each passing minute. The authors aim to share exemplary work that is possible with students of all ages. We implemented the reverse engineering process to focus on student outcomes to refine our collaborative process. The products that our students create are prime examples of how the design engineering process is applicable across disciplines. The authors firmly believe that the past and present of World cultures inspire innovation.

Keywords: collaboration, design thinking, emerging technologies, world language

Procedia PDF Downloads 21
14776 Analysing Environmental Licensing of Infrastructure Projects in Brazil

Authors: Ronaldo Seroa Da Motta, Gabriela Santiago

Abstract:

The main contribution of this study is the identification of the factors influencing the environmental licensing process of infrastructure projects in Brazil. These factors will be those that reflect the technical characteristics of the project, the corporate governance of the entrepreneur, and the institutional and regulatory governance of the environmental agency, including the number of interventions by non-licensing agencies. The model conditions these variables to the licensing processing time of 34 infrastructure projects. Our results indicated that the conditions would be more sensitive to the type of enterprise, complexity as in gas pipelines and hydroelectric plants in the most vulnerable biome with a greater value of the enterprise or the entrepreneur's assets, together with the number of employees of the licensing agency. The number of external interventions by other non-licensing institutions does not affect the licensing time. Such results challenge the current criticism that environmental licensing has been often pointed out as a barrier to speed up investments in infrastructure projects in Brazil due to the participation of civil society and other non-licensing institutions.

Keywords: environmental licensing, condionants, Brazil, timing process

Procedia PDF Downloads 112
14775 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 484
14774 Point-of-Decision Design (PODD) to Support Healthy Behaviors in the College Campuses

Authors: Michelle Eichinger, Upali Nanda

Abstract:

Behavior choices during college years can establish the pattern of lifelong healthy living. Nearly 1/3rd of American college students are either overweight (25 < BMI < 30) or obese (BMI > 30). In addition, overweight/obesity contributes to depression, which is a rising epidemic among college students, affecting academic performance and college drop-out rates. Overweight and obesity result in an imbalance of energy consumption (diet) and energy expenditure (physical activity). Overweight/obesity is a significant contributor to heart disease, diabetes, stroke, physical disabilities and some cancers, which are the leading causes of death and disease in the US. There has been a significant increase in obesity and obesity-related disorders such as type 2 diabetes, hypertension, and dyslipidemia among people in their teens and 20s. Historically, the evidence-based interventions for obesity prevention focused on changing the health behavior at the individual level and aimed at increasing awareness and educating people about nutrition and physical activity. However, it became evident that the environmental context of where people live, work and learn was interdependent to healthy behavior change. As a result, a comprehensive approach was required to include altering the social and built environment to support healthy living. College campus provides opportunities to support lifestyle behavior and form a health-promoting culture based on some key point of decisions such as stairs/ elevator, walk/ bike/ car, high-caloric and fast foods/balanced and nutrient-rich foods etc. At each point of decision, design, can help/hinder the healthier choice. For example, stair well design and motivational signage support physical activity; grocery store/market proximity influence healthy eating etc. There is a need to collate the vast information that is in planning and public health domains on a range of successful point of decision prompts, and translate it into architectural guidelines that help define the edge condition for critical point of decision prompts. This research study aims to address healthy behaviors through the built environment with the questions, how can we make the healthy choice an easy choice through the design of critical point of decision prompts? Our hypothesis is that well-designed point of decision prompts in the built environment of college campuses can promote healthier choices by students, which can directly impact mental and physical health related to obesity. This presentation will introduce a combined health and architectural framework aimed to influence healthy behaviors through design applied for college campuses. The premise behind developing our concept, point-of-decision design (PODD), is healthy decision-making can be built into, or afforded by our physical environments. Using effective design intervention strategies at these 'points-of-decision' on college campuses to make the healthy decision the default decision can be instrumental in positively impacting health at the population level. With our model, we aim to advance health research by utilizing point-of-decision design to impact student health via core sectors of influences within college settings, such as campus facilities and transportation. We will demonstrate how these domains influence patterns/trends in healthy eating and active living behaviors among students. how these domains influence patterns/trends in healthy eating and active living behaviors among students.

