Search results for: timing constraints
1527 Energy-Aware Scheduling in Real-Time Systems: An Analysis of Fair Share Scheduling and Priority-Driven Preemptive Scheduling
Authors: Su Xiaohan, Jin Chicheng, Liu Yijing, Burra Venkata Durga Kumar
Abstract:
Energy-aware scheduling in real-time systems aims to minimize energy consumption, but issues related to resource reservation and timing constraints remain challenges. This study focuses on analyzing two scheduling algorithms, Fair-Share Scheduling (FFS) and Priority-Driven Preemptive Scheduling (PDPS), for solving these issues and energy-aware scheduling in real-time systems. Based on research on both algorithms and the processes of solving two problems, it can be found that Fair-Share Scheduling ensures fair allocation of resources but needs to improve with an imbalanced system load, and Priority-Driven Preemptive Scheduling prioritizes tasks based on criticality to meet timing constraints through preemption but relies heavily on task prioritization and may not be energy efficient. Therefore, improvements to both algorithms with energy-aware features will be proposed. Future work should focus on developing hybrid scheduling techniques that minimize energy consumption through intelligent task prioritization, resource allocation, and meeting time constraints.Keywords: energy-aware scheduling, fair-share scheduling, priority-driven preemptive scheduling, real-time systems, optimization, resource reservation, timing constraints
Procedia PDF Downloads 1191526 Do European Hedge Fund Managers Time Market Liquidity?
Authors: Soumaya Ben Kheilifa, Dorra Mezzez Hmaied
Abstract:
We propose two approaches to examine whether European hedge fund managers can time market liquidity. Using a sample of 1616 European hedge funds, we find evidence of liquidity timing. More importantly, this ability adds economic value to investors. Thus, it represents valuable managerial skill and a major source of European hedge funds’ performance. Also we show that the majority of these funds demonstrate liquidity timing ability especially during liquidity crisis. Finally, it emerged that our main evidence of liquidity timing remains significant after controlling for market timing and volatility timing.Keywords: european hedge funds, liquidity timing ability, market liquidity, crisis
Procedia PDF Downloads 3921525 A Survey on Countermeasures of Cache-Timing Attack on AES Systems
Authors: Settana M. Abdulh, Naila A. Sadalla, Yaseen H. Taha, Howaida Elshoush
Abstract:
Side channel attacks are based on side channel information, which is information that is leaked from encryption systems. This includes timing information, power consumption as well as electromagnetic or even sound leaking which can exploited by an attacker. Implementing side channel attacks are possible if and only if an attacker has access to a cryptosystem. In this case, the attacker can exploit bad implementation in software or hardware which is not controlled by encryption implementer. Thus, he/she will represent a real threat to the security system. Several countermeasures have been proposed to eliminate side channel information vulnerability.Cache timing attack is a special type of side channel attack. Here, timing information is collected and analyzed by an attacker to guess sensitive information such as encryption key or plaintext. This paper reviews the technique applied in this attack and surveys the countermeasures against it, evaluating the feasibility and usability of each. Based on this evaluation, finally we pose several recommendations about using these countermeasures.Keywords: AES algorithm, side channel attack, cache timing attack, cache timing countermeasure
Procedia PDF Downloads 2991524 Solutions to Probabilistic Constrained Optimal Control Problems Using Concentration Inequalities
Authors: Tomoaki Hashimoto
Abstract:
Recently, optimal control problems subject to probabilistic constraints have attracted much attention in many research field. Although probabilistic constraints are generally intractable in optimization problems, several methods haven been proposed to deal with probabilistic constraints. In most methods, probabilistic constraints are transformed to deterministic constraints that are tractable in optimization problems. This paper examines a method for transforming probabilistic constraints into deterministic constraints for a class of probabilistic constrained optimal control problems.Keywords: optimal control, stochastic systems, discrete-time systems, probabilistic constraints
Procedia PDF Downloads 2781523 A Survey on Compression Methods for Table Constraints
Authors: N. Gharbi
Abstract:
Constraint Satisfaction problems are mathematical problems that are often used to model many real-world problems for which we look if there exists a solution satisfying all its constraints. Table constraints are important for modeling parts of many problems since they list all combinations of allowed or forbidden values. However, they admit practical limitations because they are sometimes too large to be represented in a direct way. In this paper, we present a survey of the different categories of the proposed approaches to compress table constraints in order to reduce both space and time complexities.Keywords: constraint programming, compression, data mining, table constraints
