2603 Identification of the Causes of Construction Delay in Malaysia
Authors: N. Hamzah, M.A. Khoiry, I. Arshad, W.H.W. Badaruzzaman, N. M. Tawil
Abstract:
Construction delay is unavoidable in developing countries including Malaysia. It is defined as time overrun or extension of time for completion of a project. The purpose of the study is to determine the causes of delay in Malaysian construction industries based on previous worldwide research. The field survey conducted includes the experienced developers, consultants and contractors in Malaysia. 34 causes of the construction delay have been determined and 24 have been selected using the Rasch model analysis. The analysis result will be used as the baseline for the next research to find the causes of delay in the Malaysian construction industry taking place in Malaysian higher learning institutions.Keywords: Causes of construction delay, construction projects, Malaysian construction industry, Rasch model analysis.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 75722602 Sustainable Construction in Malaysia – Developers- Awareness
Authors: Nazirah Zainul Abidin
Abstract:
The creation of a sustainable future depends on the knowledge and involvement of the people, as well as an understanding of the consequences of individual actions. Construction industry has long been associated with the detrimental effects to our mother earth. In Malaysia, the government, professional bodies and private companies are beginning to take heed in the necessity to reduce this environmental problem without restraining the need for development. This paper focuses on the actions undertaken by the Malaysian government, non-government organizations and construction players in promoting sustainability in construction. To ensure that those concerted efforts are not only skin deep in its impact, a survey was conducted to investigate the awareness of the developers regarding this issue and whether those developers has absorb the concept of sustainable construction in their current practices. The survey revealed that although the developers are aware of the rising issues on sustainability, little efforts are generated from them in implementing it. More effort is necessary to boost this application and further stimulate actions and strategies towards a sustainable built environment.
Keywords: Environmental sustainability, Malaysian construction industry, Malaysian developers, Sustainable construction.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 45942601 Sustainability in the Construction Industry in Malaysia: The Challenges and Breakthroughs
Authors: Yoong H. Chan, Brenda C. T. Lee, Jin C. Lee
Abstract:
As Malaysia aims to be a developed country by year 2020; the construction industry has since been identified as a major catalyst for the country to attain the status. It is one of the sectors that contribute to most environmental pollutions. It is, therefore, important for the industry to implement sustainable construction practices to reduce the negative impacts that it has on the environment. However, most Malaysian developers have placed much focus on market demand and economic factors; neglecting the need for attention on environmental issues. The practice of sustainable construction is deemed to be an obstacle to achieve short-term economic goals due to the higher cost incurred in the operations. Hence, choices need to be made and a balance needs to be struck in weighing the long-term environmental benefits against immediate economic factors. This paper discusses the challenges faced by Malaysian developers in adopting sustainable practices in the construction industry and the cause of these challenges. It also looks into the achievements and breakthroughs that developers in Malaysia have achieved so far. The paper aims explores the long-term benefits of sustainable practices that would potentially raise awareness on the feasibility and economic potential of sustainable construction.
