Search results for: non-implementation of projects
2156 Critical Success Factors of Information Technology Projects
Authors: Athar Imtiaz, Abduljalil S. Al-Mudhary, Taha Mirhashemi, Roslina Ibrahim
Abstract:
Information Technology (IT) is being used by almost all organizations throughout the world. However, its success at supporting and improving business is debatable. There is always the risk of IT project failure and studies have proven that a large number of IT projects indeed do fail. There are many components that further the success of IT projects; these have been studied in previous studies. Studies have found the most necessary components for success in software development projects, executive information systems etc. In this study, previous literature that has looked into these success promoting factors have been critically reviewed and analyzed. Fifteen critical Success Factors (CSF) of IT projects were enlisted and examined. These factors can be applied to all IT projects and is not specific to a particular type of IT/IS project. A hypothesis was also generated after the evaluation of the factors.Keywords: critical success factors, CSF, IT projects, IS projects, software development projects
Procedia PDF Downloads 4002155 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects
Authors: Faraz Ali Memon
Abstract:
Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.Keywords: stakeholders, UK construction, project management, cost and time
Procedia PDF Downloads 1052154 To Handle Data-Driven Software Development Projects Effectively
Authors: Shahnewaz Khan
Abstract:
Machine learning (ML) techniques are often used in projects for creating data-driven applications. These tasks typically demand additional research and analysis. The proper technique and strategy must be chosen to ensure the success of data-driven projects. Otherwise, even exerting a lot of effort, the necessary development might not always be possible. In this post, an effort to examine the workflow of data-driven software development projects and its implementation process in order to describe how to manage a project successfully. Which will assist in minimizing the added workload.Keywords: data, data-driven projects, data science, NLP, software project
Procedia PDF Downloads 832153 Activity-Based Safety Assessment of Real Estate Projects in Western India
Authors: Patel Parul, Harsh Ganvit
Abstract:
The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.Keywords: construction safety, safety assessment, activity-based safety, real estate projects
Procedia PDF Downloads 552152 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia
Authors: Kaleem Ullah, Abd Halid Bin Abdullah
Abstract:
This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun
Procedia PDF Downloads 2822151 Comparison between Approaches Used in Two Walk About Projects
Authors: Derek O Reilly, Piotr Milczarski, Shane Dowdall, Artur Hłobaż, Krzysztof Podlaski, Hiram Bollaert
Abstract:
Learning through creation of contextual games is a very promising way/tool for interdisciplinary and international group projects. During 2013 and 2014 we took part and organized two intensive students projects in different conditions. The projects enrolled 68 students and 12 mentors from 5 countries. In the paper we want to share our experience how to strengthen the chances to succeed in short (12-15 days long) student projects. In our case almost all teams prepared working prototype and the results were highly appreciated by external experts.Keywords: contextual games, mobile games, GGULIVRR, walkabout, Erasmus intensive programme
Procedia PDF Downloads 5022150 Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects
Authors: O. Badagadze, G. Sirbiladze, I. Khutsishvili
Abstract:
The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.Keywords: expert valuations, expertons, investment project risks, positive and negative discriminations, possibility distribution
Procedia PDF Downloads 6762149 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects
Abstract:
Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects
Procedia PDF Downloads 1282148 Genetic Algorithm Optimization of Multiple Resources for Multi-Projects
Authors: A. Samer Ezeldin, Sarah A. Fotouh
Abstract:
Optimization of resources is very important in all fields, as in construction management. Project managers have to face problems regarding management of cost, time and available resources of single projects and more problems arise when managing multiple projects. Most of the studies focused on optimization of resources for a single project, but, this paper will discuss the design and modeling of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in construction industry optimize the resources for single projects only, but with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources and decreases the fluctuation as much as possible. The proposed model calculates the cost of each resource, tries to minimize the cost of extra resources as much as possible and generates the schedule of each project within a selected program.Keywords: construction management, genetic algorithm, multiple projects, multiple resources, optimization