Procedia PDF Downloads 3251522 Timing Equation for Capturing Satellite Thermal Images
Authors: Toufic Abd El-Latif Sadek
Abstract:
The Asphalt object represents the asphalted areas, like roads. The best original data of thermal images occurred at a specific time during the days of the year, by preventing the gaps in times which give the close and same brightness from different objects, using seven sample objects, asphalt, concrete, metal, rock, dry soil, vegetation, and water. It has been found in this study a general timing equation for capturing satellite thermal images at different locations, depends on a fixed time the sunrise and sunset; Capture Time= Tcap =(TM*TSR) ±TS.Keywords: asphalt, satellite, thermal images, timing equation
Procedia PDF Downloads 3501521 A New IFO Estimation Scheme for Orthogonal Frequency Division Multiplexing Systems
Authors: Keunhong Chae, Seokho Yoon
Abstract:
We address a new integer frequency offset (IFO) estimation scheme with an aid of a pilot for orthogonal frequency division multiplexing systems. After correlating each continual pilot with a predetermined scattered pilot, the correlation value is again correlated to alleviate the influence of the timing offset. From numerical results, it is demonstrated that the influence of the timing offset on the IFO estimation is significantly decreased.Keywords: estimation, integer frequency offset, OFDM, timing offset
Procedia PDF Downloads 5681520 Timing and Noise Data Mining Algorithm and Software Tool in Very Large Scale Integration (VLSI) Design
Authors: Qing K. Zhu
Abstract:
Very Large Scale Integration (VLSI) design becomes very complex due to the continuous integration of millions of gates in one chip based on Moore’s law. Designers have encountered numerous report files during design iterations using timing and noise analysis tools. This paper presented our work using data mining techniques combined with HTML tables to extract and represent critical timing/noise data. When we apply this data-mining tool in real applications, the running speed is important. The software employs table look-up techniques in the programming for the reasonable running speed based on performance testing results. We added several advanced features for the application in one industry chip design.Keywords: VLSI design, data mining, big data, HTML forms, web, VLSI, EDA, timing, noise
Procedia PDF Downloads 2541519 Best Timing for Capturing Satellite Thermal Images, Asphalt, and Concrete Objects
Authors: Toufic Abd El-Latif Sadek
Abstract:
The asphalt object represents the asphalted areas like roads, and the concrete object represents the concrete areas like concrete buildings. The efficient extraction of asphalt and concrete objects from one satellite thermal image occurred at a specific time, by preventing the gaps in times which give the close and same brightness values between asphalt and concrete, and among other objects. So that to achieve efficient extraction and then better analysis. Seven sample objects were used un this study, asphalt, concrete, metal, rock, dry soil, vegetation, and water. It has been found that, the best timing for capturing satellite thermal images to extract the two objects asphalt and concrete from one satellite thermal image, saving time and money, occurred at a specific time in different months. A table is deduced shows the optimal timing for capturing satellite thermal images to extract effectively these two objects.Keywords: asphalt, concrete, satellite thermal images, timing
Procedia PDF Downloads 3221518 Conservativeness of Probabilistic Constrained Optimal Control Method for Unknown Probability Distribution
Authors: Tomoaki Hashimoto
Abstract:
In recent decades, probabilistic constrained optimal control problems have attracted much attention in many research field. Although probabilistic constraints are generally intractable in an optimization problem, several tractable methods haven been proposed to handle probabilistic constraints. In most methods, probabilistic constraints are reduced to deterministic constraints that are tractable in an optimization problem. However, there is a gap between the transformed deterministic constraints in case of known and unknown probability distribution. This paper examines the conservativeness of probabilistic constrained optimization method with the unknown probability distribution. The objective of this paper is to provide a quantitative assessment of the conservatism for tractable constraints in probabilistic constrained optimization with the unknown probability distribution.Keywords: optimal control, stochastic systems, discrete time systems, probabilistic constraints
Procedia PDF Downloads 5811517 Timetabling for Interconnected LRT Lines: A Package Solution Based on a Real-world Case
Authors: Huazhen Lin, Ruihua Xu, Zhibin Jiang
Abstract:
In this real-world case, timetabling the LRT network as a whole is rather challenging for the operator: they are supposed to create a timetable to avoid various route conflicts manually while satisfying a given interval and the number of rolling stocks, but the outcome is not satisfying. Therefore, the operator adopts a computerised timetabling tool, the Train Plan Maker (TPM), to cope with this problem. However, with various constraints in the dual-line network, it is still difficult to find an adequate pairing of turnback time, interval and rolling stocks’ number, which requires extra manual intervention. Aiming at current problems, a one-off model for timetabling is presented in this paper to simplify the procedure of timetabling. Before the timetabling procedure starts, this paper presents how the dual-line system with a ring and several branches is turned into a simpler structure. Then, a non-linear programming model is presented in two stages. In the first stage, the model sets a series of constraints aiming to calculate a proper timing for coordinating two lines by adjusting the turnback time at termini. Then, based on the result of the first stage, the model introduces a series of inequality constraints to avoid various route conflicts. With this model, an analysis is conducted to reveal the relation between the ratio of trains in different directions and the possible minimum interval, observing that the more imbalance the ratio is, the less possible to provide frequent service under such strict constraints.Keywords: light rail transit (LRT), non-linear programming, railway timetabling, timetable coordination
Procedia PDF Downloads 871516 Factors for Entry Timing Choices Using Principal Axis Factorial Analysis and Logistic Regression Model
Authors: C. M. Mat Isa, H. Mohd Saman, S. R. Mohd Nasir, A. Jaapar
Abstract:
International market expansion involves a strategic process of market entry decision through which a firm expands its operation from domestic to the international domain. Hence, entry timing choices require the needs to balance the early entry risks and the problems in losing opportunities as a result of late entry into a new market. Questionnaire surveys administered to 115 Malaysian construction firms operating in 51 countries worldwide have resulted in 39.1 percent response rate. Factor analysis was used to determine the most significant factors affecting entry timing choices of the firms to penetrate the international market. A logistic regression analysis used to examine the firms’ entry timing choices, indicates that the model has correctly classified 89.5 per cent of cases as late movers. The findings reveal that the most significant factor influencing the construction firms’ choices as late movers was the firm factor related to the firm’s international experience, resources, competencies and financing capacity. The study also offers valuable information to construction firms with intention to internationalize their businesses.Keywords: factors, early movers, entry timing choices, late movers, logistic regression model, principal axis factorial analysis, Malaysian construction firms
Procedia PDF Downloads 3781515 Business Constraints and Growth Potential of Smes: Case Study of Electrical Industry in Pakistan
Authors: Muhammad Waseem Akram
Abstract:
The current study attempts to analyze the impact of business constraints on the growth potential and performance of Small and Medium Enterprises (SMEs) in the electrical industry of Pakistan. Primary data have been utilized for the study collected from the electrical industry cluster in Sargodha, Pakistan. OLS regression is used to assess the impact of business constraints on the performance of SMEs by controlling the effect of Technology Level, Innovations, and Firm Size. To associate business constraints with the growth potential of SMEs, the study utilized Tetrachoric Correlation and Logistic Regression. Findings reveal that all the business constraints negatively affect the performance of SMEs in the electrical industry except Political Instability. Results of Tetrachoric Correlation show that all the business constraints are negatively correlated with the growth potential of SMEs. Logistic Regression results show that Energy Constraint, Inflation and Price Instability, and Bad Business Practices, all three business constraints cause to reduce the probability of income growth in sample SMEs.Keywords: SMEs, business constraints, performance, growth potential
Procedia PDF Downloads 1691514 A Golay Pair Based Synchronization Algorithm for Distributed Multiple-Input Multiple-Output System
Authors: Weizhi Zhong, Xiaoyi Lu, Lei Xu
Abstract:
In order to solve the problem of inaccurate synchronization for distributed multiple-input multiple-output (MIMO) system in multipath environment, a golay pair aided timing synchronization method is proposed in this paper. A new synchronous training sequence based on golay pair is designed. By utilizing the aperiodic auto-correlation complementary property of the new training sequence, the fine timing point is obtained at the receiver. Simulation results show that, compared with the tradition timing synchronization approaches, the proposed algorithm can provide high accuracy in synchronization, especially under multipath condition.Keywords: distributed MIMO system, golay pair, multipath, synchronization
Procedia PDF Downloads 2471513 A Second Spark Ignition Timing for the High Power Aircraft Radial Engine Using a CFD Transient Modeling
Authors: Tytus Tulwin, Adam Majczak
Abstract:
In aviation most important systems that impact the aircraft flight safety are duplicated. The ASz-62IR aircraft radial engine consists of two spark plugs powered by two separate magnetos. The relative difference in spark timing has an influence on the combustion process. The retardation of the second spark relative to the first spark was analyzed. The CFD simulation was developed as a multicycle transient model. Two independent spark sources imitate two flame fronts after an ignition period. It makes the combustion process shorter but only for certain range of second spark retardation. The model was validated by the in-cylinder pressure comparison. Combustion parameters were analyzed for different second spark retardation values. It was found that the most advantageous ignition timing in means of performance is simultaneous ignition. Nevertheless, for this engine the ignition time of the second spark plug is greatly retarded eliminating the advantageous performance influence. The reason behind this is maintaining high ignition certainty for all engine running conditions and for whole operating rpm range. In aviation the engine reliability is more important than its performance. Introducing electronic ignition system can yield from simultaneous ignition timing by increasing the engine performance and providing good reliability for all flight conditions. This work has been financed by the Polish National Centre for Research and Development, INNOLOT, under Grant Agreement No. INNOLOT/I/1/NCBR/2013.Keywords: CFD, combustion, ignition, simulation, timing
Procedia PDF Downloads 3831512 Preserving Privacy in Workflow Delegation Models
Authors: Noha Nagy, Hoda Mokhtar, Mohamed El Sherkawi
Abstract:
The popularity of workflow delegation models and the increasing number of workflow provenance-aware systems motivate the need for finding more strict delegation models. Such models combine different approaches for enhanced security and respecting workflow privacy. Although modern enterprises seek conformance to workflow constraints to ensure correctness of their work, these constraints pose a threat to security, because these constraints can be good seeds for attacking privacy even in secure models. This paper introduces a comprehensive Workflow Delegation Model (WFDM) that utilizes provenance and workflow constraints to prevent malicious delegate from attacking workflow privacy as well as extending the delegation functionalities. In addition, we argue the need for exploiting workflow constraints to improve workflow security models.Keywords: workflow delegation models, secure workflow, workflow privacy, workflow provenance
Procedia PDF Downloads 3321511 Portfolio Selection with Constraints on Trading Frequency
Authors: Min Dai, Hong Liu, Shuaijie Qian
Abstract:
We study a portfolio selection problem of an investor who faces constraints on rebalancing frequency, which is common in pension fund investment. We formulate it as a multiple optimal stopping problem and utilize the dynamic programming principle. By numerically solving the corresponding Hamilton-Jacobi-Bellman (HJB) equation, we find a series of free boundaries characterizing optimal strategy, and the constraints significantly impact the optimal strategy. Even in the absence of transaction costs, there is a no-trading region, depending on the number of the remaining trading chances. We also find that the equivalent wealth loss caused by the constraints is large. In conclusion, our model clarifies the impact of the constraints on transaction frequency on the optimal strategy.Keywords: portfolio selection, rebalancing frequency, optimal strategy, free boundary, optimal stopping
Procedia PDF Downloads 881510 Model-Based Automotive Partitioning and Mapping for Embedded Multicore Systems
Authors: Robert Höttger, Lukas Krawczyk, Burkhard Igel
Abstract:
This paper introduces novel approaches to partitioning and mapping in terms of model-based embedded multicore system engineering and further discusses benefits, industrial relevance and features in common with existing approaches. In order to assess and evaluate results, both approaches have been applied to a real industrial application as well as to various prototypical demonstrative applications, that have been developed and implemented for different purposes. Evaluations show, that such applications improve significantly according to performance, energy efficiency, meeting timing constraints and covering maintaining issues by using the AMALTHEA platform and the implemented approaches. Further- more, the model-based design provides an open, expandable, platform independent and scalable exchange format between OEMs, suppliers and developers on different levels. Our proposed mechanisms provide meaningful multicore system utilization since load balancing by means of partitioning and mapping is effectively performed with regard to the modeled systems including hardware, software, operating system, scheduling, constraints, configuration and more data.Keywords: partitioning, mapping, distributed systems, scheduling, embedded multicore systems, model-based, system analysis
Procedia PDF Downloads 6201509 Validity of a Timing System in the Alpine Ski Field: A Magnet-Based Timing System Using the Magnetometer Built into an Inertial Measurement Units
Authors: Carla Pérez-Chirinos Buxadé, Bruno Fernández-Valdés, Mónica Morral-Yepes, Sílvia Tuyà Viñas, Josep Maria Padullés Riu, Gerard Moras Feliu
Abstract:
There is a long way to explore all the possible applications inertial measurement units (IMUs) have in the sports field. The aim of this study was to evaluate the validity of a new application on the use of these wearable sensors, specifically it was to evaluate a magnet-based timing system (M-BTS) for timing gate-to-gate in an alpine ski slalom using the magnetometer embedded in an IMU. This was a validation study. The criterion validity of time measured by the M-BTS was assessed using the 95% error range against actual time obtained from photocells. The experiment was carried out with first-and second-year junior skiers performing a ski slalom on a ski training slope. Eight alpine skiers (17.4 ± 0.8 years, 176.4 ± 4.9 cm, 67.7 ± 2.0 kg, 128.8 ± 26.6 slalom FIS-Points) participated in the study. An IMU device was attached to the skier’s lower back. Skiers performed a 40-gate slalom from which four gates were assessed. The M-BTS consisted of placing four bar magnets buried into the snow surface on the inner side of each gate’s turning pole; the magnetometer built into the IMU detected the peak-shaped magnetic field when passing near the magnets at a certain speed. Four magnetic peaks were detected. The time compressed between peaks was calculated. Three inter-gate times were obtained for each system: photocells and M-BTS. The total time was defined as the time sum of the inter-gate times. The 95% error interval for the total time was 0.050 s for the ski slalom. The M-BTS is valid for timing gate-to-gate in an alpine ski slalom. Inter-gate times can provide additional data for analyzing a skier’s performance, such as asymmetries between left and right foot.Keywords: gate crossing time, inertial measurement unit, timing system, wearable sensor
Procedia PDF Downloads 1841508 Objectifying Media and Preadolescents' Media Internalization: A Developmental Perspective
Authors: Ann Rousseau, Steven Eggermont
Abstract:
The current study sought to explain pre-adolescents’ differential susceptibility to the internalization of mediated appearance ideals, using a three-wave panel survey of preadolescent girls and boys (N = 973, Mage = 11.14). Based on the premises of objectification theory and sexual script theory, we proposed a double role for pubertal timing and cross-sex interactions in preadolescents’ media internalization. More specifically, we expected pubertal timing and cross-sex interactions to (a) trigger higher levels of media internalization, directly and indirectly via body surveillance, and (b) positively moderate the relationship between objectifying media exposure and girls’ and boys’ media internalization. A first cross-lagged model tested whether the pubertal timing and cross-sex interactions could trigger preadolescents media internalization and body surveillance. Structural equation analysis indicated that pubertal timing (Wave1) positively predicted body surveillance and media internalization (both Wave3). Cross-sex involvement (Wave1) was positively linked to media internalization (Wave2), but body surveillance (Wave2) was not associated with cross-sex interactions. Results also showed a reciprocal interaction between media internalization (Wave 2 and 3) and body surveillance (Wave2 and 3). Multiple group analysis showed that the observed relationships did not vary by gender. A second moderated moderation model examined whether (a) the relationship between objectifying media exposure (television and magazines, both Wave1) and media internalization (Wave3) depended on pubertal timing (Wave1), and (b) the two-way interaction between objectifying media exposure (Wave1) and pubertal timing (Wave1) varied depending on cross-sex interactions (Wave1). Results revealed that cross-sex interactions functioned as a buffer against media internalization. For preadolescents who had fewer cross-sex interactions, early puberty (relative to peers) positively moderated the relationship between magazine exposure and the internalization of mediated appearance ideals. No significant relationships were found for television. Again, no gender difference could be observed. The present study suggests a double role for pubertal timing and cross-sex interactions in preadolescents media internalization, and indicate that early developers with few cross-sex experiences are particularly vulnerable for media internalization. Additionally, the current findings suggest that there is relative gender equity in magazines’ ability to cultivate media internalization among preadolescents.Keywords: cross-sex interactions, media effects, objectification theory, pubertal timing
Procedia PDF Downloads 3291507 Buy-and-Hold versus Alternative Strategies: A Comparison of Market-Timing Techniques
Authors: Jonathan J. Burson
Abstract:
With the rise of virtually costless, mobile-based trading platforms, stock market trading activity has increased significantly over the past decade, particularly for the millennial generation. This increased stock market attention, combined with the recent market turmoil due to the economic upset caused by COVID-19, make the topics of market-timing and forecasting particularly relevant. While the overall stock market saw an unprecedented, historically-long bull market from March 2009 to February 2020, the end of that bull market reignited a search by investors for a way to reduce risk and increase return. Similar searches for outperformance occurred in the early, and late 2000’s as the Dotcom bubble burst and the Great Recession led to years of negative returns for mean-variance, index investors. Extensive research has been conducted on fundamental analysis, technical analysis, macroeconomic indicators, microeconomic indicators, and other techniques—all using different methodologies and investment periods—in pursuit of higher returns with lower risk. The enormous variety of timeframes, data, and methodologies used by the diverse forecasting methods makes it difficult to compare the outcome of each method directly to other methods. This paper establishes a process to evaluate the market-timing methods in an apples-to-apples manner based on simplicity, performance, and feasibility. Preliminary findings show that certain technical analysis models provide a higher return with lower risk when compared to the buy-and-hold method and to other market-timing strategies. Furthermore, technical analysis models tend to be easier for individual investors both in terms of acquiring the data and in analyzing it, making technical analysis-based market-timing methods the preferred choice for retail investors.Keywords: buy-and-hold, forecast, market-timing, probit, technical analysis
Procedia PDF Downloads 971506 A Dual Spark Ignition Timing Influence for the High Power Aircraft Radial Engine Using a CFD Transient Modeling
Authors: Tytus Tulwin, Ksenia Siadkowska, Rafał Sochaczewski
Abstract:
A high power radial reciprocating engine is characterized by a large displacement volume of a combustion chamber. Choosing the right moment for ignition is important for a high performance or high reliability and ignition certainty. This work shows methods of simulating ignition process and its impact on engine parameters. For given conditions a flame speed is limited when a deflagration combustion takes place. Therefore, a larger length scale of the combustion chamber compared to a standard size automotive engine makes combustion take longer time to propagate. In order to speed up the mixture burn-up time the second spark is introduced. The transient Computational Fluid Dynamics model capable of simulating multicycle engine processes was developed. The CFD model consists of ECFM-3Z combustion and species transport models. A relative ignition timing difference for the both spark sources is constant. The temperature distribution on engine walls was calculated in the separate conjugate heat transfer simulation. The in-cylinder pressure validation was performed for take-off power flight conditions. The influence of ignition timing on parameters like in-cylinder temperature or rate of heat release was analyzed. The most advantageous spark timing for the highest power output was chosen. The conditions around the spark plug locations for the pre-ignition period were analyzed. This work has been financed by the Polish National Centre for Research and Development, INNOLOT, under Grant Agreement No. INNOLOT/I/1/NCBR/2013.Keywords: CFD, combustion, ignition, simulation, timing
Procedia PDF Downloads 2961505 Understanding Factors that May Affect Survival and Productivity of Pacific Salmonids
Authors: Julia B. Kischkat, Charlie D. Waters
Abstract:
This research aims to understand the factors that may affect the survival and productivity of Pacific salmonids through two components. The first component is lab-based and aims to improve high-performance liquid chromatography to better quantify vitamin deficiencies such as thiamine. The lab work is conducted at the National Oceanic and Atmospheric Administration (NOAA) Ted Stevens Marine Research Institute in Juneau, Alaska. Deficiencies in thiamine have been shown to reduce the survival of salmonids at early life stages. The second component involves the analysis of a 22-year data set of migration timing of juvenile Coho Salmon, Dolly Varden, Steelhead, and returning adult Steelhead at Little Port Walter, Alaska. The statistical analysis quantifies their migration fluctuations and whether they correlate to various environmental conditions such as temperature, salinity, and precipitation.Keywords: climate change, smolt timing, phenology, migration timing, salmon, time series analysis, ecology, chemistry, fisheries science
Procedia PDF Downloads 1171504 Design of Visual Repository, Constraint and Process Modeling Tool Based on Eclipse Plug-Ins
Authors: Rushiraj Heshi, Smriti Bhandari
Abstract:
Master Data Management requires creation of Central repository, applying constraints on Repository and designing processes to manage data. Designing of Repository, constraints on repository and business processes is very tedious and time consuming task for large Enterprise. Hence Visual Repository, constraints and Process (Workflow) modeling is the most critical step in Master Data Management.In this paper, we realize a Visual Modeling tool for implementing Repositories, Constraints and Processes based on Eclipse Plugin using GMF/EMF which follows principles of Model Driven Engineering (MDE).Keywords: EMF, GMF, GEF, repository, constraint, process
Procedia PDF Downloads 4971503 Timing and Impacts of Megafloods in the North Pacific as Recorded by Freshwater Diatoms
Authors: Cristina Lopes, Alan C. Mix
Abstract:
The timing and extension of large discharges from glacial lakes, known as megafloods, into the oceans have been of key importance. This type of events can influence the oceanic/land interactions and even be related with climate changes. While the impact of such floods has been fairly studied in the North Atlantic, the impact of analog floods in the North Pacific remains debatable and relatively unknown. Here we will show records of the Missoula floods that have carved the Northwest landscape and have entered the North Pacific through the Columbia River. These records are given by the presence of high (more than 40%) percentages of freshwater diatoms in marine sediments. A regression equation using these percentages allows to estimate by how much the salinities decreased. The timing and impact of North Pacific megafloods recorded in three marine cores of Oregon and California for the past 25000 years (B.P.) will be presented. These records show that the volume of freshwater that entered the North Pacific reached as far as 600 Km south of the Columbia River Mouth, decreasing the salinities by as much as 4 units.Keywords: diatoms, megafloods, Missoula, North Pacific
Procedia PDF Downloads 1721502 Estimating the Timing Interval for Malarial Indoor Residual Spraying: A Modelling Approach
Authors: Levicatus Mugenyi, Joaniter Nankabirwa, Emmanuel Arinaitwe, John Rek, Niel Hens, Moses Kamya, Grant Dorsey
Abstract:
Background: Indoor residual spraying (IRS) reduces vector densities and malaria transmission, however, the most effective spraying intervals for IRS have not been well established. We aim to estimate the optimal timing interval for IRS using a modeling approach. Methods: We use a generalized additive model to estimate the optimal timing interval for IRS using the predicted malaria incidence. The model is applied to post IRS cohort clinical data from children aged 0.5–10 years in selected households in Tororo, historically a high malaria transmission setting in Uganda. Six rounds of IRS were implemented in Tororo during the study period (3 rounds with bendiocarb: December 2014 to December 2015, and 3 rounds with actellic: June 2016 to July 2018). Results: Monthly incidence of malaria from October 2014 to February 2019 decreased from 3.25 to 0.0 per person-years in the children under 5 years, and 1.57 to 0.0 for 5-10 year-olds. The optimal time interval for IRS differed between bendiocarb and actellic and by IRS round. It was estimated to be 17 and 40 weeks after the first round of bendiocarb and actellic, respectively. After the third round of actellic, 36 weeks was estimated to be optimal. However, we could not estimate from the data the optimal time after the second and third rounds of bendiocarb and after the second round of actellic. Conclusion: We conclude that to sustain the effect of IRS in a high-medium transmission setting, the second rounds of bendiocarb need to be applied roughly 17 weeks and actellic 40 weeks after the first round, and the timing differs for subsequent rounds. The amount of rainfall did not influence the trend in malaria incidence after IRS, as well as the IRS timing intervals. Our results suggest that shorter intervals for the IRS application can be more effective compared to the current practice, which is about 24 weeks for bendiocarb and 48 weeks for actellic. However, when considering our findings, one should account for the cost and drug resistance associated with IRS. We also recommend that the timing and incidence should be monitored in the future to improve these estimates.Keywords: incidence, indoor residual spraying, generalized additive model, malaria
Procedia PDF Downloads 1211501 Exploring the Relationship among Job Stress, Travel Constraints, and Job Satisfaction of the Employees in Casino Hotels: The Case of Macau
Authors: Tao Zhang
Abstract:
Job stress appears nearly everywhere especially in the hospitality industry because employees in this industry usually have to work long time and try to meet conflicting demands of their customers, managers, and company. To reduce job stress, employees of casino hotels try to perform leisure activities or tourism. However, casino employees often meet many obstacles or constraints when they plan to travel. Until now, there is little understanding as to why casino hotel employees often face many travel constraints or leisure barriers. What is more, few studies explore the relationship between travel constraints and job stress of casino employees. Therefore, this study is to explore the construct of casino hotel employees' travel constraints and the relationship among job stress, travel constraints, and job satisfaction. Using convenient sampling method, this study planned to investigate 500 front line employees and managers of ten casino hotels in Macau. A total of 500 questionnaires were distributed, and 414 valid questionnaires were received. The return rate of valid questionnaires is 82.8%. Several statistical techniques such as factor analysis, t-test, one-way ANOVA, and regression analysis were applied to analyze the collected data. The findings of this study are as follows. Firstly, by using factor analysis, this study found the travel constraints of casino employees include intrapersonal constraints, interpersonal constraints, and structural constraints. Secondly, by using regression analysis, the study found travel constraints are positively related with job stress while negatively related with job satisfaction. This means reducing travel constraints may create a chance for casino employees