Keywords: Construction industry, construction method, sustainability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 94092600 Risk of Late Payment in the Malaysian Construction Industry
Authors: Kho Mei Ye, Hamzah Abdul Rahman
Abstract:
The purpose of this study is to identify the underlying causes of late payment from the contractors- perspective in the Malaysian construction industry and to recommend effective solutions to mitigate late payment problems. The target groups of respondents in this study were Grades G3, G5, G6 and G7 contractors with specialization in building works and civil engineering works registered with the Construction Industry Development Board (CIDB) in Malaysia. Results from this study were analyzed with Statistical Package for the Social Science (SPSS 15.0). From this study, it was found that respondents have highest ranked five significant variables out of a total of forty-one variables which can caused late payment problems: a) cash flow problems due to deficiencies in client-s management capacity (mean = 3.96); b) client-s ineffective utilization of funds (mean = 3.88); c) scarcity of capital to finance the project (mean = 3.81); d) clients failure to generate income from bank when sales of houses do not hit the targeted amount (mean=3.72); and e) poor cash flow because of lack of proper process implementation, delay in releasing of the retention monies to contractor and delay in the evaluation and certification of interim and final payment (mean = 3.66).Keywords: Underlying causes, late payment, constructionindustry, Malaysia.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 71912599 People Critical Success Factors of IT/IS Implementation: Malaysian Perspectives
Authors: Aziz, Nur Mardhiyah, Salleh, Hafez
Abstract:
Implementing Information Technology/ Information System (IT/IS) is critical for every industry as its potential benefits have been to motivate many industries including the Malaysian construction industry to invest in it. To successfully implement IT/IS has become the major concern for every organisation. Identifying the critical success factors (CSFs) has become the main agenda for researchers, academicians and practitioners due to the wide number of failures reported. This research paper seeks to identify the CSFs that influence the successful implementation of IT/IS in construction industry in Malaysia. Limited factors relating to people issue will be highlighted here to showcase some as it becomes one of the major contributing factors to the failure. Three (3) organisations have participated in this study. Semi-structured interviews are employed as they offer sufficient flexibility to ensure that all relevant factors are covered. Several key issues contributing to successful implementations of IT/IS are identified. The results of this study reveal that top management support, communication, user involvement, IT staff roles and responsibility, training/skills, leader/ IT Leader, organisation culture, knowledge/ experience, motivation, awareness, focus and ambition, satisfaction, teamwork/ collaboration, willingness to change, attitude, commitment, management style, interest in IT, employee behaviour towards collaborative environment, trust, interpersonal relationship, personal characteristic and competencies are significantly associated with the successful implementations of IT/IS. It is anticipated that this study will create awareness and contribute to a better understanding amongst construction industry players and will assist them to successfully implement IT/IS.Keywords: critical success factors, construction industry , IT/IS, people
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26702598 Attentiveness of Building Commissioning in the Malaysian Construction Industry
Authors: Kho Mei Ye, Hamzah Abdul Rahman
Abstract:
This paper provides some thoughts about the lack of attentiveness of building commissioning in the construction industry and the lack of handling in project commissioning as an integral part of the project life-cycle. Many have perceived commissioning as the problem solving process of a project, rather than the start up of the equipment, or the handing over of the project to the client. Therefore, there is a lack of proper attention in the planning of commissioning as a vital part of the project life-cycle. This review paper aims to highlight the benefits of building commissioning and to propose the lacking of knowledge gap on building commissioning. Finally, this paper hopes to propose the shift of focus on this matter in future research.Keywords: building, commissioning, construction, delay
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 21512597 Construction 4.0: The Future of the Construction Industry in South Africa
Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke
Abstract:
The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.
Keywords: Building information technology, Construction 4.0, Industry 4.0, Smart Site.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 58142596 Causes of Construction Delays in Qatar Construction Projects
Authors: Murat Gunduz, Mohanad H. A. AbuHassan
Abstract:
Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.
Keywords: Construction industry, delays, importance index.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26702595 Potential of GIS to Find Solutions to Space Related Problems in Construction Industry
Authors: V. K. Bansal
Abstract:
Geographic Information System (GIS) is a computerbased tool used extensively to solve various engineering problems related to spatial data. In spite of growing popularity of GIS, its complete potential to construction industry has not been realized. In this paper, the summary of up-to-date work on spatial applications of GIS technologies in construction industry is presented. GIS technologies have the potential to solve space related problems of construction industry involving complex visualization, integration of information, route planning, E-commerce, cost estimation, etc. GISbased methodology to handle time and space issues of construction projects scheduling is developed and discussed in this paper.Keywords: Construction, GIS in construction, Scheduling, Project Management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26652594 Contextual Factors in the Decision Making of Industrialized Building System Technology
Authors: S. A. S. Zakaria, G. Brewer, T. Gajendran
Abstract:
Currently, the Malaysian construction industry is focusing on transforming construction processes from conventional building methods to the Industrialized Building System (IBS). Still, research on the decision making of IBS technology adoption with the influence of contextual factors is scarce. The purpose of this paper is to explore how contextual factors influence the IBS decision making in building projects which is perceived by those involved in construction industry namely construction stakeholders and IBS supply chain members. Theoretical background, theoretical frameworks and literatures which identify possible contextual factors that influence decision making towards IBS technology adoption are presented. This paper also discusses the importance of contextual factors in IBS decision making, highlighting some possible crossover benefits and making some suggestions as to how these can be utilized. Conclusions are drawn and recommendations are made with respect to the perception of socio-economic, IBS policy and IBS technology associated with building projects.Keywords: decision making, technology adoptions, contextualfactors, Industrialized Building Systems
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 25972593 Identifying Project Delay Factors in the Australian Construction Industry
Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar
Abstract:
Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.