Procedia PDF Downloads 4592147 Crowdfunding for Saudi Arabia Green Projects
Authors: Saleh Komies, Mona Alharbi, Razan Alhayyani, Mozah Almulhim, Roseanne Khawaja, Ahmed Alradhi
Abstract:
One of the proposed solutions that faces some challenges is encouraging sustainable energy consumption across Saudi Arabia through crowdfunding platforms. To address these challenges, we need to determine the level of awareness of crowdfunding and green projects, as well as the preferences and willingness of Saudis to utilize crowdfunding as an alternative funding source for green projects in Saudi Arabia. In this study, we aim to determine the influence of environmental awareness and concern on the propensity to crowdfund green projects. The survey is being conducted as part of environmental initiatives to assess public perceptions and opinions on crowdfunding green projects in Saudi Arabia. A total of 450 responses to an online questionnaire distributed via convenience and snowball sampling were utilized for data analysis. The survey reveals that Saudis have a low understanding of crowdfunding concepts and a relatively high understanding of implementing green projects. The public is interested in crowdfunding green projects if there is a return on investment.Keywords: crowdfunding, green projects, awareness, Saudi Arabia, energy, solar, wind
Procedia PDF Downloads 992146 Legal Issues of Implementing Public Projects through Civic Crowdfunding
Authors: Mahdieh Dehghan Nayeri, Hani Arbabi, Seid Pooyan Ghafoori
Abstract:
Civic crowdfunding- crowdfunding public projects- which goes beyond people management- as a significant part of public projects stakeholders- and requires the active engagement of the public in both the financing and decision-making processes of public projects, is expanding. However, in most countries of the world, no specific legal framework has been approved for governing and managing the implementation of projects through this method. Through a systematic literature review, following the Preferred Reporting Items for Systematic Reviews (PRISMA), this article has studied and discussed the legal issues of civic crowdfunded projects in the countries leading the use of this method, in four themes; one related to the legal environment and three related to three leading players in civic crowdfunded projects include the investor, the platform, and the investee. The review showed that despite the increasing attention to people's engagement in public projects -financial and non-financial- not much scientific research has been done to formulate fully structured legal structures. Finally, neglected areas in research have been discussed as a guide for future research.Keywords: civic crowdfunding, equity crowdfunding, public projects, legal issues, crowdsourcing
Procedia PDF Downloads 2252145 A Case Study on the Guidelines for Application of Project Management Methods in Infrastructure Projects
Authors: Fernanda Varella Borges, Silvio Burrattino Melhado
Abstract:
Motivated by the importance of public infrastructure projects in the civil construction chain, this research shows the study of project management methods and the infrastructure projects’ characteristics. The research aims at the objective of improving management efficiency by proposing guidelines for the application of project management methods in infrastructure projects. Through literature review and case studies, the research analyses two major infrastructure projects underway in Brazil, identifying the critical points for achieving its success. As a result, the proposed guidelines indicate that special attention should be given to the management of stakeholders, focusing on their knowledge and experience, their different interests, the efficient management of their communication, and their behavior in the day-by-day project management process.Keywords: construction, infrastructure, project management, public projects
Procedia PDF Downloads 4942144 Limits and Barriers of Value Creation and Projects Development: The Case of Tunisian SMEs
Authors: Samira Boussema, Ben Hamed Salah
Abstract:
Entrepreneurship was always considered to be the most appropriate remedy for various economies’ symptoms. It is presented as a complex process that faces several barriers thereby inhibiting a project’s implementation phase. In fact, after a careful review of the literature, we noticed that empirical researches on reasons behind non-developing entrepreneurial projects are very rare, suggesting a lack in modeling the process in general and the pre-start phase in particular. Therefore, in this study we try to identify the main environmental barriers to developing business projects in Tunisia through the study of a representative sample of undeveloped projects. To this end, we used a quantitative approach which allowed us to examine the various barriers encountered by young entrepreneurs during their projects’ implementation. Indeed, by modeling the phenomenon we found that these managers face barriers of legal, financial, educational and government support dimensions.Keywords: entrepreneurship, environmental barriers, non-implementation of projects, structural modeling