Keywords: architecture and health promotion, college campus, design strategies, health in built environment

Procedia PDF Downloads 191
14773 Domain Driven Design vs Soft Domain Driven Design Frameworks

Authors: Mohammed Salahat, Steve Wade

Abstract:

This paper presents and compares the SSDDD “Systematic Soft Domain Driven Design Framework” to DDD “Domain Driven Design Framework” as a soft system approach of information systems development. The framework use SSM as a guiding methodology within which we have embedded a sequence of design tasks based on the UML leading to the implementation of a software system using the Naked Objects framework. This framework has been used in action research projects that have involved the investigation and modelling of business processes using object-oriented domain models and the implementation of software systems based on those domain models. Within this framework, Soft Systems Methodology (SSM) is used as a guiding methodology to explore the problem situation and to develop the domain model using UML for the given business domain. The framework is proposed and evaluated in our previous works, a comparison between SSDDD and DDD is presented in this paper, to show how SSDDD improved DDD as an approach to modelling and implementing business domain perspectives for Information Systems Development. The comparison process, the results, and the improvements are presented in the following sections of this paper.

Keywords: domain-driven design, soft domain-driven design, naked objects, soft language

Procedia PDF Downloads 273
14772 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.

Keywords: construction, project management, strategic leadership, sustainability, waste reduction

Procedia PDF Downloads 29
14771 The Aspect of Urban Inequality after Urban Redevelopment Projects

Authors: Sungik Kang, Ja-Hoon Koo

Abstract:

Globally, urban environments have become unequal, and cities have been segmented by income class. It is predicted that urban inequality has arisen by urban redevelopment and reconstruction projects that improve the urban environment and innovate cities. This study aims to analyze the occurrence and characteristics of urban inequality by using the housing price and sale price and demonstrating the correlation with the urban redevelopment project. This study measures 14 years of urban inequality index for 25 autonomous districts in Seoul and analyzes the correlation between urban inequality with urban redevelopment projects. As a conclusion of this study, first, the urban inequality index of Seoul has been continuously rising since 2015. Trends from 2006 to 2019 have been in U-curved shape in between 2015. In 2019, Seoul's urban inequality index was 0.420, a level similar to that of the 2007 financial crisis. Second, the correlation between urban redevelopment and urban inequality was not statistically significant. Therefore, we judged that urban redevelopment's scale or project structure has nothing with urban inequality. Third, while district designation of urban reconstruction temporarily alleviates urban inequality, the completion of the project increases urban inequality. When designating a district, urban inequality is likely to decrease due to decreased outdated housing transactions. However, the correlation with urban inequality increases as expensive houses has been placed after project completion.

Keywords: urban inequality, urban redevelopment projects, urban reconstruction projects, housing price inequality, panel analysis

Procedia PDF Downloads 185
14770 The Effect of Principled Human Resource Management and Training Based on Existing Standards in Order to Improve the Quality of Construction Projects

Authors: Arsalan Salahi

Abstract:

Today, the number of changes in the construction industry and urban mass house building is increasing, which makes you need to pay more attention to targeted planning for human resource management and training. The human resources working in the construction industry have various problems and deficiencies, and in order to solve these problems, there is a need for basic management and training of these people in order to lower the construction costs and increase the quality of the projects, especially in mass house building projects. The success of any project in reaching short and long-term professional goals depends on the efficient combination of work tools, financial resources, raw materials, and most importantly, human resources. Today, due to the complexity and diversity of each project, specialized management fields have emerged to maximize the potential benefits of each component of that project. Human power is known as the most important resource in construction projects for its successful implementation, but unfortunately, due to the low cost of human power compared to other resources, such as materials and machinery, little attention is paid to it. With the correct management and training of human resources, which depends on its correct planning and development, it is possible to improve the performance of construction projects. In this article, the training and motivation of construction industry workers and their effects on the effectiveness of projects in this industry have been researched. In this regard, some barriers to the training and motivation of construction workers and personnel have been identified and solutions have been provided for construction companies. Also, the impact of workers and unskilled people on the efficiency of construction projects is investigated. The results of the above research show that by increasing the use of correct and basic training for human resources, we will see positive results and effects on the performance of construction projects.