Keywords: Construction, delay factors, time delay, Australian construction industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12602592 Challenges and Opportunities of E-Procurement in the Construction Industry
Authors: Mansur Hamma-adama, Abdul-Basit Sa’eed Ahmad
Abstract:
Construction Industry is evolving amid the fourth industrial revolution. Transportation, commerce, manufacturing and many other industries ripened the current technological advancement and are striving to utilise every development in the IT sector. The procurement of construction works is known to be very conventional and backward in the adoption of digitalisation. The construction industry's procurement and supply chain are blamed for the most inflated cost of construction projects, mainly attributed to a lack of transparency and trust between the industry stakeholders. This research explores the challenges of e-procurement adoption in the industry and identifies the potential opportunities for its usage. This investigation's data are acquired through interviews, and the data are analysed using qualitative content analysis. This study reveals compounding challenges (i.e., corruption and lack of commitment) that lead to the failure of such efforts in Nigeria and the potential prospects (i.e., transparency and efficiency). This study is essential in developing a more effective and transparent process of procurement so that the Nigerian construction industry is not be left behind in the fast-digitalising markets.
Keywords: Challenges, construction industry, corruption, e-procurement, Nigeria, opportunities.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7262591 Time Overrun in Pre-Construction Planning Phase of Construction Projects
Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui
Abstract:
Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.
Keywords: Construction industry, Pakistan, pre-construction planning phase, time overrun.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9672590 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry
Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba
Abstract:
The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analyses were used to analyses the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitize the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.
Keywords: Black business forums, construction mafia, South African construction industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2382589 Sustainable Development in Construction
Authors: Ali Hemmati, Ali Kheyroddin
Abstract:
Semnan is a city in semnan province, northern Iran with a population estimated at 119,778 inhabitants. It is the provincial capital of semnan province. Iran is a developing country and construction is a basic factor of developing too. Hence, Semnan city needs to a special programming for construction of buildings, structures and infrastructures. Semnan municipality tries to begin this program. In addition to, city has some historical monuments which can be interesting for tourists. Hence, Semnan inhabitants can benefit from tourist industry. Optimization of Energy in construction industry is another activity of this municipality and the inhabitants who execute these regulations receive some discounts. Many parts of Iran such as semnan are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.Keywords: approval, building, construction, document, industry, IT, Semnan
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15452588 Lean TQM Automotive Factory Model System
Authors: Noor Azlina Mohd Salleh, Salmiah Kasolang, Ahmed Jaffar
Abstract:
Integrated Total Quality Management (TQM) with Lean Manufacturing (LM) is a system comprises of TQM with LM principles and is associated with financial and nonfinancial performance measurement indicators. The ultimate goal of this system is to focus on achieving total customer satisfaction by removing eight wastes available in any process in an organization. A survey questionnaire was developed and distributed to 30 highly active automotive vendors in Malaysia and analyzed by PASW Statistics 18. It was found out that these vendors have been practicing and measuring the effectiveness TQM and LM implementation. More involvement of all Malaysian automotive vendors will represent the exact status of current Malaysian automotive industry in implementing TQM and LM and can determine whether the industry is ready for integrated TQM and LM system. This is the first study that combined 4 awards practices, ISO/TS16949, Toyota Production System and SAEJ4000.Keywords: Automotive Industry, Lean Manufacturing, Operational Engineering Management, Total Quality Management