Procedia PDF Downloads 3812143 Statistical Analysis of the Main Causes of Delay Factors of Infrastructure Projects
Authors: Seyed Ali Mohammadiborna, Mehdi Ravanshadnia
Abstract:
Project delays usually detrimentally affect perceptions of project success and can in some instances, result in increased costs and other time-related damages to project stakeholders. One of the realities in the national infrastructure projects is that since the primary stakeholders are state-affiliated, the delay factors of the projects have not been seriously taken into account despite the importance of on-time completion of projects. Project postponement has different economic and social consequences and leads to the technical and economic infeasibility of the infrastructure projects in the form of reduced productivity and exploitation capacity. The present study aimed at investigating delay factors of Iranian national infrastructure projects according to regulatory reports of the Plan and Budget Organization (BPO) of Iran. The present study scrutinized the influence of each of the factors that caused delays in national Iranian infrastructure projects according to the supervision reports of the planning and budget organization in 8 years. For this purpose, the study analyzed the information regarding the impact of 12 key delay factors causing delays in average 4867 projects per year in all provinces. The said factors were classified into the three groups of executive, credit, and financial and environmental-procurement factors.Keywords: delays, infrastructure, projects, regulatory
Procedia PDF Downloads 1372142 Productivity of Construction Companies Using the Management of Threats and Opportunities in Construction Projects of Iran
Authors: Nima Amani, Ali Salehi Dastjerdi, Fatemeh Ahmadi, Ardalan Sabamehr
Abstract:
The cost overrun of the construction projects has always been one of the main problems of the construction companies caused by the risky nature of the construction projects. Therefore, today, the application of risk management is inevitable. Although in theory, the issue of risk management is divided into the opportunities and threats management, in practice, most of the projects have been focused on the threats management. However, considering the opportunities management and applying the opportunities-response strategies can lead to the improved profitability of the construction projects of the companies. In this paper, a new technique is developed to identify the opportunities in the construction projects using an improved protocol and propose the appropriate opportunities-response strategies to the construction companies to provide them with higher profitability. To evaluate the effectiveness of the protocol for selecting the most appropriate strategies in response to the opportunities and threats, two projects from a construction company in Iran were studied. Both projects selected were in mid-range in terms of size and similar in terms of time, run time and costs. Finally, the output indicates that using the proposed opportunities-response strategies show that the company's profitability in the future can be increased approximately for similar projects.Keywords: opportunities management, risk-response strategy, opportunity-response strategy, productivity, risk management
Procedia PDF Downloads 2282141 Effects of the Macro-Scale Investments/Projects to Planning System in Izmir
Authors: Neslihan Karatas, Sibel Ecemis Kilic
Abstract:
This paper aims to examine macro-scale plans and projects/investments which have been prepared for İzmir since The Republican Period. Macro projects that were proposed by central government, local government, industry and urban actors such as the chamber of commerce will be discussed and these projects and its reflections to the city's macro scale planning decisions will be evaluated based on existing development. Effects of macro plans, the related private and public investments, the developments of unplanned/specific projects to the current city form will be discussed. The factors and plans which determine urban form and the problems caused by unanticipated/uncontrolled developments will be evaluated. The proposals will be developed about more efficient planning process.Keywords: Izmir, macro projects, macro investments, planning
Procedia PDF Downloads 5902140 Occupational Safety in Construction Projects
Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush
Abstract:
This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.Keywords: management, safety, occupational safety, classification
Procedia PDF Downloads 1052139 Study of Slum Redevelopment Initiatives for Dharavi Slum, Mumbai and Its Effectiveness in Implementation in Other Cities
Authors: Anurag Jha