Keywords: human resources, construction industry, principled training, skilled and unskilled workers

Procedia PDF Downloads 60
14769 A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis

Authors: Natalia Rudeli, Elisabeth Viles, Adrian Santilli

Abstract:

Delays in the construction industry are a global phenomenon. Many construction projects experience extensive delays exceeding the initially estimated completion time. The main purpose of this study is to identify construction projects typical behaviors in order to develop a prognosis and management tool. Being able to know a construction projects schedule tendency will enable evidence-based decision-making to allow resolutions to be made before delays occur. This study presents an innovative approach that uses Cluster Analysis Method to support predictions during Earned Value Analyses. A clustering analysis was used to predict future scheduling, Earned Value Management (EVM), and Earned Schedule (ES) principal Indexes behaviors in construction projects. The analysis was made using a database with 90 different construction projects. It was validated with additional data extracted from literature and with another 15 contrasting projects. For all projects, planned and executed schedules were collected and the EVM and ES principal indexes were calculated. A complete linkage classification method was used. In this way, the cluster analysis made considers that the distance (or similarity) between two clusters must be measured by its most disparate elements, i.e. that the distance is given by the maximum span among its components. Finally, through the use of EVM and ES Indexes and Tukey and Fisher Pairwise Comparisons, the statistical dissimilarity was verified and four clusters were obtained. It can be said that construction projects show an average delay of 35% of its planned completion time. Furthermore, four typical behaviors were found and for each of the obtained clusters, the interim milestones and the necessary rhythms of construction were identified. In general, detected typical behaviors are: (1) Projects that perform a 5% of work advance in the first two tenths and maintain a constant rhythm until completion (greater than 10% for each remaining tenth), being able to finish on the initially estimated time. (2) Projects that start with an adequate construction rate but suffer minor delays culminating with a total delay of almost 27% of the planned time. (3) Projects which start with a performance below the planned rate and end up with an average delay of 64%, and (4) projects that begin with a poor performance, suffer great delays and end up with an average delay of a 120% of the planned completion time. The obtained clusters compose a tool to identify the behavior of new construction projects by comparing their current work performance to the validated database, thus allowing the correction of initial estimations towards more accurate completion schedules.

Keywords: cluster analysis, construction management, earned value, schedule

Procedia PDF Downloads 240
14768 The Work Book Tool, a Lifelong Chronicle: Part of the "Designprogrammet" at the Design School of the University in Kalmar, Sweden

Authors: Henriette Jarild-Koblanck, Monica Moro

Abstract:

The research has been implemented at the Kalmar University now LNU Linnaeus University inside the Design Program (Designprogrammet) for several years. The Work Book tool was created using the framework of the Bologna declaration. The project concerns primarily pedagogy and design methodology, focusing on how we evaluate artistic work processes and projects and on how we can develop the preconditions for cross-disciplinary work. The original idea of the Work Book springs from the steady habit of the Swedish researcher and now retired full professor and dean Henriette Koblanck to put images, things and colours in a notebook, right from her childhood, writing down impressions and reflections. On this preliminary thought of making use of a work book, in a form freely chosen by the user, she began to develop the Design Program (Designprogrammet) that was applied at the Kalmar University now LNU Linnaeus University, where she called a number of professionals to collaborate, among them Monica Moro an Italian designer, researcher, and teacher in the field of colour and shape. The educational intention is that the Work Book should become a tool that is both inspirational for the process of thinking and intuitional creating, and personal support for both rational and technical thinking. The students were to use the Work Book not only to visually and graphically document their results from investigations, experiments and thoughts but also as a tool to present their works to others, -students, tutors and teachers, or to other stakeholders they discussed the proceedings with. To help the students a number of matrixes were developed oriented to evaluate the projects in elaboration, based on the Bologna Declaration. In conclusion, the feedback from the students is excellent; many are still using the Work Book as a professional tool as in their words they consider it a rather accurate representation of their working process, and furthermore of themselves, so much that many of them have used it as a portfolio when applying for jobs.

Keywords: academic program, art, assessment of student’s progress, Bologna Declaration, design, learning, self-assessment

Procedia PDF Downloads 312
14767 Tokenization of Blue Bonds to Scale Blue Carbon Projects

Authors: Rodrigo Buaiz Boabaid

Abstract:

Tokenization of Blue Bonds is an emerging Green Finance tool that has the potential to scale Blue Carbon Projects to fight climate change. This innovative solution has a huge potential to democratize the green finance market and catalyze innovations in the climate change finance sector. Switzerland has emerged as a leader in the Green Finance space and is well-positioned to drive the adoption of Tokenization of Blue & Green Bonds. This unique approach has the potential to unlock new sources of capital and enable global investors to participate in the financing of sustainable blue carbon projects. By leveraging the power of blockchain technology, Tokenization of Blue Bonds can provide greater transparency, efficiency, and security in the investment process while also reducing transaction costs. Investments are in line with the highest regulations and designed according to the stringent legal framework and compliance standards set by Switzerland. The potential benefits of Tokenization of Blue Bonds are significant and could transform the way that sustainable projects are financed. By unlocking new sources of capital, this approach has the potential to accelerate the deployment of Blue Carbon projects and create new opportunities for investors to participate in the fight against climate change.