to travel so that they could reduce job stress, therefore raise their job satisfaction. Thirdly, this research divided the research samples into three groups by the degree of job stress. The three groups are low satisfaction group, medium satisfaction group, and high satisfaction group. The means values of these groups were compared by t-test. Results showed that there are significant differences of the means values of interpersonal constraints between low satisfaction group and high satisfaction group. This suggests positive interpersonal relationship especially good family member relationship reduce not only job stress but also travel constraints of casino employees. Interestingly, results of t-test showed there is not a significant difference of the means values of structural constraints between low satisfaction group and high satisfaction group. This suggests structural constraints are outside variables which may be related with tourism destination marketing. Destination marketing organizations (DMO) need use all kinds of tools and techniques to promote their tourism destinations so as to reduce structural constraints of casino employees. This research is significant for both theoretical and practical fields. From the theoretical perspective, the study found the internal relationship between travel constraints, job stress, and job satisfaction and the different roles of three dimensions of travel constraints. From the practical perspective, the study provides useful methods to reduce travel constraints and job stress, therefore, raise job satisfaction of casino employees.Keywords: hotel, job satisfaction, job stress, travel constraints
Procedia PDF Downloads 2511500 Modeling of Production Lines Systems with Layout Constraints
Authors: Sadegh Abebi
Abstract:
There are problems with estimating time of product process of products, especially when there is variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines, needs a precise planning to reduce volume in particular situation of line stock. In this article, by analyzing real queue systems with layout constraints and by using concepts and principles of Markov chain in queue theory, a hybrid model has been presented. This model can be a base to assess queue systems with probable parameters of service. Here by presenting a case study, the proposed model will be described. so, production lines of a home application manufacturer will be analyzed.Keywords: Queuing theory, Markov Chain, layout, line balance
Procedia PDF Downloads 6251499 The Study of Tire Pyrolysis Fuel in CI Diesel Engine for Spray Combustion Character and Performance
Authors: Chun Pao Kuo, Chi Tong Lin
Abstract:
The study explored atomization characteristics of tire pyrolysis fuel and its impacts on using three types of fuel: diesel oil mixed with 10% of tire pyrolysis fuel (called T10), diesel oil mixed with 20% tire pyrolysis (called T20), and consumer-grade diesel oil (D100). The investigators used the fuel for simulation and tests at various fuel injection timing, engine speed, and fuel injection speed to inspect impacts from fuel type on oil droplet atomization speed and output power. Actual vehicle tests were conducted using a 5-ton sedan (Hino) with 3660 cc displacement and a front-end inline four-cylinder diesel engine, and this type of vehicle is easily available from the market. A dynamometer was used to set up three engine speeds for the dynamometer testing at different injection timing and pressure. Next, an exhaust analyzer was used to measure exhaust pollution at different conditions to explore the effect of fuel types and injection speeds on output power in order to establish the best operation conditions for tire pyrolysis fuel.Keywords: diesel engine, exhaust pollution, fuel injection timing, tire pyrolysis oil
Procedia PDF Downloads 4081498 Speech Rhythm Variation in Languages and Dialects: F0, Natural and Inverted Speech
Authors: Imen Ben Abda
Abstract:
Languages have been classified into different rhythm classes. 'Stress-timed' languages are exemplified by English, 'syllable-timed' languages by French and 'mora-timed' languages by Japanese. However, to our best knowledge, acoustic studies have not been unanimous in strictly establishing which rhythm category a given language belongs to and failed to show empirical evidence for isochrony. Perception seems to be a good approach to categorize languages into different rhythm classes. This study, within the scope of experimental phonetics, includes an account of different perceptual experiments using cues from natural and inverted speech, as well as pitch extracted from speech data. It is an attempt to categorize speech rhythm over a large set of Arabic (Tunisian, Algerian, Lebanese and Moroccan) and English dialects (Welsh, Irish, Scottish and Texan) as well as other languages such as Chinese, Japanese, French, and German. Listeners managed to classify the different languages and dialects into different rhythm classes using suprasegmental cues mainly rhythm and pitch (F0). They also perceived rhythmic differences even among languages and dialects belonging to the same rhythm class. This may show that there are different subclasses within very broad rhythmic typologies.Keywords: F0, inverted speech, mora-timing, rhythm variation, stress-timing, syllable-timing
Procedia PDF Downloads 526