Abstract:
Dharavi is the largest slum in Asia, for which many redevelopment projects have been put forth, to improve the housing conditions of the locals. And yet, these projects are met with much-unexpected resistance from the locals. The research analyses the why and the how of the resistances these projects face and analyses these programs and points out the flaws and benefits of such projects, by predicting its impact on the regulars of Dharavi. The research aims to analyze various aspects of Dharavi, which affect its socio-cultural backdrops, such as its history, and eventual growth into a mega slum. Through various surveys, the research aims to analyze the life of a slum dweller, the street life, and the effect of such settlement on the urban fabric. Various development projects such as Dharavi Museum Movement, are analyzed, and a feasibility and efficiency analysis of the proposals for redevelopment of Dharavi Slums has been theorized. Flaws and benefits of such projects, by predicting its impact on the regulars of Dharavi has been the major approach to the research. Also, prediction the implementation of these projects in another prominent slum area, Anand Nagar, Bhopal, with the use of generated hypothetical model has been done. The research provides a basic framework for a comparative analysis of various redevelopment projects and the effect of implementation of such projects on the general populace. Secondly, it proposes a hypothetical model for feasibility of such projects in certain slum areas.Keywords: Anand Nagar, Bhopal slums, Dharavi, slum redevelopment programmes
Procedia PDF Downloads 3302138 National Project 'Environment' of Russian Federation as a Management Tool in Achieving SDGs
Authors: Ekaterina Posokhova, Boris Gavrilov
Abstract:
Priority national projects have become an essential phenomenon in the Russian Federation. Both regional and local government institutions and a significant part of the society have been involved in their implementation. The scale and multispectricity of the national projects give a reason to believe that their concept is beyond the scope of the individual state programs. The national project “environment” contains federal projects on waste management, water, and air quality, ecotourism development, and biodiversity conservation highlights the importance of the preservation and restoration of Volga River and Lake Baikal ecosystems. This study assesses the national projects according to their relativeness with the current SDGs (i.e., SGD 14 and 15), evaluates the methodology of the projects. The paper considers the peculiarities of the national projects as strategic management tools as well as the possibility of amending the project objective indicators. Conclusion on the effectiveness of NP in terms of achieving SDGs is provided.Keywords: management, SDP, russia, conservation, law
Procedia PDF Downloads 1442137 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects
Authors: Mai Ghazal, Ahmed Hammad
Abstract:
Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management
Procedia PDF Downloads 3692136 Static Analysis Deployment Model for Code Quality on Research and Development Projects of Software Development
Authors: Jeong-Hyun Park, Young-Sik Park, Hyo-Teag Jung
Abstract:
This paper presents static analysis deployment model for code quality on R&D Projects of SW Development. The proposed model includes the scope of R&D projects and index for static analysis of source code, operation model and execution process, environments and infrastructure system for R&D projects of SW development. There is the static analysis result of pilot project as case study based on the proposed deployment model and environment, and strategic considerations for success operation of the proposed static analysis deployment model for R&D Projects of SW Development. The proposed static analysis deployment model in this paper will be adapted and improved continuously for quality upgrade of R&D projects, and customer satisfaction of developed source codes and products.Keywords: static analysis, code quality, coding rules, automation tool
Procedia PDF Downloads 5202135 National Projects' Impact on the Regional Division
Authors: Mosaad Hamouda, Kamal Khalaf, Zaker Mousa
Abstract:
National projects are considered Egypt's future vision in investing its various resources and the best way to bring about a developmental renaissance that constitutes a quantum leap because of its developmental impact on the planning regions, which it achieves in attracting and localizing investments to achieve urban development, and what this has a noticeable impact on dividing those regions in order to achieve a developmental balance or at least reduce the severity of the disparities between them, by measuring the impact of these projects, which appear in the per capita share of the various developmental variables, and also analyzing global and local experiences so that a balanced division of the country’s regions can be reached, and the research finds a set of planning foundations that are compatible with the settlement of these national projects in the future.Keywords: national projects, regional development, division of regions, development disparities