Keywords: blue bonds, blue carbon, tokenization, green finance

Procedia PDF Downloads 62
14766 PPPs as Panacea to Delivery of Public Sector Construction Project in Zimbabwe

Authors: Ringisai Abigail Mawondo-Dhliwayo, Kahilu Kajimo-Shakantu

Abstract:

Due to financial challenges which governments in general face, it is becoming more difficult for many to continually use their limited resources to undertake infrastructural development. Governments increasingly now need other delivery approaches, in particular, the Public-Private Partnerships which make it possible for the public sector to achieve infrastructural development without incurring any/minimum cost. The literature reviewed outlined that benefits of PPPs include timely delivery of quality projects with cost limits. The methodology utilized for the empirical study comprised six interviews and sixty questionnaires which were undertaken and administered by construction consultants and government officials involved in PPPs projects. The results obtained showed that PPPs are not widely used in Zimbabwe although the need for their use exists. The study also found some challenges which prevent or derail the rate at which PPPs are utilized, of which the primary one was a political influence. It is concluded that despite limitations, PPPs remain the most effective and viable option for the delivery of government projects. The study recommends that policy and framework for the implementation of PPPs be developed. More useful information could have been obtained if final users of PPPs projects were included in the sample for data collection.

Keywords: construction projects, procurement, public private partnerships, public sector

Procedia PDF Downloads 233
14765 The Engineering Design of the Temple of Dendera in the City of Qena, Egypt

Authors: Shady Ahmed Emara

Abstract:

Introductory statement: The temple is characterized by a unique engineering design. This study aimed to explain the means that were used to reach this design. Background of the Study: Temple of Dandara consists of 24 columns with a height of 18m and a diameter of 2m. This paper is about the engineering method for constructing these huge columns. Two experiments were conducted at the temple. The first experiment used AutoCAD to compare the similarity of the columns in terms of dimensions. The second experiment used a laser rangefinder to measure the extent of the match between the heights between the columns. The Major Findings of the Study: (1) The method of constructing the columns was through several divided layers. It is divided into two halves and built opposite each other to maintain the integrity of the columns. (2) The match between the heights of the columns, which reached the error rate between one column and another, is only 1 mm. Concluding Statement: Both experiences will be explained through 2D and 3D.

Keywords: ancient, construction, architecture, building

Procedia PDF Downloads 79
14764 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 377
14763 An Integrated Framework for Wind-Wave Study in Lakes

Authors: Moien Mojabi, Aurelien Hospital, Daniel Potts, Chris Young, Albert Leung

Abstract:

The wave analysis is an integral part of the hydrotechnical assessment carried out during the permitting and design phases for coastal structures, such as marinas. This analysis aims in quantifying: i) the Suitability of the coastal structure design against Small Craft Harbour wave tranquility safety criterion; ii) Potential environmental impacts of the structure (e.g., effect on wave, flow, and sediment transport); iii) Mooring and dock design and iv) Requirements set by regulatory agency’s (e.g., WSA section 11 application). While a complex three-dimensional hydrodynamic modelling approach can be applied on large-scale projects, the need for an efficient and reliable wave analysis method suitable for smaller scale marina projects was identified. As a result, Tetra Tech has developed and applied an integrated analysis framework (hereafter TT approach), which takes the advantage of the state-of-the-art numerical models while preserving the level of simplicity that fits smaller scale projects. The present paper aims to describe the TT approach and highlight the key advantages of using this integrated framework in lake marina projects. The core of this methodology is made by integrating wind, water level, bathymetry, and structure geometry data. To respond to the needs of specific projects, several add-on modules have been added to the core of the TT approach. The main advantages of this method over the simplified analytical approaches are i) Accounting for the proper physics of the lake through the modelling of the entire lake (capturing real lake geometry) instead of a simplified fetch approach; ii) Providing a more realistic representation of the waves by modelling random waves instead of monochromatic waves; iii) Modelling wave-structure interaction (e.g. wave transmission/reflection application for floating structures and piles amongst others); iv) Accounting for wave interaction with the lakebed (e.g. bottom friction, refraction, and breaking); v) Providing the inputs for flow and sediment transport assessment at the project site; vi) Taking in consideration historical and geographical variations of the wind field; and vii) Independence of the scale of the reservoir under study. Overall, in comparison with simplified analytical approaches, this integrated framework provides a more realistic and reliable estimation of wave parameters (and its spatial distribution) in lake marinas, leading to a realistic hydrotechnical assessment accessible to any project size, from the development of a new marina to marina expansion and pile replacement. Tetra Tech has successfully utilized this approach since many years in the Okanagan area.