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 27752587 Barriers to the Use of Factoring Accounts Receivables: The Ghanaian Contractor’s Perception
Authors: E. Kissi, V. K. Acheamfour, J. J. Gyimah, T. Adjei-Kumi
Abstract:
Factoring accounts receivable is widely accepted as an alternative financing source and utilized in almost every industry that sells business-to-business or business-to-government. However, its patronage in the construction industry is very limited as some barriers hinder its application in the construction industry. This study aims at assessing the barriers to the use of factoring accounts receivables in the Ghanaian construction industry. The study adopted the sequential exploratory research method where structured and unstructured questionnaires were conveniently distributed to D1K1 and D2K2 construction firms in Ghana. Using the one-sample t-test and Kendall’s Coefficient of concordance data were analyzed. The most severe challenge concluded is the high cost of factoring patronage. Other critical challenges identified were low knowledge on factoring processes, inadequate access to information on factoring, and high risks involved in factoring. Hence, it is recommended that contractors should be made aware of the prospects of factoring of accounts receivables in the construction industry. This study serves as basis for further rigorous research into factoring of accounts receivables in the industry.
Keywords: Barriers, contractors, factoring accounts receivables, Ghanaian, perception.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5482586 Critical Factors to Company Success in the Construction Industry
Abstract:
Achieving success is a highly critical issue for the companies to survive in a competitive business environment. The construction industry is also an area where there is strong competition due to a large number of construction contractors. There have been many factors such as qualified employees, quality workmanship and financial management that can lead to company success in the construction industry. The aim of this study was to investigate the critical factors leading to construction company success. Within this context, a survey was carried out among 40 Turkish construction companies which are located in the Northwest region of Turkey. In this survey, top-level managers and owners of the companies were interviewed. The interviews took place over a five month period between January and May 2007. Finally, the ranking of the critical success factors has been determined by using the Simple Multi Attribute Rating Technique (SMART). Based on the results, business management, financial conditions and owner/manager characteristics were determined as the most important factors to company success.Keywords: Company success, construction, organization, success factors.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 98092585 Uptake of Off-site Construction: Benefit and Future Application
Authors: Faisal Alazzaz, Andrew Whyte
Abstract:
Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.
Keywords: Building projects, Employer empowerment, Off-site construction benefits, Productivity.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 54662584 When Construction Material Traders Goes Electronic: Analysis of SMEs in Malaysian Construction Industry
Authors: Dzul Fahmi Nordin, Rosmini Omar
Abstract:
This paper analyzed the perception of e-commerce application services by construction material traders in Malaysia. Five attributes were tested: usability, reputation, trust, privacy and familiarity. Study methodology consists of survey questionnaire and statistical analysis that includes reliability analysis, factor analysis, ANOVA and regression analysis. The respondents were construction material traders, including hardware stores in Klang Valley, Kuala Lumpur. Findings support that usability and familiarity with e-commerce services in Malaysia have insignificant influence on the acceptance of e-commerce application. However, reputation, trust and privacy attributes have significant influence on the choice of e-commerce acceptance by construction material traders. E-commerce applications studied included customer database, e-selling, emarketing, e-payment, e-buying and online advertising. Assumptions are made that traders have basic knowledge and exposure to ICT services. i.e. internet service and computers. Study concludes that reputation, privacy and trust are the three website attributes that influence the acceptance of e-commerce by construction material traders.Keywords: Electronic Commerce (e-Commerce), Information and Communications Technology (ICT), Small Medium Enterprise (SME)