Procedia PDF Downloads 1262134 Exposing the Concealed Impact: Evaluating the Role of Development Projects on Corruption Perception in Afghanistan
Authors: Jawad Taheri
Abstract:
This paper investigates the impact of foreign aid-funded development projects on corruption perception in Afghanistan, utilizing instrumental variable (IV) approaches in regression analysis setting. Seven sub-categories of development projects are examined in order to have a glance over comparative usefulness of each project. The study incorporates natural disaster indicators as exogenous variables to mitigate endogeneity concerns and control variables. The findings reveal significant associations between certain types of projects and corruption perception. Road and bridge construction, irrigation, and agriculture projects are found to decrease corruption perception, fostering optimism and trust within affected communities. Mosque construction and healthcare initiatives aligned with religious beliefs also contribute to reduced corruption perception. However, drinking water projects are associated with increased corruption perception, highlighting potential challenges in their implementation. The study emphasizes the importance of well-implemented projects, cultural contexts, and effective governance in mitigating corruption and fostering trust within communities. These findings contribute to a refined understanding of the relationship between development projects and corruption perception in Afghanistan.Keywords: foreign aid, development projects, corruption perception, Afghanistan, instrumental variable analysis, survey of Afghan people (SAP), natural disasters, exogenous variation
Procedia PDF Downloads 762133 The Mechanism of Upgrading and Urban Development in the Egyptian City: Case Study of Damietta
Authors: Lina Fayed Amin
Abstract:
The research studied, in the beginning, the related urban concepts such as the urban, development, urban development. As it also deals with the upgrading, urban upgrading, community participation and the role of local administration in development and upgrading projects. Then it studies some regional upgrading & urban development projects in Egypt followed by international projects, and the analysis the strategies followed in dealing with these projects. Afterwards, we state the regional aspects of both Damietta governorate & city, dealing with its potentials & development constraints. Followed by studying the upgrading and urban development projects strategies in reflection to the city’s crucial problems, and the constraints that faced the upgrading & development project. Then, it studied the implementation of the project’s strategies & it provided the financial resources needed for the development project in Damietta city. Followed by the studying of the urban and human development projects in the upgrading of Damietta city, as well as analyzing the different projects &analyzing the results of these projects on the aspects of the city’s needs. Then the research analysis in comparison the upgrading and urban development project in Damietta and the regional upgrading and development projects in Egypt. As well as the comparison between the upgrading and urban development project and the international projects in some Arabic and foreign countries in relation to the goals, problems, obstacles, the community participation, the finance resources and the results. Finally, it reviews the results and recommendations that were reached as a result of studying the similar urban upgrading projects in Egypt and in some Arabic and foreign countries. Followed by the analytical analysis of the upgrading and urban development in EgyptKeywords: Damietta city, urban development, upgrading mechanisms, urban upgrading
Procedia PDF Downloads 4242132 Factors Leading to the Renegotiation of Private Finance Initiative Design-Build-Finance-Operate Road Projects in the UK
Authors: Ajibola Fatokun, Akintola Akintoye, Champika Liyanage
Abstract:
The issue of renegotiation has not received public sector applause because of the outcomes recorded over years. Numerous reasons have been adduced by the stakeholders for the renegotiation of PPP road projects. In some instances, the reason can also be the factor leading to the renegotiation of PFI (DBFO) road projects. Thus, a number of factors inform the decision of the primary stakeholders to renegotiate the contract. This paper, therefore, evaluates and assesses the factors leading to the renegotiation of PFI (DBFO) road projects in the UK. Qualitative interviews involving both public and private stakeholders were extensively adopted on five PFI (DBFO) case study road projects in order to address the aim of this study. This serves to complement the findings of the literature with respect to the factors leading to the renegotiation of PPP road projects. The findings of this research reveal the respective factors leading to the renegotiations of PFI (DBFO) road projects in the UK. However, the prominent factors are a change in scope of the works necessitating works removal and an addition of assets, change in standards and obsolete specification occasioned by the long duration of the PFI road project concession among others.Keywords: renegotiation, factors, Private Finance Initiative (PFI), design-build-finance-operate (DBFO) road projects