Keywords: wave modelling, wind-wave, extreme value analysis, marina

Procedia PDF Downloads 59
14762 Investigating Re-Use a Historical Masonry Arch Bridge

Authors: H. A. Erdogan

Abstract:

Historical masonry arch bridges built centuries ago have fulfilled their function until recent decades. However, from the beginning of 20th century, these bridges have remained inadequate as a result of increasing speed, size and capacity of the means of transport. Although new bridges have been built in many places, masonry bridges located within the city limits still need to be used. When the size and transportation loads of modern vehicles are taken into account, it is apparent that historical masonry arch bridges would be exposed to greater loads than their initial design loads. Because of that, many precautions taken either remain insufficient or damage these bridges. In this study, the history of Debbaglar Bridge, one of the historic bridges located in the city center of Aksaray/Turkey is presented and its existing condition is evaluated. Structural analysis of the bridge under present conditions and loads is explained. Moreover, the retrofit and restoration application prepared considering the analysis data is described.

Keywords: adaptive re-use, Aksaray debbaglar bridge, masonry bridge, reconstruction

Procedia PDF Downloads 288
14761 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 383
14760 The Concept of Universal Design in the Independent City Life of Disabled Individuals

Authors: Berfu Guley Goren, Ayse Lale Berkoz

Abstract:

The aim of the study is to analyze the concept of universal design and accessibility to make the city which allows equality and independence for individuals. In the content of the study, literature researches and observations of samples in Istanbul, Turkey are analyzed. As a result proposals are going to be developed to create the cities which are designed for everyone. In globalization process, in cities, population have been increasing dramatically with social and economic activities. Medical developments have been effective in prolonging human life and the disability that comes with aging has also increased in parallel with the disabled population. Nowadays disability is an important phenomenon. Because approximately 1 billion people live with disabilities. The heterogeneous structure formed by the rapid gathering of individuals with different social, economic and physical characteristics in the cities creates great spatial diversity and richness in the cities with different needs brought together. Unlike the cultural and physical wealth in these places and the potential to integrate and diversify the urban people, unfortunately, the designs in practice cause the urban areas to break apart, the urbanities to tear themselves apart, to interfere with their communication and interactions. The social and physical structure of the city is important to feel belonging to the urban society. In most cities when an observation is made, obstructions for people with disabilities can be seen in urban physical structure and design. With these obstructions, people with disabilities cannot live in urban space, and they are desolated in urban life. The city, which offers equal opportunity, the relation between economic development, social justice and built environment must be planned synchronous. Isolation and stigmatization must be abolished by regulations, activities of awareness and universal urban design. Without regard to social, economical and physical features every individual has the same right, which is using the freedom of movement. Supporting freedom of movement of every individual may be ensured by universal design and its principles. So urban spaces are going to be for every individual. For equal opportunity in urban services, urban design must be the focus on every individual including people with disabilities. In built environment practices, democratic suitable spaces should be created. In this respect, urban planners, architects, political decision-makers and other relevant actors should work together and should think very versatile.

Keywords: disability, equality, universal design, urban design

Procedia PDF Downloads 281
14759 Study of Open Spaces in Urban Residential Clusters in India

Authors: Renuka G. Oka

Abstract:

From chowks to streets to verandahs to courtyards; residential open spaces are very significantly placed in traditional urban neighborhoods of India. At various levels of intersection, the open spaces with their attributes like juxtaposition with the built fabric, scale, climate sensitivity and response, multi-functionality, etc. reflect and respond to the patterns of human interactions. Also, these spaces tend to be quite well utilized. On the other hand, it is a common specter to see an imbalanced utilization of open spaces in newly/recently planned residential clusters. This is maybe due to lack of activity generators around or wrong locations or excess provisions or improper incorporation of aforementioned design attributes. These casual observations suggest the necessity for a systematic study of current residential open spaces. The exploratory study thus attempts to draw lessons through a structured inspection of residential open spaces to understand the effective environment as revealed through their use patterns. Here, residential open spaces are considered in a wider sense to incorporate all the un-built fabric around. These thus, include both use spaces and access space. For the study, open spaces in ten exemplary housing clusters/societies built during the last ten years across India are studied. A threefold inquiry is attempted in this direction. The first relates to identifying and determining the effects of various physical functions like space organization, size, hierarchy, thermal and optical comfort, etc. on the performance of residential open spaces. The second part sets out to understand socio-cultural variations in values, lifestyle, and beliefs which determine activity choices and behavioral preferences of users for respective residential open spaces. The third inquiry further observes the application of these research findings to the design process to derive meaningful and qualitative design advice. However, the study also emphasizes to develop a suitable framework of analysis and to carve out appropriate methods and approaches to probe into these aspects of the inquiry. Given this emphasis, a considerable portion of the research details out the conceptual framework for the study. This framework is supported by an in-depth search of available literature. The findings are worked out for design solutions which integrate the open space systems with the overall design process for residential clusters. The open spaces in residential areas present great complexities both in terms of their use patterns and determinants of their functional responses. The broad aim of the study is, therefore, to arrive at reconsideration of standards and qualitative parameters used by designers – on the basis of more substantial inquiry into the use patterns of open spaces in residential areas.

Keywords: open spaces, physical and social determinants, residential clusters, use patterns

Procedia PDF Downloads 125
14758 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 233
14757 The Functional-Engineered Product-Service System Model: An Extensive Review towards a Unified Approach

Authors: Nicolas Haber

Abstract:

The study addresses the design process of integrated product-service offerings as a measure of answering environmental sustainability concerns by replacing stand-alone physical artefacts with comprehensive solutions relying on functional results rather than conventional product sales. However, views regarding this transformation are dissimilar and differentiated: The study discusses the importance and requirements of product-service systems before analysing the theoretical studies accomplished in the extent of their design and development processes. Based on this, a framework, built on a design science approach, is proposed, where the distinct approaches from the literature are merged towards a unified structure serving as a generic methodology to designing product-service systems. Each stage of this model is then developed to present a holistic design proposal called the Functional Engineered Product-Service System (FEPSS) model. Product-service systems are portrayed as customisable solutions tailored to specific settings and defined circumstances. Moreover, the approaches adopted to guide the design process are diversified. A thorough analysis of the design strategies and development processes however, allowed the extraction of a design backbone, valid to varied situations and contexts whether they are product-oriented, use-oriented or result-oriented. The goal is to guide manufacturers towards an eased adoption of these integrated offerings, given their inherited environmental benefits, by proposing a robust all-purpose design process.

Keywords: functional product, integrated product-service offerings, product-service systems, sustainable design

Procedia PDF Downloads 270
14756 The City of Images: Urban Mobility Policies and Extra-Small Tactical Projects for Promoting the Quality of Urban Life of People with Autism Spectrum Disorder in the Everyday City

Authors: Valentina Talu, Giulia Tola

Abstract:

Current researches and applications aimed at exploring the role of spatial configuration as a means for improving the autonomy of people with ASD (Autism Spectrum Disorder), almost exclusively focus on the definition of criteria for the design of closed, separated, private spaces devoted only to people - mainly children - with ASD. In fact, very few researches specifically investigate the relation between the city and people with autism, focusing on their sensory experiences related to the interaction with the urban environment. The growing incidence of ASD and the need to guarantee during adulthood the actual opportunity to exercise the achieved level of autonomy and independency, emphasizes the necessity to ‘broaden’ the research perspective by investigating also the specific contribution of urban mobility policies and urban design to the enhancement of the quality of life of people with ASD. Starting from these considerations, the paper describes an ongoing research focused on the relation between the city and people with autism spectrum disorder, with the specific aim of promoting their possibility of walking across the city at the neighborhood scale, thus making the access to relevant urban spaces and services possible. In the first part, the paper proposes a framework for illustrating the commonly recurring problems that people with ASD face in their daily life when they interact with the urban environment (with reference to the capability approach). Subsequently, with the support of an in depth analysis of existing contributions (researches and projects) and an exchange with different experts (neuropsychiatrists, teachers, parents), are identified two urban requirements, then 'translated' into an integrated system of urban mobility policies and extra-small tactical project aimed at enhancing the actual possibility for people with ASD of walking through the city autonomously and safely. According to this vision, the promotion of the autonomy of people with ASD through the adoption of mobility policies and micro tactical urban projects can represent an opportunity for promoting and improving the overall quality of urban life.

Keywords: city and people with ASD, quality of urban life of disadvantaged people, urban capabilities, urban design

Procedia PDF Downloads 136