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18432583 An Evaluation of the Effectiveness of Health and Safety Induction Practices in the Zambian Construction Industry
Authors: Josephine Mutwale-Ziko, Nonde Lushinga, Inonge Akakandelwa
Abstract:
The study discusses the effectiveness of health and safety induction practices on construction sites against the background of the Zambian construction industry experience. The research design included the literature review of relevant literature. Questionnaires and interviews were administered to regulatory bodies, health, and safety personnel. Observation was also employed on construction sites to assess the health and safety practices being used. Health and safety in the construction industry are not something to be ignored or overlooked. The construction industry needs to take heed of the serious consequences of inadequate health and safety induction practices. The implications of inadequate health and safety induction procedures included among others threats to profitability, corporate social responsibility and increased turnover of the workforce leading to poor productivity. Adequate health and safety practices can improve the health and wellbeing of employees, reduce financial implications on firms and encourage productivity on construction sites. Despite this, accidents are still prevalent on construction sites in Zambia. The overall result of this research denotes that the implementation of health and safety induction practices is inadequate, as indicated by the negligent and non-adherent attitude to health and safety induction aspects on the sites by most stakeholders on construction sites. Therefore, health and safety induction practices are ineffective as preventive measures for reduction of accidents on construction sites in Zambia.Keywords: Accidents, employees, health and safety, inadequate induction.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18482582 Embodied Carbon Footprint of Existing Malaysian Green Homes
Authors: Fahanim Abdul Rashid, Muhammad Azzam Ismail
Abstract:
Part and parcel of building green homes (GHs) with favorable thermal comfort (TC) is to design and build with reduced carbon footprint (CF) from embodied energy in the building envelope and reduced operational CF overall. Together, the environmental impact of GHs can be reduced significantly. Nevertheless, there is still a need to identify the base CF value for Malaysian GHs and this can be done by assessing existing ones which can then be compared to conventional and vernacular houses which are built differently with different building materials. This paper underlines the research design and introduces the case studies. For now, the operational CF of the case studies is beyond the scope of this study. Findings from this research could identify the best building material and construction technique combination to build GHs depending on the available skills, financial constraints and the condition of the immediate environment.
Keywords: Embodied carbon footprint, Malaysian green homes.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 21972581 Lean Implementation: An Investigation in Successfully Adopting a Lean Philosophy
Authors: P. Ahern, D. Collery
Abstract:
The implementation of lean thinking in the manufacturing industry revolutionized the traditional approach to large-scale production through the process of identifying the waste in each task and putting in place mitigation measures to eliminate the waste in all its forms. The Irish construction industry, however, has been much slower to adopt the principles of lean, opting instead to stick with the traditional approach to construction project delivery which is inherently wasteful. Lean thinking holds the potential to revolutionize the construction industry in a similar manner to the adoption of lean manufacturing. Lean principles present opportunities for reduced project duration, reduced project cost, improved quality, and elimination of re-works and non-value-added activities. This research has been designed to accumulate research data through available literature, electronic surveys, and interviews. The results show an industry reluctant to accept change and an undefined path to successful lean construction implementation.