Procedia PDF Downloads 3422131 Sustainability: Effect of Earthquake in Micro Hydro Sector, a Case Study of Micro Hydro Projects in Northern Part of Kavre District, Nepal
Authors: Ram Bikram Thapa, Ganesh Lama
Abstract:
The Micro Hydro is one of the successful technology in Rural Nepal. Kavre is one of the pioneer district of sustainability of Micro Hydro Projects. A total of 30 Micro Hydro projects have been constructed with producing 700 KW of energy in northern side of the Kavre district. This study shows that 67% of projects have been affected by devastating earthquake in April and May, 2015. Out of them 23% are completely damaged. Most of the structures are failure like Penstock 71%, forebay 21%, powerhouse 7% have been completely damaged and 91% Canal & 44% Intake structures have been partially damaged by the earthquake. This paper empathizes that the engineering design is the vital component for sustainability of Micro Hydro Projects. This paper recommended that technicians should be considered the safety factor of earthquake and provision of disaster recovery fund during design of Micro Hydro Projects.Keywords: micro hydro, earthquake, structural failure, sustainability
Procedia PDF Downloads 3482130 Connecting Students and Faculty Research Efforts through the Research and Projects Portal
Authors: Havish Nalapareddy, Mark V. Albert, Ranak Bansal, Avi Udash, Lin Lin
Abstract:
Students engage in many course projects during their degree programs. However, impactful projects often need a time frame longer than a single semester. Ideally, projects are documented and structured to be readily accessible to future students who may choose to continue the project, with features that emphasize the local community, university, or course structure. The Research and Project Portal (RAPP) is a place where students can post both their completed and ongoing projects with all the resources and tools used. This portal allows students to see what other students have done in the past, in the same university environment, related to their domain of interest. Computer science instructors or students selecting projects can use this portal to assign or choose an incomplete project. Additionally, this portal allows non-computer science faculty and industry collaborators to document their project ideas for students in courses to prototype directly, rather than directly soliciting the help of instructors in engaging students. RAPP serves as a platform linking students across classes and faculty both in and out of computer science courses on joint projects to encourage long-term project efforts across semesters or years.Keywords: education, technology, research, academic portal
Procedia PDF Downloads 1372129 Causes of Construction Delays in Qatar Construction Projects
Authors: Murat Gunduz, Mohanad H. A. AbuHassan
Abstract:
Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.Keywords: construction industry, delays, importance index, frequency index
Procedia PDF Downloads 3632128 Mega Development Projects Problems and Challenges From a Social Science Perspective: A Critical Review
Authors: Shakir Ullah
Abstract:
This article reviews social science understanding to explore the challenges megaprojects face before and after implementation. It also sheds light on the problems directly and indirectly caused by mega development projects in the project implemented areas. By Using a qualitative approach such as thematic analysis, the article uses recent literature such as published articles, government reports, and books to cite examples of different mega projects worldwide. The study report that mega development projects are a necessary element of the modern-day infrastructural development process as they represent the perfect example of urban socioeconomic development. They are introduced and implemented by multinational companies with the support of state authorities to produce the common good. However, they are not devoid of their critical challenges and bring implicit and explicit problems to the targeted localities. The article takes insights from social science research for suggestions on how to reduce the challenges faced by project implementers and problems received by local people due to the fault lines of such projects.Keywords: development, mega-projects, challenges, problems
Procedia PDF Downloads 1032127 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments
Authors: Ahmad Baghdadi, Mohammed Kishk
Abstract:
Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia
Procedia PDF Downloads 543