Keywords: Barriers, lean construction, lean implementation, lean manufacturing, lean philosophy.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3092580 The Impact of the Type of Diversification of Listed Construction Enterprises in China on Corporation Performance
Authors: Yi-Hsin Lin, Ying-Ying Li
Abstract:
The construction industry is the pillar industry in China, accounting for about 6% of the gross domestic product. Along with changes in the external environment of the construction industry in China, the construction firm faces fierce competition. The paper aims to investigate the relationship between diversified types of construction firm and its performance in China. Based on generalist and specialist strategy in organizational ecology, we think a generalist organization can be applied to an enterprise with diversified developments, while specialist groups are extended to professional enterprises .This study takes advantage of annual financial data of listed construction firm to empirically verify the relationship between diversification and corporation performance establishing a regression equation to econometric analysis. We find that: 1) Specialization can significantly improve the level of profitability of listed construction firms, and there is a significant positive relationship with corporate performance; 2) The level of operating performance of listed construction enterprises which engage in unrelated diversification is higher than those with related diversification; 3) The relationship between state-owned construction firms and corporate performance is negative. The more the year of foundation is, the higher performance will be; however, the more the year of being listed, the lower performance will be.Keywords: Diversification, Specialization, Construction Firm, Performance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 17492579 A New Fuzzy Decision Support Method for Analysis of Economic Factors of Turkey's Construction Industry
Authors: R. Tur, A. Yardımcı
Abstract:
Imperfect knowledge cannot be avoided all the time. Imperfections may have several forms; uncertainties, imprecision and incompleteness. When we look to classification of methods for the management of imperfect knowledge we see fuzzy set-based techniques. The choice of a method to process data is linked to the choice of knowledge representation, which can be numerical, symbolic, logical or semantic and it depends on the nature of the problem to be solved for example decision support, which will be mentioned in our study. Fuzzy Logic is used for its ability to manage imprecise knowledge, but it can take advantage of the ability of neural networks to learn coefficients or functions. Such an association of methods is typical of so-called soft computing. In this study a new method was used for the management of imprecision for collected knowledge which related to economic analysis of construction industry in Turkey. Because of sudden changes occurring in economic factors decrease competition strength of construction companies. The better evaluation of these changes in economical factors in view of construction industry will made positive influence on company-s decisions which are dealing construction.
Keywords: Fuzzy logic, decision support systems, construction industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16362578 Causality between the Construction Industry and the GDP in the United Arab Emirates
Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed
Abstract:
In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.
Keywords: Construction value addition, Granger causality, Growth of GDP, UAE.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12832577 Spam E-mail: How Malaysian E-mail Users Deal with It?
Authors: Yanti Rosmunie Bujang, Husnayati Hussin
Abstract:
This paper attempts to discuss the spam issue from the Malaysian e-mail users- perspective. The purpose is to discover how Malaysian users handle the spam e-mail problem. From the experiences we hope to discover the necessary effort needed to be undertaken to face this problem in the context of Malaysia. A survey was conducted to understand how Malaysian individual perceived spam and what they actually do with the spam e-mail they received in their daily life. The findings indicate that the level of awareness on spam issue in action is still low and need some extra effort by government and relevant agencies to increase their level of awareness.
Keywords: E-mail, Malaysia, spam, users' perspective.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18882576 Causes of Delays in Construction Projects: A Case Study for Petrochemical Industry of Iran
Authors: S. Bagher Daryaii
Abstract:
Delays in construction projects are one of the most common risky problems and regardless of the causes, the delays can occur in all projects and all industries. The impact of delays has a wide range from neglectable ones to losing the project's importance or its economic justification. In this paper, by doing research and interview with managers, executors, consultants and supervisors of construction projects in the petrochemical industry, their opinions about reasons of delays in projects have been gathered.
Keywords: Analysis of delays, causes of delays, delays in petrochemical projects, project delays.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4522575 Resources and Strategies towards the Development of a Sustainable Construction Materials Industry in Botswana
Authors: G. Malumbela, E. U. Masuku
Abstract:
The economy of Botswana has increased extensively since its independence. In contrast to this increase, the construction industry which is one of the key indicators of a developing nation continues to be highly dependent on imported building material products from the neighbouring countries of South Africa, Namibia, Zimbabwe, and Zambia. Only two companies in the country currently blend cement. Even then, the overwhelming majority of raw materials used in the blends are imported. Furthermore, there are no glass manufacturers in Botswana. The ceramic industry is limited to the manufacture of clay bricks notwithstanding a few studios on crockery and sanitary ware which nonetheless use imported clay. This paper presents natural resources and industrial waste products in Botswana that can be used for the development of sustainable building materials. It also investigates at the distribution and cost of other widely used building materials in the country. Finally, the present paper looks at projects and national strategies aimed at a country-wide development of a sustainable building materials industry together with their successes and hitches.Keywords: Botswana construction industry, construction materials, natural resources, sustainable materials.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19632574 Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-
Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes
Abstract:
This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.
Keywords: Construction management, Factors, Improvement, Labor productivity, Lean construction.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6968